+ All Categories
Home > Documents > Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ...

Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ...

Date post: 06-Jan-2018
Category:
Upload: nigel-mclaughlin
View: 220 times
Download: 1 times
Share this document with a friend
Description:
Push System ●Traditional system ●Work is pushed to the next station as it is completed ●No regard to next station’s readiness for work ●Risk of bottlenecks
50
Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada
Transcript
Page 1: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Just In Time (JIT) & Lean Operations

Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada

Page 2: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

The Systems● Push System

● Pull System (Just-In-Time)

● Continuous Improvement (Just-In-Time)

Page 3: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Push System● Traditional system

● Work is pushed to the next station as it is completed

● No regard to next station’s readiness for work

● Risk of bottlenecks

Page 4: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Push System Demonstration

Rolo Pretzel Delights

Page 5: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Workstations and Process

Warehouse

• Raw Materials

Prep

• Place pretzels on baking tray

• Place Rolos on top of pretzels

Bake

• 350 for 2 minutes

Finishing

• Top with pretzel

• Cool for 1 ½ minutes

Page 6: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

● Prep workstation quickly builds excess inventory● Cycle time increases with bottleneck in Bake workstation

Little’s Law

5 10.04 8.53 7.02 5.51 4.0

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

Little's Law

BakePrep

Units

in P

roce

ss

Minutes

Finish

Page 7: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

WIP & Cycle Time

Push System WIP Prep 15Bake 1Finish 0Total 16

Finished Units 4 Cycle Time +8.5 minutes

Page 8: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

The Systems● Push System

● Pull System (Just-In-Time)● Continuous Improvement (Just-In-Time)

Page 9: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Lean Operations ● Began as lean manufacturing in the mid 1900’s

● Developed by Toyota

● Influenced by the limited resources available at that time

Page 10: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Characteristics of Lean Systems● Waste Reduction – A hallmark of lean systems

● Continuous Improvement – Never ending efforts to improve

● Use of Teams – Cross-functional teams, especially for process improvement

● Work Cells – Along with cellular layouts allow for better communication and use of people

● Visual Controls – Simple signals that enable efficient flow and quick assessment of operations

Page 11: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Characteristics Continued…● High Quality – In processes and in output

● Minimal Inventory – Excess inventory is viewed as a waste

● Output to Only Match Demand – Throughout the entire system; referred to as a “demand pull”

● Quick Changeovers – Enables variety for batch production

● Small Lot Sizes – Enables variety for batch production

● Lean Culture – Entire organization embraces lean concepts and strives to achieve them

Page 12: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

5 Principles of Lean Systems1. Identify customer values

2. Focus on processes that create value

3. Eliminate waste to create “flow”

4. Produce only according to customer demand

5. Strive for perfection

Page 13: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Key Benefits of Lean Systems● Reduce waste due to emphasis on waste reduction

● Lower costs due to reduced waste and lower inventories

● Increase quality motivated by customer focus and the need for high-quality processes

● Reduce cycle time due to elimination of non-value-added operations

● Increase flexibility due to quick changeovers and small lot sizes

● Increase productivity due to elimination of non-value-added processes

Page 14: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Key Risks of Lean Systems ● Increase stress on workers due to increased responsibilities for equipment

changeovers, problem solving, and process and quality improvement

● Fewer resources available if problems occur (inventory, time, people)

● Supply chain disruptions can halt operations due to minimal inventory of time buffers

Page 15: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

The Toyota Approach ● Toyota served as the model of lean systems, particularly in manufacturing

● Known as the Toyota Production System (TPS)

● Toyota terminology commonly adopted for lean systems:

o Muda – Waste and inefficiencyo Kanban – Manual system that signals the need for parts or materialso Heijunka – Workload leveling o Kaizen – Continuous improvement of the system o Jidoka – Quality at the source (automation)

Page 16: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Balanced System Goals● Achieve a smooth, rapid flow of materials and/or work through the system

● Make the process time as short as possible by using resources in the best possible way

● Eliminate disruptions

● Make the system flexible

● Eliminate waste, especially excess inventory

Page 17: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Different Types of Wastes ● Excess Inventory

● Overproduction

● Waiting Time

● Unnecessary Transporting

● Processing Waste

● Inefficient Work Methods

● Product Defects

● Underused People

Page 18: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Building Blocks● Product Design

● Process Design

● Personnel/Organizational Elements

● Manufacturing, Planning and Control

Page 19: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Product Design● Standard Parts – Fewer parts to deal with so less training time and

reduced costs

● Modular Design – Extension of standard parts; clusters of parts treated as a single unit

● Highly Capable Production Systems – Without good quality, there is a disruption in the smooth flow of work

● Concurrent Engineering – Changes in engineering could cause disruptions

Page 20: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Process Design● Small Lot Sizes – Reduce inventory and lower costs

● Set-up Time Reduction – Strong emphasis on reducing set-up times

● Manufacturing Cells – Specialized areas to reduce changeover times

● Quality Improvement – Automation to detect problems in the work flow

Page 21: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Process Design Continued…● Work Flexibility – Ways to increase and reduce bottlenecks

● Balanced System – Time needed for work assigned to each workstation must be less than or equal to the cycle time

● Inventory Storage – Lean systems are designed to minimize inventory storage

● Fail Safe Methods – Methods to prevent breakdowns in productions

Page 22: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

5 Key Personnel/Organizational Elements of Lean Systems

● Workers as assets

● Cross-trained workers

● Continuous improvement

● Cost accounting

● Leadership/project management

Page 23: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Pull Systems● Good for steady flow of repetitive work

● Workstation pulls output from the preceding station as it is needed

● Demand comes from customer or master schedule

● Supply equals demand – “Just in time”

● Better coordination – just enough output to meet anticipated demand of next station including flow rate and time

● If long cycle time, buffer of stock in between workstations triggered by dip of supply level threshold

● Reduces excessive inventory

Page 24: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Pull SystemDemonstration

Rolo Pretzel Delights

Page 25: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Andon● Japanese communication system of green/yellow/red lights at workstations

to signal when and where there are problems or slowdowns during production

● Requires active support and involvement from all management levels to create culture for all workers

● Dedicated team focuses on how to continuously improve

● Communicating goals and achievements key to success

Page 26: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Andon Goals● Reduce inventories

● Reduce setup cost and time

● Improve quality

● Increase the output rate

● Cut waste and inefficiency

Page 27: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

● Prep workstation no longer builds up inventory● Cycle time consistent

Little’s Law

10987654321

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

BakePrep

Uni

ts in

Pro

cess

Minutes

Finish

Page 28: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

WIP & Cycle Time

Push System Pull SystemWIP Prep 15 0Bake 1 1Finish 0 0Total 16 1

Finished Units 4 4Cycle Time +8.5 minutes 3.5 minutes

Page 29: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

The Systems● Push System

● Pull System (Just-In-Time)

● Continuous Improvement (Just-In-Time)

Page 30: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

7 Key Manufacturing Planning and Control Elements

● Level loading

● Pull systems

● Visual systems

● Limited work-in-process

● Close vendor relationships

● Reduced transaction processing

● Preventative maintenance and housekeeping

Page 31: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Visual Systems● Pull system workflow is dictated by “next-step-demand”

Shout & WaveKanban Card

Demand Communication

Page 32: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Continuous Improvement

Demonstration with Kanban

Rolo Pretzel Delights

Page 33: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Compute KanbanThe number of kanban cards in a system is an important variable

N = DT(1 + X) C

N = Total number of containersD = Planned usage rateT = Avg waiting time for replenishing + Avg production timeX = Possible inefficiency of systemC = Capacity of standard container

Page 34: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Rolo Pretzel Delights Example

N = (864)(0.01)(1 + 0.1) 9

N = ?D = 864 parts/dayT = .01 dayX = .10C = 9 parts/sheet

Page 35: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Vendor Relationships

The Good The Bad &

The Ugly

Page 36: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Reduced Transaction Processing● Logistical

● Balancing

● Quality

● Change

Page 37: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Traditional Supplier Networks

Page 38: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Tiered Supply Networks

Page 39: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

The Kaizen Philosophy for Eliminating Waste

1. Waste is the enemy, and to eliminate it we must get our hands dirty

2. Improve gradually and continuously instead of major changes infrequently

3. Involve everyone: top managers, middle managers, and workers

4. Built on a cheap strategy; it does not require spending a large amount of money on technology and consultants

5. Can be applied anywhere

Page 40: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Kaizen Philosophy Continued…6. Supported by a visual system: a total transparency of procedures,

processes, and values, making problems and wastes visible to all

7. Focuses attention where value is created

8. Process oriented

9. Stresses that the main effort of improvement should come from new thinking and a new work style

10.Essence of organizational learning is to learn while doing

Page 41: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Value Stream Mapping● Sketch of entire process:

o Arrival of supplieso Delivery to customer

● Quick walkthrough

● Data collection

Page 42: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Value Improvement● Increase value (Customer)

o Identify stepso Eliminate if no value createdo Repeat

Page 43: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Office Waste● Excess inventory

● Over processing

● Waiting times

● Unnecessary transportation

● Processing waste

● Inefficient work methods

● Mistakes

● Underused people

Page 44: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Transition● Management commitment

● Effort required

● Worker support

● Reduce set up time

● Convert backwards

● Suppliers

Page 45: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Obstacles● Culture

● Suppliers:o Resource & long term commitmento Quality control – supplier o Frequent deliverieso Frequent changes

Page 46: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Lean Services● Eliminate disruptions

● System flexibility

● Reduce setup/processing time

● Eliminate Waste

● Minimize Process

● Simplify Process

Page 47: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Continuous Improvement

Demonstration

Rolo Pretzel Delights

Page 48: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Work-In-Process

10987654321

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

BakePrep

Uni

ts in

Pro

cess

Minutes

Finish

Page 49: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

WIP & Cycle Time

Push System Pull System Continuous ImprovementWIP Prep 15 0 0Bake 1 1 2Finish 0 0 1Total 16 1 3

Finished Units 4 4 7Cycle Time +8.5 minutes 3.5 minutes 3.5 minutes

Page 50: Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.

Operation Summary● Balanced, smooth workflow operation


Recommended