2200: Demand Planning Overview
Supply Chain Platform
Training
Buyer Training
July 2, 2007
8/6/2019 k m project
2/46
B2200 - 2Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Course Objectives
After completing this course, you should be able to:
> Understand the demand planning business process
> Define some new demand planning terms
> Navigate the MCV page
> Access supply path items from My Workspace
> Access supply path items by searching or filtering
8/6/2019 k m project
3/46
B2200 - 3Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Business Process
Buyers collaborate with their suppliers to share requirements, along withlead times and other details.
1. Planning Schedule: Buyer publishes requirements and makes commitments for a set
of items being procured from the supplier for a specified delivery plant/storage
location.
2. Supplier Response: Suppliers respond to every requirement that they cannot meet.
Suppliers may also be expected to provide lead times and to fill in other key data
fields.
Supplier Response
Planning Schedule
BuyerSupplier
1
2
8/6/2019 k m project
4/46
B2200 - 4Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Process Workflow
Standard Planning Schedules
1.Buyer Published Requirements/Commitments -> Prior Requirements/Commitments
2.Planned Delivery Time/Response Time -> Prior Planned Delivery Time/Response Time
3.Incoming Requirements/Commitments -> Requirements/Commitments
4.Status -> New
Responses by Supplier
Supplier Responses loaded
Planning Schedule Responses
New Planning Schedule
Notification to Supplier
Status for the Schedule Response
Item set to Sent by Supplier
Buyer SupplierExostar Hub@ E2open
8/6/2019 k m project
5/46
B2200 - 5Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Planning Schedule
Typically released once a week (dependson the buyer) and sent to the collaboration
hub
Structured in the following manner:
> Can contain one or more SchedulingAgreements for a supplier
> Each Scheduling Agreement can contain
one or more Schedule Response Items
item and site (delivery plant/storage
location) combinations
> Each Schedule Response item can be one
or more Requirement Schedules and/or
Commit Schedules
Header
Planning Schedule
ScheduleAgreement
Sch ResponseItem/site
Requirement
ScheduleAgreement
Commit
Requirement
Requirement
Commit
Requirement
Sch ResponseItem/site
Sch ResponseItem/site
Header
8/6/2019 k m project
6/46
B2200 - 6Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Planning Schedule - Response
In many cases, Suppliers do notneed to respond to buyers requirements ifthey agree with what is published.
> However, lack of suppliers response is assumed to be an acknowledgement as well
as a commitment to the published requirements.
> NOTE: Some buyers expect a sent response, even if there are no changes made.
Suppliers are expected to respond when they cannotprovide a commit thatmatches the buyers requirements.
> Suppliers can:
Change the date for a specified quantity or
Under/over commit a quantity for a date or
Spread capacity commits over multiple time buckets
In this case, the supplier will need to specify the new commitmentdate/quantity pairs.
Suppliers will be required to specify a Reason for not being able to match
the date/quantity requirements.
8/6/2019 k m project
7/46
B2200 - 7Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Planning Schedule - Response
This is the list of reason codes that areavailable for selection by suppliers.
Suppliers can provide an optional note
associated with the change. Selecting
Other Please Specify makes the Notefield mandatory.
Once the supplier has reviewed and
responded to the items, the supplier must
change the Status to Sent for all schedule
items on the planning schedule. Only when the supplier marks the PS as
Sent will the response be sent to the
buyers backend system.
Reason Displayed Reason Code
Sent via B2B
Material Shortage A
Machine Reliability B
Tooling Issues C
Lack Of Capacity D
Shop Floor Planning E
Non Conformance F
Sub Tier Supply Failure G
Data Integrity H
Schedule Line Change I
Design Change J
Shipped S
Other - Please Specify X
8/6/2019 k m project
8/46
B2200 - 8Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
SCP Process: Respond to a PS
SupplierLocatesPlanningSchedule
SupplierReviews
Commitmentson
PlanningSchedule
Supplier SendsResponse to
Buyer
Finish
SupplierUpdates PS
FinishNo
Changes
Changes
8/6/2019 k m project
9/46
B2200 - 9Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Using Some New Terms
8/6/2019 k m project
10/46
B2200 - 10Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Supply Path Item
SCP organizes Material Master data for demand planning into objects known as
Supply Path Items.
A. Dimensions of a supply path item are: Buyer + Site + Item + Supplier
Site is a combination of Delivery Plant and Storage Location
Item tracks both Buyer Material Number and Supplier Material Number
B. Attributes are the supporting data related to a supply path item
These items are applied to long-term planning schedules, standard planning
schedules, and inventory status cycles
Supply Path Item is often referred to as a Collaboration or Collab.
Customer Site Item Supplier
B. Attributes
For example: Unit Priceand Delivery Address
A. Supply Path Item Dimensions
SupplierBuyer SiteMaterial No.
Supplier
Mat. No.
8/6/2019 k m project
11/46
B2200 - 11Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Multi-Collab View (MCV) Page
1. The Supply Path Item is shown on the Multi Collab View (MCV) page, which displays
data related to Long Term Planning Schedules, Standard Planning Schedules, orInventory Status Cycle.
2. This data is organized and aggregated in time-buckets.
2
1
8/6/2019 k m project
12/46
B2200 - 12Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Overview of the MCV Page
2. Data Measures
1. Information
common toall items3. Time Buckets
4. PIT (Point-in-time)
5. Exception alert
8/6/2019 k m project
13/46
B2200 - 13Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Multi Collab View (MCV) Page
Timeline extends out for 2 years (by default)
Legend (L) color coding helps differentiate the default time buckets
> 4 weeks of Daily time buckets
> 8 Weekly time buckets starting on a Monday
> 21 Monthly time buckets starting on the 1st of each month
L
8/6/2019 k m project
14/46
B2200 - 14Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Navigating the Multi-Collab View (MCV) Page
8/6/2019 k m project
15/46
B2200 - 15Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
MCV Page Supply Path Items
1. One supply path item SCP displays up to 5 per page
2. Scroll down to see more supply path items (2), or use left & right arrows to advance to the next
page (3)
2
1
3
8/6/2019 k m project
16/46
B2200 - 16Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
MCV Page Attributes
1. Supply Path Item Attributes describe the item in more detail, scroll left/right to view
2. Use ( ) to expand visibility to attributes on the screen
3. Use ( ) and then click on Attribute Detail to view more details of the supply path items data
21
3
8/6/2019 k m project
17/46
B2200 - 17Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
MCV Page Data Measures & TimeBuckets
1. Time Buckets each column on the right side represents a day, week or month
Daily (green) Weekly (blue) Monthly (pink)
2. Data Measures each row in the supply path item is defined by a data measure
3. Point-In-Time (PIT) where a column and row meet in the time bucket area is a date and quantity
pair that is defined by the data measure for that row
Example: There is a demand for (5) items on April 26, 2007.
2
1
3
8/6/2019 k m project
18/46
B2200 - 18Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Prior Data Measures
When a new Planning Schedule is uploaded, the existing Current Requirements data
measures are rolled-over to become Prior Requirements and the new Planning
Schedule is published as the current data.
8/6/2019 k m project
19/46
B2200 - 19Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Legend for PS Highlighting
Supplier Response Mismatch Supplier Response differs from Schedule
Demand Change (Current) Demand differs from Previous Demand
Schedule Change (Current) Schedule differs from Previous Schedule
PDT/RT Change Current Planned Delivery Time (PDT) is different from
previous PDT
Status Supplier has viewed the collaboration
Status Supplier has sent the collaboration to the Buyer
Past Due The current date (today) is later than the Schedule Date(red shows the actual schedule date)
Past Due The current date is later than the Schedule Date (yellow is
all dates after the schedule date)
8/6/2019 k m project
20/46
B2200 - 20Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Data Measures
Data Measure Type View/Edit Capabilities Description
Prior Demand Base DM Buyer & Supplier read only Previous demand quantity
Demand Base DM Buyer Upload
Buyer & Supplier read only
Current demand quantity
Demand Change Exception Buyer & Supplier read only Flagged for all t ime buckets where Demand Qty Prior DemandQuantity
Prior Schedule Base DM Buyer & Supplier read only Previous schedule quantity
Schedule Base DM Buyer & Supplier read only Current schedule quantity
Schedule Change Exception Buyer & Supplier read only Flagged for all time buckets where Schedule Qty Prior Schedule Qty
Past Due Items Exception Buyer & Supplier read only Flagged for all time buckets where:
US Variant:Requirement Date is earlier than Run Date OR
Commitment Date is earlier than Run Date
UK Variant: Statistical Date is earlier than Run Date ORCommitment Date is earlier than Run Date
Supplier Response Base DM Buyer read only
Supplier read/write
Suppliers confirmation quantity
Schedule ResponseMismatch Exception Buyer & Supplier read only Flagged for all time buckets where Response Qty Prior ResponseQty
PDT/RT Change Exception Buyer & Supplier read only Flagged for all time buckets where Planned Delivery/Response Time Prior Planned Delivery/Response
Status Exception Buyer & Supplier read only Flagged:
Red when schedule line item is new & Supplier has not viewed it
Green when Supplier views schedule line item
Yellow when Supplier sends a Response
8/6/2019 k m project
21/46
B2200 - 21Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Working with the MCV Page
8/6/2019 k m project
22/46
B2200 - 22Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Navigating the MCV Page
1. Enter the Start Date and End Date, and/or choose the Calendar.
2. Click the Refresh button.
Note: This only resets the displayed viewof data. It has no effect on data that was sent by the Buyer.
1. Calendar View Selectors
2. Refresh Button
8/6/2019 k m project
23/46
B2200 - 23Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Viewing PIT Details
1. To view all Point In Time (PIT) Attributes for a data measure, click the data measure
name.
2. To view the PIT Attributes for a specific PIT, click the value in the PIT.
1
2
SupplierReason Code
SupplierNotes
8/6/2019 k m project
24/46
B2200 - 24Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Collab Details Menu
1. Click the Collab Details ( ) icon to see a menu that provides access to collaboration-
related data.
2. Click Attribute Detail to see the pop up window.
21
8/6/2019 k m project
25/46
B2200 - 25Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Accessing Items from My Workspace
8/6/2019 k m project
26/46
B2200 - 26Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
My Workspace
1. From the Navigation tree, click My Workspace.
2. In the Problem Summary section, click the number in the Planning Schedule Status
row, for example to access Planning Schedules that are New click Planning Schedule
Status in the High column.
1
2
Categories:
High = New
Medium = Viewed
Low = Sent
8/6/2019 k m project
27/46
B2200 - 27Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
My Workspace
4. From the resulting list, click the checkboxes that you want to view.
5. Click the Multi Collab button.
6. The selected supply path items are displayed on the MCV page (5 items per page)
4
5
8/6/2019 k m project
28/46
B2200 - 28Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Searching and Filtering for Supply Path Items
8/6/2019 k m project
29/46
B2200 - 29Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Accessing Supply Path Items
There are several methods you can use to access Long TermPlanning Schedules (A), Standard Planning Schedules (B), or
Inventory Status (C):
1. Filteris best used when items or names are unknown. Filter
displays a list from which you can select, instead of manually
typing search criteria.
2. Search is best used when you know the item numbers,
names or descriptions that can be manually typed into the
search fields. Search is simpler and more straightforward
than Filter.
3. My Workspace is best used when you want to access itemsgrouped by Category and Status
2
1
3
21
2
1
A
B
C
8/6/2019 k m project
30/46
B2200 - 30Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Searching for Planning Schedules
1. From the Navigation Tree, click [+] Demand Planning & Forecasting to expand
the tree
2. Click [+] Planning Schedules, for example
3. Click the Search option to access the Search page
4. Enter your search criteria
5. Click the Search button to search for Collabs that match your criteria
1
2
3
4
5
8/6/2019 k m project
31/46
B2200 - 31Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Searching for Planning Schedules
7. From the list of supply path items that match your search criteria, select the
checkboxes that you want to view
8. Click the View button (scroll right and down to see button)
9. Supply path items are displayed on the MCV page
Note: If there is only one supply path item available, the system skips this step and
immediately goes to the MCV page.
7
8
8/6/2019 k m project
32/46
B2200 - 32Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Filtering for Supply Path Items
1. From the Navigation Tree, click [+] Demand Planning & Forecasting to expand the
tree
2. Click [+] Standard Planning Schedules, for example
3. Click Filterto access the Filter Parameters page
1
23
8/6/2019 k m project
33/46
B2200 - 33Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Filter Parameters page
A. You select from the Filter Parameteroptions starting from the top and working down.
Choices made for each item will affect the list of options for each item below it.
B. As you work your way down, the choices are displayed in the FilterBuilder.
ParameterSelector
Parameter
List
AddButton
Search Box
FilterDisplay
B
A
Add AllButton
8/6/2019 k m project
34/46
B2200 - 34Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Filtering for Supply Path Items
5. Click the checkboxes for the line items you want to add to the Filter.
> Note: If only one item, its automatically selected - skip immediately to the next parameter.
6. Click the Add button to add the items to the Filter Builder(A).
7. Click the yellow arrow [>] icon to the right of the next parameter down, then repeat
Steps 5 and 6 until your Filter Builder is complete.
5
6
A
7
If you are not sure
which items to selectfor a filter parameter(i.e. Customer Site)then click the Add Allbutton.
8/6/2019 k m project
35/46
B2200 - 35Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Filtering for Supply Path Items
8. When you have completed all your selections and the Filter Builder(A) is complete,click the Next button to generate a list of all items that match your Filter criteria
8
A
8/6/2019 k m project
36/46
B2200 - 36Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Filtering for Supply Path Items
9. From the list of supply path items that match your filter criteria, click the checkboxes
for the items that you want to view
10. Click the View button
11. Supply path items are displayed on the MCV page
Note: If there is only one item available, the system skips this step and immediately
provides a view of that item
9
10
8/6/2019 k m project
37/46
8/6/2019 k m project
38/46
B2200 - 38Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Business Process
Buyers use Long Term Planning Schedules (LTPS) to communicate theirlong-term needs to their suppliers.
The Long Term Planning Schedule is a reference document and suppliers are
notexpected to respond to it.
Planning Schedule
BuyerSupplier
8/6/2019 k m project
39/46
B2200 - 39Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Process Workflow
BuyerCollaboration
HubSupplier
Long Term Planning Schedules
LTPS Request Schedules loaded
8/6/2019 k m project
40/46
B2200 - 40Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Publishing Schedule
Long Term Planning Schedules canbe released and sent to the
collaboration hub multiple times during
a week.
LTPSs are similar in structure to
Standard Planning Schedules.
> They consist of multiple Requirement
and Commitment Schedules for one or
more items being procured from a
supplier for a given buyer site.
> Each requirement schedule conveys
the quantity of material requested by
buyer for a particular date.
LTPS
Sch. Agreement
Header
Item/site
Requirement
Sch. Agreement
Requirement
Requirement
Requirement
Item/site
Item/site
8/6/2019 k m project
41/46
B2200 - 41Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
SCP Process: Review a Long Term PS
SupplierLocates
Long Term
PlanningSchedule
SupplierReviews
Commitments
onPlanningSchedule
Finish
8/6/2019 k m project
42/46
B2200 - 42Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Reviewing a Long Term Planning Schedule
8/6/2019 k m project
43/46
B2200 - 43Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
LTPS PIT Fields are not editable
The LTPS looks almost the same as a standard PS, with the exception that a
supplier cannot create a response (there is no Supplier Response field).
8/6/2019 k m project
44/46
B2200 - 44Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
LTPS Data Measures
When a new Long Term Planning Schedule is uploaded, the existing CurrentRequirements data measures are rolled-over to become Previous
Requirements and the new LTPS is published as the current data.
8/6/2019 k m project
45/46
B2200 - 45Copyright 2005-2007 Exostar LLC and E2open, Inc. All Rights reserved. Proprietary and Confidential
Data Measures
Data Measure Type View/Edit Capabilities Description
Prior Demand Base DM Buyer and Supplier read only Previous Demand Quantity
Demand Base DM
Buyer Upload
Buyer and Supplier read only
Current Demand Quantity
Demand Change Exception Buyer and Supplier read only Flagged for all buckets where Demand Qty Prior Demand Qty
Prior Schedule Base DM Buyer and Supplier read only Prev ious Schedule Quantity
Schedule Base DM Buyer and Supplier r ead only Current Schedule Quantity.