Kaimann
project: KaiPRO F-ALU sHINES AT SABIC’S CHEMOLOT
- Project
Manufacturing and processing chemi-
cals into useful plastics and polymers
is a major industry that requires major
levels of investment and the highest
levels of process control.
than skyscrapers, the naphtha crack-
ers were hard to access and the nature
of the site made scaffolding physically
impossible. Operational constraints
also dictated that the equipment must
remain in continuous operation, mak-
ing installation especially difficult.
After researching and evaluating
several insulation options, Sabic ap-
proached Kaimann. Our local Kaimann
representatives worked closely with
thermal insulation contractors Harsco
and proposed a Kaipro system with a
Kaiflex Protect F-Alu covering that was
specially tailored to meet the technical
requirements identified by Sabic.
Layers of highly reliable, closed cell
Kaiflex rubber insulation will keep the
pipes free from ice build up and cor-
rosion for many years whilst Kaiflex
Protect F-Alu provides a professional
and resilient finish without the disad-
vantages of metal cladding. In light of
the extreme temperatures and oper-
ating conditions an additional vapour
tight barrier was used between Kaiflex
layers to enhance protection against
creeping moisture ingress.
Since the quality of installation would be critical
No-where is this more apparent than
at Sabic’s world leading “Chemelot”
production site at Geleen in the Nether-
lands which notably include two naph-
tha crackers.
Operating at temperatures as low as
-120°C, these naphtha crackers had
been in place for over 40 years and
were previously insulated with rigid
foam insulation covered by a thin wa-
ter vapour barrier. This insulation had
long exceeded the lifespan for which
it had been designed and there was a
risk of ice formation on the insulation
surface. A new insulation system was
needed that would be both reliable and
long lasting.
The project presented a number of
challenges. With vertical stacks taller
“a major industry that requires major levels of investment “
Kaimann
iNDEX sECTION2
Kaimann NetherlandsN
ETH
ERLA
NDS
-Project
sABI
C CH
EMEL
OT//
Kai
PRO
f-Al
u
Kaimann Netherlands
to the success of the project, the technical submission from Kaimann incorporated de-tailed application instructions and drawings that were modifi ed and structured to refl ect the unique challenges present.
As the project progressed the advantages of fl exible Kaifl ex insulation material became increasingly apparent to the Harsco contractors who had to install the material while ab-seiling down a highly exposed vertical stack! The naphtha crackers also featured several large pipe bends so Kaimann supplied Harsco with a sheet cutting pattern for each bend to realise signifi cant time sav-ings on site.
Kaimann operates a quality management system that meets the requirements of ISO 9001 and the high level of manufacturing controls & monitoring processes allows Kaimann to guarantee the quality of every sheet of Kaiflex – essential on a project of this nature.
Thanks to the combination of high level of product quality and a techni-cal support service work-ing closely with the insulation con-tractors, Kaim-ann was able to provide a com-prehensive so-lution that satis-
fi ed Sabic’s requirements.