    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Target

    Sr. No. Who

    1 NA

    Kaizen Unique No: - MBU/01/10 11/1 (HORIN

    DEPLOYMENT)

    Kaizen Theme:- To give proper identification

    to master batches.

    Kaizen Idea:- Toimprove the space and proper marking of master

    batches.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:- Buckets are provided for

    keeping the master batches and proper

    identification done on each bucket.Problem Status:- Earlier master batches are

    kept in Bags without identification.

    Team:- MUSAFIR BROTHERS UDYOG

    Completio

    Productivity 15 Min 0Min

    Start Date:- 7-10-2010

    Cost

    Quality

    After:- Env

    Horizontal Deploymen

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Root Cause : No proper marking and proper place

    for master batches.Results:-

    Problem Analysis:-

  • 7/30/2019 Kaizen Idea new.xls

    2/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Targ

    Sr. No. Who

    1

    Kaizen Unique No: - MBU/01/10 11/2 (HOR

    DEPLOYMENT)

    Kaizen Theme:- To improve productivity at

    suppliers end.

    Kaizen Idea:-To improve the process with reduction in set-up

    time & using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-

    Mould lifting which was earlier done by Metal

    Chain which require high man time due to

    Nut/Bolt Assy. & being heavy in wt. Same

    replaced to Synthetic Sling which is easy to fit

    & operate.

    Problem Status:- Less Productivity due to high

    set-up time observed in Plastic Component.

    Team:- MUSAFIR BROTHERS UDYOG

    Start Date:- 26-9-2010 Comple

    Productivity 24 Min 15 M

    Cost

    Quality

    After:- Env

    Horizontal Deploym

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    NA

    Root Cause : Improper operations & lack of

    knowledge about SMED resulted in high mould set

    up time

    Results:-Tool Changeover time on 180 T M/c reduced by 8 Min

    with this change

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time in lifting the tool found to be 2nd

    bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 24 min were for tool

    lifting

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

  • 7/30/2019 Kaizen Idea new.xls

    3/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Ta

    Sr. No. W

    1

    Kaizen Unique No: - MBU/01/10 11/3 (H

    DEPLOYMENT)

    Kaizen Theme:- To improve productivity at

    suppliers end.

    Kaizen Idea:- Toimprove the process with reduction in set-up time &

    using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-Conventional cooling nipples on which cooling pipe

    was fitted after heating & sealed with metallic wire

    replaced by push fit PU Nipples which proved to be

    more productive .

    Problem Status:- Less Productivity due to high

    set-up time observed in Plastic Component.

    Team:- MUSAFIR BROTHERS UDYO

    Com

    Productivity 22 Min 10

    Start Date:- 05-10-2010

    Cost

    Quality

    After:- Env

    Horizontal Depl

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Root Cause : Improper operations & lack ofknowledge about SMED resulted in high mould set

    up time.

    Results:-Tool Changeover time on 180 T M/c reduced by 10

    Min with this change

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time in fixing tool cooling nipples found

    to be 3rd

    bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 22 Min were for fixing

    cooling nipples/pipes on tool

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

  • 7/30/2019 Kaizen Idea new.xls

    4/17

    4

    MUSAFIR BROTHERS UDYOG

    Kaizen Theme:- To improve productivity atsuppliers end.

    Problem Status:- Less Productivity due to high

    set-up time observed in Plastic Component.

    Root Cause : Improper operations & lack ofknowledge about SMED resulted in high mould set

    up time.

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time found to be bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 21 Min were for making

    cooling battery operational.

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

    Page 4

  • 7/30/2019 Kaizen Idea new.xls

    5/17

    4

    "KAIZEN IDEA SHEET"

    Result Area h i Before

    Sr. No.

    1

    Kaizen Unique No: - MBU/01/10 1

    DEPLOYMENT)

    Kaizen Idea:- Toimprove the process with reduction in set-up time

    & using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-Ordinary cooling battery (for Hydraulic Oil Cooling)

    which had ordinary cooling pipes (heated & sealed)

    replaced by quick fit cooling battery with push fit

    PU nipples.

    Team:- MUSAFIR BROTHERS

    Start Date:- 05-10-2010

    Productivity 21

    Cost

    Quality

    After:- Env

    Horizontal

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Results:-Tool Changeover time on 180 T M/c reduced by 9

    Min with this change

    Page 5

  • 7/30/2019 Kaizen Idea new.xls

    6/17

    4

    Target After Verified By

    Who When Status

    /4 (HORINZONTAL

    DYOG

    Completion Date:- 15-10-2010

    10 12Akash; during

    supplier visit

    Deployment

    NA NA NA

    Page 6

  • 7/30/2019 Kaizen Idea new.xls

    7/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Targe

    Sr. No. Who

    1

    Kaizen Unique No: - MBU/01/10 11/5(HOR

    DEPLOYMENT)

    Kaizen Theme:- To improve productivity at

    suppliers end.

    Kaizen Idea:- Toimprove the process with reduction in set-up time &

    using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-

    Locating Rings made w.r.t all mould/machine

    dimensions & used for easy changeover. Usage

    of locating rings reduced adjustment time

    between M/c Nozzle & mould Sprue Bush

    Problem Status:- Less Productivity due to high

    set-up time observed in Plastic Component.

    Team:- MUSAFIR BROTHERS UDYOG

    Start Date:- 17-9-2010 Comple

    Productivity 10 Min 2 Min

    Cost

    Quality

    After:- Env

    Horizontal Deploym

    Where

    Before:-

    OHS

    Delivery

    Morale

    Root Cause : Improper operations & lack of

    knowledge about SMED resulted in high mould setup time.

    Results:-Tool Changeover time on 180 T M/c reduced by 8

    Min with this change

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time found to be bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 7-8 Min were for tool

    adjustment in absence of locating ring.

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

  • 7/30/2019 Kaizen Idea new.xls

    8/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Targ

    Sr. No. Wh

    1 NA

    Kaizen Unique No: - MBU/01/10 11/6 (HOR

    DEPLOYMENT)

    Kaizen Theme:- To improve productivity at

    suppliers end.

    Kaizen Idea:- Toimprove the process with reduction in set-up time &

    using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-

    Mould moved on a make shift arrangement

    requiring 2 people to do the job instead a pallet

    lifter deployed which does the job more

    effeciently requiring only a single person.

    Problem Status:- Less Productivity due to high

    set-up time observed in Plastic Component.

    Team:- MUSAFIR BROTHERS UDYOG

    Comple

    Productivity 10 Min 7 Mi

    Start Date:- 29-09-2010

    Cost

    Quality

    After:- Env

    Horizontal Deploy

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Root Cause : Improper operations & lack of

    knowledge about SMED resulted in high mould set

    up time

    Results:-Tool movement time to M/c reduced by 3 Min with

    this change

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time found to be bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 10 Min were for Mould

    Movement to M/c.

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

  • 7/30/2019 Kaizen Idea new.xls

    9/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Result Area h i Before Ta

    Sr. No. W

    1 N

    Kaizen Unique No: - MBU/01/10 11/7 (H

    DEPLOYMENT)

    Kaizen Theme:- To improve productivity at

    suppliers end.

    Kaizen Idea:- Toimprove the process with reduction in set-up time &

    using minimum workforce.

    Zone/Dept Coordinator:- 1

    Team Leader:- Akash

    Counter Measure:-Allen Key replaced by ratchet spanner Allen key

    which proved to be more handy & productiveProblem Status:- Less Productivity due to high

    set-up time/labour shortage observed in Plastic

    Component.

    Team:- MUSAFIR BROTHERS UDYO

    Com

    Productivity 7 Min 5

    Start Date:- 23-10-2010

    Cost

    Quality

    After:- Env

    Horizontal Deplo

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Root Cause : Improper operations & lack ofknowledge about SMED resulted in high mould set

    up time

    Results:-Tool Changeover time on 180 T M/c reduced by 2

    Min with this change

    Problem Analysis:-Study made on Process Flow of IM Comp. Manff. &

    high set-up time found to be bottleneck operation.

    Average tool changeover time was in the range of

    90 to 170 Min. Out of which 7 Min were for

    operations involving searching & usage of allen key

    Lack of proper knowledge , unutilization of

    productivity improvement tools.

  • 7/30/2019 Kaizen Idea new.xls

    10/17

    MUSAFIR BROTHERS UDYOG "KAIZEN IDEA SHEET"

    Root Cause : No arrangement of tools Results:-5-10 min saved in searching of tool.

    Problem Analysis:- there is no

    proper place for tools, which give rise

    to wastage of time in searching of

    tools.After:-

    Before:-

    Kaizen Theme:- To save time insearching of tools.

    Kaizen Idea:-To develop a tool box for tools.

    Counter Measure:- Spanner & other

    tools are arranged on shadow board

    and near to machines.

    Problem Status:- As the tools are not

    arranged and at proper place,

    workers has to waste there time in

    searching tools.

  • 7/30/2019 Kaizen Idea new.xls

    11/17

    Result Areah i

    Before Target After Verified By

    Sr. No. Who When Status

    1 NA NA NA

    Horizontal Deployment

    Where

    NA

    Morale

    OHS

    Delivery

    Env

    Cost

    Quality

    Productivity 10 Min 0 min 0 Min Akash; during supplier visit

    Kaizen Unique No: - MBU/03/10 11/8 (HORINZONTAL

    DEPLOYMENT)

    Zone/Dept Coordinator:- 3

    Team Leader:- Akash

    Team:- MUSAFIR BROTHERS UDYOG

    Start Date:- 10-10-2010 Completion Date:- 17-10-2010

  • 7/30/2019 Kaizen Idea new.xls

    12/17

    MUSAFIR BROTHERS UDYOG

    Kaizen Theme:- To Save time For searching

    Dies.

    Problem Status:- Worker has to search for dies

    since not arranged and marked.

    Root Cause : No arrangement & numbering of dies

    accordingly.

    Problem Analysis:-Since Dies are not arranged or marked, lots of time

    is waste in searching of dies,which reduces the

    production and manpower.

  • 7/30/2019 Kaizen Idea new.xls

    13/17

  • 7/30/2019 Kaizen Idea new.xls

    14/17

    "KAIZEN IDEA SHEET"

    Result Area h i Before

    Sr. No.

    1

    Kaizen Unique No: - MBU/03/10 1

    DEPLOYMENT)

    Kaizen Idea:-

    To develop die stand & give numbers to each

    die.

    Zone/Dept Coordinator:- 3

    Team Leader:- Akash

    Counter Measure:-

    Now die stand is made for arrangement of dies

    and they are arranged on stand according to

    there number.

    Team:- MUSAFIR BROTHERS

    Productivity 22 Min

    Start Date:- 17-9-2010

    Cost

    Quality

    After:- Env

    Horizontal

    Where

    Before:-

    OHS

    Delivery

    Morale

    NA

    Results:-Tool Changeover time on 180 T M/c reduced by 10

    Min with this change

  • 7/30/2019 Kaizen Idea new.xls

    15/17

  • 7/30/2019 Kaizen Idea new.xls

    16/17

    Target After Verified By

    Who When Status

    NA NA NA

    /9 (HORINZONTAL

    DYOG

    Completion Date:- 20-10-2010

    10 Min 12 MinAkash; during

    supplier visit

    Deployment

  • 7/30/2019 Kaizen Idea new.xls

    17/17


Recommended