Kaizen Event : UC Squib Productivity Improvement and
Reduction in Rejection.
Team Leader:Deepak(ME).
Team members: Kiran (Prod), Rajesh (ME), Prasad (Tool Main), Paramesh (Prod)
Date : 18th March 2010
page 2
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Base line
Metric Baseline Target Improvement
Cycle Time 54 sec 40 sec 26%
Rejection percentage 12% 4% 67%
Mold down time 6.3 hrs/month 1 hr/month 84%
page 3
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
PRODUCT OVER VIEW
UC squib is used in air bag application. It is used for secure connection of the airbag ignitor via the cable harness to the airbag control box. We produce around 39 pn according to different lengths and cables.
Customer:- Autoliv,Takata,Filec.
page 4
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Why this project?
• Increase in customer demand.
• The daily machine capacity was 7500nos
• Customer escalation regarding delivery
• High scrap percentage.
page 5
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Pareto Analysis
Rejection reasons Qty Percentage
Material entry 13636 39.81
Flash on cable 4735 13.82
Rough finish 3970 11.59
Flash on contact 3642 10.63
Incoming problem 2969 8.67
Short shot 2584 7.54
Contamination 1343 3.92
Contact visible 726 2.12
Contact height
variation 352 1.03
Cable damage 296 0.86
Pareto for rejection qty
39.81
53.63
65.22
75.8684.52
92.07 95.99 98.11 99.14 100.00
0
2000
4000
6000
8000
10000
12000
14000
16000
Material entry Flash on cable Rough finish Flash on contact Incomingproblem
Short shot Contamination Contact visible Contact heightvariation
Cable damge
Reasons
Qty
0.00
20.00
40.00
60.00
80.00
100.00
120.00
page 6
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Action Plan
Major Problem Causes Corrective action proposedMaterial entry Gap between ferrite and contact.
Narrow process window . Delay in cycles.
Optimizing the cycle time.
By increasing mold open/Close speed,By increasing nozzle advance/retraction speed.Rotary table speed.Adding one more operator station for part removal.
Flash on cable Improper placement.Narrow process window.Imbalance in filling.
Training to operators .
Optimizing the cycle time.
page 7
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Action Plan
Major Problem Causes Corrective action proposed
Rough finish
DroolingDelay in cycle
Narrow process window.
Imbalance in filling.
Optimizing the cycle time
Flash on contact Delay in cycle
Narrow process window.
Imbalance in filling.
Optimizing the cycle time
page 8
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Action plan
Burn mark
No air vents
Air vents provided
Before After Before After
Cable insertionNozzle Retraction speed (%):-25Nozzle retract stroke(mm):260Delay time (sec):-15
Nozzle retraction
Nozzle Retraction speed (%):-40Nozzle retract stoke(mm):223Delay time (sec):-2
Speed(%):-35Rotary table movement
Speed(%):-50 Opening speed(%):15/40/20 Mold opening Opening speed(%):15/40/20
Closing speed(%):15/20/15
Mold closingClosing speed(%):35/45/15
Speed(%):-35Rotary table movement
Speed(%):-50
Nozzle advance speed (%):-50/15
Nozzle advanceNozzle advance speed (%):-50/15
Cable removal
Injection
page 9
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Action Plan
• One more stage for manpower added for part removal and insertion
instead of one person doing it.
• Training for all UC Squib operators as per WI.
Before After
page 10
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Benefits
• Productivity Improvement.
• Efficiency improvement
• Improvement in mold down time
84% .
Daily output
9065
12545
0
2000
4000
6000
8000
10000
12000
14000
Before After
Qty
Efficiency
155
110127
138
0
20
40
60
80
100
120
140
160
180
November December January Febraury
Month
Eff
page 11
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Benifits
Rej PPM
9 0 3 3 2
3 8 2 553 4 571
4 2 72 1
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
November December January FebruaryMonth
PP
M• Reduction in rejection.
• Mold down time reduced from 6.3 hrs to 1 hr.
page 12
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Benefits and Next Action Plan
Savings ($) December January February
3547 4038 4446
Next Action Plans
• Replacing the injection unit with nozzle shut of unit.
• Working on Visual inspection stages .
page 13
Information is Tyco Electronics Confidential & ProprietaryDo Not Reproduce or Distribute
Thank you