+ All Categories
Home > Documents > Kanban Production Control System

Kanban Production Control System

Date post: 20-Jan-2016
Category:
Upload: joshua
View: 63 times
Download: 0 times
Share this document with a friend
Description:
Kanban Production Control System. CC cell. MF assembly. Withdrawal Kanban. Production Kanban. Kanban Production Control System. T=0. CC cell. MF assembly. Withdrawal Kanban. Production Kanban. Kanban Production Control System. T=1. CC cell. MF assembly. Withdrawal Kanban. - PowerPoint PPT Presentation
14
Kanban Production Control System MF assembly CC cell Withdrawal Kanban Production Kanban
Transcript
Page 1: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

Page 2: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=0

Page 3: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=1

Page 4: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=1

CT of 1st lot=1+4

Page 5: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=2

CT of 1st lot=1+4

Page 6: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=2

CT of 1st lot=1+4

CT of 2nd lot=2+4

Page 7: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=3

CT of 1st lot=1+4

CT of 2nd lot=2+4

Page 8: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=3

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

Page 9: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=4

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

Page 10: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=4

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 11: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=5

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 12: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=5

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 13: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=6

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

Page 14: Kanban Production Control System

Kanban Production Control System

MF assemblyCC cell

Withdrawal Kanban

Production Kanban

T=6

CT of 1st lot=1+4

CT of 2nd lot=2+4

CT of 3rd lot=3+4

CT of 4th lot=4+4

CT of 5th lot=6+4


Recommended