Selleck
Kangley
NorthBend
Cedar Falls
Existing Transmission Lines
Proposed Transmission LineAlternatives Under Consideration
BPA Substation
Alternative
#*
#*
#*
#*
#*#*
#*
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
Sam
mam
ishLake
Washington
Puget
Sound
MuckleshootReservationMuckleshootReservation
PuyallupReservationPuyallupReservation
SeattleBellevue
Renton
Tacoma
North Bend
Lake
SurpriseLakeSurpriseLake
Enumclaw
Cedar
Kent
BlackDiamond
Issaquah
Cedar R
Green
River
Kangley
¡¢5
¡¢405
¡¢5
¡¢90
UV202
UV18
UV169
UV516
UV164
UV410
UV167
UV515
UV167
UV900
UV203UV202
A C
B
DRiver
Cedar RiverCedar RiverWatershedWatershed
StampedeStampedePassPass
Preferred AlternativePreferred Alternative
MapleValley
1
SnoqualmieSnoqualmiePassPass
RaverSubstation
TacomaTacoma
Echo LakeSubstation
CovingtonSubstation
Maple ValleySubstation
ADDITIONAL ALTERNATIVES
CONSIDERED
´
LegendExisting BPA Transmission Lines
Proposed Transmission LineAlternatives Under Consideration
BPA Substations#
May, 2003
MapLocation
AlternativesConstruct New Single-Circuit 500-kVLine from tap near Kangley to Covington Substation. Rebuild portionof Covington - Maple Valley 230-kV to Double-Circuit 500-kV.
Rebuild Portion of Rocky Reach-Maple Valley 345-kV to Double-Circuit 500-kV from East of StampedePass to Echo Lake Substation.
Construct New Single-Circuit500-kV Line West of the CedarRiver Watershed to the EchoLake - Maple Valley Lines.
Construct New Single-Circuit500-kV Line from East ofStampede Pass Adjacent to Rocky Reach-Maple Valley Line.
C
B
A
D
Map 2
0 3 6 9 12
Miles
!
!!!!!!!!!!!!!!!
! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!! ! ! !
!! !!!!!!!!!!!!
! ! !! !!!!
! ! ! ! ! ! !
!!!!!!!!!!!!!!!!!!!
! ! ! !! ! !!!!!!!!!!!!!
!!
!!!!!!!
!!!!!!!!!!!!!!
!!!!!!
!!!!!!
!!!!!
!!!!
!
!!!!!
!!!!
!!!!!!!!!!!!!!!!!
!!!!!!!!!!
!!!!!!!!!
!!!!!!!! !
!!
!!!!!
!!!!!
!!
!!
!!!!
!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!
! ! ! ! ! !!!
! ! !!!
! ! ! ! ! !!
! ! ! !!!!!! ! ! ! ! ! ! !!!!!!
#*
#*
#*
!(
!(
!(
!(
!(
!(
!(
!(
UV18
ST18
ST516
ST169
ST169
Alternative CAlternative C
Option C2Option C2Shared by A and CShared by A and C
Option C1Option C1
Option COption CAlternative AAlternative A
Cedar RiverCedar River
WatershedWatershed
Ra
ging River
Holder Creek
Fi ftee
nmile
Cre
ek
Rock C
reek
Ce
dar River
Issaquah C
r
Ced
ar R
Lake
Youngs Carey Creek
LakeSawyer
WalshLake
SummitSummit
HobartHobart
SelleckSelleck
KangleyKangley
FairwoodFairwood
MaplewoodMaplewood
CovingtonCovington
RavensdaleRavensdale
Cedar Cedar GroveGrove
MeridianMeridianHeightsHeights
MeridianMeridian
BlackBlackDiamondDiamond
Maple Maple ValleyValley
RaverRaverSubstationSubstation
Echo LakeEcho LakeSubstationSubstation
CovingtonCovingtonSubstationSubstation
SE 200th StSE 200th St
SE 216th StSE 216th St
276th
Ave
SE
276th
Ave
SE
196th
Ave
SE
196th
Ave
SE
Kent - Kangley RdKent - Kangley Rd
SE 240th StSE 240th St
Sawyer RdSawyer RdCovington - Covington -
SE 224th StSE 224th St
190th
Ave
SE
190th
Ave
SE
148th
Ave
SE
148th
Ave
SE
Petrovitsky Rd
Petrovitsky Rd
Petrovitsky Rd
Petrovitsky RdCedarCedar Grove Rd
Grove Rd
164th
Ave
SE
164th
Ave
SE
SE Wax Rd
SE Wax Rd
Witte
Rd
Witte
Rd
April, 2003
! King
Chelan
KittitasPierce
Seattle
Alternatives A and C
LegendProposed Transmission Line Alternatives
Map 9
RECREATIONand
OWNERSHIP
Source: Washington DNR, King County GIS, 2000.
Project Location
map area
0 1 2 3
Miles
! !!! ! ! ! Trail
Other State Lands
Other Public - City or County
Other Private or Unspecified
Existing BPA Transmission Lines
Existing BPA Substation#
Bonneville Power Administration
´
State Park or Recreation Area
WA Dept. of Natural Resources
Cedar River Watershed Boundary
Private Timber or Other Private Land
City