+ All Categories
Home > Documents > Kankosh Telecom Asiaktcasia.ir/wp-content/uploads/2016/08/CompanyProfile18072016.pdf · TSS project...

Kankosh Telecom Asiaktcasia.ir/wp-content/uploads/2016/08/CompanyProfile18072016.pdf · TSS project...

Date post: 27-Aug-2018
Category:
Upload: vuongduong
View: 226 times
Download: 0 times
Share this document with a friend
27
Kankosh Telecom Asia Address: No.3 ,30 rd Alley , Behnam St, Ayatollah Kashani, Tehran, Iran Postal Code:1471716813 Fax: 44969008 Tel: 44969004 -7
Transcript

Kankosh Telecom Asia

Address: No.3 ,30rd Alley , Behnam St, Ayatollah Kashani, Tehran, Iran Postal Code:1471716813 Fax: 44969008 Tel: 44969004 -7

Company Review

Launched in 2006 at Tehran, Iran

Established trust relationship with major operators in Iran by Completing several challenging projects ranging from RF Design, SA, CW, TI to ROM & Turn-key projects in the last 8 years

Geographical distribution of projects covers 75% of Iran

population.

Our expertise is running projects in all areas of wireless engineering from A to Z with articulated project management.

Kankosh ’s goal is simple

To provide professional service to each of our clients and to build long-lasting relationships.

To promote forward thinking solutions and do it with style and finesse and earn the ultimate customer satisfaction.

To extend rollout management services for main operators in Telecom Industry.

Geographical Diversity of Kankosh Projects

Core business of Kankash Telecom

• Modernization and swap

• Full Turn-key Rollout projects including Site Acquisition , Civil Work ,Telecom Design, Implementation and optimization for Macro and In-building sites

• Drive Test , Radio Verification Test, Single Site Verification(SSV) and post processing for 3G,2G, LTE and Wimax rollout and optimization projects.

• Field optimization services in all over Iran

• Turn Key EPC repeater projects.

• Supplying telecom equipment

• Wi-Fi Solutions and Implementation for Access and Core

• Supply Wi-Fi equipment including AP and AC

• Design ,Supply and Implement IBS solutions

• Power supplying solutions using solar power

Despite sanction and dollar fluctuation that cause many bankruptcy for all competitors, our forward thinking strategy guaranteed survival of our business.

We concern about clients satisfaction, human capital improvement, systematic approach and improvement and achieve accepted quality

We never leave a project which we committee to accomplish. We always tried to control risk and align our strategy and risk plan.

Kankosh lives with its values

Voice of Customer

…Our business relationship has

absolutely profitable and satisfactory to all

concerned with…

…As a customer ,we would like to say

our appreciation for the Integrity ,

Commitment and Good service …

…Executing the task in minimum

time frame with superior technical

skills and loyalty to quality. …

…Complete work with respect of

Quality , HSE standard and project

Schedule …

List of Current Project

List of Current Projects

• Swap, Modernization, DT, SSV, and optimization of MTN sites to 3G and LTE technologies in 4 provinces (Client: MTN – from 1393 to present )

• Mobinnet nationwide Wimax Optimization (clienent:Mobinnet-from 1395 to present )

• Design, supply and implementation of MCI IBS sites in Tehran (Client: NAK- from 1395 to present)

• Rollout Projects for the Wimax sites in all over Iran (Client: Mobinnet – from 1391 to present).

• 3G & LTE swap of MTN sites in Tehran and Alborz (Client: Huawei – from 1393 to present)

• New Site Turnkey Project in Tehran (Client: MTN – from 1394 to present )

• High speed MW swap and implementation all over Iran (Client: Mobinnet)

• Total coverage solution using repeaters in all over Iran (Client: MTN – from 1393 to present)

• Supply & support of repeaters in Fras, Khorasan, Esfehan and Tehran (Client: TCI – from 1393 to present)

• Wi-Fi design, supply and Installation for Shahid Beheshti & Sooreh Universities (Client: Jameh Mobin – from 1394 to present )

• Full Turn-Key Project in Tehran (Client: Rightel- from 1393 to present)

• 3G & LTE swap of MTN sites in Yazd (Client: ZTE– from 1394 to present)

List of Completed Project

List of Completed Projects (2010-2014) Completed in 2014:

• DT , RVT, SSV for 3G Project (Client: NAK)

• Full Turn-key project in Tehran (Client: Rightel)

• Supply & warranty of 2 repeaters in Esfahan (Client: TCI)

• Supply and implementation for 25 repeater in Khorasan (Client: TCI)

• EPC Turn-Key solar repeater project for Boushehr (Client: TCI)

Completed in 2013:

• Road Coverage Optimization & Solution (Client: NAK)

• Tunnels Coverage for FM, Fire Brigades, Ambulance & VHF signals (Client: Tehran Municipality)

• Tower painting project of 200 sites in Gilan (Client: MTN)

• International Spectrum Management of 16000 sites of Iran in ITU(Client: Communication Regulatory Authority)

• IBS Turn-key project for MCI (Client: NSN)

• Cell upgrade project for MTN (Client: NSN)

• TI for MTN IBS sites (Client: NSN)

Completed in 2012:

• WLL Repeaters (Client: MCI)

• Metro tunnels optimization (Client: MCI)

• Wimax Turn-key Project of 100 sites for Mobinnet (Client: Huawei)

• Tower painting project of 350 sites for MTN (Client: NSN)

• FAC( Final Acceptance Certificate) project for Irancell sites (Client: NSN)

Completed in 2011:

• Wimax TSS of 280 sites for Mobinnet (Client: Huawei)

• Drive Test , Verification and pre-launch Optimization for Irancell sites (Client: NSN)

• Post processing & DT of Irancell sites (Client: NSN)

List of Completed Projects (2007-2009)

Completed in 2010:

EPC Turn-Key project (Client: East Azarbaijan TCI)

2000 Watt Solar Power Station (Client: Yazd TCI)

Network planning and SA of 230 sites of MCI Phase 4 (Client: Kerman TCI)

Completed in 2009:

Network planning and optimization for Irancell sites, phase 3 (Client: NSN)

TSS project for 3rd operator (Client: NSN)

RF Optimization for MCI (Client: NSN)

NWPL for Irancell sites in Tehran (Client: NSN)

Completed in 2008:

Rollout Management of 76 MCI Sites in Yazd from SA to PAC for GC (Client: PI)

Rollout Management of 60 MCI Sites in Kerman from SA to PAC for GC (Client: PI)

Turn key Project in Yazd & Kerman for 34 MCI sites for GC (Client: PI)

TI project for Irancell IBS sites (Client: NSN)

Completed in 2007:

NWPL & Transmission planning for 124 MCI Micro & IBS sites including the DAS design & EIRP plan in Nokia region (Client: PI)

Rollout Management of 35 MCI IBS sites from SA to PAC (Client: PI)

Following Pages are review of our last 9 years sample projects

Wi-Fi Implementation and supply equipment 1.Design and Installation of 500 access points and an

access controller (support account:120000 user) in Shahid Beheshti University to cover and support network and internet in managing way with high efficiency performance (Client: Mobinnet)

Wi-Fi Implementation and supply equipment 2.Design and Installation of 100 access points and an

access controller(support account:15000 user) in Sooreh University to cover and support network and internet in managing way with high efficiency performance (Client: Sooreh University)

Wi-Fi Implementation and supply equipment 3.Supply equipment and equipment and network

troubleshooting for National library of Iran

4. Rollout Management of 76 GC sites in Yazd(Client: PI)

Object Achievement

Cost Under Budget

Progress On Plan

Quality Base on Plan

5. Rollout Management of 35 IBS Sites in Tehran (Client: PI)

6. Rollout Management of 60 GC sites in Kerman (Client: PI)

7.MCI 124 IBS and Micro Sites NWPL in Tehran, Kerman and Yazd (Client: PI) DAS Design,RF Design, TSS, TSSR,Transmission Design, Call off, LOS,EIRP Plan, Rollout Supervision

8. WiMAX TSS, RVT & Turn key Project(Client: Huawei)

Completed 280 TSS, RF Design, TSSR & Detailed Design

Radio verification test (RVT) for 100 sites using Probe (Huawei DT tool) .

Wimax network optimization using X-CAL & X-CAP tools.

Main subcontractor of Huawei for the Wimax network design and implementation.

Installation, Commissioning & achieving PAC for100 Wimax sites

Overcoming several administrative obstacles to receive different types of permissions from MCI in order to survey and co-locate Wimax equipment on the MCI sites.

10. IBS Implementation project for SA, CW, & TI of MCI sites (Client: NSN)

Main subcontractor of NSN for MCI IBS project

Pre site survey, preparing PSR & Walk Test

VSWR test during installation and preparing site for commissioning

Commissioning and site integration

11.Verification(GPRS, MMS, and Edge tests) and pre-

launch. / FAC( Final Acceptance Certificate) project/ Drive Test, Post processing & Optimization of Iran cell sites in 5 provinces for Irancell sites (Client: NSN)

9. EPC Turn-Key 39 repeater project for sites (Client: East Azarbaijan TCI)

Design, Construction, Installation, Commission optimization, Site Folder & PAC for 33 repeater sites

Design and implementation of 18 Solar power system(400 Watt each) including foundation, tower installation and ground system

Installation and implementation of a supervisory system for monitoring 33 repeaters in the MSC and OMC (NOC).

Benchmarking & Drive Testing, Short Call and Long Call data collection in 5 provinces: Khorasan, Semnan, Mazandaran, Golestan and Tehran.

5 fully equipped DT teams

Post processing of Iran cell sites in 5 provinces for NSN

12.Drive test and post processing of Irancell sites (Client: NSN)

13. Tower painting project for MTN for 350 sites(Client: NSN)

Implemented the standard of MTN for painting towers in 3 layers using wash primer & polyurethane materials.

Strong Project management & quality control

15. Network planning and SA of 230 sites of MCI Phase 4 (Client: Kerman TCI)

Network planning of 230 sites from nominal points to lease contracts & datasheets.

Total drive test of province in addition to evaluating the BSC Dump and KPI of all the sites in the province in order to identify the nominal points for 1800 and 900 MHz sites.

Candidate evaluating and developing SARs.

Site acquisition of over 120 sites all over the Kerman province.

Technical site survey, TSSR, FSR, detailed design & Datasheets for 230 sites.

16. Network planning and SA of 230 sites of MCI Phase 4 (Client: Kerman TCI)

Total drive test of province in addition to evaluating the BSC Dump and KPI of all the sites in the province in order to identify the nominal points for 1800 and 900 MHz sites.

Candidate evaluating and developing SARs.

Site acquisition of over 120 sites all over the Kerman province.

Technical site survey, TSSR, FSR, detailed design & Datasheets for 230 sites.

14. Cell Upgrade Project for 80 MTN sites (Client: NSN)

Main subcontractor of NSN for MTN Cell upgrade project (80 sites)

New sector and new unit installation

VSWR test and preparing site for commissioning

Re-commissioning and site integration with new configuration

17. Wimax Turn-key Project in Tehran(Client: MobinNet)

Main subcontractor of MobinNet for rollout, site integration, site re-location and COW in Tehran (Cell On the Wheel).

Total implementation of Wimax sites

Re-locating the MobinNet central main hub site from Grand Tehran Hotel to Fanavari Park.

Installation and commissioning of BSC switch & RTN

Installation and commissioning of high capacity links

18. Turnkey Rollout Project in Shiraz , Kermanshah & Ahvaz.(Client: MobinNet)

Main subcontractor of Mobinnet Turn key project for southern provinces.

Site Acquisition, TSSR, Civil Work, Telecom Implementation, Documentation (Site Folder) and Delivery of sites in the provinces of Shiraz, Kermanshah & Ahvaz.

Total implementation of Wimax sites.

Main subcontractor of MTN for tower painting project of over 200 sites in Gilan province.

Dispatched 12 skillful teams to complete painting of 70 sites in less than 3 months and delivered sites to MTN and received 70 FAC & COC.

Strong project management & quality control

19. Full Turn-key project in Tehran(Client: NAK)

20. Tower painting project for MTN sites in Gilan

(Client: MTN)

Main subcontractor of NAK Turn key project for Tehran province.

Site Acquisition, TSSR, Civil Work, Telecom Implementation, Documentation (Site Folder) and Delivery of sites in Tehran province

Total implementation of GSM sites.

Cell upgrade and site expansion

Modernization of sites

Site swap

21. ITU International Spectrum Management & Link Design (Client: Communication Regulatory Authority)

Defining location for stations and checking for line of sight

Defining frequency, bandwidth, emission class and power for each link by using tools such as: TerRaQ, TerRaNV, TerRaNotices & Connect

Developing a report about comparison between Iran’s background in international registration and the other countries

Publishing a brochure about Iran’s CRA achievement in the subject of international spectrum management.

22. Road Coverage Optimization & Solution(Client: NAK)

Analyze log files of the road sites in 8 provinces using Actix to identify the poor coverage areas .

Site Audit and Site Survey of over 500 sites adjacent to the problem areas in 8 provinces.

Optimization of sites adjacent to problem areas to improve coverage.

Providing MCPA, TMA, & repeater solutions to achieve the desired coverage.

Verification test and delivery.

23. Tunnels Coverage for FM, Fire Brigades, Ambulance & VHF signals

Design, assemble, install & commission of the broadcasting emergency messages over FM radio in Tohid & Resalat tunnels consisting of voice devices, optical devices & FM & VHF amplifiers to broadcast proper signals in the tunnels.

Technical survey and testing inside Tohid & Resalat tunnels

Design and simulation of wave propagation using HFSS software

Testing and coverage optimization