Kaohsiung LRT Project (Phase I) Kaohsiung LRT Project (Phase I) Project Brief Project Brief
Transcript
  • Kaohsiung LRT Project (Phase I)Kaohsiung LRT Project (Phase I)Project Brief Project Brief

  • Project DescriptionProject Description

    Bid Strategies and Qualifications of TenderBid Strategies and Qualifications of Tender

    Milestones, Payment and Evaluation CriteriaMilestones, Payment and Evaluation Criteria

    ContentContent

    Brief of Preliminary Design of Civil & Track Brief of Preliminary Design of Civil & Track WorkWorkBrief of E&M System SpecificationBrief of E&M System Specification

  • 3 33

    Policy for Public TransportPolicy for Public Transport-- 6 Transfer Hubs6 Transfer HubsHigh Efficiency Transfer hubs

    One Harbour, 2 Stations and 3 Mountains (Shan)

    Transfer Hubs 桃源那瑪夏

    六龜

    岡山站

    鳳山站

    左營高鐵站

    小港站

    高雄車站

    旗山站岡山

    阿蓮 田寮路竹

    (高科)

    湖內

    燕巢

    茄萣

    永安

    彌陀

    梓官

    內門 杉林甲仙

    美濃

    林園

    大樹

    屏東

    大發工業區

    大寮

    橋頭

    楠梓 大社

    仁武

    鳥松

    鳳山

    左營

    鼓山

    前鎮

    小港

    苓雅

    三民

    塩埕

    前金

    新興

    旗津

    3

    30minutes for daily life

    Shortage the distance, improve the development30 min from HSR Zuoying to Chishan transfer hub

    10

    Main Center

    Service Inter-city

    Character Metropolitan

    Transfer Kaohsiung Stn. HSR Zuoying

    Transportation Tool

    TRA、MRT、Highway Express、Bus

    HSR、TRA、MRT、Highway Express、Bus

    Secondary Center

    Service Metropolitan

    Character Rural Connection

    Transfer 旗山站 鳳山站

    岡山站 小港站

    Transportation Tool

    Highway Express、Bus

    TRA、MRT、Highway Express、Bus

  • 4

    Project Description

    義路

    寶獅

    五塊厝

    崗山仔

    三多

    本館

    中 正

    鼎金

    (覆鼎金)

    林內山

    路路

    三多

    一路

    二一

    路二 路

    一 路

    天鼎

    祥一

    二 權

    路一

    灣仔內

    大路

    和光

    五福

    維二

    多二

    中 正

    路路

    三 民

    三莊

    一 路

    全 一

    一 路

    青年

    中 正

    六 合

    七 賢

    二路

    民 生

    山三

    鴨母寮

    瑞隆

    獅甲

    二 路

    多四

    年青

    路 山

    四路

    路路

    一二

    如二

    凹底子

    苓雅寮

    三路

    愛 五 福三

    四路

    仁五

    福四

    建鼓

    烏松

    北汕尾

    內惟

    內惟

    狗山

    C4

    C5

    C7

    C6

    C22C25

    C32

    C31

    C29

    C28

    C27

    C23 C26C24

    C33

    C35

    C34

    C3

    C2

    C1

    C30

    鼓山站

    大順站

    美術館站

    C8C9

    C10C11C12

    C13C14

    C15

    C16

    C17

    C18

    C19

    C20

    C21

    第一階段已通車路段

    第二階段通車目標

    R13

    R6

    O1

    N

    內惟站

    三塊厝站高雄站 民族站

    Whole route length of LRT is about 22.1km, with 36 stations and 1 depot, 1 stabling yard.Phase I: From C1 to C14, about 8.7km, with 14 stations and 1 depot.Budget : About 6.8Billion NTD

    (For reference only)Completion Deadline : NTP+24(months)

  • 5

    Kaohsiung LRT Kaohsiung LRT (1st Phase)

    C1凱旋/一心

    一心路

    C2凱旋/瑞田

    C3中山/凱

    旋C5成功/時代大道

    C6成功/正勤

    C7成功/復興

    C8成功/新光

    C9三多/苓南

    C10光榮碼頭

    C12駁二/大義

    C13駁二/七賢

    凱旋

    成功路

    海邊

    七賢路臨海

    二路

    中華路

    二聖路

    三多路

    四維

    五福路

    中正路

    中山路

    中華路

    光華路

    中山路

    大義街

    新光路

    復興三路

    正勤路

    瑞隆路

    鎮興路

    時代大道

    R6 瑞田街

    C4中華

    /凱旋

    C11真愛

    碼頭

    C15

    C16

    O1

    機廠

    TSS1

    TSS2

    TSS3

    TSS4

    TSS5

    C14捷運西子灣

    TSS6

    Length 8.7km, 14 stations, 1 depot, 6 TSSs.

    Kaisyuan Rd.→Chenggon Rd.→Sin-GuangRd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.

  • 6

    Project DescriptionProject DescriptionE&M System :Rolling Stock - 100% low floor Car Body,more than 250 passengers for each TramPower Supply – Catenary freeSignaling – Tram in priorityEmbedded track with grass for main line(Not including road junctions and special sections)Land Acquisition: Completed before October 2012Bidding plan :Tender announce: End of June 2012Preparation for tender : At least 40 days based on government procurement laws; However, if contract award date is not approved by Execution Yuan, the bid will be reserved till approval is granted.

  • 77

    1. Bid Type

    It is a Design- Build bid which includes civil work, track-

    work and E&M system.

    The contract is awarded to the most advantageous tender.

    2. Tenders

    Tender alone, or joint venture of four or less.

    Companies from GPA members countries will be allowed.

    3. Project Management Delivery (Client’s duties)Engage with a Project Management Consultant (including

    verification, validation and certification for E&M system) and a

    Construction Supervision Consultant.

    Bid Strategies

  • 88

    Qualifications in general

    A. Tender subject related : (For each member of Joint Venture)

    1. Certificate of Company Registration2. Certificate of Tax Payment Invoice3. Domestic Tenders and their owner shall provide original

    stamp form and waiver.

    B. Capability of contract performance :─Proof of Credit : 1. Certificate of “No dishonored”2. Certificate or supporting documents issued by bank or

    financial institution of “no refund in the last three years”

  • 99

    Qualifications in particular, 1 of 4Qualifications in particular, 1 of 4

    Joint venture tender with considerable experience in: 1. Class A construction company.2. Rolling Stock manufacture company : Having at least one

    completed project in rolling stock manufacture for tram or metro system in the past 15 years

    3. Track-work : Having at least one completed track work project in the past 15 year

    4. E&M Integration : Having at least one completed core E & M system (rolling stock, power supply and signaling system)of the Tram or metro system In the past 15 years

    The leading firm of the tender should have the largest portion of contract value and has to be more than 30% of that Input of any member of the joint venture shall not be less than 10% of the contract value.

  • 1010

    Tender alone:The tender can be submitted by Class A construction company only and its portion can not be less than 50% of contract valueTender’s shortage of particular qualifications can be provided by professional sub-contractors.Those professional sub-contract shall submit a joint statement or an agreement for tender.

    Members of joint venture or professional sub-contractors can not be changed after contract is awarded, unless agreed by the Client.

    Qualifications in particular, 2 of 4Qualifications in particular, 2 of 4

  • 1111

    Considerable experience/track record:(applicable for tender alone or joint venture tender)

    In the past 15 years, the tender has to achieve one of the following conditions :1) Having a single contract with contract value

    not less than 2/5 of the budget of this project.2) Having accumulated contract value not less than the

    budget of this project.

    Qualifications in particular, 3 of 4Qualifications in particular, 3 of 4

  • 1212

    With considerable financial resources :

    1.Single tender has to achieve one of the follows conditions:(1) Paid-up capital is not less than /10 of the budget of the project.(2) Accountants certificate or audit by auditing body of a fiscal year or the most recent annual financial report, and its content fulfill the follows︰A. Net value not less than 1/12 of this budget.B. Current assets not less than current liabilities.C. Total indebtedness not more than four times of the net value.

    But not for the privatization of public enterprises.2.For joint venture tender :Each member’s paid-up capital is not less than 1/3 of those above. orNet value in financial report is not less than 1/3 of those above.And each one should fulfill requirements stated in 1.(2).B and C as above.

    Qualifications in particular, 4 of 4Qualifications in particular, 4 of 4

  • 1313

    Foreign firms’ qualification :Documents should be translated into Chinese and be notarized by Taiwanese government representative office overseas.• Company’s registration certificate:

    Should be issued/validated by Taiwanese government before tender submission•Requirements given by Taiwanese law for certain expertise of professional and technical personnel, except through the mutual recognition, should be complied.•Credit proof:

    Should be provided.•In the country having difficulty in providing documents stated above, please kindly describe the reason and provide equivalent

    qualifications.

    For Foreign companyFor Foreign company

  • 1414 14

    MilestoneMilestone

    NTP+19 months,1st tram test run on main lineNTP+22 months,System E&M substantial completionNTP+24 months,MOTC Test completion,ready for revenue operation

  • 1515 15

    1. No advance payment2. Valuation :

    Civil Work, Track work and Building Service :a. By design stages for design b. By time for constructionc. For Building Service - By Milestone

    E&M System :Milestone are defined by detail design , equipment

    delivery, installation and testing.

    Payment

  • 1616 16

    Evaluation Criteria• Team members and Experiences/Track

    Record• Understanding of Project, Solution and

    Delivery Plan• Design concepts and Construction planning• System characteristics and requirements• Cost quotation and analysis• Other creative and feasible solutions• Presentation and Q&A(Shall be confirmed by the Selection Committee)

  • 1717

    Route, Station, and TSSRoute, Station, and TSSTrack and PlatformTrack and PlatformDepot preliminary layoutDepot preliminary layoutStation design requirementStation design requirementBridge Bridge KMCPMC InterfaceKMCPMC Interface

    Track type and grassTrack type and grass

    Brief of Civil work and TrackBrief of Civil work and Track

  • 1818

    一.顧問團隊與實績二.對本計畫了解與對策三.設計構想與規劃四.工作計畫與執行策略五.結語

    Kaohsiung LRT (Phase I)Kaohsiung LRT (Phase I)

    C1凱旋/一心

    一心路

    C2凱旋/瑞田

    C3中山

    /凱旋C5

    成功/時代大道

    C6成功/正勤

    C7成功/復興

    C8成功/新光

    C9三多/苓南

    C10光榮碼頭

    C12駁二/大義

    C13駁二/七賢

    凱旋

    成功路

    海邊路

    七賢路臨海

    二路

    中華路

    二聖路

    三多路

    四維

    五福路

    中正路

    中山路

    中華路

    光華路

    凱旋路

    中山路

    大義街

    新光路

    復興三路

    正勤路

    瑞隆路

    鎮興路

    時代大道

    R6 瑞田街

    C4中華

    /凱旋

    C11真愛

    碼頭

    C35

    C15

    C36

    C37

    C16

    O1

    機場

    TSS1

    TSS2

    TSS3

    TSS4

    TSS5

    C14捷運西子灣

    TSS6

    The Route , Station and TSSThe Route , Station and TSS

    Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.

  • 1919

    Track and Station (Platform) of Phase ITrack and Station (Platform) of Phase I

    Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.

    Platform type: Station C1-C14 is side platformStation type: Except C11 is a elevated station, rest are surface stations。TSS: TSS1-TSS6, 6 TSS in total。Special track work layout:

    C1 C2 C3 C4 C5 C6 C7 C8

    C9 C10 C11 C12 C13 C14

    TSS1 TSS2

    TSS3 TSS4

    TSS5

    TSS6

  • 2020

    一.顧問團隊與實績二.對本計畫了解與對策三.設計構想與規劃四.工作計畫與執行策略五.結語

    EntranceMain store

    cars

    WORKSHOP

    & OFFICES

    Open workshopsTramway

    lifting

    Inspection pits & roof platforms

    PIT WHEEL LATHE

    & PAINTING BOOTH

    凱旋路

    Base Base area:aboutarea:about 3300033000 ㎡㎡

    Waste collection areaExternal storageTraction Deprot/

    Sub-Station/Engine room

    Daily Inspection/Washing Machine

    Stabling

    STABLING Intervention

    vehiclesPeripheral road

    Kaisyuan Rd.

    RESERVE FOR TRA

    Depot first step layoutDepot first step layout

    Kaisyuan Rd.

    RESERVE FOR TRA

  • 2121

    Standard StationsStandard Stations-- ConcernsConcernsTropical Climate and Urban LandscapeAs a shelter from the rain and sun- shineMaterial durability and corrosion Overall design including stations, pavement and bikeway

  • 2222

    StationStation

    Standard stations : 10Special station :

    C3、C9、C11、C14Delivery of two among four Special station needs well-known international architect to get involved.

  • 2323

    RequirementRequirement-- C14C14Station:

    1. The Side platform uses original TRA station。

    Track:1. It shall keep current TRA track (gauge 1067mm)

    together with light rail track (standard gauge 1435mm), it combines the old and new cultures together.

    2. The old TRA tracks has to be moved and saved during construction stage. After installing new rail, the old TRA track will be put back to new track-bed with the soil and grass,

    3. During detailed design stage, said detailed design has to be sent to culture property committee for review and approval.

  • 2424

    Viaduct & Viaduct & landscape bridgelandscape bridgeViaduct: Between C10 & C12 around 910MHas to concern Kaohsiung Maritime Cultural & Popular Music Center (KMCPC) entrances and exits & road locationViaduct & pier type should consider global metropolitan landscape.

    C5成功/時代大

    C6成功/正勤

    C7成功/復興

    C8成功/新光

    C9三多/苓南

    C10光榮碼頭

    C12駁二/大義

    C13駁二/七賢

    成功路

    海邊路

    七賢路

    中華路

    大義街

    新光路

    C11真愛

    碼頭

    C14捷運西子灣

    Other bridge: between C5 & C6,cross by the 5th ship crossing 5th channel, about 80m.

    Landscape bridge: cross Love River, main span is 115m.

  • 2525

    Landscape bridgeAn old TRA structure ,crossing Love River and completed in 46 years ago , span about 96m, deck width 4m,superstructure is steel U- shape girder, substructure is RC, now is used for a pedestrian bridges.

    海音中心路段

    愛河

    Landscape bridge location

    Remove existing bridge (including superstructure & substructure) , reserves the TRA substructure.New LRT bridge should consider global metropolitan landscape , Consist with KMCPMC pedestrian bridges.

    Consider & set up sound barrier (noise walls), construction safety, noise prevention

  • 2626

    LRT Landscape bridge simulation( 60M + 115M + 60M )

    LRT Landscape bridge simulation (Better idea can be provided in the proposal)

  • 2727

    8M

    2M

    7.2M

    8M

    Embankme

    nt (About 82M)

    Parking lot

    Parking lot

    K.M.C.P.M.C.

    Haibian Rd.

    英雄

    Love River

    View of the sea Building

    viaductAbout 98M

    KMCPMC. Interface (middle section)

  • 2828

    KMCPMC. Interface (west side)

    K.M.C.P.M.C.

    Performance Hall

    Embankment

    (About 82M)

    C11

    海音中心西站

    Clearencemaintain4.6M

    Clearence maintain4.6MPier should not conflict

    with main entrances and exits

    公園路

    Kaohsiung Harbor

    Viaduct about 98M

    Warehouse

    viaduct

    LRT ROUTE

    Clearence maintain3.5M,Pier should not conflict with

    entrances and exits

  • 2929

    Track workTrack work

    Track work1.Standard Gauge 1,435mm, Continuous welding rail2.Horizontal alignment min. Radius 25m.3.The max. gradient 5%.

    Track Layout1.The Embedded track (Grass Track ) at grade section.2.The Depot track was Ballasted track, and the Embedded

    track and maintenance pit at building. 3. The turnout use the Radius 50m (Main line) and

    25m(Depot).4. It uses the Noise and Vibration prevent Track at section

    of C10-C12 for the environmental protection consideration.

  • 30 3030

    Brief of E&M Spec Brief of E&M Spec

    E&M System In General E&M System In General

    Rolling Stock SpecificationRolling Stock Specification

    Power Supply ConfigurationPower Supply Configuration

    Signaling System ConfigurationSignaling System Configuration

    Communications ConfigurationCommunications Configuration

    Automatic Fare Collection FrameworkAutomatic Fare Collection Framework

  • 31 3131

    E&M System PositionE&M System Position

    E&M System includes:

    • Rolling Stock • Communications System• Electrification System• Automatic Fare Collection• Signaling System • Maintenance Facilities• Operation Control Center

  • 32 3232

    Rolling Stock Rolling Stock

    Catenary free100% low floor Car BodyAppearance on Kaohsiung sea image, approved by OwnerDual track, operating at rightManual drive on signal, 1 driver per train

  • 33 3333

    Rolling Stock Specifications Rolling Stock Specifications --11

    系統型式Type

    鋼輪鋼軌,標準軌距Steel wheel-rail, gauge 1,435mm

    載客量Capacity

    座位坐滿+立位5人/m2時載客量 250人Capacity is 250 for full seated and stand in 5 passengers/m²

    車身高度Height

    3.80 公尺以下Less than 3.80m

    軸重Axle load

    小於 13噸Less than 13 tons

    車身材質Material of car body

    金屬Metal

    車身寬度Width

    2.65 公尺2.65 m

    急衝度Jerk 1.3 m/sec

    3 加速度Acceleration 1.3 m/sec

    2

    正常/緊急減速度Normal/Emergency Deceleration

    0.8~1.5 /2.70m/sec2

    車門入口處地板高Floor height at entrance

    350 公厘(距軌道頂面)350 mm(To TOR)

  • 34 3434

    輪椅上下車處Wheelchairs entrance

    兩處Two entrances

    車上驗票機Ticket verify on board

    設於中央握把Located on central column

    門寬Width of door

    雙扇1.3公尺Double leaf, 1.3m單扇0.8公尺Single leaf, 0.8m

    車廂月台高度差Difference in height between cabin door threshold and platform

    ±25 mm

    駕駛室Driving cab

    前後兩端均設Two ends of tram

    車間通道Gangway

    無車間通道門Pass, without door

    動力供應方式Power supply

    電力,無架空線/架空線(機廠)By electricity, dual for catenary free and OCS in depot

    車廂內裝特別需求Special needs of interior

    1.無障礙環境For disable

    2.腳踏車固定架For bike

    推進最大坡度Max. slope 60

    0/00最小轉彎半徑Min. curvature

    25公尺25 m

    Rolling Stock specifications Rolling Stock specifications --22

  • 35 3535

    TRACTION POWER TRACTION POWER SYSTEMSYSTEM

    TSS 6A

    TSS 6B

    TSS1 DTSSTSS2TSS3TSS4TSS5

    DC 750V AC

    380V/220V

    DC 750V

    DC750V AC

    380V/220V

    DC750V AC

    380V/220V

    DC750V

    DC750V AC

    380V/220V

    DC 750V AC

    380V/220V

    DC 750V AC

    380V/220V

    AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV

    • 6 traction substations, including DTSS(TSS1) and TSS2~TSS6

    • TPC AC 22.8kV DualLoop• Any one TSS failure will not affect

    operationDTSS and TSS1 backup each otherTSS6 should be designed backup

    • TSS interior(land limited)Typical TSS:15m(L)*7m(W)*4m(H)DTSS+TSS1:

    17m(L)*10m(W)*4m(H)TSS2: 13m(L)*9m(W)*4m(H)TSS6: 15m(L)*10m(W)*4m(H)

    • TSS2 should rebuild from exist building under elevated road

    • TSS5 should consider half under ground design• Traction Power System Voltage Level

  • 36 3636

    SIGNALLINGSIGNALLING SYSTEM (Configuration)SYSTEM (Configuration)• Modify/Replace road traffic controller

    to perform priority. Bidder should coordinate in design phase.

    • Train detectors provide vehicle locations to controller

    • Controller send road traffic light and LRT signalling to ITS center, but send LRT signalling to OCC only

    • Without ATP,ATS and auto train recognized function

    • Non-motorized switch installed at route crossing, but motorized switch installed at terminal and depot. Interlocking system installed on the wayside

    • Only 1 signalling room located in DTSS

    • OCC can execute depot shunting but not main line

    Depot signallingzone

    Terminal signallingzone

    Terminal signallingzone

  • 37 3737

    Communication SystemCommunication System

  • 38 3838

    Communication System -1• The design and operation of LRT Communication system

    should be based on whole-line. The design must consider the future expandability. The system will cover all regions (trainset, stations, tracks, depot / maintenance workshop / OCC, etc.).

    • Telephone system : OCC should install an electronic digital PBX. Voice transmission by Internet Protocol(the Voice over IP).

    • Passenger Information Display Systems: Stations Dot matrix information display should be provided. OCC edit console select the monitor to insert the real-time and pre-recorded message (such as: delays, commercial advertising, passenger information, emergency messages, train messages and the government propaganda etc.).

  • 39 3939

    Communication System -2• Digital Radio System: use TDMA protocol digital radio

    system (Standard definition by European Telecommunications Standards Institute (ETSI)). Based on IP network technology.

    • Clock System: To provide LRT standard clock signal generated by master clock located in OCC equipment room, transmitted to LRT system clock device through the transmission network .

    • Fiber Optic Communication Transform System : Transmit voice, data, video and control/monitor signal between OCC, workshop, station and ancillary buildings (eg, TSS). Include fiber optic cable and Gigabit (GbE) Ethernet System.

    • CCTV system: Video signals transmitted via a Gigabit (GbE) Ethernet, and provide the IP (Internet Protocol) network camera.

  • 40 4040

    Automatic Fare Collection SystemOperation Company Outside

    Ethernet

    Internet or VPN

    E‐ticketing  Co. A

    Clearing Host

    E‐ticketing  Co. B

    ClearIing Host

    E ‐ticketing  Co. C

    Clearing Host

    E ‐ticketing  Co. D

    Clearing Host

    DPS

    Workstation 

    OR

    Single trip ticket TVM

    Station Validators

    Station Switch Hub

    On‐Board Validators

    Handheld ticket‐checking 

    machine

    Firewall

    Wireless access point

    Ethernet

    ‧ Fare  param eters system

    ‧ Black  lis t m anagem ent  system

    ‧ Data  managem ent system

    ‧ A  system  operation managem ent  system

    ‧ Data  transm iss ion system

    C P S

    Passenger

    Single trip ticket  TVM 

    On‐Board Validator

    Station validator

    Payment method

    By e‐ticketingBy single trip ticket  

    Single trip ticket 

    Get on the tarin

    Get on the tarin

    Get on the tarin

  • THANK YOU FOR YOUR ATTENTION


Recommended