Kaohsiung LRT Project (Phase I)Kaohsiung LRT Project (Phase I)Project Brief Project Brief
Project DescriptionProject Description
Bid Strategies and Qualifications of TenderBid Strategies and Qualifications of Tender
Milestones, Payment and Evaluation CriteriaMilestones, Payment and Evaluation Criteria
ContentContent
Brief of Preliminary Design of Civil & Track Brief of Preliminary Design of Civil & Track WorkWorkBrief of E&M System SpecificationBrief of E&M System Specification
3 33
Policy for Public TransportPolicy for Public Transport-- 6 Transfer Hubs6 Transfer HubsHigh Efficiency Transfer hubs
One Harbour, 2 Stations and 3 Mountains (Shan)
Transfer Hubs 桃源那瑪夏
六龜
岡山站
鳳山站
左營高鐵站
小港站
高雄車站
旗山站岡山
阿蓮 田寮路竹
(高科)
湖內
燕巢
茄萣
永安
彌陀
梓官
內門 杉林甲仙
美濃
林園
大樹
屏東
大發工業區
大寮
橋頭
楠梓 大社
仁武
鳥松
鳳山
左營
鼓山
前鎮
小港
苓雅
三民
塩埕
前金
新興
旗津
3
30minutes for daily life
Shortage the distance, improve the development30 min from HSR Zuoying to Chishan transfer hub
10
Main Center
Service Inter-city
Character Metropolitan
Transfer Kaohsiung Stn. HSR Zuoying
Transportation Tool
TRA、MRT、Highway Express、Bus
HSR、TRA、MRT、Highway Express、Bus
Secondary Center
Service Metropolitan
Character Rural Connection
Transfer 旗山站 鳳山站
岡山站 小港站
Transportation Tool
Highway Express、Bus
TRA、MRT、Highway Express、Bus
4
Project Description
義路
寶獅
五塊厝
一
崗山仔
三多
中
山
順
本館
功
路
二
公
大
一
中 正
路
順
三
路
如
鼎金
(覆鼎金)
林內山
速
路路
四
三
三多
一路
凱
路
鼎
金
平
凱
旋
二一
路
旋
路
凱
一
路二 路
一 路
九
路
天鼎
力
祥一
路
二 權
二
路一
聖
路
旋
三
灣仔內
民
族
一
建
大路
一
和光
華
路
五福
一
路
維二
路
多二
民
權
一
路
路
建
民
族
國
路
路
路
街
中 正
二
路路
路
四
維
三
多
三 民
三莊
三
一
一 路
二
路
一
全 一
一
一
五
福
一 路
青年
路
建
中 正
六 合
七 賢
國
熱
如
十
河
二路
民 生
路
四
山三
路
旋
鴨母寮
凱
一
路
路
瑞隆
山
路
四
山
三
路
心
中
中
獅甲
功
二
路
二
路
二 路
博
愛
盟
一
中
路
街
路
九
四
三
成
多四
中
華
路
路
路
中
維
年青
二
中
華
三
中
正
華
合
二
路
路 山
一
路
一
路
四路
二
路
三
路路
一二
如二
河
全
立
路
路
凹底子
中
華
自
同
苓雅寮
成
功
賢
六
中
二
國
三路
路
河
愛 五 福三
三
路
二
路
九
熱
十
河
民
生
四路
中
華
一
仁五
福四
路
七
建
建鼓
路
仁
愛
洲
前
路
七
賢
三
路
國
四
路
山
烏松
北汕尾
洲
三
路
中
廟
二
山
九
如
三
內惟
內惟
九
如
四
鼓
山
鼓
路
路
狗山
中
C4
C5
C7
C6
C22C25
C32
C31
C29
C28
C27
C23 C26C24
C33
C35
C34
C3
C2
C1
C30
鼓山站
大順站
美術館站
C8C9
C10C11C12
C13C14
C15
C16
C17
C18
C19
C20
C21
第一階段已通車路段
第二階段通車目標
R13
R6
O1
N
內惟站
三塊厝站高雄站 民族站
Whole route length of LRT is about 22.1km, with 36 stations and 1 depot, 1 stabling yard.Phase I: From C1 to C14, about 8.7km, with 14 stations and 1 depot.Budget : About 6.8Billion NTD
(For reference only)Completion Deadline : NTP+24(months)
5
Kaohsiung LRT Kaohsiung LRT (1st Phase)
C1凱旋/一心
一心路
C2凱旋/瑞田
C3中山/凱
旋C5成功/時代大道
C6成功/正勤
C7成功/復興
C8成功/新光
C9三多/苓南
C10光榮碼頭
C12駁二/大義
C13駁二/七賢
凱旋
路
成功路
海邊
路
七賢路臨海
二路
中華路
二聖路
三多路
四維
路
五福路
中正路
中山路
中華路
光華路
中山路
大義街
新光路
復興三路
正勤路
瑞隆路
鎮興路
時代大道
R6 瑞田街
C4中華
/凱旋
C11真愛
碼頭
C15
C16
O1
機廠
TSS1
TSS2
TSS3
TSS4
TSS5
C14捷運西子灣
TSS6
Length 8.7km, 14 stations, 1 depot, 6 TSSs.
Kaisyuan Rd.→Chenggon Rd.→Sin-GuangRd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.
6
Project DescriptionProject DescriptionE&M System :Rolling Stock - 100% low floor Car Body,more than 250 passengers for each TramPower Supply – Catenary freeSignaling – Tram in priorityEmbedded track with grass for main line(Not including road junctions and special sections)Land Acquisition: Completed before October 2012Bidding plan :Tender announce: End of June 2012Preparation for tender : At least 40 days based on government procurement laws; However, if contract award date is not approved by Execution Yuan, the bid will be reserved till approval is granted.
77
1. Bid Type
It is a Design- Build bid which includes civil work, track-
work and E&M system.
The contract is awarded to the most advantageous tender.
2. Tenders
Tender alone, or joint venture of four or less.
Companies from GPA members countries will be allowed.
3. Project Management Delivery (Client’s duties)Engage with a Project Management Consultant (including
verification, validation and certification for E&M system) and a
Construction Supervision Consultant.
Bid Strategies
88
Qualifications in general
A. Tender subject related : (For each member of Joint Venture)
1. Certificate of Company Registration2. Certificate of Tax Payment Invoice3. Domestic Tenders and their owner shall provide original
stamp form and waiver.
B. Capability of contract performance :─Proof of Credit : 1. Certificate of “No dishonored”2. Certificate or supporting documents issued by bank or
financial institution of “no refund in the last three years”
99
Qualifications in particular, 1 of 4Qualifications in particular, 1 of 4
Joint venture tender with considerable experience in: 1. Class A construction company.2. Rolling Stock manufacture company : Having at least one
completed project in rolling stock manufacture for tram or metro system in the past 15 years
3. Track-work : Having at least one completed track work project in the past 15 year
4. E&M Integration : Having at least one completed core E & M system (rolling stock, power supply and signaling system)of the Tram or metro system In the past 15 years
The leading firm of the tender should have the largest portion of contract value and has to be more than 30% of that Input of any member of the joint venture shall not be less than 10% of the contract value.
1010
Tender alone:The tender can be submitted by Class A construction company only and its portion can not be less than 50% of contract valueTender’s shortage of particular qualifications can be provided by professional sub-contractors.Those professional sub-contract shall submit a joint statement or an agreement for tender.
Members of joint venture or professional sub-contractors can not be changed after contract is awarded, unless agreed by the Client.
Qualifications in particular, 2 of 4Qualifications in particular, 2 of 4
1111
Considerable experience/track record:(applicable for tender alone or joint venture tender)
In the past 15 years, the tender has to achieve one of the following conditions :1) Having a single contract with contract value
not less than 2/5 of the budget of this project.2) Having accumulated contract value not less than the
budget of this project.
Qualifications in particular, 3 of 4Qualifications in particular, 3 of 4
1212
With considerable financial resources :
1.Single tender has to achieve one of the follows conditions:(1) Paid-up capital is not less than /10 of the budget of the project.(2) Accountants certificate or audit by auditing body of a fiscal year or the most recent annual financial report, and its content fulfill the follows︰A. Net value not less than 1/12 of this budget.B. Current assets not less than current liabilities.C. Total indebtedness not more than four times of the net value.
But not for the privatization of public enterprises.2.For joint venture tender :Each member’s paid-up capital is not less than 1/3 of those above. orNet value in financial report is not less than 1/3 of those above.And each one should fulfill requirements stated in 1.(2).B and C as above.
Qualifications in particular, 4 of 4Qualifications in particular, 4 of 4
1313
Foreign firms’ qualification :Documents should be translated into Chinese and be notarized by Taiwanese government representative office overseas.• Company’s registration certificate:
Should be issued/validated by Taiwanese government before tender submission•Requirements given by Taiwanese law for certain expertise of professional and technical personnel, except through the mutual recognition, should be complied.•Credit proof:
Should be provided.•In the country having difficulty in providing documents stated above, please kindly describe the reason and provide equivalent
qualifications.
For Foreign companyFor Foreign company
1414 14
MilestoneMilestone
NTP+19 months,1st tram test run on main lineNTP+22 months,System E&M substantial completionNTP+24 months,MOTC Test completion,ready for revenue operation
1515 15
1. No advance payment2. Valuation :
Civil Work, Track work and Building Service :a. By design stages for design b. By time for constructionc. For Building Service - By Milestone
E&M System :Milestone are defined by detail design , equipment
delivery, installation and testing.
Payment
1616 16
Evaluation Criteria• Team members and Experiences/Track
Record• Understanding of Project, Solution and
Delivery Plan• Design concepts and Construction planning• System characteristics and requirements• Cost quotation and analysis• Other creative and feasible solutions• Presentation and Q&A(Shall be confirmed by the Selection Committee)
1717
Route, Station, and TSSRoute, Station, and TSSTrack and PlatformTrack and PlatformDepot preliminary layoutDepot preliminary layoutStation design requirementStation design requirementBridge Bridge KMCPMC InterfaceKMCPMC Interface
Track type and grassTrack type and grass
Brief of Civil work and TrackBrief of Civil work and Track
1818
一.顧問團隊與實績二.對本計畫了解與對策三.設計構想與規劃四.工作計畫與執行策略五.結語
Kaohsiung LRT (Phase I)Kaohsiung LRT (Phase I)
C1凱旋/一心
一心路
C2凱旋/瑞田
C3中山
/凱旋C5
成功/時代大道
C6成功/正勤
C7成功/復興
C8成功/新光
C9三多/苓南
C10光榮碼頭
C12駁二/大義
C13駁二/七賢
凱旋
路
成功路
海邊路
七賢路臨海
二路
中華路
二聖路
三多路
四維
路
五福路
中正路
中山路
中華路
光華路
凱旋路
中山路
大義街
新光路
復興三路
正勤路
瑞隆路
鎮興路
時代大道
R6 瑞田街
C4中華
/凱旋
C11真愛
碼頭
C35
C15
C36
C37
C16
O1
機場
TSS1
TSS2
TSS3
TSS4
TSS5
C14捷運西子灣
TSS6
The Route , Station and TSSThe Route , Station and TSS
Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.
1919
Track and Station (Platform) of Phase ITrack and Station (Platform) of Phase I
Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd.→Linhaixin Rd.
Platform type: Station C1-C14 is side platformStation type: Except C11 is a elevated station, rest are surface stations。TSS: TSS1-TSS6, 6 TSS in total。Special track work layout:
C1 C2 C3 C4 C5 C6 C7 C8
C9 C10 C11 C12 C13 C14
TSS1 TSS2
TSS3 TSS4
TSS5
TSS6
2020
一.顧問團隊與實績二.對本計畫了解與對策三.設計構想與規劃四.工作計畫與執行策略五.結語
EntranceMain store
cars
WORKSHOP
& OFFICES
Open workshopsTramway
lifting
Inspection pits & roof platforms
PIT WHEEL LATHE
& PAINTING BOOTH
凱旋路
Base Base area:aboutarea:about 3300033000 ㎡㎡
Waste collection areaExternal storageTraction Deprot/
Sub-Station/Engine room
Daily Inspection/Washing Machine
Stabling
STABLING Intervention
vehiclesPeripheral road
Kaisyuan Rd.
RESERVE FOR TRA
Depot first step layoutDepot first step layout
Kaisyuan Rd.
RESERVE FOR TRA
2121
Standard StationsStandard Stations-- ConcernsConcernsTropical Climate and Urban LandscapeAs a shelter from the rain and sun- shineMaterial durability and corrosion Overall design including stations, pavement and bikeway
2222
StationStation
Standard stations : 10Special station :
C3、C9、C11、C14Delivery of two among four Special station needs well-known international architect to get involved.
2323
RequirementRequirement-- C14C14Station:
1. The Side platform uses original TRA station。
Track:1. It shall keep current TRA track (gauge 1067mm)
together with light rail track (standard gauge 1435mm), it combines the old and new cultures together.
2. The old TRA tracks has to be moved and saved during construction stage. After installing new rail, the old TRA track will be put back to new track-bed with the soil and grass,
3. During detailed design stage, said detailed design has to be sent to culture property committee for review and approval.
2424
Viaduct & Viaduct & landscape bridgelandscape bridgeViaduct: Between C10 & C12 around 910MHas to concern Kaohsiung Maritime Cultural & Popular Music Center (KMCPC) entrances and exits & road locationViaduct & pier type should consider global metropolitan landscape.
C5成功/時代大
道
C6成功/正勤
C7成功/復興
C8成功/新光
C9三多/苓南
C10光榮碼頭
C12駁二/大義
C13駁二/七賢
成功路
海邊路
七賢路
中華路
大義街
新光路
C11真愛
碼頭
C14捷運西子灣
Other bridge: between C5 & C6,cross by the 5th ship crossing 5th channel, about 80m.
Landscape bridge: cross Love River, main span is 115m.
2525
Landscape bridgeAn old TRA structure ,crossing Love River and completed in 46 years ago , span about 96m, deck width 4m,superstructure is steel U- shape girder, substructure is RC, now is used for a pedestrian bridges.
海音中心路段
愛河
Landscape bridge location
Remove existing bridge (including superstructure & substructure) , reserves the TRA substructure.New LRT bridge should consider global metropolitan landscape , Consist with KMCPMC pedestrian bridges.
Consider & set up sound barrier (noise walls), construction safety, noise prevention
2626
LRT Landscape bridge simulation( 60M + 115M + 60M )
LRT Landscape bridge simulation (Better idea can be provided in the proposal)
2727
8M
2M
7.2M
8M
Embankme
nt (About 82M)
Parking lot
Parking lot
K.M.C.P.M.C.
Haibian Rd.
英雄
路
Love River
View of the sea Building
viaductAbout 98M
KMCPMC. Interface (middle section)
2828
KMCPMC. Interface (west side)
K.M.C.P.M.C.
Performance Hall
Embankment
(About 82M)
C11
海音中心西站
Clearencemaintain4.6M
Clearence maintain4.6MPier should not conflict
with main entrances and exits
公園路
Kaohsiung Harbor
Viaduct about 98M
Warehouse
viaduct
LRT ROUTE
Clearence maintain3.5M,Pier should not conflict with
entrances and exits
2929
Track workTrack work
Track work1.Standard Gauge 1,435mm, Continuous welding rail2.Horizontal alignment min. Radius 25m.3.The max. gradient 5%.
Track Layout1.The Embedded track (Grass Track ) at grade section.2.The Depot track was Ballasted track, and the Embedded
track and maintenance pit at building. 3. The turnout use the Radius 50m (Main line) and
25m(Depot).4. It uses the Noise and Vibration prevent Track at section
of C10-C12 for the environmental protection consideration.
30 3030
Brief of E&M Spec Brief of E&M Spec
E&M System In General E&M System In General
Rolling Stock SpecificationRolling Stock Specification
Power Supply ConfigurationPower Supply Configuration
Signaling System ConfigurationSignaling System Configuration
Communications ConfigurationCommunications Configuration
Automatic Fare Collection FrameworkAutomatic Fare Collection Framework
31 3131
E&M System PositionE&M System Position
E&M System includes:
• Rolling Stock • Communications System• Electrification System• Automatic Fare Collection• Signaling System • Maintenance Facilities• Operation Control Center
32 3232
Rolling Stock Rolling Stock
Catenary free100% low floor Car BodyAppearance on Kaohsiung sea image, approved by OwnerDual track, operating at rightManual drive on signal, 1 driver per train
33 3333
Rolling Stock Specifications Rolling Stock Specifications --11
系統型式Type
鋼輪鋼軌,標準軌距Steel wheel-rail, gauge 1,435mm
載客量Capacity
座位坐滿+立位5人/m2時載客量 250人Capacity is 250 for full seated and stand in 5 passengers/m²
車身高度Height
3.80 公尺以下Less than 3.80m
軸重Axle load
小於 13噸Less than 13 tons
車身材質Material of car body
金屬Metal
車身寬度Width
2.65 公尺2.65 m
急衝度Jerk 1.3 m/sec
3 加速度Acceleration 1.3 m/sec
2
正常/緊急減速度Normal/Emergency Deceleration
0.8~1.5 /2.70m/sec2
車門入口處地板高Floor height at entrance
350 公厘(距軌道頂面)350 mm(To TOR)
34 3434
輪椅上下車處Wheelchairs entrance
兩處Two entrances
車上驗票機Ticket verify on board
設於中央握把Located on central column
門寬Width of door
雙扇1.3公尺Double leaf, 1.3m單扇0.8公尺Single leaf, 0.8m
車廂月台高度差Difference in height between cabin door threshold and platform
±25 mm
駕駛室Driving cab
前後兩端均設Two ends of tram
車間通道Gangway
無車間通道門Pass, without door
動力供應方式Power supply
電力,無架空線/架空線(機廠)By electricity, dual for catenary free and OCS in depot
車廂內裝特別需求Special needs of interior
1.無障礙環境For disable
2.腳踏車固定架For bike
推進最大坡度Max. slope 60
0/00最小轉彎半徑Min. curvature
25公尺25 m
Rolling Stock specifications Rolling Stock specifications --22
35 3535
TRACTION POWER TRACTION POWER SYSTEMSYSTEM
TSS 6A
TSS 6B
TSS1 DTSSTSS2TSS3TSS4TSS5
DC 750V AC
380V/220V
DC 750V
DC750V AC
380V/220V
DC750V AC
380V/220V
DC750V
DC750V AC
380V/220V
DC 750V AC
380V/220V
DC 750V AC
380V/220V
AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV AC 22.8kV
• 6 traction substations, including DTSS(TSS1) and TSS2~TSS6
• TPC AC 22.8kV DualLoop• Any one TSS failure will not affect
operationDTSS and TSS1 backup each otherTSS6 should be designed backup
• TSS interior(land limited)Typical TSS:15m(L)*7m(W)*4m(H)DTSS+TSS1:
17m(L)*10m(W)*4m(H)TSS2: 13m(L)*9m(W)*4m(H)TSS6: 15m(L)*10m(W)*4m(H)
• TSS2 should rebuild from exist building under elevated road
• TSS5 should consider half under ground design• Traction Power System Voltage Level
36 3636
SIGNALLINGSIGNALLING SYSTEM (Configuration)SYSTEM (Configuration)• Modify/Replace road traffic controller
to perform priority. Bidder should coordinate in design phase.
• Train detectors provide vehicle locations to controller
• Controller send road traffic light and LRT signalling to ITS center, but send LRT signalling to OCC only
• Without ATP,ATS and auto train recognized function
• Non-motorized switch installed at route crossing, but motorized switch installed at terminal and depot. Interlocking system installed on the wayside
• Only 1 signalling room located in DTSS
• OCC can execute depot shunting but not main line
Depot signallingzone
Terminal signallingzone
Terminal signallingzone
37 3737
Communication SystemCommunication System
38 3838
Communication System -1• The design and operation of LRT Communication system
should be based on whole-line. The design must consider the future expandability. The system will cover all regions (trainset, stations, tracks, depot / maintenance workshop / OCC, etc.).
• Telephone system : OCC should install an electronic digital PBX. Voice transmission by Internet Protocol(the Voice over IP).
• Passenger Information Display Systems: Stations Dot matrix information display should be provided. OCC edit console select the monitor to insert the real-time and pre-recorded message (such as: delays, commercial advertising, passenger information, emergency messages, train messages and the government propaganda etc.).
39 3939
Communication System -2• Digital Radio System: use TDMA protocol digital radio
system (Standard definition by European Telecommunications Standards Institute (ETSI)). Based on IP network technology.
• Clock System: To provide LRT standard clock signal generated by master clock located in OCC equipment room, transmitted to LRT system clock device through the transmission network .
• Fiber Optic Communication Transform System : Transmit voice, data, video and control/monitor signal between OCC, workshop, station and ancillary buildings (eg, TSS). Include fiber optic cable and Gigabit (GbE) Ethernet System.
• CCTV system: Video signals transmitted via a Gigabit (GbE) Ethernet, and provide the IP (Internet Protocol) network camera.
40 4040
Automatic Fare Collection SystemOperation Company Outside
Ethernet
Internet or VPN
E‐ticketing Co. A
Clearing Host
E‐ticketing Co. B
ClearIing Host
E ‐ticketing Co. C
Clearing Host
E ‐ticketing Co. D
Clearing Host
DPS
Workstation
OR
Single trip ticket TVM
Station Validators
Station Switch Hub
On‐Board Validators
Handheld ticket‐checking
machine
Firewall
Wireless access point
Ethernet
‧ Fare param eters system
‧ Black lis t m anagem ent system
‧ Data managem ent system
‧ A system operation managem ent system
‧ Data transm iss ion system
C P S
Passenger
Single trip ticket TVM
On‐Board Validator
Station validator
Payment method
By e‐ticketingBy single trip ticket
Single trip ticket
Get on the tarin
Get on the tarin
Get on the tarin