Salient Designs Plastics: Kawasaki Mule 3000/3010 - 4000/4010 Top
Installation Instructions: SD601
Installation Instructions: SD647
Place the hard top onto the Mule roll cage with the 2
overhead light indents facing the front of the vehicle.
Using the 4 metal “U” Clamps align each clamp with
the pre-punched holes in the top and attach each
clamp around the roll bar using the supplied hard-ware. The approximate time to accomplish this in-
stallation is about 15 minuets.
Optional Dome Light Kit Instructions (SD647): 1) Locate the 2 dimples in the center of the top
(these are on the interior of the top!) Drill these
2 holes using a 1/4” drill bit.
2) Once drilled place the dome light pod at the drilled location and bolt the pod to the top with
the wires facing rearward of the top.
3) Once secured route the wires across the top to
the rear cross section roll bar and route the wires
towards the drivers side of the roll cage, route
these wires down the bar to the under seat area
of the vehicle near the battery.
4) Locate the vinyl round boot that has the 4 male/
female bullet connectors, these are typically to
the left of the battery location strapped to the
main vertical wire harness.
5) Once located plug the dome light harness red male into 1 of the female receptacles and repeat
with the black wire to the female receptacle.
6) Test the dome light, it should only operate while
the ignition key is in the on/run position!
Salien
t Desig
ns P
lastics
888-477-0011 or 8
17-477-0011
roger@
salien
t-desig
ns.co
m sa
les@salien
t-desig
ns.co
m Roger H
ughes C
ell 214-957-3099
www.sa
lient-d
esigns.co
m
Salient Designs Plastics
888-477-0011 or 817-477-0011
roger@
salien
t-designs.com sales@
salient-designs.com Roger Hughes Cell 214-957-3099
www.salient-designs.com
Mule Top after it is installed correctly.
Location of the rubber boot that has the Ignition and ground
bullet connectors.
Bullet connectors wire colors are Blue Brown Black &
Black.