2
Client: ExxonMobil Development Company (EMDC) Entity: KBR, Granherne Location: Offshore Nigeria - 160km southeast of Lagos, Nigeria Scope: FPSO Design Management Status: Completed 2001 Details: • Erha is a new-build spread-moored FPSO with a barge-shaped hull. It has a displacement of approximately 345,000 tonnes and 2.2 million barrels of storage capacity. • Dimensions - Length: 285 meters Beam: 63 meters Depth: 32 meters • The FPSO topside facilities are designed to process 230,000 bpd of oil, 60,000 bpd water, 480,000 mmscfd gas, and 450,000 bpd water injection. • Water injection is the primary reservoir pressure support to meet the 25 year design life of the development. • Processed crude is initially stored in the FPSO storage tanks and transferred utilizing Offloading Lines (OLL) to a Single Point Mooring (SPM) offloading buoy, which is moored approximately 2km from the FPSO. • KBR participated in the ExxonMobil-led integrated team that executed the following: Provided FPSO Design Development project management, interface management, cost estimating supporot, and long lead equipment support Erha FPSO Offshore Nigeria - 160km southeast of Lagos, Nigeria Continued on next page
Transcript

Client: ExxonMobil Development Company (EMDC)

Entity: KBR, Granherne

Location: Offshore Nigeria - 160km southeast of Lagos, Nigeria

Scope: FPSO Design Management

Status: Completed 2001

Details:• Erha is a new-build spread-moored FPSO with a barge-shaped hull. It has a displacement

of approximately 345,000 tonnes and 2.2 million barrels of storage capacity.

• Dimensions -

– Length: 285 meters

– Beam: 63 meters

– Depth: 32 meters

• The FPSO topside facilities are designed to process 230,000 bpd of oil, 60,000 bpd water, 480,000 mmscfd gas, and 450,000 bpd water injection.

• Water injection is the primary reservoir pressure support to meet the 25 year design life of the development.

• Processed crude is initially stored in the FPSO storage tanks and transferred utilizing Offloading Lines (OLL) to a Single Point Mooring (SPM) offloading buoy, which is moored approximately 2km from the FPSO.

• KBR participated in the ExxonMobil-led integrated team that executed the following:

– Provided FPSO Design Development project management, interface management, cost estimating supporot, and long lead equipment support

Erha FPSO

Offshore Nigeria - 160km southeast of Lagos, Nigeria

Continued on next page

Client: ExxonMobil Development Company (EMDC)

Entity: KBR, Granherne

Location: Offshore Nigeria - 160km southeast of Lagos, Nigeria

Scope: FPSO Design Management

Status: Completed 2001

– Leveraged available reference design deliverables to accelerate the schedule and reduce cost, while ensuring the maximum HSE integrity

– Defined and advanced the Technical design of the FPSO topsides, hull and moorings

– Developed technical input in support of the well desfined EPCIH ITT package

– Defined and developed technical input for the DBM including functional requirements

– Developed PDMS Model containing equipment and pipe routing (6” and larger)

– Engaged and integrated Nigeria’s National Engineering and Technical Company (NETCO) into the team for progression of design, performance studies, technology transfer, and on-the-job training

– Investigated and participated in the development of base level Nigerian Content

– Conducted FPSO HAZOP with considerable participation from Nigerian Representatives and Shell

Highlights•67,405 engineering man-hours were executed

•Peak manpower: 153