+ All Categories

kCHF

Date post: 02-Jan-2016
Category:
Upload: imani-stevens
View: 14 times
Download: 0 times
Share this document with a friend
Description:
CAST FRC 27.02.09. kCHF. axion physics. CAST FRC-D 2008-28. Status of Contributions, Draft Budget Request for 2009 and Outlook for the Longer Term Future. Martyn Davenport 27 th February 2009. Outline. Status of Common Fund T297400 Closure of Addendum No 2 (2005 to 2007) - PowerPoint PPT Presentation
Popular Tags:
31
kCHF axion physi cs CAST FRC 27.02.09
Transcript
Page 1: kCHF

kCHF

axion physics

CAST FRC 27.02.09

Page 2: kCHF

Status of Contributions, Draft Budget Request for 2009 and Outlook for the Longer

Term Future 

 Martyn Davenport

27th February 2009

CAST FRC-D 2008-28

Page 3: kCHF

Outline

• Status of Common Fund T297400 Closure of Addendum No 2 (2005 to 2007) Addendum No 3 to CAST MOU (2008 to 2010) Status of contributions to Addendum No3 for 2008 Magnet operation 2008 The status of the CAST Common Fund end 2008

• Draft Budget Request 2008 Addendum No3

• Overall Financial Situation and Future Outlook Overall Financial Situation Future Outlook

Page 4: kCHF

CAST MOU

Phase II of CAST

• 4He running 2005-2006 and building of 3He gas system 2007

Addendum No2• Category A Common items (cash + in-kind) Budget 1485 kCHF

• Category A Common items (cash + in-kind) Contributions 1402 kCHF

• Category B (Detector M&O + Investment) Contributions 782 kCHF Ended Dec 2007, final contributions came in May 2008.

• Closure details in this report

• 3He running 2008-2010

Addendum No3 • Released for signature in July 2008

• Category A Common items (cash + in-kind) Budget 1387 kCHF

• Category B (Detector M&O + Investment) Budget 1292 kCHF FRC 2008 report

• Report on the end of first year of the 3He run

Page 5: kCHF

Closure of Addendum No 2 (2005-2007)

Including contributions arriving in 2008

[kCHF]

Balance (already including 10kCHF for 2008 from MPS)

4.1

Spending Commitments31.3

Effective balance - 27.2

Outstanding contributions from Addendum No2 77.6

Table 1: Status of CAST Common fund end of 2007

Institute[kCHF]

Total [kCHF]

Greek Delegation 36.3 36.3

U Patras 11.0 + 15.0(special) 26.0

U Dogus 10.0 10.0

AU Thessaloniki 2.9 (special) 2.9

Total 75.2

Table 2: Details of payments closing the outstanding contributions from Addendum No2

The effective carry forward from Add. No2 to Add. No 3 48.0 kCHF (note: value in Add No3 document was approx at 27k)

-27.2 + 75.2 =48.0 kCHF

Page 6: kCHF

Summary of Addendum No2

Table A5: Summary of Category A contributions and Category B expenditure

(2005+2006), 2007 and final contributions in 1H2008

Page 7: kCHF

Addendum No 3 (2008 – 2010)

• Add. No 3 (CAST FRC-D 2007-25) Covering 3He running Completed in July 2008 and sent out for signature. CAST Thanks to D Jacobs

• For his huge help, patience and rigour during its long gestation Category A budget 2008-2010

• Total 1387 kCHF (98k less than budget Add No2)

• Inherent deficit in Add. No3 (at end 2010) 171.8 kCHF

• This deficit is reduced by carry over of 48k from Add No2 to 123.8k Spending and income profiles

2008 2009 2010 Total

General M&O 361 354 330 1045

Investments in Common Items 157 126 59 342

Total 518 480 389 1387

Expected income 421.41 404.4 389.4 1215.2

Projected annual balance -96.6 -75.6 0.4 -171.8

Projected balance including 48kCHF carry-over from Add. No2

-48.6 -75.6 0.4 -123.8

[1] The number of 428.4k in Addendum No3 has been reduced by 7k since the MPS commitment was already paid in 2007.

Page 8: kCHF

InstituteTeam leader

(CAST contact)Physicists

Minimum annual

contribution assuming 5k/PhD[kCHF]

CERN M. Davenport 4 20

IRFU-Saclay, France I. Giomataris 4 20

UP, UTH, NCSR, NTUA, Greece K. Zioutas 8 40

UC, USA J. Collar 1 5

TUD,MPE,UFRA, M. Kuster 4 20

MPP, Germany G. Raffelt 2 10

UD, Turkey S. Cetin 3 15

INR, Russia S. Gninenko 1 5

LLNL, USA M. Pivovaroff 3 15

UBC, Canada M. Hasinoff 1 5

RBI, Croatia M. Krcmar 3 15

UZ, Spain J. Morales 6 30

UT, Italy G. Cantatore 3 15

MPS, Germany S. Solanki 1 5

TOTAL  44 220

Table A7: Institutes: manpower and team leader

Page 9: kCHF

Status of contributions to Add No3 for 2008

CashType I

In-kindType II

TotalCommitted1

Type I and IIOutstanding from 2008

[kCHF] [kCHF] [kCHF] [kCHF] [kCHF]Carry over from Add. No2 to Add. No3

48 (not incl. in the total)

CERN 20 62 82 87 5

IRFU-Saclay, 32.7   32.7 342

Greek Delegation UP, UTH, NCSR, NTUA, Greece

100 [GD]26.2 [UP]

6.72 [UTH]1.50 [UTH] 2.82 [NCSR] 137.24

100 [GD]30 [UP]

12 [UTH]3.8 [UP]

3.78 [UTH]

UC,   0TU-Darmstadt, UFRA,MPE, Germany 9.53 19.2 28.7 32 3.3MPP, 20 8.13 28.13 10U Dogus, Turkey 15   15 15INR, 0 5 5 5LLNL, 0 0 0 30 30UBC, 0 3.2 3.2 5 1.8RBI, 15 0  15 15UZ, 27.3 5 32.3 30UT, 6.63 8.5 15.13 16.5 1.37MPS, 04 0  0 04

UFREI 8.67 8.67 0TOTAL 287.725 115.35 403.07 (96%) 421.5 49.05 (12%)

As listed in Add No 3 Annex 7 except for MPS (7kCHF), where 0k has been inserted due to early payment in 2007[2] commitment was for 20k euros, exchange rate variations result in differences when expressed in CHF[3] Includes contribution also for 2009[4] 10kCHF paid by MPS for 2008 in 2007 financial year, [5] An additional 2.35kCHF was received into T297400 in 2008 as a reimbursement

Expect at least 34k to arrive in 2009Not bad! But 104k of it arrived only in December

Page 10: kCHF

Category B Contributions 2008

InstituteX-ray detector or

sub-system

X-ray detector M&O

[k euros]

TOTAL[ kCHF]

1.6 CHF/euro

IRFU-Saclay, France Micromegas 25.0 40.0

UZ, Spain New Sunset MM 43.1 69.0

MPE/(WHI) /TUD/ , Germany

CCD-Telescope GRID measurements and alignment of telescope

11.0 (MPE)22.4 (TUD)

17.6 (MPE)35.8 (TUD)

TOTAL  101.5 162.4

InstituteX-ray detector or

sub-system

X-ray detector M&O

[k euros]

X-ray detector M&O

[kCHF]

TOTAL[ kCHF]

1.6 CHF/euro

IRFU-Saclay, France Micromegas new detectors

25.0 40.0

UZ, Spain New Sunset MM 17.3 27.7

NCSR, GreeceMicromegas new detectors

5.5 5.5

MPE/(WHI) /TUD/ , Germany

Electronics for new CCD camera

70.0 (MPE) 112.0

TOTAL  112.3 5.5 185.2

M&O

Developments & Investment

Page 11: kCHF

Summary of Contributions 2008

Category

2008 [kCHF]

Fraction Fraction

Category A (I) 287.7 0.380.53

Category A (II) 115.4 0.15

Category B (a) 162.4 0.220.47

Category B (b) 185.2 0.25

Total 750.7 1.00

Table 7: Summary of Category A contributions and Category B expenditure for Addendum no 3 (1.1.2008 to 31.12.2008)

The total contributions to Addendum No3

for the year 2008 to CAST Category A and B amount to 750.7 kCHF

Page 12: kCHF

Magnet operation 2008

Actual costs Add No3 Estimates

ItemCAST/Dept

Units 2007 2008 2009 2008 2009 2010

Cryogenics M&O (incl gases) AT (kCHF) 180 180 180 180 180

Cryogenics power TS (hours) 2976 7000 5400 6720 5500 6720

(kCHF) 82 193 185 152 185

Magnet Power Supply TS (hours) 450 3527 5000 3700 5000

(kCHF) 3 25 36 26 36

PS Field Support AB (kCHF) 5 5 5

CAST (kCHF) 5 5 358 401

Annual Total CERN (kCHF) 270 398 401 759 1160

Integrated Total Add No 3

[1] Calculated assuming 55 CHF/MWhr

The magnet operating costs were as estimated in the Addendum No3.

Page 13: kCHF

CAST Common Fund status end 2008

The total contributions to the CAST Common Fund in the 2008 were:

Balance end 2007 4.13Contributions to complete Add. No 2 75.2Contributions towards Add. No 3 287.72Reimbursement 2.35

Total 369.4 kCHF

The total expenditures in 2008 by CAST 264.5 kCHF Common Fund(Add. No2 commitments plus Add. No3)

The balance at the end of 2008 was 104.9 kCHF (plus 8.6kCHF commit.)The available funds for new spending in 2009 96.3 kCHF

Addendum No 3 ONLYExtracting the spending for Category A for Add. No3 2008 budget items only and adding ‘In kind’ contrib.:

Spending from Common Fund 233.2 kCHF (264.5-31.3)Spending ‘In Kind’ 115.4 kCHF

Total 348.6 kCHF

Compare with projected Add. No 3 spending for 2008 518 kCHF

Total Income 2&3

Total Spent 2&3

Page 14: kCHF

CAST Common Fund status end 2008• The spending in 2008 on Add No 3 was well below the

original spending plan (518 - 348.6) = 169.4 kCHF

• Income for Add. No 3 was 403.1 kCHF compared with expected from Add. No3 of 428.4 kCHF

• Expected balance Add. No 3 spending• Add. No3 expected a deficit at end of 2008 of:

– 428.4+29-518 = -60.6 kCHF

• Adjusted Add No3 expectation and real carry over– 421.8+48-518 = - 48.2 kCHF

• 2008 actual contributions (cash and in kind) updated numbers– 403.1+2.35+48-518 = -64.6 kCHF

• Real situation 403.1+2.35+48-348.6 = 104.9 kCHF (with 8.6k outstanding commitments )

• The low spending in 2008 is the reason for the positive balance of 104.9 kCHF Balance of CF low/negative - tight constraints

• Items down-sized and or staged Late design, specification and orders

• Order at start of 2009 104.9 CHF instead of an expected deficit from the Add. No3 of = - 64.6 kCHF.

• Money not really saved - spending peak now shifted from 2008 to 2009

Page 15: kCHF

Draft Budget request 2009

• Budget based on following program

1H2009 Shutdown and commissioning and alignment• Repair 3He leaks• Improve instrumentation inside cryostat

– New temp. probes for cold windows

• Upgrade 3He metering system• Upgrade general and detector vacuum systems• Maintenance of magnet movement system

2H2009 Data taking• 160 calendar days

• Budget re-evaluated

Include staged items Enhanced upgrade to vacuum system and 3He system More subsistence to support experiment in period of manpower shortages

Page 16: kCHF

Summary CAST SHUTDOWN SCHEDULE

Page 17: kCHF

Summary of budget request

M&O 2009 [kCHF]Industrial Support and Subsistence 190Running Costs 211Common Investments 101Vacuum Upgrade 833He upgrade 37Contract with ABB1 15

Total 637

[1] It should be noted that a major item at the 2007 FRC and in the completion of Add No3 was the proposed upgrade (100 kCHF) to the cryogenics PLC (> 20 years old and unsupported at CERN from 2Q2009).

A relatively low-cost compromise was eventually found thanks to AT-CRG which entailed creating a rapid intervention service contract with ABB.

• 2008 Spending down by 169.4kCHF c.f. Add. No3 estimate

• Spending 2009 increased by 157kCHF to Draft Request of 637 kCHF

Page 18: kCHF

Draft Budget – detailed (part1)

Page 19: kCHF

Draft Budget – detailed (part 2)

Page 20: kCHF

Budget estimates for Add. no3

Page 21: kCHF

Comparison of Add. No3 and 2009 budget

Page 22: kCHF

Overall Financial situation

• Draft budget request 2009 637 kCHF

• Income Balance 1.1.2009 96.3 kCHF (104.9-8.6) Missing receipts 2008 34.0 kCHF (Out of max. 49k) Promised contributions 404.4 kCHF (Add. No3)

• Total contributions 537.4 kCHF

• Projected balance end 2009 -102.3 kCHF Note, no contingency included on an eventual overspend for 130kCHF project

• Could it be more –ve ? Typically 10% funds arrive late, final receipts (say) 95% of promised Will assume promised contrib. down by 7.5% (30.3k)

• In order to get a more adequate and manageable budget to work with in the key year 2009

• Resultant balance -132.6kCHF The Add. No3 has had an embedded 125k deficit from the outset – no change The year 2010 has no projected imbalance (income-expenditure)

• New funding 130 kCHF is taken as the target new funds to aim for to find in 2009

Page 23: kCHF

Spending profiles

• Overall expenditures are not significantly changed between Add. No3 estimates and latest projections

• Peak spending shifted to 2009

Page 24: kCHF

Filling the budget hole ~ 130kCHF

• Increase per capita contribution from Institutes ? All Institutes requested to pay their promised Add. No3 contributions by early April 2009 Plus the 3kCHF/PhD extra need to fill hole

• Most Institutes have already agreed funding arrangement up to end 2010. No change possible

• All Institutes asked to provide information by May 2009 of extra contributions

• All Institutes asked to advance also 2010 contributions where possible

• Special contributions from Funding Agencies? CAST spokesman has made a request to the Greek Delegation

• Extraordinary contribution of 50k€

• Aim to fill up to least half way

• CAST Collaboration meeting May 2009 Cryostat closed, all systems pumping down. Main intervention completed. Status of requests for increased contributions from Funding Agencies

• Probably no final decision yet? List of additional contributions from Institutes Status of spending on upgrades Good, but not final indication of what will be required

Page 25: kCHF

Filling the budget hole ~ 130kCHF

• What if all indicators in summer 2009 point to sizeable deficit in 2010 ? Need help and understanding from FI Dept to keep running with –ve balance

• Reducing costs Need to start cost cutting in mid-2009 & for all 2010 Personnally - Highly preferable to the alternative...............

• Curtailing run Needs a very careful study to evaluate cost effectiveness Absolutely last resort

• Probably not very cost effective Financial savings not commensurate with loss of physics data ?

• 2010 – Max . 220 calendar days available for physics

• Curtail 3 months early (quick estimate – will save 50-60 kCHF running costs)– Lose 84 calendar days ~ 40% of run

– Lose ~ 15 mbar @ 1.8K (step size 1.3Dp)

Page 26: kCHF

Future Outlook Completion of Add. No3 physics program

• 2009 shutdown upgrades should provide a sound foundation for next 1.5 years running Operating at highest densities in cold bore - ‘Unknown territory’ Enable us to operate with no heating on X-ray windows

• Without excessive ‘condensation’ on the windows 3He upgrade will allow us to manipulate gas from cold bore to storage and back again without

4-5 day extra overheats each time

• Present projections for attainable coverage to end of 2010 ? Present step size 1.2 Dp (Dp is original planned step size from 2006 typically 0.1mbar @1.8K))

• 100 mbar @ 1.8K possible ma = 1.054 eV

Increase step size to 1.3Dp • 106 mbar @ 1.8K possible ma = 1.085 eV

Increase step size to 1.53 Dp• 120 mbar @1.8K possible ( CAST Phase II target) ma = 1.155 eV

• Before data taking restarts .. Comprehensive re-evaluation of physics aims and running program

• Maximum discovery potential vs maximum mass coverage ?

• First one then the other (with lower sensitivity pressure ramping)?

• Optimised program will be presented to SPSC in June.

Page 27: kCHF

a) Step = 1 P (usual 1 step)

b) Step = 1.2 P

c) Step = 1.3 P

Page 28: kCHF

Future outlook - Manpower• Manpower to take operate CAST 2009-2010 ?

3He data taking is complex• Pressure step in middle of solar tracking

• Fill up metering volume ready for next shift - for next pressure step

• Periodic bake-out of windows, recovery from quenches, precision refilling of cold bore– NEED EXPERIENCED PERSONNEL AND CONTINUITY

– 3He , Vacuum, Slow Control , Magnet Movement

CAST team – personnel issue serious• Lost some of our accustomed support from PH

– via Fellows and Associates in last year (1FTE?)

• Senior – Not available for extended visits to CERN

• Post Doc / Applied Fellow– Nearing end of tenures

– Highly experienced and skilled - ‘irreplaceable’

– Must keep close to CAST until near end of 2010/find them positions/ find & train replacements

• PhD students– Generation of excellent students now graduating

– Bedrock of CAST operation

– Some new PhD positions left unfilled.

Funds increased in budget to support CAST members.• Likely to be needed also in 2010 – not yet included

• Need maximum possible support from CERN via Fellows and Associates

Page 29: kCHF

Future outlook - Preparation for beyond Add. No 3

• Study groups formed in CAST to look into future developments for CAST

• Preparation of submissions to May 2009 Workshop “New opportunities”

• Personal view: 2009-2010

• Preparations underway in 2009 shutdown to facilitate parasitic running low energy photon detectors during X-ray data taking.

– Ready when a low-background detector is available

• Prototype tests of a Paraphoton experiment by attaching test vessel to CAST support girder – Funding applied for

– Manpower external to CAST X-ray operation

2011- 2012 a possibility....• Return to low pressure/vacuum running with ultra-low background X-ray detectors

– Lower the sensitivity limit of CAST in this region significantly

• Parallel running with ultra-low background low energy detectors

• Parallel running with a full scale Paraphoton detection vessel

• CAST collaboration feels it important and relevant to Continue its central role in linking together other teams in the field To welcome new collaborators and ideas To build on the considerable accumulated knowledge and expertise in the team To maintain fruitful contacts with CERN-based technical experts who support us

Continue to exploit the unique experimental instrument that is CAST

Page 30: kCHF

kCHF

axion physics

CAST FRC 27.02.09

Page 31: kCHF

Recommended