Kellogg-3 rd Street Bridge Transportation Committee Meeting 11/30/2020
Transcript
Page 1: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Kellogg-3rd Street BridgeTransportation Committee Meeting

11/30/2020

Page 2: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Kellogg-3rd Street Bridge

Owner: City of Saint Paul Department of Public Works

Project Manager: Brent Christensen, Public Works Bridge [email protected]

Project Engineer/ Jamison Beisswenger, SRF ConsultingDesign Consultant:

Page 3: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Project Background

1983 2014 2020

MnDOT constructs existing bridge (Hwy 5)

City acquires bridge by MnDOT turnback, inspects & maintains(longest locally-owned bridge)

City plans rehabilitation project to address cracking issues.

SRF performs structural analysis & finds critical deficiencies. City removes all traffic loads from bridge cantilevers.

City requests external funding & begins design w/ local funds

State assigns $52M to reconstruction; $7M Federal grant

also anticipated

Page 4: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Anticipated Schedule

Input Survey Completed Summer 2020Preliminary Layout Reviews OngoingVirtual Public Event January 2021Public Art Incorporation February 202160% Plans June 202190% Plans September 2021Final Plans December 2021Bidding Spring 2022Construction Summer 2022 – Fall 2024 (estimate)

Page 6: Kellogg-3rd Street Bridge - Saint Paul, Minnesota
Page 7: Kellogg-3rd Street Bridge - Saint Paul, Minnesota
Page 8: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Input Survey (April – July 2020)

Page 9: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Input Survey (April – July 2020)

Intersection Safety Importance

Very Somewhat Neutral Not

Page 10: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Q3 Do you have any question/comment/concern? (Open-Ended Responses)

“Probably don't need bike-pedestrian trails on both sides. Better to have 1 side for bikes, 1 for pedestrians.”

“Keep John Street to Kellogg connection.”

“Speed limit needs to be monitored more. Many vehicles go 40-50 mph while on bridge.”

“Complement new US-52 bridge.”

“Please make sure the four lanes remain...even if you add pedestrian and bicycle lanes. Cars first!”

“Protected Bicycle lanes are critical.”

“We've been getting by with three traffic lanes for quite some time with zero issues…”

(not inclusive of all responses)

Input Survey (April – July 2020)

Page 11: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Bikeway Connection

12-foot ped/bike bridge sidewalk; off-street path continues west to connect to existing facilities.

Page 12: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Gold Line BRT Coordination

Page 13: Kellogg-3rd Street Bridge - Saint Paul, Minnesota
Page 14: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Wakan Tipi @ Bruce Vento

Page 15: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Wakan Tipi @ Bruce Vento

Page 16: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

BNSF/UPRR/RCRRA Railways

Page 17: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Lafayette Intersection Improvements

New Signalized Intersection & 5-lane Road Section (all geometry under review)

Page 18: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Union Depot Lot B Intersection

Signal Relocation to Lafayette (under review)

Ped Refuge Median (under review)

Page 19: Kellogg-3rd Street Bridge - Saint Paul, Minnesota

Road section varies between Broadway & Lafayette in accordance with available Right-of-Way

Page 20: Kellogg-3rd Street Bridge - Saint Paul, Minnesota
Page 21: Kellogg-3rd Street Bridge - Saint Paul, Minnesota
Page 22: Kellogg-3rd Street Bridge - Saint Paul, Minnesota