3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Transcript
Page 1: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

Page 2: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

Current State • Two stand alone facilities -

without renewal, the existing facilities would not last for the next generation.

Proposed Actions

• KTHR, the MOH and the Kelvington and area steering committee agree to pursue a project to add the hospital and primary health care clinic to the existing LTC, with renovations to LTC

• Project is approved for a Lean 3P process for March 2013

Page 3: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

Project Metric

• $15M Project Budget

Future State

• Pursue “right size” integrated services to include Acute Care, ER/outpatient, Lab and Diagnostics, Support Services, Primary Health Care Clinic

• Create efficiencies to find savings to reinvest into significant LTC renovations.

• Together with patients, providers and community, design a patient-centred facility that will provide the flexibility to meet the needs of Kelvington and area residents into the future.

Page 4: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

better health• Family Focus

• Long Term Care Connection

• Health and Wellness Education

• Patients & Families at the Centre of the Process

Page 5: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

better teamsDesign:

• facilitates communication

• improves flows

• breaks down professional barriers

• improves patient care

Page 6: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

better care• Design focuses on the

real physical needs for the spaces

• Design will allow providers to spend more time with patients

• Integration of services and providers will improve the care for the Patients and Residents

Page 7: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

7 Ways

better health• Long Term Care

Connection

better teams• Integrated Team with LTC

Page 8: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

7 Ways – Option 3

better health• Long Term Care

Connection

better teams• Integrated Team with LTC

Page 9: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better health

better teams

better care

Page 10: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better health• Health Education and

Wellness

• Family Focus

Page 11: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better teams• Facilitates

communication

• Breaks down professional barriers

Page 12: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better teams• Improves Flows

• Improves Patient Care

• Release Time to Care

Page 13: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better care• Design focuses on the real

physical needs for the spaces

Page 14: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

3P Event Week

better care• Design will allow

providers to spend more time with patients

• Integration of services and providers will improve the care for the Patients and Residents

Page 15: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

30/60 Day Work

7Flows / 7Wastes

• Trace all 7 Flows• Patients• Family• Clinicians• Medication• Supplies• Equipment• Information

• Evaluate the Waste• Edit the Design

Page 16: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

30/60 Day Work

7Flows / 7Wastes

• Evaluate the Waste• Edit the Design

Page 17: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

30/60 Day Work

7Flows / 7Wastes

• 30/60/90 Day work included the design of 3P Sub-teams in a 2 day event focussed on the 7 Flow/7Wastes.

• This event design, developed by our team has become the standard work for our 30/60/90 Day work.

Page 18: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

Results

better value• Primary Care Clinic

rooms 40% larger than typical for Collaborative Primary Care

• Staff flows greatly reduced.

• The 12hr Nurse shift reduced travel distance by 18%, and the 8 hour nurse reduced travel by 55% for a savings of over 4700 steps in daily

Page 19: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

Results

better value• Construction budget for

addition from $12.5M to $9.1M

• Capital dollars freed for desperately needed renovations to the existing LTC facility

Page 20: Kelvington Integrated Health Facility Addition and Removal

3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY

better health

better teams

better care

better value