No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained herein was prepared for information to the German Parliamentarians visiting Kenya 26 February 2015, Kenya CONFIDENTIAL Albert Mugo, MD & CEO, KenGen Disclaimer: Kenya’s Geothermal Journey
Transcript
Page 1: Kenya's Geothermal Journey

No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained herein was prepared for information to the German Parliamentarians visiting Kenya

26 February 2015, Kenya

CONFIDENTIAL

Albert Mugo, MD & CEO, KenGen

Disclaimer:

Kenya’s Geothermal Journey

Page 2: Kenya's Geothermal Journey

1

OUTLINE:

Discussion3

Kenya’s Geothermal Journey2

Preamble – Geothermal Potential in Africa and Kenya1

Page 3: Kenya's Geothermal Journey

2Source: TMO; Internet Sources; Argeo

>20,000MW potential

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Kenya> 10,000MW

Ethiopia>5,000MW

Rwanda>700MW

Tanzania > 650MW

Uganda > 450MW

DRC - ?

Comoros - ?

Zambia - ?

Malawi - ?

Mozambique - ?

Djibouti - ?

Eritrea - ?

Burundi - ?

Sudan - ?

1

Kenya

Huge Geothermal Potential in Africa but very little has been tapped…

Page 4: Kenya's Geothermal Journey

3

Kenya’s Geothermal Potential 10 GW in over 23 sites…

Source: TMO; Internet Sources; Argeo

• Suswa,• Longonot,• Olkaria,• Eburru, • Menengai,• Arus-Bogoria,• Lake Baringo,• Korosi,• Paka,• Lake Magadi,• Badlands,• Silali,• Emuruangogolak,• Namarunu• Barrier• Mwananyamala• Homa Hills• Nyambene Ridges• Chyulu Hills

> 10,000MW in over 23 sites

1

Olkaria Block(1,200MW)(i)Developing 350MW(ii) Drilling for 560MW (the first 324MWe commissioned)

Menengai Block (1,600MW)

(Drilling Ongoing)90MWe tender awarded to private developers

Private developers already licensed at Olkaria, Akiira and Longonot fields

Page 5: Kenya's Geothermal Journey

4

OUTLINE:

Discussion3

Kenya’s Geothermal Journey2

Preamble – Geothermal Potential in Africa and Kenya1

Page 6: Kenya's Geothermal Journey

5Source: TMO; BDS Division

1956-59 1967-70 1971-76 1976-85 1986-98

• Two Exploratory wells drilled to a depth of ~950m

• GoK & UNDP entered into an agreement to extensively undertake geothermal resource assessment

1999-2006

This decision was the turning point in Geothermal Development in Kenya …

• Six wells were drilled with positive results.

• Decision was taken to concentrate Geothermal Development at Olkaria area (~80km2).

• Drilling was accelerated and about 23 wells drilled

• 45 MW (Olkaria I) commissioned between 1981-1985

• Most financing was from World Bank

• Drilling continued in Olkaria II Steam field ~ 30 wells drilled by 1992

• From 1992, financiers pulled out and no major works undertaken until 1999

• Exploratory/ Discovery wells drilled in 1999 in Olkaria IV field

• Production drilling & commissioningOlkaria II 70MW in 2003

• Thro’ GoKfunding, appraisal drilling started in 2006

• Concession given to Orpower 4 in Olkaria III field in 1998

GEOTHERMAL: DEVELOPMENT IN KENYA TO-DATE3

Page 7: Kenya's Geothermal Journey

6

2007 - date

• Production drilling started in Olkaria I&IV (about 57 wells drilled with over ~ 370MW capped)

• Olkaria I & IV 280MW - 2014

• Olkaria II 3rd Unit 35MW commissioned

• Over ~US$1,065m committed by development partners over the years in Olkaria

About US$ 1,065 million have been committed by DFIs in Olkaria Field

Current total Geothermal Capacity for Kenya is ~

579MW

Source: SBP; BD Division

GEOTHERMAL: DEVELOPMENT IN KENYA TO-DATE (Cont.)23

Olk. I 45MW

[1981-85]

Olk. II 70MW [2003]

Olk. I 3rd Unit (35MW) [2010]

Olk. I&IV (280MW)

[2014] TotalIDA (US$ 'm) 118 108 29 120 375EIB (US$ 'm) 8.8 39 50 108 205.8KfW (US$ 'm) 11 12 - 99 122CDC(£ 'm) 15.5 - - - 15.5AfD (US$ 'm) - - 28 118 146JICA (US$ 'm) - - - 201 201

Page 8: Kenya's Geothermal Journey

7

Milestones

1985

Olkaria I - 45MW

KENYA GEOTHERMAL: MILESTONES OVER THE YEARS

2003

Olkaria II – 70MW

2009

Orpower II – 36MW

2

Orpower I –13MW

1998

2010

Olkaria II unit 3 – 35MWOserian – 2MW

2013

Commencement of Olkaria I&IV 280MW WellHeads75MW

2012

Pilot Wellhead – 5MWOrpower III – 61MW

2011

Eburru – 2.5MW

2014

Olkaria I & IV – 280MWWellheads – 40MW

Page 9: Kenya's Geothermal Journey

8Source: TMO; http://en.wikipedia.org/wiki/Geothermal_electricity

KENYA’S POSITION IN THE GEOTHERMAL DEVELOPMENT GLOBALLY

011813152728425697104163204208

579664895901980

1,333

1,894

3,389

537

Aus

tralia

Eth

iopi

a

Thai

land

Aus

tria

Ger

man

y

Fran

ce

Chi

na

Por

tuga

l

Gua

tem

ala

Pap

ua N

ew G

uine

a

Rus

sia

Nic

arag

ua

Turk

ey

El S

alva

dor

Cos

ta R

ica

Japa

n

Ken

ya

Icel

and

New

Zea

land

Italy

Mex

ico

Indo

nesi

a

Phi

lippi

nes

USA

• World Geothermal Installed Capacity ~ 12,239MWe

Kenya is 9th with ~ 579MWe (4.7%)

3

Page 10: Kenya's Geothermal Journey

9Source: KenGen

KENYA’S GEOTHERMAL JOURNEY FROM 1956 to DATE

240

220

172162

144

128114

106103

101100999694918779

6759

504641363127242115119743

2012

2011

2010

1994

1993

1992

1991

1990

1988

1988

1987

1986

1985

1984

1983

1982

1981

2013

2009

2008

2007

1999

1998

1997

1996

+126%

1980

1979

1978

1975

1974

1973

1956

2014

Little activity for ~15yrs. No funding for geothermal.

3

4

Page 11: Kenya's Geothermal Journey

10

GOVERNMENT DRILLING COMMITMENTS OVER THE YEARS

Source:KenGen, TMO

380

200

1,278

33

200

160

4580

170

Total20132010

10

2012201120082004 2005 2006 2014

US$ ‘m

GoK has committed over US$ 1.2bln to mitigate

drilling risk

3

Page 12: Kenya's Geothermal Journey

11Source: KenGen;

955

17,615

InterestDuring

Construction

Admin-stration

685

Consul-tancy

500

Substation&

Transmission

585

PowerPlant

6,600

SteamField

2,810

Drilling

5,480

Total

US$ million

Approximately US$ 18billion required to

develop the projected 5GW of

geothermal by 2030

ESTIMATED INVESTMENT IN GEOTHERMAL BY 2030

Page 13: Kenya's Geothermal Journey