CONCERNING THE COMPANY
Introduction ..........................................................................................................................................................7
Structure .................................................................................................................................................................8
Fields of activities..............................................................................................................................................9
Quality ................................................................................................................................................................... 10
Our customers ..................................................................................................................................................11
Partners .................................................................................................................................................................12
Training of Specialists .................................................................................................................................. 13
DESIGNING AND SUPPORT OF CONSTRUCTION
Preliminary design study ............................................................................................................................ 17
Field of activities ............................................................................................................................................. 18
Leading projects ............................................................................................................................................. 20
INDUSTRIAL AUTOMATION
Field of activities ............................................................................................................................................. 25
Standard solutions ......................................................................................................................................... 26
Leading projects in the field of industrial automation ..............................................................36
ELECTRICAL ENGINEERINGCompetences of electrical direction ................................................................................................... 41
Leading projects in the electrical direction ..................................................................................... 42
ENERGOTECHNOLOGICAL AUDITEnergotechnological audit ........................................................................................................................49
Leading projects ............................................................................................................................................58
Experience of international projects ..................................................................................................59
PRODUCTION
Production capacities ..................................................................................................................................63
REFERENCE LIST 71
CERTIFICATES AND PERMITS 83
TABLE OF CONTENTS
Engineering that creates advantages6
Management Company KER-Holding
ENGINEERING SECTION
KER-Engineering
KER-AvtomatikaKER-Naladka
TatNIPIenergopromEngineering Centre Energoprogress
KERKER-Montazh
Laying pipelines and oil pipelinesKER MEZAPMK-23
CONSTRUCTION AND INSTALLATION SECTION
Branch off icein Turkmenistan
Branch off ice in the Hashemite Kingdom of Jordan
Branch off icein Moscow
Branch off ice in Republicof Kazakhstan
Electrical Plant EnergoInvest Sarajevo (Republic of Srpska, Bosnia
and Herzegovina).
www.ker-eng.com 7
CO
NC
ER
NIN
G T
HE
CO
MPA
NY
Let me bring to your attention a group of
companies KER-Engineering that is capable
of solving engineering problems of diff erent
complexity. The main profi le of the company
is integrated engineering services in power
and production sectors.
KER-Engineering is more than1000 qualifi ed experts.
KER-Engineering is more than700 implemented projects.
Advantages of cooperation with us are:
Experience and reputation: The Com-
pany’s potential is based on specialists who
have more than 25-30 years of work experi-
ence in the engineering fi eld.
Currently, we have completed more than
one hundred major projects, most are at
strategic sites: Combined Heat and Power
Plants (CHPs), State District Power Plants
(SDPPs), Hydraulic Power Plants (HPPs), etc.
Quality of our work: Services performed
with a high degree of professionalism, timely
and quality service, effi ciency - all this is a
business card of KER-Engineering.
Companies from Russia, the USA, Germa-
ny, France, China, the Ukraine, and Belarus
are among our partners.
Developments of our company has re-
ceived recognition from the customers not
only in Russia, but also in countries near and
far abroad.
Our integrated solutions:
Group of companies KER-Engineering
provides a wide range of engineering solu-
tions - from design and survey works to ser-
vice maintenance. We off er more than 100
kinds of services, a number of projects is
carried out on a turnkey basis.
Find detailed information on our compe-
tences in the sections of this catalogue and
at our web-site.
Director General of KER-Engineering
Valery Arapov.
DEAR COLLEAGUES!
INTRODUCTION
Management CompanyKER-Holding LLC
www.ker-holding.ru
KER-Engineering LLC
www.ker-eng.com
We are always open to all forms of cooperation and will seriously consider your individual needs!
Engineering that creates advantages8
STRUCTURE
KER-Engineering is a group of companies that
specialize in providing integrated services in the
fi eld of engineering.
KER-Engineering is a part of Management
Company KER-Holding (www.ker.ru) that per-
forms the full cycle of project management (EPC/
EPCM-contractor) and implements integrated
solutions in construction and maintenance of
industrial facilities with installation of high-tech-
nology equipment in the power sector, petro-
chemical and oil refi ning, metallurgy, machinery
building, oil and gas industry in Russia, CIS and
abroad.
TatNIPIenergoprom Branch performs design
and survey works and engineering support ser-
vices for construction.
KER-Avtomatika Branch is automation of tech-
nological processes and production, electrical engi-
neering, production of equipment.
Engineering Centre Energoprogress Branch is
integrated engineering support and maintenance of
heating and electrical equipment for TPP.
KER-Naladka Branch is commissioning works
and operational tests of power equipment and ex-
amination of technical devices.
KER-Engineering Group is based on the follow-
ing principles:
Unifi ed technical policy;
Flexible project management system;
Maximum independence of the branch-
es.
Electrical Plant EnergoInvest (Bosnia and Herze-
govina)
INTEGRATED ENGINEERING SERVICES
KER-Engineering top management
TatNIPIenergoprom Branch
Integrated designing in
in power and production
sectors
Industrial automation.
Rehabilitation of electrical
equipment
Technical audit. Tests and
diagnostics of equipment.
Industry examination.
Commissioning.
Performance adjustment.
KER-Avtomatika BranchEngineering Centre
Energoprogress BranchKER-Naladka Branch
Electrical Plant EnergoInvest (Bosnia and
Herzegovina)
www.ker-eng.com 9
CO
NC
ER
NIN
G T
HE
CO
MPA
NY
FIELDS OF ACTIVITIES
Preliminary design survey in power and
production sectors
Examination (technical condition assess-
ment) of a facility including examination of
industrial safety of technical equipment,
buildings and facilities, examination of mod-
ernization and redesign projects. Develop-
ment of investment programs, development
of technological, environmental, economic
and fi nancial documentation for implemen-
tation of projects for industrial modernization
and rehabilitation.
Integrated designing
Development of projects (thermal power
plants, combined heat and power plants,
boiler houses, heating networks, and power
supply of industrial enterprises, agricultural
facilities, public buildings and facilities) as
well as development of heat and power sup-
ply schemes for industrial facilities, cities and
towns.
Construction support
Preparation and processing of initial data
for designing and rehabilitation of facilities,
technical support of the project phase (su-
pervise of development of design and esti-
mate documentation, its coordination with
customers and in regulatory authorities), ar-
rangement of technical supervision.
Integrated industrial automation
Full range of services for development and
implementation of automated process con-
trol systems (DCS): site survey, development
of project documentation and engineering
solutions, installation, commissioning, service
maintenance.
Rehabilitation of electrical equipment
Rehabilitation and construction of 6 - 220
kV class substations; rehabilitation of electri-
cal equipment at generating stations, repair
of 0.4 - 220 kV class power electrical equip-
ment, designing and implementation of DCS
for electrical equipment, power supply DCS
(remote control, automated measuring and
information system for electric power fi scal
accounting).
Integrated energotechnological audit of
enterprises
A range of services that allow to estimate
eff ectiveness of industrial processes, con-
sumption and transfer of heat and power en-
ergy as well as develop measures to enhance
effi ciency of power equipment and related
processes.
Electrical engineering
A range of services in the electrical area:
rehabilitation and construction of 6 - 500 kV
class substations; rehabilitation of electri-
cal equipment at generating stations, repair
of 0.4 - 550 kV class power electrical equip-
ment, DCS for electrical equipment at substa-
tions, diagnostics and technical inspection of
electrical equipment.
Production of equipment
Production of software and hardware
packages, control cabinets, frequency trans-
formers, soft starters, complete pumping sta-
tions, sensors, valves, etc.
Engineering that creates advantages10
QUALITY
Qualitative performance of works is the leading
principle of KER-Engineering, a formula of the com-
pany’s competitiveness in the domestic and foreign
markets.
One of the main priorities is creating a team of
highly qualifi ed specialists.
The Company’s backbone is made up of special-
ists who came from KazEnergoNaladka Company
(Kazakhstan) and the Volga branch of VNIPIenergo-
prom OJSC. Experience of these specialists in the
fi eld of engineering is 20-25 years, many experts are
Doctors of Science.
Quality policy key provisions:
Operation in the quality control system
The Company’s quality management system has
been certifi ed for compliance with ISO 9001:2008.
Quality management system was preceded by the
considerable preparatory work. A set of standards
was created defi ning common rules of works, crite-
ria for measuring the quality of works at all stages of
production were developed, provisions on divisions
were completely revised.
Commitment to international quality standards
Our Company pays great attention to develop-
ment and improvement of quality of services. The
Company has a number of licenses and certifi cates
for implementation of engineering services.
Individual approach to customer
We off er integrated solutions that meet the cus-
tomer’s needs, fully tailored to a particular facility.
Modern, effi cient technologies and materials
KER-Engineering constantly monitors the mar-
ket for new technologies, actively implements the
most eff ective of them in its activities, is engaged in
its own developments.
Involvement of staff
Every employee of the Company, from the
worker to the Director General, is responsible for
the quality of their work. KER-Engineering pursue
a policy which aim is provoke interest of each em-
ployee in the results of their work as well as sum-
mon creative abilities of employees.
Advanced training
KER-Engineering attaches great importance to
training and professional development of its em-
ployees including training abroad.
www.ker-eng.com 11
CO
NC
ER
NIN
G T
HE
CO
MPA
NY
OUR CUSTOMERS
KER-Engineering has an extensive experi-ence in development and implementation of engineering projects in Russia as well as in CIS and foreign countries: Kazakhstan, Belarus, the Ukraine, Pakistan. Quality of works is con-fi rmed by the positive reviews of customers.
Russia Research and Production Enterprise Bio-
techprogress CJSC; The Defense Ministry of the Russian Fed-
eration; Bashkirenergo OJSC; VNIPINEFT OJSC; Kazancompressormash OJSC; KAMAZ OJSC; Mosenergo OJSC; Nizhnekamskshina OJSC; Wholesale Generating Company-1 OJSC; Wholesale Generating Company-2 OJSC; Wholesale Generating Company-3 OJSC; Wholesale Generating Company-4 OJSC; OZNA OJSC; RusGidro OJSC; Territorial Generating Company-1 OJSC; Territorial Generating Company-4 OJSC; Territorial Generating Company-5 OJSC; Territorial Generating Company-6 OJSC; Territorial Generating Company-11 OJSC; Territorial Generating Company-16 OJSC; Generating Company OJSC; Bashkir Generating Company LLC; Yenisei Territorial Generating Company
OJSC (Territorial Generating Company-13); Fortum OJSC; Orenburg Territorial Gener-
ating Company OJSC; Grid Company OJSC; FEZ Alabuga.
CIS and foreign countries Ekibastuz SDPP-1 LLP (Kazakhstan); Ekibastuz SDPP-1 (Kazakhstan); Eurasian Energy Corporation JSC, Aksu TPP (Kazakhstan); MAEK-Kazatomprom LLP, CHPs-1, 2, 3
(Kazakhstan, Aktau); Republican unitary enterprise Grodno-
energo, Lida CHP (Belarus); Vostokenergo LLC, Kurakhovo TPP (the
Ukraine); Najibia TPP (Iraque); Metallurgical Plant Pakstil (Pakistan); Fria CHP (Guinea); CHP at the Oil
Refi nery Plant (Republic of Yemen); United Power Company JSC (Kazakhstan); AlES JSC (Kazakhstan); AES Ust-Kamenogorsk CHP JSC (Ka-
zakhstan).
Oil and Gas Industry Oil Company Rosneft OJSC; Lukoil
OJSC; Mid-Volga Transnefteprodukt OJSC; Novosibirskneftegaz OJSC (TNK-VP); Nizhnekamsktekhuglerod OJSC. Kazanorgsintez OJSC; Nizhnekamskneftekhim OJSC; TAIF-NK OJSC; TANEKO OJSC; Tatneft OJSC;
Housing and public utility sector Moscow United Energy Company OJSC; Chelnyvodokanal CJSC; Municipal Unitary Enterprise Yelabuga-
Vodocanal; Naberezhnye Chelny Heat Distribution
Company OJSC; Kazan Heat Distribution Company OJSC; Almetyevsk heating networks OJSC.
Machine-building industry Sollers; Kazan Helicopter Plant OJSC; Central automobile repair factories.
Metallurgy Novolipetsk Metallurgical Combine OJSC; Metallurgical plant (Myanma-Burma Un-
ion)
Food processing industry; Tatspirtprom OJSC; Zainsk sugar OJSC; Chelny-Broiler LLC.
Engineering that creates advantages12
PARTNERS
In the fi eld of design and con-
struction supervision:
Ural-TEP Design and Engineering Center
CJSC (Ekaterinburg);
OPTEN Limited CJSC (Moscow);
Teploelectroproekt Institute (Nizhny
Novgorod);
Belarusian Foreign Energy Project Com-
pany;
Biotechprogress Research and Production
Enterprise (St. Petersburg);
Teploelectroproject (Lviv, Ukraine) LLC;
Zarubezhenergoproekt LLC (Ivanovo);
Energostroyoptik OJSC (Moscow);
Kazan Electroproject LLC (Kazan);
Scientifi c Production Association for Re-
search and Design of Power Equipment named
after Polzunov OJSC (St. Petersburg);
Krasny Kotelshchik OJSC (Taganrog);
Podolsk boiler plant CJSC;
Azimut Scientifi c and Production Centre LLC
(Kazan);
KamTISIZ OJSC (Naberezhnye Chelny);
BelNIPIenergoprom Republican Unitary
Enterprise (Minsk);
In the fi eld of industrial automation:
Global manufacturers
Siemens
Emerson
Metso
Yokogawa
Danfoss
Schneider Electric
ABB
t Domestic manufacturers.
Krug Research and Production Company
Volmag CJSC
Vibrobit Scientifi c Production Association
Biotechprogress Research and Production
Enterprise CJSC;
EKRA Research and Production Enterprise
SOUTH-SYSTEM plus OJSC
ARGO Research and Development Centre
VZLYOT CJSC
ITV
In the fi eld of reconstruction of electrical
equipment:
Siemens;
EKRA Research and Production Enterprise
ABB;
Schneider Electric.
In the fi eld of energy process audit:
MP Diagnost CJSC (Moscow);
Pergam Company CJSC (Moscow);
Priborostroitel Plant CJSC (St. Petersburg);
Vector Scientifi c and Production Company
CJSC (Moscow);
ELNAP LLC (Moscow);
DIAKS LLC (Moscow);
Electrical Systems LLC (St. Petersburg) and
others.
Engineering companies (EPM, EPC-Contractors)
Management Company KER-Holding LLC
INVENT LLC
Е4-Sibkotes OJSC
Sealtek CJSC
Ural Power Engineering Centre OJSC
Design organizations
VNIPIenergoprom Association OJSC
VNIPIneft OJSC
TatNIPIenergoprom LLC
VNIIR OJSC
All-Russian Research Institute of Metrology
named after D.I.Mendeleyev FSUE
www.ker-eng.com 13
CO
NC
ER
NIN
G T
HE
CO
MPA
NY
TRAINING OF SPECIALISTS
Advanced training
Employees are trained in training cent-
ers of Siemens, Emerson. There is a training
center on the basis of KER-Engineering that
specializes in staff development. We have
experience of training specialists from Arabic
countries.
The Company provides training and certifi -
cation of specialists in several areas:
Setting up automatic regulation systems
of thermal power processes;
Process protections and interlocks;
The principle and structure of TPP and oth-
ers.
Cooperation with higher education institutions
Interaction with higher education institu-
tions for target staff training is allocated to one
of the strategic directions of KER-Engineering.
The basic engineering staff of the Company
consists of graduates of leading Russian uni-
versities:
Moscow Power Engineering Institute (Tech-
nical Institute),
Kazan State Power Engineering University,
Kazan State Technical University named af-
ter A. N.Tupolev,
Kazan State Technological University,
Tomsk Polytechnic University,
Ivanovo Power Engineering University.
Our main partners are:Kazan State Power Engineering University
Annually, students of this University under-
take an internship at the enterprises KER-Av-
tomatika, Engineering Centre Energoprogress,
TatNIPIenergoprom. Upon completion of the
practice, most part of students remain in the
Company and successfully perform engineer-
ing tasks. The contract of target preparation of
specialists was signed with Kazan State Power
Engineering University.
KER-Avtomatika Company takes an ac-
tive part in technical equipping of training and
laboratory facilities of Process and Produc-
tion Automation Department of the Kazan
State Power Engineering University. 3 modern
specialized training facility for settings of au-
tomatic control systems for boiler supply and
superheated steam were presented for the
Department. A specialized laboratory was ar-
ranged there. It is planned to arrange a com-
bined training centre.
Kazan State Technical University named af-
ter A. N.Tupolev
Interconnection of KER-Engineering
Company and Kazan State Technical Univer-
sity named after A. N.Tupolev for target prep-
aration of specialists is implemented in the
framework of the contract signed between
KER-Holding and Kazan State Technical Uni-
versity named after A. N.Tupolev. Students
directed from KER-Engineering enterprises,
along with the traditional training courses,
receive education on additional targeted
training programs according to the activities
of their enterprises. The work on the com-
bined development of modern computer de-
sign technologies started.
Kazan State Academy of Architecture and
Construction
The Academy students undertake an an-
nual internship in the subdivisions of KER-
Engineering. After graduation a number of
graduates fi nd employment in the company.
www.ker-eng.com 17
DE
SIG
NIN
G A
ND
SU
PP
OR
T O
F C
ON
ST
RU
CT
ION
Implementation of General Designer func-tions.
Development and support of investment projects on production reconstruction and
upgradingPreliminary design survey — facility tech-
nical and economic audit which helps to esti-mate effi ciency of processes for the purpose of optimization and improving of energy re-source use effi ciency, reliability of equipment and technical installations.
Following the audit completion, the cus-tomers are off ered with:
plans of low-cost measures such as: ad-justment and optimization of equipment op-erational modes, implementation of optimal technologies and engineering solutions;
investment projects on upgrading the main process and power equipment;
feasibility study of investment programs; calculation and assignment of residual
operation life; consulting activities on support of invest-
ment projects; business plan, development of process,
environmental, economic and fi nancial docu-mentation for the project.
Support services for investment projects — consulting and supervision activities:
preparation of contract documentation; bid arrangement; evaluation of proposals and drawing up
recommendations for their implementation; contractor selection and contracting for
the project; inspection of the project implementation,
quality management; management of equipment supply and
installation; acceptance testing, technical conclusion -
the facility acceptance act; commissioning and performance adjust-
ment work; facility personnel training; development of
operational documentation; development of process maps; provision of conditions for occupational
safety and health.
Designing Preparation and approval of the design
assignment with collection of initial data need-ed;
Integrated design of a new construction facility, expansion and rehabilitation of power
facilities, power supply facilities of enterprises,
public buildings and constructions. Issue of de-
sign and estimate documentation;
Selection of subcontract organizations
including control over development of design
and estimate documentation;
Approval of design documentation in the
prescribed manner by the customer and regu-
latory bodies;
Expert examination of design and esti-
mate documentation.
Construction enginnering support
Obtaining and execution of initial data for
design of construction and rehabilitation facili-
ties;
Approval of design documentation includ-
ing obtaining a building permission;
Information and advisory services;
Arrangement of technical supervision,
participation in working committees;
Rendering services to foreign investors in
the design and construction under contracts.
Engineering surveys
Geodetic engineering surveys;
Geological engineering surveys;
Surveys of ground building materials;
Coordination of survey work.
PRELIMINARY DESIGN SURVEY
Engineering that creates advantages18
FIELD OF ACTIVITIES
Solution of design problems in the fi eld of:
rehabilitation and upgrading of existing facili-
ties;
construction of new facilities.
Types of design work:
design of vibration control systems and me-
chanical values, turbine generating units and pump
equipment;
integrated design of Electric Plants;
integrated design of electric substations (volt-
age class up to 220 kV), open switchgears, closed
switchgears, integrated switchgears;
design of engineering systems (water supply
and sewage, heating and ventilation, power equip-
ment and electric lighting, low-voltage systems, au-
tomation and control);
electrical networks (Overhead transmission
lines up to 500 kV);
design of off site fl yovers (high and medium
pressure steam lines (up to 140 at), steam and fuel
oil pipelines, pipelines of process systems, gas pipe-
lines);
design of gas supply systems (natural gas
main pipelines, gas distribution stations, gas control
points, gas pipelines of distribution networks);
warehouses, storages, tank farms (of oil prod-
ucts and solid fuel, refrigerators);
design of treatment facilities (waste waters
from chemical water treatment facilities, process
water, storm water);
Integrated design of heat sources:
Combined Heat and Power Plants (CHPs based
on the cycles of steam turbines, gas turbines, com-
bined cycle turbines);
small-scale CHPs (based on gas turbine and gas
piston cycles);
heating networks;
central heat supply stations;
pump stations;
boiler houses (district, quarterly, electric boiler
houses);
development and design of power supply sys-
tems and heat supply systems at industrial enter-
prises and settlements.
Special sections of project documentation:
labor and working condition management;
engineering and technical civil defense meas-
ures;
protection of structures against corrosion;
fi re alarm systems, fi re alarm systems and fi re
warning systems;
alarm, surveillance and control systems;
construction arrangement.
www.ker-eng.com 19
DE
SIG
NIN
G A
ND
SU
PP
OR
T O
F C
ON
ST
RU
CT
ION
Engineering staff
The following departments were created
to solve tasks of design and engineering sup-
port of construction:
Department of Integrated Design for
large-scale facilities;
Department of Integrated Design for
small-scale facilities;
Department of Integrated Design for
backbone electric grids;
Technical Department provides general
technical records, as well as activities aimed at
improving quality of the developed design and
estimate documentation and productivity of
designers in accordance with the quality man-
agement system (ISO 9001-2001).
A staff of experts is represented by the
following specialties:
Chief Project Engineers;
Chief Technicians;
Leading experts in the directions:
— Heat supply;
— Power supply;
— Construction and architecture;
— Development of environment
impact assessment and environmental pro-
tection sections;
— Design of fi re and alarm systems;
— Development of water supply
and sewerage sections;
— Design of gas distribution and gas
consumption systems;
— Design of primary chemistry sec-
tions;
— Design of DCS;
Engineering and survey work experts;
Estimators.
Engineering capability
Using modern software products in design-
ers’ work signifi cantly reduces the time for de-
sign work, ensures high quality of work, ena-
bles the unifi cation of nodal solutions, allows
to choose the best process solutions.
Currently, the following are successfully
used: Compas 10, RastrWin 2.25.1.1, AUTOCAD
2007, Start 4.6, SCAD 11.1 (S128max), Funda-
ment 12.3, Grand smeta 3, Astra-Nova’2007.
Department for registration and documen-
tation support is equipped with professional
equipment (printers, copiers, scanners) for
solving problems concerning production and
reproduction of design and estimate docu-
mentation, create backup documentation.
The geological and survey group is
equipped with a multipurpose rig MBU-5-01, as
well as all necessary materials for drilling works
in various ways.
Engineering that creates advantages20
LEADING PROJECTS
Development of external power supply
circuit for TANEKO Refi nery and Petrochemical
Plant Complex (Nizhnekamsk)
Customer: VNIPIneft OJSC (Moscow)
Objective: Develop an optimal external power
supply circuit with connection to:
existing mains power system of the Repub-
lic of Tatarstan;
the projected circuit of internal electric pow-
er supply of the Complex;
with due regard to the future growth of
electric loads and fl ow distribution in the adja-
cent power center.
Calculations network modes on the various op-
tions are made using software RastrWin 2.25. 1st
stage — without cogeneration installation, 2nd stage
— with due regard to cogeneration installation.
The best option was chosen, scopes of elec-
tric network construction were determined with
due regard to “narrow places” in Nizhnekamsk
power district.
Upgrading (rehabilitation) of heat power plants
including implementation of steam and gas
cycles
Projects with participation of our specialists:
Construction of CCGT-230 at Zainsk SDPP
(replacement of Unit No.1 of CCGT consisting of:
Alstom 170 MW gas turbine plant, Steam Turbine
K-80 UMTZ);
Rehabilitation of Kazan CHP-1 including
creation of CCGT (2nd stage of CCGT construc-
tion including increase of capability from 50 up to
150 MW due to installation of 70 MW gas turbine
plant and 30 MW steam turbine);
Expansion of Kazan CHP-3 including instal-
lation of CCGT-190 (an unit of 2 Ansaldo 65 MW
gas turbine plants and 60 MW steam turbine);
Construction of two CCGT-95 at Yelabuga
CHP (Ansaldo 65 MW gas turbine plant and 30 MW
steam turbine);
Information systems: the operative-infor-
mation package and the automated control sys-
tem (Naberezhnye Chelny and Kazan).
Construction and expansion of heat power
plants and boiler houses, rehabilitation of heat-
ing circuits
Projects with participation of our specialists in
70-90-ies:
Expansion of Oryol CHP:
а) installation of Unit No.4 (the boiler Е - 500
t/h, the turbine Т-110 MW);
б) construction of the boiler plant;
в) a peak boiler house including installation of
KVGM-180 hot-water boiler;
Expansion of Arzamas CHP (two E-220 pow-
er boilers, two PT-25 turbines);
Construction of Azino and Savinovo district
boiler houses with PTVM-180, KVGM-180 hot-
water boilers, DE-25 steam boiler; Kazan Heating
Networks;
Rehabilitation of a combined heat and pow-
er plant at Kazan CHP-1 with the purpose of heat
power increase.
Introduction of automated control systems of
equipment operational modes
A project of introduction of Vibrobit-200, Vi-
brobit-300 vibration and mechanical value con-
trol system at turbines of branches of Tatenergo,
Wholesale Generating Company-3, Southern Ural
SDPP;
Introduction project of the automated pow-
er control system at Wholesale Generating Com-
pany-3, Southern Ural SDPP;
Introduction of test stands for internal com-
bustion engines at Kamaz OJSC and the Ministry
of Defense;
Introduction project of the dry ash removal
system at Wholesale Generating Company-2,
Troitsk SDPP.
www.ker-eng.com 21
DE
SIG
NIN
G A
ND
SU
PP
OR
T O
F C
ON
ST
RU
CT
ION
Upgrading and rehabilitation of water treat-
ment and circulation water supply systems
Projects with participation of our specialists:
Full-scale DCS for chemistry departments
at Kazan CHP-1, Kazan CHP-2, Kazan CHP-
3, Zainsk SDPP, Nizhnekamsk CHP-1, Nizh-
nekamsk CHP-2;
Upgrading of 3rd stage of water deminer-
alization at Zainsk SDPP;
A project of enforcement and replacement
of cooling tower building structure, ceiling, roof
covering of the main building of Nizhnekamsk
CHP-1.
Construction and rehabilitation of electric
substations, open switchgears, closed
switchgears
Projects with participation of our specialists:
Working project for construction of 220
kV open switchgear at Kazan CHP-3 with
two 125 MVA automatic transformers;
Rehabilitation of 220/110/35/6 kV
Suleyevo Substation — Almetyevsk electrical
networks, Studenets — Bugulma electrical
networks;
Rehabilitation of open switchgears,
closed switchgears at Kazan CHP-3, Nizh-
nekamsk CHP, Urussu SDPP, Zainsk SDPP,
Kazan Electric Networks, Yelabuga Electric
Nretworks, etc. including replacement of
electric equipment. Protection of modern
equipment was performed with the use of
microprocessor technology as replacement
of electromechanical devices;
Working project of 110/6 kV Sidorovka
Substation;
Naberezhnye Chelny Electrical Networks;
Working project of Pismyanka Substation-15;
Rehabilitation of 110 kV open switch-
gear (5 cells), 6 kV closed switchgear; Bu-
gulma electrical networks;
Rehabilitation of 220 kV Nizhnekams-
kaya Substation, 110 kV open switchgear;
Nizhnekamsk electrical networks;
220/110/35/6 kV Abdrakhmanovo Substa-
tion. 110 kV open switchgear (2nd stage). 2nd
stage of design; Almetyevsk Electrical Networks;
Rehabilitation of35 kV Severnaya Substa-
tion including transition to 110 kV; Kazan CHP-2.
Introduction of advanced management modes
of equipment, frequency regulation of pumps
Projects with participation of our specialists:
Installation project for Voith Turbo hy-
draulically actuated clutch on feedwater
pumps at Zainsk SDPP, Naberezhnye Chelny
CHP, Nizhnekamsk CHP, network pumps at
the industrial boiler house-1, 3 at Naberezh-
nye Chelny CHP;
Introduction of RU-DRIVE high-voltage
frequency converters at the booster pump-
ing plant-5 of Naberezhnye Chelny Heat
Distribution Company (2 pcs.), on KSNR-3
network pumps, on drill pumps (13 pcs.), Tat-
neft-Burenie OJSC;
Introduction project of Vacon frequen-
cy converter on network pumps at Nizh-
nekamsk CHP-1, Kazan CHP-3, pump station
Nos.2, 5 of Nizhnekamsk operational area
(Kazan Heating Networks).
www.ker-eng.com 25
IND
US
TR
IAL
AU
TO
MA
TIO
N
FIELD OF ACTIVITIES
Automation services:
Designing.
Supply of equipment.
Installation and commissioning.
Technical and service maintenance, repair.
DCS for heat and hydraulic power industry:
DCS of main equipment at TPP (power units,
boiler units, turbine generating units) and HPP (hy-
droelectric sets);
DCS of auxiliary equipment at TPP (chemical
water treatment, feedwater installations, techni-
cal water supply, etc.);
DCS of fuel handling facilities at TPP (fuel
oil handling facilities, gas distribution plants, fuel
handling);
DCS of small-scale systems and heat supply
(steam and hot-water boilers, boiler houses).
DCS for electric power industry:
Automated Control Systems for electric
equipment of stations and substations (remote
control, Automatic system for Commercial Me-
tering of Electric Energy, monitoring of relay pro-
tection, automation and emergency automation
devices, monitoring of power equipment);
Automation of control centres of all levels
(a substation, the distribution zone, Electric Net-
work Enterprise, Energosystems Grid Control
Centre).
DCS for housing and public utilities:
DCS for booster pumping stations;
DCS for sewage pumping stations;
DCS for treatment facilities;
DCS for pump stations of heat distribution
(district heat stations, booster pumping stations,
central heating units, etc.);
Automated Systems for Commercial and
Technical Metering (Automatic Systems for Com-
mercial Metering of Electric Energy, Automatic
Systems for Commercial Metering of Heat, Auto-
matic Systems for Commercial Metering of Gas).
DCS for machine building and automotive
industry:
CNC systems;
Test stands of equipment; DCS of crane fa-
cilities;
DCS for pressure machines;
DCS for conveyer systems.
DCS for various industries:
Operative-information packages (MESsys-
tems, SCADA, operative-information packages);
Automated Systems for Commercial and
Technical Metering (Automatic Systems for Com-
mercial Metering of Electric Energy, Automatic
Systems for Commercial Metering of Heat, Auto-
matic Systems for Commercial Metering of Gas).
Communications systems (fi ber optic lines,
Ethernet, radio-Ethernet, radio modem com-
munication, dedicated and dial-up lines, high-
frequency communication);
Variable frequency electric drive (high fre-
quency converters, low-voltage frequency con-
verters, DC converters, electric motors, genera-
tors);
Microprocessor relay protection; Facility re-
mote control systems: fi re alarm systems, CCTV
and others;
Metrological calibration of fl ow meters and
heat meters.
DCS for oil production:
Control system for booster pump stations;
Group metering pump station control sys-
tem;
Group pumping station control system;
Balanced pumping unit control system;
Drilling rig control system;
Automation of oil depots and storage tanks.
Engineering that creates advantages26
STANDARD SOLUTIONS
DCS for power units — full-scale control of
power units operating on fuel oil and coal to en-
sure specifi ed given heat and electric power ca-
pacity.
The system provides: increasing reliability;
improvement of technical and economic
indicators;
increasing service life;
improvement of working conditions of op-
erating personnel;
decreasing operating costs by reducing the
costs of current and scheduled repairs.
The hardware and software package is imple-
mented on the base of Ovation (Emerson).
Introduced at: Ekibastuz SDPP-1 (Kazakhstan), 6 power
units per 500 MW (st. No.3, 4, 5, 6, 7, 8); Aksu TPP
(Kazakhstan), 300 MW power unit st. No.1;
Chelyabinsk CHP-3, 200 MW power unit st.
No.1.
Automatic frequency and power regulation
system for power units is designed to ensure
power unit participation in frequency control (rat-
ed primary and automatic secondary) and power
control at block-type thermal power plants.
The system also provides: remote centralized unit load control, coor-
dinated automatic regulation of the boiler and
turbine;
high level of unit control automation in all
modes;
high accuracy of the specifi ed load main-
tenance.
The hardware and software package is imple-
mented on the base of Ovation (Emerson).
Introduced at: Zainsk SDPP, 10 power units
per 200 MW (st. No.2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12).
Vibration and mechanical value control sys-
tem
The system allows: Perform quality control of energy supplied
or dispensed;
Improve reliability and effi ciency of data col-
lection;
Signifi cantly reduce the cost of mainte-
nance and repair of equipment by improving reli-
ability of operation, reducing operating costs for
maintenance of switching channels, reducing the
number of attendants, i.e. ensure resource sav-
ing;
Reduce the time of process failure detec-
tion, as well as prevent development of critical
faults;
Analyze energy losses of dispensed energy
resources, identify areas with high losses;
Develop an effi cient mode of system opera-
tion based on accumulated data.
www.ker-eng.com 27
IND
US
TR
IAL
AU
TO
MA
TIO
N
STANDARD SOLUTIONS
DCS for the gas turbine plant — control
of gas turbine plant elements: a gas turbine
engine, a boiler-utilizer, a booster gas com-
pressor and the electrical part of the gas
turbine plant.
The system provides: automatic startup of the plant includ-
ing connection to the consumer’s network;
improvement management quality;
reliability, increasing service life;
improvement of technical and eco-
nomic indicators.
The hardware and software package
is implemented on the base of Ovation
(Emerson).
Introduced at: Kazan CHP-1, two gas turbine plants
per 25 MW;
Lida CHP (Belarus), 25 MW gas turbine
plant;
TKN-VR, two gas turbine plants per 5
MW.
Automatic vibration and diagnostic
monitoring system (ASKVD) of the turbine
generating unit — is designed for continu-
ous monitoring of vibration, process status
of the turbine generating unit in stationary
and transient operational modes.
The system provides: reducing probability of false shutdowns of
units associated with malfunction of measur-
ing systems, prevents accidents, emergency
or forced shutdowns as well as sudden de-
struction of the turbine generating unit.
Introduced at: Nizhnekamsk CHP;
Kazan CHP-2;
Kazan CHP-3;
Naberezhnye Chelny CHP;
Zainsk SDPP;
Urussu SDPP.
DCS for the hydraulic unit — provides
reliable, economic and safe operation of
hydraulic units.
The system provides:In relation to main process equipment:
improvement of operational quality of
hydraulic units (ensuring process modes of
operation, increasing plant availability fac-
tor, etc.)
reducing operational costs.
Introduced at: Nizhnekamsk HPP, hydraulic units
Nos.9, 10, 11, 12.
Engineering that creates advantages28
Turbo feed pump control system.
Designation and functions:An object of control is a steam turbine and
a feed pump together forming a single unit — a
turbo feed pump.
The automatic control, regulation and pro-
tection system for the turbo feed pump allows
operational control of the feed pump by chang-
ing its speed.
This system provides management and participates in control of the turbo feed pump in the following operating modes:
verifi cation of prestart readiness;
startup of the turbo feed pump;
rise of the turbo feed pump to operating
pumps;
connecting of the turbo feed pump to the
network (of the feed pipeline);
normal operating conditions; placement of
the turbo feed pump under idling conditions
at disconnection of the turbo feed pump
from the feed pipeline network (recirculation
mode);
shutdown mode (both normal and emer-
gency).
The automatic control, control and protec-tion system for the turbo feed pump performs the following tasks which can be divided into groups:
regulation of the turbo feed pump;
emergency protection;
actuator control;
information functions, operator interface.
Introduced at:Novo-Kemerovo CHP (Kuzbassenergo OJSC)
STANDARD SOLUTIONS
www.ker-eng.com 29
IND
US
TR
IAL
AU
TO
MA
TIO
N
STANDARD SOLUTIONS
DCS for the boiler unit — increasing ef-
fi ciency, reliability and safety of the boiler
unit under all operating conditions. DCS is
performed as a single system for the whole
boiler unit and its auxiliary equipment.
The system provides: reliable, effi cient and safe operation of
the boiler unit;
improvement of operational quality of
thу boiler unit (ensuring process modes of
operation, increasing plant availability fac-
tor, etc.)
reducing operational costs.
The hardware and software package is
implemented on the base of PCS (Siemens),
Ovation (Emerson), Krug-2000 (Krug).
Introduced at: Kazan CHP-1, the boiler unit st. No.11;
Kazan CHP-2, the boiler units st. Nos.7,
11;
Kazan CHP-3, the boiler unit st. No.5;
CHP-1, Aktau (Kazakhstan), the boiler
units st. No. 4, 5;
CHP-2, г. Актау (Kazakhstan), the boiler
units st. No.1, 10, 11, 12, 13;
Lida CHP (Belarus), the boiler unit No.2;
DCS for the boiler unit ignition — designed
for process control of burner ignition in boiler
units of diff erent capacities working on fuels
such as gas and conform with the “Safety rules
for gas distribution and consumption” of the
gas supply system.
The system provides: ignition by introducing modern manage-
ment system based on the industrial hardware
and software package that meets all equire-
ments for functionality, security and fault toler-
ance of automated systems;
Increasing “survivability” due to the use of
the redundancy and backup principle for main
units and systems precluding a system failure
in case of failure of any element or loss of sup-
ply voltage.
Introduced at: Smolensk SDPP, the boiler units st. No.2, 3;
Verkhny Tagil SDPP, the boiler unit st.
No.16;
Zainsk SDPP, the boiler unit st. No.6.
Engineering that creates advantages30
STANDARD SOLUTIONS
DCS for water treatment installations — au-
tomatic and manual control of chemical water
treatment processes.
The system provides: automatic regulation of process parameters in
controlled processes under the specifi ed settings;
automatic functional group control;
manual (local) control of equipment from local
control rooms;
manual (remote) control of equipment from
panels of control cabinet operators and a control
center;
process interlocks, protections and alarms;
visualization and process control using opera-
tor’s automated workplace (AWP) in the control room;
alarm (visual and sound) system of equipment
fault conditions and overanging of process param-
eters.
The hardware and software package is designed
on the base of Siemens equipment and software.
Introduced at: Kazan CHP-1;
Kazan CHP-2;
Kazan CHP-3;
Nizhnekamsk CHP;
Zainsk SDPP;
Tomsk CHP-3.
DCS for the gas distribution plant — automatic,
remote and local manual control of the gas distri-
bution plant.
The system provides: high reliability of gas supply to consumers;
high level of process security;
environmental safety of manufacture;
high quality of the process management
due to modern regulation algorithms;
effi ciency of gas distribution plant manage-
ment, coordinated management of supply fa-
cilities and gas reducing from the unifi ed control
point;
increasing reliability and maintainability of
control equipment;
developed diagnostic tools to reduce the
time for repairs;
statistical accumulation of equipment oper-
ation data to predict preventative maintenance.
Implemented on the base of Siemens.
Introduced at: Nizhnekamsk CHP;
Zainsk SDPP;
Kazan CHP-3.
www.ker-eng.com 31
IND
US
TR
IAL
AU
TO
MA
TIO
N
STANDARD SOLUTIONS
DCS for the pump station — control and
management of process operational modes
of pumps at the pump station, as well as its
auxiliary mechanisms.
DCS for the pump station is used in water
supply systems, fi re fi ghting systems, boiler
feed and water transport, control systems
for CHP, boiler rooms and central heat sup-
ply stations.
The system provides: signifi cant reduction of power con-
sumption at pump stations and increase of
process effi ciency;
reducing operational costs and pro-
cess losses: decrease of inter-repair cycle
of pump and electric equipment, pipeline
valves, increase of their service life, reducing
risk of pipeline ruptures;
technology quality improvement due
the use of developed tools of browsing and
analysis of accumulated process informa-
tion;
developed diagnostic tools to reduce
the time for repairs;
statistical accumulation of equipment
operation data to predict preventative main-
tenance.
The hardware and software package is
implemented on the base of Siemens.
Introduced at: Zainsk SDPP;
Kazan CHP-1;
Kazan CHP-2;
Naberezhnye Chelny CHP;
Nizhnekamsk CHP;
Housing and Public Utilities (Kazan,
Naberezhnye Chelny.
The commercial metering system of
thermal energy, liquid and gas fl ow — data
acquisition from metering stations of heat-
ing energy, liquid and gas fl ow in the uni-
fi ed control point. Commercial metering of
liquids (including sewage water) and gas is
carried out.
The system allows: Perform quality control of energy sup-
plied or dispensed;
Improve reliability and effi ciency of data
collection;
Signifi cantly reduce the cost of mainte-
nance and repair of equipment by improving
reliability of operation, reducing operating
costs for maintenance of switching chan-
nels, reducing the number of attendants, i.e.
ensure resource saving;
Reduce the time of process failure de-
tection, as well as prevent development of
critical faults;
Analyze energy losses of dispensed
energy resources, identify areas with high
losses;
Develop an effi cient mode of system
operation based on accumulated data.
Introduced at: Zainsk SDPP;
Kazan CHP-1;
Naberezhnye Chelny CHP;
630 apartment buildings (Naberezhnye
Chelny);
District boiler houses Azino, Savinovo
(Kazan).
Engineering that creates advantages32
STANDARD SOLUTIONS
Control system for booster pump stations
Process management and control at booster
pump stations including: at intermediate oil con-
tainers, oil delivery pumping units, multiphase
installations, line heaters, gas separators, gas
tanks, intermediate water tanks, intermediate
water tanks, oil basic production fl ow meters,
sampler devices and gas analyzers.
Main functions: liquid level measurement in tanks,
automatic regulation of liquid level;
automation system management; data
transfer to control centers;
security alarm system management at the
booster pumping station rooms;
fi re alarm system management at the
booster pumping station; temperature measure-
ment in the Control and Instrumentation room,
etc.
Introduced at: Tatneft OJSC.
Control system for group metering
pump stations
Process management and control at group
metering pump stations including: at interme-
diate oil containers, oil delivery pumping units,
drainage tanks, oil and water basic production
fl ow meters.
Main functions: liquid level measurement in tanks;
level alarm in each of tanks (top emergency
level, upper level, lower level); automatic regula-
tion of oil level within the specifi ed limits; voltage
availability control;
monitoring of security alarm for the group-
metering pump station rooms;
Monitoring of fi re alarm for the group-me-
tering pump station, etc.
Control system for cluster pump stations
Process management and control of cluster
pump stations.
Main functions: Startup and shutdown control of the main
pump which raises water pressure in the manual
and automatic mode;
Emergency and process parameter con-
trol within the specifi ed limits and, if necessary,
emergency shutdown;
Communication with the dispatching sys-
tem for telemetry and remote control, etc.
Introduced at: Tatneft OJSC.
www.ker-eng.com 33
IND
US
TR
IAL
AU
TO
MA
TIO
N
STANDARD SOLUTIONS
DCS for power supply (remote con-
trol, relay protection and automatics and
emergency control schemes monitoring,
DCS, Automated Dispatch Control Sys-
tems) — operational dispatching manage-
ment and data exchange with the auto-
mated system with the system operator.
The system provides: high reliability of facility operation;
operational dispatching manage-
ment;
process data exchange with the au-
tomated system with the system opera-
tor;
high reliability of the substation by
monitoring the internal state of the facility
(definition of equipment performance ca-
pability, management of equipment criti-
cal parameters, fire alarm, security alarm
systems);
parameter accuracy.
Introduced at: Zainsk SDPP;
Nizhnekamsk HPP;
Naberezhnye Chelny CHP;
Urussu SDPP;
Kazan CHP –1, 2, 3;
Kazan electrical networks;
Bugulma electrical networks;
TANEKO OJSC.
DCS for substation electric equip-
ment — substation process control. Facil-
ity control from the unified control center
is performed due to subsystem incorpora-
tion: relay protection and automatics and
emergency control schemes monitoring,
Automated Dispatch Control Systems, Au-
tomated Measuring and Information Sys-
tem for Commercial Metering of Electric
Energy, Automated Measuring and Infor-
mation System for Commercial Metering
of Thermal Energy, diagnostic system of
the main equipment.
The system provides: high reliability of the substation oper-
ation due to operational interaction with
related objects (remote control and relay
protection status);
high reliability of the substation by
continuous monitoring of the facility
(definition of equipment performance ca-
pability, management of equipment criti-
cal parameters, fire alarm, security alarm
systems);
increase of reliability and maintain-
ability of control equipment, reducing of
operational costs and process losses:
increase of inter-repair cycle of electric
equipment, increase of service life, etc.;
Introduced at: Kazan electrical networks;
Bugulma electrical networks;
Volga electrical networks;
Nizhnekamsk electrical networks.
Engineering that creates advantages34
STANDARD SOLUTIONS
Control system for drilling pump
in a container design
Designation: frequency regulation of pump unit perfor-
mance;
control of auxiliary electrical machinery and
mechanisms of the pump module.
Main functions: automatic startup and shutdown of mod-
ule equipment by means of corresponding algo-
rithms;
trip of the module in emergency events and
generation of the corresponding message to the
operator’s panel;
delivery of control actions on the frequency
converter of the drill pump drive;
archiving of the module parameters and re-
port generation;
maintenance of temperature mode
(+15..+35 С) in the module (at the ambient tem-
perature from –40 to +40 С).
The system is based on RU-DRIVE medium-
voltage frequency converter located in the con-
tainer.
The hardware package includes: A medium-voltage frequency converter (6
kV);
A central cabinet of the pump plant auto-
matic control;
A single-block precision air conditioner;
An incoming cubicle;
An insulated container with a rigid welded
frame of steel beams and profi les.
A Mobile Control Cabinet for the pumping jack
A Mobile Control Cabinet for the pumping jack
based on the variable frequency drive is designed
for optimum control of the sucker rod pump elec-
tric motor.
A Mobile Cabinet is applied at oil producing
companies that use sucker rod pump plants with
pumping jacks for oil production.
Main functions: smooth bumpless startup of the pumping
unit drive motor with programmable acceleration
time;
smooth bumpless automatic startup with
programmable startup delay time after power
failure;
continuously variable number of oscillations
of the pumping jack in the automatic and manual
mode from 0 to 200% of the rated oscillations;
automatic self-tuning of pumping mode en-
suring maximum fi ll of the plunger pump;
speed regulation of the rod string move-
ment from cycle to cycle and within the cycle ac-
cording to any given law, etc.
www.ker-eng.com 35
IND
US
TR
IAL
AU
TO
MA
TIO
N
Integrated systems of bridge technical securityBuilding of the integrated system allows to
maintain the highest level of security.
The package includes: a video surveillance system; a security
and alarm system; a perimeter security lighting alarm sys-
tem; an automatic fi re alarm and fi re extin-
guishing system; an information, warning and evacuation
system; an automated control system for road
safety; an access monitoring and control system; an emergency calling and dispatch com-
munication system; a local area network system, a fi bre optic
communication line; a power supply system.
Introduced at: A bridge crossing over the Volga river, Vol-
gograd city;A bridge crossing over the Vyatka river,
Mamadysh city;
A perimeter security alarm and CCTV systemThe system is designed for: registering attempts of trespassing of the
protected area and generating relevant infor-mation about such trespassing to the offi cials
who perform operational duty in the facility for decision-making;
a “patrolling” mode in the video surveil-lance system for an alarm line of the protected facility;
Main functions: video surveillance of an alarm line; display of TV images from all cameras at
the central guard post; recording of TV images when receiving
alarm messages; viewing of the video data base; coopera-
tion with previously installed systems.Introduced at: Zainsk SDPP; Nizhnekamsk CHP; Yelabuga CHP.
STANDARD SOLUTIONS
Engineering that creates advantages36
LEADING PROJECTSIN THE FIELD OF INDUSTRIAL AUTOMATION
POWER SECTOR
DCS for 220 MW CCGT at Kazan CHP-2
The project is implemented within the frame-
work of 220 MW CCGT construction at Kazan
CHP-2. Construction period: 2011 - 2014.
Management Company KER-Holding LLC is
the General Contractor (EPC-contractor).
KER-Engineering Company is the General De-
signer, it is also responsible for turnkey DCS imple-
mentation and a full range of services regarding
electric equipment. The Vendor of the software
and hardware package for DCS was competi-
tively selected together with the Customer and
the General Contractor. Congifuration of the soft-
ware and hardware package was determined.
Contracts were signed with GE Company for the
software and hardware package supply and engi-
neering support of the Project. Designers of KER-
Engineering were trained to use ОС 6000Е System
in GE Center of Automation System Development
and Production (Shanghai, China).
DCS for a new power unit at Abakan CHP
The Contract was signed with SiberiaEnergo-
Engineering OJSC for turnkey creation of DCS for
a new power unit st. No.5 at Abakan CHP (Yenisey
Territorial Generating Company-13 OJSC.)
A branch of KER-Engineering, KER-Avtomati-
ka Company acts as a contractor to design DCS
upper level, installation of fi eld instrumentation
and commissioning. The Vendor of the hardware
and software package for a new power unit is
Metso Corporation, a contract was signed for
supply from Metso Automation CJSC.
The automation system for the power unit is
designed to optimize processes, ensure high reli-
ability and reduce human factor infl uence.
Upgrading of Automatic Frequency and Active
Power Regulation Systems for 11 power units per
200 MW each at Zainsk SDPP
The Automatic Frequency and Power Regu-
lation System is designed to ensure power unit
participation in frequency and power control at
block-type thermal power plants. According to
the results of the work performed, certifi cates of
conformity with the standard of the System Op-
erator — Central Dispatch Department of Russian
Unifi ed Energy Systems OJSC. Result: active par-
ticipation of power units at the ancillary service
market since 2011.
Upgrading of control and management systems
for 6 power units per 500 MW each at Ekibastuz
SDPP-1 (Kazakhstan) including introduction of
the full-scale DCS
A modern DCS is designed for process control
of high capacity fuel oil- or coal-powered power
units. A modern DCS for a power unit is imple-
mented based on Ovation hardware and soft-
ware package.
Result: full-scale automatic control of the
power unit with the purpose to provide specifi ed
heat and electric power.
DCS of 50 MW gas turbine unit at Kazan CHP-1
DCS is designed for control of all gas turbine
plant elements: a gas turbine engine, a boiler-uti-
lizer, a booster gas compressor and the electrical
part of the gas turbine plant.
The gas turbine plant is equipped with the
control and management system based on Ova-
tion hardware and software package (Emerson).
Result: automatic regulation of process pa-
rameters with specifi ed characteristics, control
www.ker-eng.com 37
IND
US
TR
IAL
AU
TO
MA
TIO
N
of the fuel rate controller in the gas turbine
engine; functional group control (startup of
the gas turbine engine including its connec-
tion to the network).
Upgrading of control and management of
boilers and turbines at Kazan CHP-1, Kazan
CHP-2, Kazan CHP-3, Ust-Kamenogorsk
CHP, CHP-1, Aktau CHP-2, Petropavlovsk
CHP
The full-scale DCS provides process con-
trol of boilers and turbines of various capac-
ity.
All implemented DCS are built on the
base of modern hardware and software
packages: Ovation (Emerson), PCS 7 (Sie-
mens), KRUG-2000 (Scientifi c and Production
Company KRUG),
Result: full-scale automatic control of the
boiler and turbine with the purpose to pro-
vide specifi ed heat and electric power.
Introduction of automatic ignition systems
for boiler units at Smolensk SDPP, Verkhniy
Tagil SDPP and Zainsk SDPP
An automatic ignition system is designed
to improve industrial safety and reliability of
the boiler unit. All implemented automatic
ignition systems are accomplished using
AMAKS gas units based on Ovation (Emer-
son) and PCS 7 (Siemens) software and hard-
ware packages.
Result: compliance of gas facilities with
safety rules of gas consumption systems.
Introduction of information and measuring
systems at CHP-2, CHP-3 (Aktau), Na-
berezhnye Chelny CHP, Nizhnekamsk CHP
The systems provide the required accu-
racy, reliability and timeliness of operational
information provided to the staff , improve-
ment of equipment reliability due to high
fault tolerance of modern hardware and
software packages: Ovation (Emerson) and
PCS 7 (Siemens).
Result: introduction of the information
and measuring system which besides solv-
ing monitoring tasks allows to create a base
for the follow-up expansion of the system
and increase the number of functions (for
example, implementation of the automated
control system for the boiler unit No.1 CHP-2
(Aktau) on the base of the implemented in-
formation and measuring system).
OIL AND GAS INDUSTRY
Design of the Automated System for Elec-
tric Energy Accounting at TANEKO Refi nery
and Petrochemical Plant Complex
The power supply system of the Com-
plex includes: steam supply, power supply,
and Automated System for Electric Energy
Accounting. The project includes innovative
solutions by KER-Avtomatika and Siemens.
Result: an optimal energy supply sys-
tem is developed with due regard to phased
construction of internal and external power
supply facilities.
HOUSING AND PUBLIC UTILITY SECTOR
Analysis of equipment operation at over
800 central thermal points in Moscow
(MOEK OJSC)
Analysis of operational modes and pa-
rameters of the equipment at central ther-
mal points was carried out. Result: off ers for
Engineering that creates advantages38
design of automatic regulation systems with use
of frequency drives were developed.
Development and introduction of the dispatch-
ing system for heat and hot water metering
stations in 630 apartment buildings in Na-
berezhnye Chelny
Innovative solutions in the fi eld of commercial
metering of heat energy, water, gas has been im-
plemented. For this development, the Company
was awarded with the diploma of the Ministry of
Industry and Trade of the Republic of Tatarstan in
the competition of energy effi cient equipment
and technologies.
Result: introduction of energy- and resource-
saving technologies in housing and public utili-
ties, rational mode of heat consumption.
MACHINE-BUILDING INDUSTRY
Development and introduction of internal com-
bustion engine test stands in KAMAZ OJSC
Kontur-Sid software and hardware package
developed by KER-Avtomatika specialists is in-
tended for automatic control of test stand and
automatic line equipment. Kontur-Sid package is
based on a variable frequency drive with a recov-
ery function (energy return for reuse in the same
process). Result: increase of accuracy and reli-
ability of control systems due to introduction of
new and high technology equipment; improving
of technical and economic indicators.
Upgrading of the main assembly line at the
automobile plant (KAMAZ OJSC)
The control system and electric part have
been replaced. The following modern Siemens
equipment has been installed: Simatic S7-300
controller, frequency converters, etc. Supervisory
control has been performed. The synchronizing
system for automobile and footway conveyors
has concurrently been restored. Result: improve-
ment of conveyor reliability, increase in labor pro-
ductivity.
CITY AND TRANSPORT INFRASTRUCTURE
Construction of the integrated security support
system of bridge crossings over the Volga river
(Volgograd) and the Vyatka river (Mamadysh)
The multipurpose platform integrates dispa-
rate systems in a coordinated working infrastruc-
ture. The platform includes the following subsys-
tems: the video surveillance system, the alarm
system, the warning and evacuation system, the
road safety system, the fi re alarm and fi re extin-
guishing system, the power supply system, local
area networks.
Result: reliable control, security service opti-
mization, reducing costs.
PULP AND PAPER INDUSTRY
Upgrading of gas pipelines and DCS of steam
boilers at Employee-owned Enterprise Na-
berezhnye Chelny Cardboard and Paper Mill
CJSCр
At Naberezhnye Chelny Cardboard and Pa-
per Mill upgrading of steam pipelines and DCS of
steam boilers Е-160-24-250 GM st. Nos.1, 2 and
PTVM-ZOM (r) as well as auxiliary equipment has
been performed on the base of PCS 7 hardware
and software package (Siemens).
Due to introduction, management effi ciency
and boiler reliability has been increased, techni-
cal and economic indicators have been improved.
www.ker-eng.com 41
EL
EC
TR
ICA
L E
NG
INE
ER
ING
COMPETENCES OF ELECTRICAL DIRECTION
Rehabilitation and construction of 6 – 220kV
substations
Installation of metalware;
Installation of power equipment (mains
transformers and measuring transformers;
vacuum and SF6 circuit breakers, etc.);
Installation of secondary circuits: con-
trol cables, external, internal and protective
lighting;
Installation of power compensation
systems;
Installation of relay protection, auto-
matics and emergency control schemes,
carrier-current protection and HF commu-
nication;
Installation of Automated Process Con-
trol Systems for electrical energy supply,
communication systems (including fi ber-
optic lines), fi re and security alarm and CCTV
monitoring systems;
High-voltage tests;
Commissioning works (power equip-
ment, relay protection and automatics,
emergency control schemes);
Commissioning works of automated
control and communication systems.
Rehabilitation of electrical
equipment at generating stations
Power equipment: generator circuit
breakers and disconnectors, current and
voltage transformers, conductors;
Generator relay protection and auto-
matics, emergency control schemes;
Electrical part of auxiliary mechanisms
in turbo-and hydro generating units, 0.4 - 6
kV switchgears;
Automated Process Control Subsys-
tems of electrical equipment;
Excitation systems.
Repair of 0.4 – 220kV class power electrical
equipment
Measuring current and voltage trans-
formers;
Power cable lines and cable installa-
tions;
Cable communication lines;
Switchgears, including switching equip-
ment;
Accumulator installations and DC
shields;
Earthling equipment and overvoltage
protection devices;
Lighting installations;
Relay protection and automatics and
emergency control schemes;
Automated Control Systems of Electri-
cal Energy Supply: remote control, Automat-
ed Information and Measuring System for
Commercial Metering of Electrical Energy.
Engineering that creates advantages42
LEADING PROJECTS IN THE ELECTRICAL DIRECTION
Construction of Elabuga-500 new genera-
tion substation
The substation is designed to meet the
growing demand for electricity of enterprises
located in Alabuga special economic zone.
The substation is designed to provide power
for the Complex of petrochemical and refi n-
ing plants in Nizhnekamsk (TANEKO OJSC).
Besides, the substation will increase electric
power supply for Elabuga and Kazan. As a re-
sult of the bid, KER-Engineering Company is
defi ned as the General Contractor. The work
started in 2011. And already in 2013, the fi rst
electricity was supplied to consumers.
Reconstruction of 500 kV Kinderi substation
Kinderi Substation is a 500kV master sub-
station, it provides electrical energy to Kazan
power district consumers; energy emergency
in peak-load hours reaches 700MW. Recon-
struction of Kinderi Substation is justifi ed by
the need to increase electric power supply
reliability for the specifi ed power district. One
of the most powerful transit of electricity in
Russia - the Northern transit - is performed
through Kinderi Substation. Staged and scale
reconstruction of Kinderi substation has been
carried out since 2000. Since 2011, a new
stage of integrated reconstruction for Kin-
deri substation has begun with the purpose
to provide Kazan consumers and facilities of
Universiade 2013 with reliable electric power
supply.
Upgrading of the excitation system at
Zainsk SDPP
Upgrading of TVG-200-2 turbine generat-
ing unit st. No.12 has been performed includ-
ing replacement of the outdated system for
a modern thyristor self-excitation system
at Power Machines OJSC. KER-Avtomatika
Company has performed thewhole range of
services from design to construction, instal-
lation and commissioning works.
Rehabilitation of main electric equipment in
Mosenergo OJSC
KER-Avtomatika took an active part in re-
habilitation of electric equipment at CHP-17
and CHP-23 (Moscow). Particularly, rehabilita-
tion of the power unit st. No.4 was performed
at CHP-17: the worn-out and obsolete Т-100–
2 turbine generating unit with the electric
machine excitation system was replaced with
a modern TZFP-110–2 MUZ turbine generat-
ing unit with a capacity of 110 MW completed
with the static thyristor excitation system.
Rehabilitation of 35–220 kV circuit breakers
at Bugulma-500 Substation
Replacement of 220 kV air circuit break-
ers for SF6 circuit breakers was carried out
in 2009 at Bugulma-500 Substation (Bugulma
Electrical Networks). Rehabilitation of two
cells — 220 kV Bugulma-Pismyanka overhead
transmission line and 220 kV Bugulma- Ab-
drakhmanovo overhead transmission line.
Construction, installation and commis-
sioning work was performed together with
Electroneftegas LLC. This included disman-
tling of appr. 2 km of cable and cabling of
a 9 km new line, a full range of adjustment
work was performed with regard to relay pro-
tection and automatics. Satisfactory labour
management at the substation and timely
delivery of materials and equipment made it
possible to implement the rehabilitation work
during one month.
Besides replacement work of 220 kV air
www.ker-eng.com 43
circuit breakers, major repairs of three
cells at 220 kV open switchgear was
made. It included major repairs of VVB-
220 air circuit breakers and RNDZ-220
disconnectors, as well as two 35 kV cells
of the open switchgear.
Upgrading of the excitation system at
Nizhnekamsktechuglerod OJSC
The existing system of TG-1, 2 tur-
bine generating units, type SHSV-3 did
not provide parallel operation of said tur-
bine generating units in violation of the
stability of the power system. A UNITROL
1000 type reliable brushless, diode, digital
excitation system by ABB (Switzerland)
was installed to eliminate this signifi cant
drawback.
Rehabilitation of the key single line
diagram at Kazan CHP-2 (Generating
Company OJSC)
Rehabilitation the key single line dia-
gram at Kazan CHP-2 was performed to
provide uninterrupted and reliable power
supply for Kazan consumers. Particularly,
the following was performed: rehabilita-
tion of the open switchgear-35 including
replacement of 35 kV cells for 110 kV cells
and installation of VEB-110–2000–50 SF6
circuit breakers; rehabilitation of two 35
kV overhead transmission lines at Lenin-
skaya Substation to 110 kV cross-linked
PE overhead transmission line; rehabilita-
tion of DZSH-110 including installation of
new panels.
The current-limiting device at Naberezh-
nye Chelny CHP (R&D)
TOU-N-110 current-limiting devices
were installed at Naberezhnye Chelny
CHP in neutrals of Т-3, Т-4, Т-6, Т-7 block
transformers and AT-5, AT-8 single wind-
ing transformers for limitation of inter-
ruptible steady short-circuit currents and
surge currents of transformers.
As compared to traditional methods
of current-limiting divisions, current-lim-
iting networks have such advantages as:
action inertialess, 1.5-2.5 time limitation
of short-circuit surge currents, 1.2-1.4
time limitation of hazardous short-cir-
cuit let-through currents in transformer
windings.
Use of current-limiting devices con-
tributes to maintaining dynamic stabil-
ity of power systems during emergency
disturbance related to switching of acci-
dental and artifi cial short circuits. Use of
current-limiting devices allows to reduce
turbine unloading necessary to preserve
the 20-40% stability and also improve
intersystem connection capacity up to
25%.
Upgrading of VVG-20 generator circuit
breakers including replacement of relay
protection and automatics at Nizh-
nekamsk HPP
At Nizhnekamsk HPP, the electric
scheme of 4 unitized blocks is used in-
cluding connection of two pairs of hy-
draulic generators to the block-type
transformer through VVG-20 type air
circuit breaker. Due to obsolescence and
physical deterioration of the specifi ed
circuit breakers being used in heavy con-
ditions (the number of operating cycles
per year is more than 500), replacement
of VVG-20 type circuit breakers to SF6
type is provided in the investment pro-
gram of Generating Company OJSC.
EL
EC
TR
ICA
L E
NG
INE
ER
ING
Engineering that creates advantages44
According to the level of switchable short-
circuit currents on generator voltage busbars
(short circuit reference point К1), a SF6 circuit
breaker with breaking currents more than
150 kA shall be applied. The only one circuit
breaker that suits such breaking currents is
HEC-7 type circuit breaker by ABB Company
(Switzerland) with breaking current of 160 kA.
However, the cost of HEC-7 is appr. $1 mln.
And its overall dimensions do not allow to
install it into the existing camera of VVG-20
circuit breaker.
For this reason, it has been determined to
use a SF6 circuit breaker of the same manu-
facturer, HECS-130R type instead HEC-7 of
for replacement of VVG-20 circuit breaker, as
its cost is 3.5 times less than the cost of HEC-
7. But the rated short circuit breaking current
makes up all in all 130 kA, i.e. less than the
calculated breaking current which is 146.2 kA.
To provide compliance with interrupting
capacity of short circuit currents in the gen-
erator, it has been determined to apply step
cutoff : cut off the circuit breaker of an adja-
cent pair of generators with the fi rst time de-
lay, and then cut off the circuit breaker of the
damaged pairs.
At such cutoff , current decreases to 112.8
kA, i.e. complies with interrupting capability of
HECS-130R.
In 2008 the fi rst project was implement-
ed regarding replacement of two generator
circuit-breakers including simultaneous re-
placement of protection to microprocessor
type.
Upgrading of 6 kV integrated switchgear
at Naberezhnye chelny CHP
Upgrading of 6 kV integrated switchgear,
section 2 РА, Б and 4 РА, Б includes:
replacement of worn-out and obsolete
VMPE-10 oil circuit breakers to VBE-10–
31,5/630 (1000, 1600) UHL-2 vacuum circuit
breakers;
replacement of relay protection and
control equipment based on electromechan-
ical relays to SPAC 810 type microprocessor
equipment which provides high accuracy and
consistency of performance. This can signifi -
cantly improve reliability, sensitivity and high-
speed performance of protection, as well as
reduce selectivity level.
Surge arresters OPN-6 were installed to
protect transformers, electric motors and 6
kV busbars from surge voltage.
The arc protection unit complete with
Duga-0 arc fault registration unit was assem-
bled to protect equipment from short circuits;
replacement of NTMI—6 voltage transformer
to ferroresonance transformers NAMIT-10-2
UHL was made.
Upgrading of 0.4 kV BOP switchgear
at Naberezhnye Chelny CHP
Upgrading of 0.4 kV BOP switchgear (1 nor-
mally open contact) provides replacement of
obsolete overaged equipment that requires
costly spare parts (discontinued) for modern
equipment satisfying all requirements and
standards.
During the project implementation, pan-
els of Neva control board low-voltage unit
(produced by Eltehnika-Volga) were mounted
complete with Schneider Electric Masterpact
NT16 and Compact NSX1OO-630 A type cir-
cuit breakers. To reduce mechanical stress on
electric motors and improve their operational
availability, Altistart 48 soft starters ensuring
high reliability, security and ease of com-
missioning were mounted. Replacement of
power and control cables, secondary circuit
wiring and relay protection devices was also
performed.
www.ker-eng.com 45
IND
US
TR
IAL
AU
TO
MA
TIO
N
ВС board at Naberezhnye Chelny CHP
Normal operation of DC Board equip-
ment infl uences electric equipment
maintainability at electric plants and net-
works.
At large power plants and substations,
DC centralized battery supply leads to the
need for construction of control current
extended and extensive network.
DC Board is designed to provide di-
rect ВС current supply to consumers. The
Board structurally consists of 9 closed
double operation cabinets with bottom
feed-through and 7 distribution panels.
DC board cabinets are manufactured in
Convertor CJSC (Moscow).
A distribution part of DC board consists
of three sections combined with section-
al switches. Working supply input is made
to the second section, from that section
nominal reserve supply of the DC Board is
performed through the interredundancy
panel. Emergency oil pump motors, sole-
noid supply circuits, emergency lighting,
alarm and control circuits are powered by
the fi rst and third sections. Protection of
DC Board connections is performed with
automated VA 55–41 type circuit break-
ers and RBKOO power cutout switches
(with PPN-33 fuse elements ППН-33).
The microprocessor automation sys-
tem is used for monitoring the status of
direct current in the DC Board.
Dispatch boards of Grid Company OJSC
The Dispatch Service of Grid Company
OJSC is designed to ensure: fault toler-
ance and reliability of the power system,
distribution of electric energy in accord-
ance with the schedule load, support for
installed power system parameters (volt-
age, frequency in the power supply cir-
cuit, etc.), maximum operation effi ciency
of the power system as a result of opti-
mal use of various energy sources. Any
changes in operational modes and status
of the power system elements are to be
displayed in a convenient form for the
dispatcher.
For today, dispatch boards are the
most common devices for display of
large-scale circuits in the integral form.
The dispatcher uses them to manage
and coordinate joint operation of several
electrical circuits within a single grid.
Status information of grid facilities
and subsystems included into it is col-
lected, processed and displayed by auto-
mated systems.
This task is successfully solved by
modern control and monitoring systems
by KER-Engineering included into DATS
hardware and software package: DATS
AKP, DATS APU, DATS ADSHCH.
Having a multi-module structure, DATS
hardware and software package provides
high fault tolerance and scalability for fu-
ture upgrading. Multifunctionality of DATS
hardware and software package allows
to perform collection, processing, stor-
age and transfer of information, along
with providing time synchronization with
low level devices.
Introduction of the emergency parame-
ter recording system for relay protection
and emergency automatics Grid Com-
pany OJSC, Generating Company OJSC
According to the requirements of the
system operator, when an alarm event
occurs, emergency oscillograms shall be
provided to a representative of the sys-
tem operator within 30 minutes.
Engineering that creates advantages46
Protection packages by diff erent manu-
facturers and remoteness of control facilities
signifi cantly complicate this task. In 2008-
2009, projects have been developed monitor-
ing systems for relay protection and emer-
gency automation have been implemented
at all stations of Generating Company OJSC
and 4 substations of Grid Company OJSC (Ta-
tenergo). In this regard, optimum selection of
equipment for each facility without any strict
peg to a certain manufacturer was provided
(in our projects we used equipment by Ecra
Scientifi c and Production Company, Prosoft-
Systems Company, ABB, etc.) It is planned
to introduce this system at all 110–220 kV
substations of Grid Company OJSC during 10
years.
Since 2010, it is planned to connect all the
newly introduced monitoring systems into
the Control Center of Grid Company OJSC.
Upgrading of emergency automatics at Nizh-
nekamsk HPP (500 kV lines)
In 2009 implementation of emergency
automatics upgrading project (2nd startup
package).
Taking into account increasing importance
of this project in uninterrupted and reliable
electric supply to consumers in Kama region
industrial area, we involved leading adjust-
ment companies in Russia for individual ad-
justment works (in the fi eld of relay protection
and emergency automatics) - KaskadGroup
Company, Ecra Scientifi c and Production
Company, Prosoft-Systems Company.
2 high-voltage receivers and transmitters
were installed, adjusted and commissioned at
500 kV overhead transmission line Udmurts-
kaya and 500 kV overhead transmission line
Zianskaya (per each specifi ed line).
The work under the specifi ed project was
continued in 2010. The ultimate goal is au-
tomatic loading and unloading of hydraulic
generators at Nizhnekamsk HPP, and, if nec-
essary, energizing of reserve hydroelectric
generators and de-energizing of operating
ones at defi cit and surplus power, respective-
ly, in the energy system.
www.ker-eng.com 49
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
49494949
Energy and Technology Audit
Energy surveys allow to defi ne eff ective-
ness of industrial processes, consumption
and transfer of heat and power energy as
well as develop measures to enhance effi -
ciency of power equipment and related pro-
cesses.
Energy Audit is inspection (energy audit) of enterprise
energy infrastructure; adjustment of heating
networks and heat supply systems;
tests and adjustment of heating net-
works for thermal and hydraulic losses;
technical and economic analysis of op-
timization options for composition and op-
erational modes of main and auxiliary equip-
ment, circuits of heat and electric power
supply;
calculation and expert examination of
loss limits, specifi c rates of heat and elec-
tric power consumption for production and
transport, norms fuel stockpiling standards.
We suggest: technical examination of heat and
steam supply systems, metering stations in-
cluding analysis of existing modes using ad-
vanced computer modeling techniques (GIS
Zulu);
statement of reasons for own genera-
tion installations of compressor packages,
gas turbine plants at CHP including calcula-
tion of optimum schemes for including them
into the power supply system;
implementation of methods and soft-
ware packages for calculation of electric en-
ergy loss standards in electric networks of a
company;
introduction analysis of variable fre-
quency drives and fl uid couplings for pump
equipment;
electronic schemes of heat supply for a
district, a city, an enterprise including optimi-
zation of heating system operational mode
and generation capacity equipment load.
The Customer gets: reliable information about energy con-
sumption on the inspected facility;
solutions for optimization of heat- and
electric supply;
eff ectiveness evaluation of energy re-
source use;
decrease in heat consumption for bal-
ance of plant, ensuring the required heating
mode;
a list of energy-saving measures, up-
grade options, technical and economic cal-
culations and choice of optimal investment
into development of a company infrastruc-
ture;
a enterprise energy certifi cate.
The work is performed on the base of: a Certifi cate of inclusion on the register
of companies authorized to carry out energy
audits is issued by the Central Offi ce of Fuel
and Energy Resource Management in the Re-
public of Tatarstan;
a Certifi cate of inclusion on the register
of companies authorized to carry out energy
inspections issued by the International Acad-
emy of Energy Science;
a Certifi cate of membership in Energy
Audit Companies Council of Oil and Gas In-
dustry;
a Certifi cate of energy auditor accredi-
tation in GASPROM OJSC.
Engineering that creates advantages50
Integrated diagnostics of electrical equipment
Integrated diagnostics of electrical equipment
is performed to identify defects at an early stage
and prevent emergency shutdown of electrical
equipment, planning of maintenance and up-
grading of equipment.
Integrated diagnostics is integrated inspection of turbine generating
units and power transformers;
inspection and diagnostics of
— high-voltage circuit breakers;
— earthing devices;
— electric motors;
— switching devices;
— suspended and frame insulation;
— current and voltage transformers;
adjustment of Peterson coils;
chromatographic analysis of
circuit-breaker oil;
cable oil;
hydrogen from the generator housing;
commissioning and maintenance of chro-
matographic systems.
qualitative analysis of stator winding insu-
lation abrasion particles in impurities in oil from
drainages;
integrated diagnosis of turbine generators
during repair;
determination of electronic environment at
110–500 kV substation and its infl uence to relay
protection and emergency automatics
Thermal imaging diagnostics of energy and
process equipment
Heat monitoring of electric and heat equip-
ment at power facilities, heating networks, ad-
ministrative and industrial buildings and struc-
tures is required to detect latent defects arising
from the installation, repair and on the process
of operation.
Heat monitoring of electric equipment of 35–500 kV substa-
tions and distribution substations;
contact connections of overhead transmis-
sion lines;
active steel state of the generator stator;
state of power cells, complete transformer
stations, integrated switchgears;
buildings and structures;
thermal insulation of power and hot water
boilers, furnaces, reactors including defi nition of
heat losses to the environment;
chimney status;
technical condition of thermal insulation of
above and below ground heating pipelines and
water pipelines, leak spot search using thermal
and acoustic leak detectors;
search of leakage spots into the turbine
vacuum system with a halogen leak detector;
leak detection.
www.ker-eng.com 51
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
51515151
Expert examination of industrial safety
and inspection of buildings and structures,
power transmission lines and substations
We perform: Inspection of buildings and structures
of I and II levels of responsibility:
measurement of foundation yielding in
buildings and structures;
drawing up datasheets for buildings.
Examination of industrial safety of buildings
and structures at a hazardous industrial fa-
cility;
We additionally perform: inspection of bearing structures, inter-
fl oors constructions, roofs, thermal and
noise insulation;
thermal imaging inspection of enclo-
sure structures to identify heat losses and
cold air leakage spots;
state diagnostics of water, heat and
steam supply systems (including thermal
imaging);
inspection of distribution substations,
electric networks and earthing devices;
inspection of status of concrete, brick
and other chimneys and gas approaches by
the thermal imaging method.
Expert examination of industrial safety and
inspection of hoisting mechanisms
We perform: technical diagnostics and expert exam-
ination including issue of the safety expert
review report on possibility and operational
conditions of hoisting machines:
— tower cranes,
— travelling cranes,
— trestle cranes,
— fully mobile cranes,
— hoisting devices,
— skylifts,
— loader cranes;
technical diagnostics and expert exam-
ination of crane tracks including determina-
tion of industrial safety on the possibility and
conditions of their operation;
non-destruction inspection of metal
and welded joints of hoisting machines;
drawing up datasheets for:
— crane runways;
— hoisting cranes, not registered
in bodies of Rostekhnadzor (Federal Service
for Environmental, Technological, and Nu-
clear Supervision) of Russia;
— cross arms;
commissioning work on protection sys-
tems and security devices for traditional and
microprocessor type hoisting machines;
installation, maintenance and repair of
security devices and protective equipment
hoisting machines;
commissioning work on protection sys-
tems and security devices for loader cranes;
maintenance of security devices and
protection equipment for loader cranes.
Engineering that creates advantages52
Diagnostics of turbine generating units and
auxiliary equipment at TPP
Diagnostic services for turbine and auxiliary
equipment are aimed at achieving the objec-
tives of testing and adjustment of the main
and auxiliary equipment of TPP turbine depart-
ments.
We perform: diagnostics of status of the turbine au-
tomatic control system in order to obtain in-
formation about the current condition of the
automatic control system nodes, estimate the
amount of maintenance and repair, identify the
nature of defects and technical assistance in
their elimination;
pre-start setting of the turbine automatic
control system to ensure safe, reliable and ef-
fi cient operation;
thermal and rapid tests of turbine units to
determine the current change in the general
operating economy, state estimation of turbine
fl ow part, eff ectiveness estimation of regen-
erative heaters and a condensing unit, defect
detection and repair quality estimation;
auxiliary equipment tests (heat transfer
equipment, pumps of various types) which in-
clude: characteristic formation, performance
evaluation, identifi cation of effi ciency reduc-
tion reasons, selection of optimal operating
conditions;
testing of technical and recycling water
supply systems;
determination of steam, condensate and
coolant losses in the process.
We implement new methods and technolo-
gies for measuring Automated Regulation Sys-
tem parameters using a computer control sys-
tem that reduces complexity and duration of
diagnosis, excludes possibility of human error
when measuring turbine Automated Regulation
System performance.
Expert examination of industrial safety, techni-
cal diagnosis and metal status monitoring at
hazardous production facilities
Highly qualifi cation of specialists for diagno-
sis of metal is confi rmed with prizes in regional
and Russian NDT competitions.
We perform: Industrial safety expert review of: boiler in-
spection facilities; gas distribution and gas con-
sumption; facilities of explosive and chemically
hazardous processes in oil and gas industry;
strength analysis;
technical certifi cation of boiler metal-
works;
technical certifi cation of boiler inspection
facilities;
non-destructive metal testing;
metallographic studies including metal
structure investigation in replicas;
chemical and spectral analysis of metal
composition;
mechanical testing of metal properties; in-
spection of steam turbines with the purpose to
extend their economic life;
revision of hanger-support systems; revi-
sion of process pipelines; investigation of fail-
ure causes of pieces of equipment.
www.ker-eng.com 53
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
53535353
Engineering support of water treatment
and water treatment mode of thermal
power equipment
Fields of activities: Audit of technical condition of water
treatment schemes, water treatment mode
of thermal power equipment, chemical con-
trol reliability in operation;
Introduction of advanced energy- and
resource-saving water treatment technolo-
gies and management of boiler water treat-
ment modes.
We perform: adjustment of water treatment and
condensate plants, water-chemistry condi-
tions of heat and power equipment including
making up process fl ow diagrams in accord-
ance with the requirements of Rostechnad-
zor (Federal Service of Environmental, Tech-
nological and Nuclear Supervision) of Russia;
state inspection of water treatment
plants and water chemistry of thermal pow-
er equipment including proposals for their
upgrading;
thermochemical tests of boilers and
evaporators including establishment of qual-
ity standards for feed and boiler water;
pre-start and operational chemical
cleaning of boilers and adjustment of con-
servation schemes for thermal power equip-
ment;
complete chemical analysis of all types
of water, quality and quantity composition
of deposits from the surfaces of heat power
equipment
including selection of technologies for
their removal; energy oil analysis and recom-
mendations on how to prolong their service
life;
state estimation of energy oils and their
value relative to fresh oil cost;
determination of solid insulation state
by polymerization degree;
guidance and counseling services to
chemical laboratories of energy enterprises
in terms of preparation for certifi cation and
accreditation.
We introduce new technologies of: preliminary water treatment with the
use of fl occulants;
corrective water treatment in closed-
circuit cooling systems and heating net-
works with salt deposition and corrosion
inhibitors;
assessment of energy oil status by in-
duction period of oxidation;
water demineralization according to
APKORE counterfl ow ionization scheme and
membrane methods.
The Customer gets: reduction of service water production
cost, decrease in negative environmen-
tal impact, corrosion process slowdown of
thermal power equipment and extension of
its service life.
Engineering that creates advantages54
Metrological provision of production,
consumption and transport of energy resources
Our purpose is to provide reliable measure-
ment results in accordance with state standards,
as well as protection of the rights and legitimate
interests of the objects and subjects of economic
activity from the negative consequences of in-
correct measurements.
Metrological provision is to: repair, calibrate (preparation for verifi cation),
adjust measuring instruments of all types;
perform very precise measurements; ar-
range work in conjunction with regional Stand-
ardization, Metrology and Certifi cation Centers
for calibration of current and voltage transform-
ers (16 kV), Automated Information and channels
of Measuring System of Commercial Energy Me-
tering, DCS;
introduce measurement systems for fuel
oil, chemicals (acid, alkali, coagulant, transformer
and turbine oils, technical fl uids);
develop and implement automated systems
of fuel oil commercial metering;
measure electric power quantities and elec-
tric energy quality indicators.
Service maintenance of gas detection equip-ment in accordance with state standards:
on-site repair, calibration, adjustment, veri-
fi cation, together with regional Standardization,
Metrology and Certifi cation Centers;
audit of coolant and water costs; design,
consultation, installation, commissioning and
maintenance of heating energy, hot and cold wa-
ter, sewage, corrosive environments, steam, gas
followed by scheduling; design, installation and
commissioning of automated systems for heat-
ing, ventilation and hot water supply, selection
of the best possible equipment under the design
parameters of the heat loads;
development, design, installation and ad-
justment of Automatic Systems for Commercial
Metering of Heat, Electric Energy and Gas;
development and introduction of measure-
ment procedures;
performance monitoring of metering sta-
tions with respect to monitoring of heat con-
sumption and making up monthly reports;
calibration and verifi cation of heat, fl ow and
level meters;
service and metrological support of energy
source metering stations and liquid media.
Services for corporate clients: Carrying out system analysis of measuring
instrument status, inspection and testing to de-
termine the priorities in solving problems of met-
rological provision of production and distribution
of heat and electric energy;
Development of plans for organizational
and technical activities to improve production ef-
fi ciency by improving metrological provision.
To enter into the Federal Wholesale Market of Electrical Energy/ Power, we perform:
Project development and implementation of
electric energy accounting systems;
Creation and implementation of energy bal-
ance programs.
www.ker-eng.com 55
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
55555555
Certifi cation of workplaces according
to work conditions
We perform: certifi cation of workplaces;
industrial environment management at
workplaces;
measurement of physical factors (noise,
infrasound, microclimate, light environment
parameters, electromagnetic fi elds) on the
territory of enterprises including sanitary
protection zones;
measurements of chemical factors at
industrial environment;
sanitary-hygienic examination of work-
places and PCs;
measurement and estimation of haz-
ardous and harmful chemical factors for
assessment of workplaces and production
control;
measurement of infl uencing factor val-
ues in locations of electric energy meters.
Service eff ectiveness indicator: No claims by the State Inspectorate
of Labour, the Federal Service on Custom-
ers’ Rights Protection and Human Well-being
Surveillance (Pospotrebnadzor) and pros-
ecutors during site inspections;
The company’s competitiveness in the
domestic and international markets after
Russia’s WTO accession.
The Customer gets: justifi cation to the tax authorities of the
expenditures required to further improve-
ment of working conditions (extra clothing,
protective equipment, etc.) with allocation of
these costs to production costs;
positive solution of Pension Funds of
preferential pensions for the company’s em-
ployees;
justifi cation of benefi ts and compensa-
tions for work in dangerous and unhealthy
working conditions, tax reduction for the
payroll of the company’s employees accord-
ing to the results of workplace assessment;
discounts on insurance rates paid by
the company for compulsory social occupa-
tional injury insurance;
integrated assessment of working con-
ditions at each workplace.
The following is at the disposal of quali-
fi ed professionals: modern measuring and
analytical equipment, successful completion
experience of analysis and normalization of
workplace ecology in the energy system and
at enterprises of the Republic of Tatarstan.
Engineering that creates advantages56
Chemical and analytical research in the field
of ecology
Fields of activities: Chemical and analytical studies and
control of pollutants in environment and
work space (waste and natural waters, un-
derground waters, atmospheric air, flue gas-
es, sanitary protection zone air and working
space air);
Development of water and gas chemical
analysis techniques.
We perform: quantitative chemical analysis of:
— wastewater, stormwater and
meltwater;
— domestic wastewater;
— wastewater of suction pipes;
— grease interceptor effectiveness;
— local treatment facility effective-
ness;
— emissions from mobile sources;
— surface waters of natural facili-
ties;
— underground water, piezometer
well water;
— industrial emissions and flue gas
composition;
— workplace and indoor air;
measurement and estimation of hazard-
ous and harmful chemical factors for assess-
ment of workplaces and production control;
efficiency verification of dust and gas
trapping units;
characterization of ambient air and air at
the sanitary protection zone border;
guidance and counseling services (prep-
aration for certification and accreditation) for
waster water laboratories.
We develop new techniques for quantita-
tive chemical analysis.
Development of ecological permission
documentation for industrial enterprises
Development and approval of: projects of maximum (temporarily) at-
mosphere discharge standards;
projects of maximum (temporarily) ter-
rain relief discharge standards;
projects of permissible water body dis-
charge standards;
materials justifying the planned activities
of the enterprise for management of hazard-
ous waste to obtain licenses; calculation of
damage for fishing industry caused by intake
of water from water bodies, the project of
waste generation and disposal limits; hazard-
ous waste production and consumption data
sheets;
environmental impact assessment with
regard to economic and other activities during
development of pre-design including the pre-
investment and design documentation;
training and support materials to obtain a
license for handling hazardous waste;
drawing up and approval of the environ-
mental management declaration.
www.ker-eng.com 57
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
57575757
Rehabilitation of TPP water treatment
with application of highly efficient mem-
brane technology for ultrafiltration, mi-
crofiltration and back osmosis
Customer: Generating Company OJSC,
7 branches.
Implemented at Zainsk SDPP (exist-
ing plants).
Feasibility study for seven thermal
power plants of Generating Company OJSC.
Project effectiveness: reduction of
water production cost, reduction of envi-
ronmental impact.
Integrated energy audit of generating
and network companies at Tatenergo
OJSC including technical and economic
evaluation of energy saving measures
Customer: Tatenergo OJSC.
22 companies with specified capacity
of 7,016 MW, 4,360 Gcal have been sur-
veyed.
The total identified reserve for in-
creasing efficiency of generation, trans-
port, electricity and heat production
made up 328 mln. rubles.
Project development and implementa-
tion of electric energy, heat and gas
accounting systems for generating
companies.
Customer: Generating Company OJSC,
9 branches.
Over 10,000 energy supplies metering
stations.
Project development and implementa-
tion of electric energy accounting sys-
tems for network companies. Creation
and implementation of energy balance
programs
Customer: Grid Company OJSC, 9
branches.
Over 120,000 electric energy metering
points.
Electronic simulation of heat supply
systems for cities and settlements
Customer: Generating Company OJSC,
3 branches.
Simulation modes of heat supply by
means of the developed scheme allows to
consider a possibility of heating networks
for transfer of thermal energy (for both
existing and predictive heat consumption
with due regard to city development) us-
ing analysis of heat supply options.
Stages:1. Application of a new technology of
electronic simulation and development
forecasting of urban heating schemes,
while optimizing loads of existing thermal
power plants and building new generation
facilities.
2. Development of an electronic simu-
lator of Kazan thermal supply system for
main networks for modeling of heat sup-
ply modes with due regard to connection
of new consumers.
LEADING PROJECTS
Engineering that creates advantages58
LEADING PROJECTS
Calculation technology has been devel-
oped and agreed in All-Union Electric Power
Research Institute.
An electronic simulator for calculation of
technical losses for each enterprise within
Generation Company OJSC has been devel-
oped and implemented.
Technical examination of equipment at
Nizhny Novgorod SDPP named after Winter
(Territorial Generating Company-6, Balakhna,
Nizhny Novgorod Region).
Customer: Ost West Capital LLC
1. Integrated evaluation of technical condi-
tion has been carried out including evaluation
of power equipment, buildings and structures,
integrated operation of the equipment as a
whole.
2. A forecasted investment program, in-
cluding planned implementation activities has
been provided;
3. A possibility of upgrading the plant in-
cluding installation of additional PT-80 steam
turbine, or on the basis of Siemens gas turbine
plant and required investment scope has been
estimated.
www.ker-eng.com 59
EN
ER
GO
TE
CH
NO
LO
GIC
AL
AU
DIT
59595959
Consulting services for upgrading of 160 MW CHP and technical water supply
Customer: PAK Steel Metallurgical Plant (Karachi, Pakistan)
Performing consultant expert function in implementation of the turnkey project.
1st stage: Integrated diagnostic inspec-tion of CHP and technical water supply equipment to determine its restoration up to design indicators for power, performance and effi ciency.
ROI analysis of the restoration costs, preparation of tender documentation.
Tendering process for contractor selec-tion for rehabilitation of CHP and technical water supply.
2nd stage: Project implementation super-vision and control.
Implementation:1. Diagnostic inspection equipment of
TPP and technical water supply has been performed.
2. Rehabilitation scope has been deter-mined.
3. Bid documentation for implementation of rehabilitation has been designed.
Consulting services for upgrading of thermal mechanical equipment at CHP of the alu-
mina refi nery plant (Fria, Republic of Guinea)Customer: Sibkotes CJSC1. Integrated inspection of Chemical De-
partment equipment, the water chemistry control system, boiler equipment to deter-mine the quantitative and qualitative com-position of sediments.
2. Development of recommendations for improving reliability of CHP thermal and me-chanical equipment equipment.
Implementation:1. CHP thermal and mechanical equip-
ment diagnostic inspection report was pro-vided.
2. A plan of activities to bring the plant thermal and mechanical equipment in ac-cordance with the requirements of standards, regulations and specifi cations was provided.
3. Rehabilitation variants of demineral-ized water schemes were developed with the use of membrane technology.
Technical inspection, development of tech-nical requirements and bid documentation for TPP construction at the oil refi nery plant
(Aden, Republic of Yemen).Customer: Aden Oil Refi nery Company1st stage: Inspection of a construction
site, preparation of technical requirements
2nd stage: Bid documentation prepara-tion for TPP construction.
Implementation:1. Integrated assessment of suitability of
the site for construction and resource re-quirements; evaluation of circuit solutions for communication and future infrastruc-ture (including equipment) of an enterprise; development of technical requirements for power plant construction.
2. Bid documentation has been devel-oped
3. Criteria for evaluating bids for potential partners were developed.
Development of the feasibility study for replacement and development of generat-
ing capacities at MAEK KazatompromCustomer: MAEK Kazatomprom LLP, Re-
public of KazakhstanAssessment of technical condition of
thermal and electrical equipment, water treatment circuits, fuel supply and techni-cal water supply systems for CHP-1, CHP-2 and CHP included in the Mangistausskiy load center, development of the technically sound solution for decommissioning of gen-erating capacities up to 2020 and prepara-tion of optimal program for replacement of generating capacities at MAEK Kazatom-prom to construction of a combined cycle plant with a capacity of 230 MW.
EXPERIENCE OF INTERNATIONAL PROJECTS
www.ker-eng.com 63
PR
OD
UC
TIO
N
6363
Group of Companies KER-Engineering
has its own production base with a total area
of 1500 sq.m. Assembly sites for manufac-
tured equipment, testing laboratories, work-
shop service and repair services are located
at the production base.
RU-DRIVE HIGH FREQUENCY CONVERTERS
Designation:RU-DRIVE high frequency converters
designed for frequency startup and speed
regulation of induction motors with squir-
rel-cage rotor with capacity from 250 up to
5,000kW and rated voltage of 3, 6, 10kV.
RU-DRIVE frequency converters imple-
ment a direct conversion of the input high
voltage (without using 50 Hz step-down and
step-up transformer).
They implement advanced technical so-
lutions for transformation of high voltage
by fully controllable semiconductor devices
that provide a sinusoidal current in the mo-
tor windings with low distortion and reduce
losses in the motor.
Area of application: Energy Industry: forced draft fans, com-
pressors, etc.
Metallurgical Industry: cleaning pumps, fur-
nace fans, etc.
Petrochemical and Chemical Industry: oil
transfer pump, compressors, etc.
Urban construction: water supply pumps,
air conditioning compressors, etc.
Functions: Regulation of rotation frequency in the
range from 0 to 120 Hz in the closed and open
loop;
Startup (shutdown) of high-voltage induc-
tion motors for the time from 10 to 1600 sec-
onds;
Ensuring reliability and increased life of
motors;
Elimination of water hammer in the pipe-
line system;
Decrease in equipment fault rate and re-
ducing repair costs, etc.
PRODUCTION CAPACITIES
Engineering that creates advantages64
KER SERIES PRESSURE TRANSMITTERS DS III —
convenient and accurate digital pressure trans-
mitters. Parameter adjustment is performed
using the control buttons, via HART-communi-
cation, PROFIBUS PA or FOUNDATION Fieldbus
interface.
Extensive functionality enables the pres-
sure transmitter to be precisely adapted to the
demands of production. Despite the numerous
setting options, operation of the device is very
simple.
DS III pressure transmitters are available in
diff erent versions for measuring:
excessive pressure
absolute pressure
diff erential pressure
level
volume
weight
volumetric fl ow rate
mass fl ow rate
Advantages High quality and long service life
High reliability even under strong chemical
and mechanical infl uences
For aggressive and non-aggressive gases,
vapors and liquids
Extensive diagnosis and simulation func-
tions
Separate replacement of a measuring cell
and electronics without recalibration
Minor deviation from the characteristics
Low long-term drift
Parts in contact with the medium are made
of high quality materials (such as stainless steel,
Hastelloy, gold, monel, tantalum)
A reconfi gurable measurement range
is from 0.01 mbar up to 400 bar for DS III with
HART-interface
A reconfi gurable measurement range is
from 1 mbar up to 400 bar for DS III with PROFI-
BUS PA or FOUNDATION Fieldbus interface
High measurement accuracy
Parameterization via control keys and
HART communication or
PROFIBUS PA or FOUNDA-TION Fieldbus in-
terface.
Area of application:DS III series pressure transmitters can be
used in industries with high chemical and me-
chanical loads. EMC in the range of 10 kHz ... 1
GHz allows to use DS III pressure transmitters in
areas with high electromagnetic emissions.
Pressure transmitters with protection type
“Intrinsic safety” and “Flameproof casing” can
be installed in potentially explosive atmos-
pheres (zone 1) or in zone 0. The transmitters
have EC type inspection certifi cate and comply
with the relevant harmonized European stand-
ards (ATEX).
Pressure transmitters with protection type
“Intrinsic safety” for use in zone 0 can be operat-
ed with power supplies of “ia” and “ib” category.
Pressure transmitters can be equipped with
various designs of the separation membrane for
specifi c applications, for example, for measuring
substances with high viscosity.
www.ker-eng.com 65
PR
OD
UC
TIO
N
6565
A pressure transmitter can be controlled
locally with 3 control keys, or programmed
externally via HART-communication or
PROFIBUS PA or FOUNDATION Fieldbus in-
terface.
Approval documents: Certifi cate of Compliance No.РОСС
RU.МХ11. Н00239 in the Certifi cation Sys-
tem GOST R of the Federal Agency for Tech-
nical Regulation and Metrology;
Type approval certifi cate of measur-
ing instruments RU.C.30.065.A №44518 reg-
istered in the Federal Agency for Technical
Regulation and Metrology under No.48319-
11;
Certifi cate of Compliance for ex-
plosion-proof equipment No.ТС RU C
RU.ГБ08.В.00008, series RU No.0018916.
Meets the requirements of the Technical
Regulations of the Customs Union “On se-
curity of equipment for use in potentially
explosive atmospheres” (TR TS 012/2011)
GOST R 51330.0-99, GOST R 51330.1-99,
GOSR R 51330.10-99.
Engineering that creates advantages66
HARDWARE AND SOFTWARE PACKAGE FOR GAS
DISTRIBUTION UNITS
Designation:Hardware and software package for gas dis-
tribution units is designed for:
— automatic, remote and local manual pro-
cess control of the gas distribution units;
— regulation of process parameters, imple-
mentation of process protections and interlocks
of equipment;
— process parameter data acquisition, current
processing and storage of primary data and data
exchange with the dispatch and control system).
System functions: automatic remote and manual control of
gas distribution plant equipment; functional
group control;
automatic regulation of process parameters;
diagnostics and protection of controlled
equipment;
process parameter data acquisition, current
processing and storage of primary data and data
exchange with the upper level system (a control
centre), display of process fl ow on Workstation
screen of a gas distribution plant operator.
DATS HARDWARE AND SOFTWARE PACKAGE
Designation: measurement of process parameters for
transfer and distribution of electric energy;
process parameter control at electric sub-
stations and power plants;
creation of information and control systems
to automate process parameters for transfer and
distribution of electric energy;
dispatch control of facilities in the normal
and emergency modes.
Advantages: A standard set of basic functions: digital sig-
nal input, analog signal input, digit-pulse signal
input, digital signal output;
A wide range of input/output signals — from
32 up to 256 signals of each type — serves to
adapt to facilities of diff erent information capac-
ity;
A block-modular structure allows to use dif-
ferent structural elements (cabinets) for optimal
placement of equipment at the facility. It is also
possible to space individual functional units and
up to 500 m, etc.
www.ker-eng.com 67
PR
OD
UC
TIO
N
6767
RODNIK HARDWARE AND SOFTWARE
PACKAGE
Rodnik hardware and software package
is designed to automate processes of chem-
ical water treatment.
The control system is a multifunction
system with a block and modular architec-
ture adaptable to the requirements of a par-
ticular facility.
The package provides: Automatic regulation of process pa-
rameters in controlled processes under the
specifi ed settings;
Automatic control of equipment — func-
tional group control;
Manual (local) control of equipment
from local control rooms;
Manual (remote) control of equipment
from panels of control cabinet operators and
a control centre;
Process protection, alarms and inter-
locks;
Visualization and process control using
operator’s automated workstation (AWP) in
the control room;
The basis of the whole automation
package of water treatment plants includes
the following subsystems:
DCS for: the chemical injection package;
the clarifi cation agent;
the solvents recovery unit;
the mechanical fi lters;
the H-cation and anion fi lters;
the sorption fi lters;
the reverse osmosis plant;
the microfi ltration plant;
the ultrafi ltration plant;
the bioreactors.
Automated Control System for pump stations.
The hardware and software package is
designed on the base of Siemens equipment
and software.
Certifi cate of Conformity No.POCC RU.АЯ
54.В13155 of the State Committee for the
Russian Federation for Standardization and
Metrology.
Engineering that creates advantages68
POTOK HARDWARE AND SOFTWARE PACKAGE
Potok hardware and software package is de-
signed for automatic control and monitoring of
production cycles of pump stations.
Area of application:Potok is used in water supply systems, fi re
fi ghting systems, boiler feed and water transport,
process supply systems in the chemical and oil
industries. Potok also can function as an integral
part of control systems at CHP, boiler houses and
heat points.
System functions: Pressure (level, fl ow, temperature) mainte-
nance at output of pump unit groups in the au-
tomatic mode;
Smooth startup of pump units;
Transition to the next pump (by status) in
case of malfunction of the main pump;
Automatic rotation of the pump units with
the purpose of uniform load;
Protection of pumps in case of emergencies;
The alarm system, information display and
input by the operator in the dialog mode by
means of the control panel LCD;
Automatic registration of the operation time
and emergency causes in the controller memory.
The system is implemented on the base of
Siemens and Schneider Electric.
Test stands for CONTUR SID
internal combustion engines
Test stands for internal combustion engines
are designed for carrying out trial runs, accept-
ance tests and predelivery tests while manufac-
turing, major and routine repair of internal com-
bustion engines in power ranges from 63 to 1,800
horse power. CONTUR SID stands have a GOST R
certifi cate of conformity.
Area of application for stands: Verifi cation of engine assembly quality
Engine adjustment
Cold operational engine test
Hot operational engine test without load
Hot operational engine test under load
Engine parameter check
Engine acceptance tests
Engine predelivery tests
The economic eff ect of introduction: Improvement of manufacture quality, major
and routine repair of internal combustion engines
Increase testing quality due the use of de-
veloped tools of browsing and analysis of accu-
mulated process information
Increase eff ectiveness of equipment due to
the use of energy recovery to the network
Increase testers’ measures of responsibility
Provide safe working environment Provide
advanced diagnostic tools to reduce time for
maintenance and repair works.
www.ker-eng.com 69
PR
OD
UC
TIO
N
6969
POTOK KNU COMPLETE PUMP STATIONS
Designation:POTOK KNU complete pump stations are
designed for systems of water supply, heat-
ing, fi re fi ghting, air conditioning, boiler feed
up.
Contents of equipment:A pumping unit is an integrated engi-
neering solution for commissioning, the only
thing needed is to bring the pipeline and pro-
vide voltage supply. POTOK KNU is equipped
with pumps of world’s leading manufacturer
of pumping equipment — WILO Company.
A wide range of pumping unit application
is provided due to diff erent scale of POTOK
KNU variations:
a number of pumps is from 2 up to 6;
performance frequency regulation;
digital regulation with smooth startup
of pumps;
digital regulation.
Functions:The automatic control cabinet provides
the following functions:
maintenance of the given parameter
(pressure, temperature, fl ow ...);
protection of the motor, pumps, the hy-
draulic system;
automatic rotation of pump operating
time by operator selection;
emergency situation alarm with decod-
ing;
temporary schedule control;
control in the automatic or manual
mode;
graphic touch screen of the interface;
displaying of key parameters.
The principle of operation of the pump-ing unit with digital regulation:
In automatic mode, maintaining of the
controlled parameter is carried out through
startup/shutdown of the pump depending
on the signal from the feedback sensor.
Startup of the fi rst pump if the adjustable
parameter did not come out to the desired
mode for the specifi ed period of time, start-
up of the second pump, etc. Similarly, in re-
verse order, up to the complete shutdown of
all pumps.
Manual mode for testing and commis-
sioning.
The principle of operation of the pump-ing unit with digital regulation:
In automatic mode, maintaining the ad-
justable parameter is done by changing
rotation frequency of the pump driven by
the frequency converter. A signal from the
feedback transducer is compared with a
predetermined setpoint. In case of disagree-
ment, the automatic regulation system in-
creases or decreases rotation frequency of
the pump driven by the frequency converter.
When the frequency converter reaches its
frequency limit values (min, max), the auto-
matic control system enables/disables the
next pump (by status).
Manual mode for testing and commis-
sioning.
Engineering that creates advantages70
INFORMATION SIGNS AND POSTERS ON LABOUR
SAFETY, FLOW DIAGRAMS
We suggest: training video fi lms in VHS, CD and DVD for-
mat and training multimedia software in CD for-
mat on diff erent topics;
any informational signs and posters includ-
ing safety-related signs and posters (according
to GOST — State Standard), photoluminescence
evacuation signs (according to GOST Р12.2.143-
2002), fi re evacuation plans, etc.;
fl ow diagrams of labour management for
fuel and energy complex enterprises;
virtual labour safety rooms equipped with
tests, educational video fi lms, informational ma-
terials executed in the form of multimedia soft-
ware; stands of various subjects; thematic rooms,
labour safety rooms, educational classrooms, en-
terprise museums in complete sets according to
agreed variants.
We use new technologies: printing of information signs and plates as
one-of-a-kind and exclusive products on any
process base of thickness no more than 13 mm,
on sheet and roll materials (polystyrene, glass,
aluminum, ceramics, glass, etc.). using a UV print-
er. Sericol ultraviolet ink (England) provides high
adhesion and resistance to physical and weather
impact.
The Customer gets: information products made in accordance
with the current legal framework and using mod-
ern techniques and technologies with due regard
of the Customer’s requirements;
modern labour safety rooms, classrooms
staff ed with stands, software, videos, fl owcharts,
signs and posters made in accordance with the
applicable legal documents.
www.ker-eng.com 71
RE
FE
RE
NC
E L
IST
KEY REFERENCES(Find detailed references on the CD-ROM attached to
the booklet or at website www.ker-eng.com)
Turbine generating unit, st. No.9. Upgrading of the network water scheme.
Kazan CHP-2 2010
Design and survey work under the project for the gas distribution plant No.2 at Savinovo boiler house
Kazan CHP-2 2010
PROJECTS ENTERPRISES DATE
DESIGNING AND SUPPORT OF CONSTRUCTION
Development of external power supply at TAIF-NK Advanced Oil Processing Center (Nizh-nekamsk)
TAIF-NK OJSC 2013
The scheme of power distribution and external power supply at Hayat Kimya LLC - Sanitary Paper Plant (FEZ Alabuga)
Hayat Kimya LLC 2013
Design and survey work: Construction of 110/10 kV Innopolis Substation
Kazan GIPRONIIaviaprom CJSC
2013
Design and survey work: External power supply scheme of the second stage of sapphire produc-tion for optoelectronics
KamaKristall-Technology LLC
2013
Design of power supply facilities at ammonia, methanol and carbamide plant (Mendeleyevsk, Tatarstan)
NIIK OJSC 2012
Development of design and detailed design docu-mentation for heat supply of Laura Merlen Kazan trading centre located at Amirkhan str., Kazan (correction)
Modern Energy Modeling LLC
2012
Upgrading of the high pressure cylinder of the tur-bine generating unit No.8 including introduction of cell shroud seals at Verkhniy Tagil SDPP
Quartz-Western Siberia CJSC
2011
Rehabilitation of the turbo feed pump including replacement of the pump to the modern pump under the project “Rehabilitation of 300 MW power unit, st. No.10 at Sredneuralskaya SDPP”.
REP-Engineering 2011
Design work in accordance with specifi cations for power supply of the working site No. at Kamstroytechservice LLC with a capacity of 250 kW fed from electric networks of KMPO OJSC. Detailed design documentation stage.
Kamgesenergostroy Company
2011
Engineering that creates advantages72
Upgrading of PTVM-100 boiler, st. No.2 including installation of new type heating surfaces
Naberezhnye Chelny CHP 2010
Design work under the project for rehabilitation of 110 kV Kirovskaya Substation
Kazan electrical networks 2010
Design work under the project Rehabilitation of 220/110/35/6 kV Pismyanka open switchgear, construction of 2-circuit overhead transmission line (split of 220 kV Uzlovaya-Abdrakhmanovo-Bugulma overhead transmission line with over-hang to Pismyanka Substation) for power supply of Electric Metallurgical Plant (TatSteel CJSC).
Bugulma electricalnetworks
2010
Technical and economic calculation for CCGT at Kazan CHP-2
Kazan CHP-2 2010
Implementation of the detailed design “Upgrading of gas distribution plants (1, 2) of Orenburg gas”
Zainsk SDPP 2010
Rehabilitation of 110 kV overhead transmission line at Yuzhnaya - Kovali-1, 2 Substation
Volga Electrical Networks 2009
Development of the external power supply scheme at Ammonia OJSC facility (Mendeleyevsk)
Ammonia OJSC 2009
External heat supply. 2nd stage. Heating networks from the gate valve switching station before the heat point at Nizhnekamsk CHP working site up to 140 at main steam pipeline and the turbine generating unit No.5 in the main building of Nizhnekamsk CHP (the hardware and software package-2)
Nizhnekamsk CHP (the hardware and software package-2)
2009
Development of the external power supply scheme of the facility under construction – Heavy Residue Deep Refi ning Complex at Taif-NK OJSC (Nizhnekamsk) (pre-design)
TAIF-NK OJSC 2009
Development of the external power supply scheme for the electric metallurgical plantTatSteel CJSC (Leninogorsk, Tatarstan)
TatSteel CJSC 2009
Upgrading of chemical water treatment equip-ment (transition of fi lter chains Nos.2 - 9 to counterfl ow chains (Upcore type)
Nizhnekamsk CHP (the hardware and software package-2)
2009
Design stage. 110-220/6 kV main step down substations 1,2,3,4 with 110-220 kV feeding lines of the Complex power supply scheme
TANEKO Refi nery and Pet-rochemical Plant Complex
2008
Project of Automated System for Accounting of Electric Energy
TANEKO Refi nery andPetrochemical Plant Complex
2008
Construction project for 220 kV and 110 kV gas insulated switchgear
TANEKO Refi nery andPetrochemical Plant Complex
2008
PROJECTS ENTERPRISES DATE
www.ker-eng.com 73
RE
FE
RE
NC
E L
IST
PROJECTS ENTERPRISES DATE
Design stage. In-site power supply.Cogeneration installation.
TANEKO Refi nery andPetrochemical Plant Complex
2008
Design stage. 110-220/6 kV power transmis-sion lines with 220-110 kV feeding lines of the Complex external power supply scheme including development of the design stage for special transition of 220 kV power transmission lines Kama-Complex over the Kama river
TANEKO Refi nery andPetrochemical Plant Complex
2008
Design stage. Heating networks from the border of Nizhnekamsk CHP (the hardware and software package-2) including heating networks up to the border of the Complex
TANEKO Refi nery andPetrochemical Plant Complex
2008
Rehabilitation of the cooling tower No.1including transition to the fi lm-type spray system
Naberezhnye Chelny CHP 2008
Rehabilitation of the cooling tower includingapplication of modern polymer structuralmaterials
Nizhnekamsk CHP 2008
Rehabilitation of BG-1600 cooling tower, st. No.1
Petrozavodks CHP, Branch of Territorial Generating Company-1 OJSCKarekEnergoGeneration Company
2008
Construction of Azino, Savinovo district boiler houses with PTVM-180, GVGM-180 hot water boilers, DE-25 steam boiler
Kazan Heating Networks 2008
Working project for construction of 220 kVopen switchgear with two 125 MVA automatic transformers
Kazan CHP-3 2008
Engineering that creates advantages74
Projects Corporate customer Date
AUTOMATIONOF PROCESSES AND PRODUCTION
DCS for a new power unit at Abakan CHP Yenisei Territorial Gen-erating Company OJSC (Territorial Generating Company-13)
2013
DCS for CCGT-220MW (design and survey work) based on GE hardware and software package
Kazan CHP-22012-2013
A set of works on installation, repair, technical and service maintenance of DCS, Control and Instru-mentation, fi re and security alarm and CCTV for AMAKS gas blocks
Kazan CHP -1Kazan CHP -2Kazan CHP -3 Naberezhnye Chelny CHPZainsk SDPP Yelabuga CHP Nizhnekamsk HPP Nizhnekamsk CHP LLCNizhnekamsk CHP, Territorial Generating Company-16 OJSC
2002-2013
Upgrading of gas pipelines and DCS for Е-160-24-250 GM steam boiler, st. No.1
Naberezhnye Chelny Cardboard and Paper Mill
2013
DCS for 6 power units per 500 MW each, st. No.3, 4, 5, 6,7, 8 based on Ovation hardware and software (Emerson)
SDPP-1, Ekibastuz(Kazakhstan) 2005-2012
Upgrading of the voltage regulator system for hy-draulic generators No.1-16 based on SIMATIC PCS 7 hardware and software package (SIEMENS)
Nizhnekamsk HPP2010-2012
DCS for the gas turbine power plant GTRR-24 MWat Dvurechenskiy oil fi eld
2012
Automatic Control System of К-205 turbine generat-ing unit, st. No.10 based on Ovation hardware and software package
Verkhniy Tagil SDPP2012
Introduction of automated control, regulation and protection system for R-3,15-1.28/0.2P drive turbine on the base of PCS 7 hardware and software pack-age (Siemens)
Novo-Kemerovo CHP
2012
Upgrading of TGM-84 B boiler unit, st. No.10 includ-ing installation of new AMAKS gas blocks
Kazan CHP-12012
DCS for the boiler unit based on the hardware and software package (Siemens)
Tatneft Neftekhimservis OJSC
2012
Introduction of the frequency-regulated drive system at water supply pumping units in the south-western and north-eastern parts (Naberezhnye Chelny)
Chelnyvodokanal CJSC
2011
Automatic Frequency and Active Power Regulation System for 11 power units per 200 MW st. no. 2, 3, 4, 5, 6, 7, 8, 9, 10, 11,12 based on Ovation hardware and software package (Emerson)
Zainsk SDPP
2004-2011
www.ker-eng.com 75
RE
FE
RE
NC
E L
IST
Projects Corporate customer Date
Installation of variable frequency drives for pumps network
Novo-Sterlitamack CHPKumertau CHP Salavat CHP Sterlitamack CHP
2011
Installation of Automated Systems for Commercial Metering of Electric Energy at BSI Substation, Shilna Substation, ZYAB Substation, Chulman Substation, KBK Substation, Centre Substation, Tukayevskaya Substation, Pervomayskaya Substation, Chelny Substation, 35 distribution substations, 85 heating substations
Naberezhnye Chelny Electrical Networks
2011
The main control board building. Upgrading of the main control board including installation of the automated system of frequency discharge based on microprocessor protection
Kazan CHP
2011
The control system for the main assembly line GSK-1
KAMAZ OJSC2011
Construction of the integrated security system for bridge crossings
A bridge crossing over the Vyatka river A bridge crossing over the Volga river
2009-2011
Automated Ignition Control System for TPE-208 type burners at the power unit st. No.3 based on SIMATIC PCS 7 hardware and software (Siemens)
Smolensk SDPP2010
DCS for the boiler unit No.5 based on SIMATIC PCS 7 hardware and software (Siemens)
Mariy Pulp and Paper Mill2010
Information Display System for the main control panel at Nizhnekamsk HPP
Nizhnekamsk HPP2010
Automated Regulation System for the boiler unit No.13 based on SIMATIC PCS 7 hardware and soft-ware package (Siemens)
Aktau, CHP-2(Kazakhstan) 2010
Automated Control System for heat supply of North-Eastern and South-Western Districts of Naberezh-nye Chelny based on SIMATIC WinCC software (Siemens). The system control centre.
Naberezhnye Chelny Heat Distribution Company OJSC
2009-2010
Technical re-equipping of power plant perimeter defense including the personnel access control system, CCTV system based on ITV equipment
Zainsk SDPP2009
Technical re-equipping of the fuel and lubricant storage (Automated Control System for tank levels, gas analyzers, fi re alarm, ventilation) based on SIEMENS equipment
Begishevo Airport
2009
Development and introduction of Substation DCS (design, supply, installation, adjustment)
110 kV LeninskayaSubstation110 kV SevernayaSubstation110 kV Vostochnaya Substation
2008-2009
Engineering that creates advantages76
Projects Corporate customer Date
Automated System for Electric Energy Account-ing for Refi nery and Petrochemical Plant Complex (project) based on SIEMENS equipment
TANEKO Refi nery and Petrochemical Plant Complex OJSCNizhnekamsk
2008
Full-scale automated system for the chemistry department based on equipment by SIEMENS,KER-Avtomatika
Kazan CHP-1 Kazan CHP-3Nizhnekamsk CHPZainsk SDPP
2007-2008
Automated data acquisition for calculation of tech-nical and economic indicators of the power plant (14 power boiler units, 11 turbine generating units, balance-of-plant equipment) based on equipment by Krug Scientifi c and Production Company, Volmag CJSC
Naberezhnye Chelny CHP
2007-2008
Development and installation of the Automated system for Accounting of power resources.Introduction of heat energy and hot water metering stations in apartment buildings based on equipment by Vzlyot CJSC
630 apartment buildings (Naberezhnye Chelny)
2007-2008
Analysis of equipment operational modes, develop-ment of project documentation for a frequency-regulated electrical drive installation
800 central heat supply stations in Moscow 2007-2008
The automatic fi re alarm and fi re extinguishing system
Nizhnekamsk HPP Kazan CHP-3 Naberezhnye Chelny CHP
2007-2008
The automatic regulation system for the power plant with cross links (3 energy boiler units BKZ-420 and 3 turbine generating unit PT-60, PT-80) based on Ovation hardware and software package (Emerson)
Priufi mskaya CHP
2007-2008
The automated system of the supervisory control of the poultry processing plant
Chelny-Broiler LLCNaberezhnye Chelny
2007-2008
The automation system for gas distribution plants based on SIEMENS and KER-Avtomatika equipment
Kazan CHP-3 Nizhnekamsk CHPZainsk SDPP
2007
DCS for 50 MW gas turbine unit based on OVATION hardware and software package (EMERSON)
Kazan CHP-12005
www.ker-eng.com 77
RE
FE
RE
NC
E L
IST
Projects Corporate customer Date
DCS for a new power unit at Abakan CHP Yenisei Territorial Gen-erating Company OJSC (Territorial Generating Company-13)
2013
DCS for CCGT-220MW (design and survey work) based on GE hardware and software package
Kazan CHP-22012-2013
A set of works on installation, repair, technical and service maintenance of DCS, Control and Instru-mentation, fi re and security alarm and CCTV for AMAKS gas blocks
Kazan CHP -1Kazan CHP -2Kazan CHP -3 Naberezhnye Chelny CHPZainsk SDPP Yelabuga CHP Nizhnekamsk HPP Nizhnekamsk CHP LLCNizhnekamsk CHP, Territorial Generating Company-16 OJSC
2002-2013
Upgrading of gas pipelines and DCS for Е-160-24-250 GM steam boiler, st. No.1
Naberezhnye Chelny Cardboard and Paper Mill
2013
DCS for 6 power units per 500 MW st. no. 3, 4, 5, 6,7, 8 based on Ovation hardware and software pack-age (Emerson)
SDPP-1, Ekibastuz(Kazakhstan) 2005-2012
Upgrading of the voltage regulator system for hy-draulic generators No.1-16 based on SIMATIC PCS 7 hardware and software package (SIEMENS)
Nizhnekamsk HPP2010-2012
DCS for 24 MW gas turbine power plant Dvurechenskiy oil fi eld 2012
Automatic Control System of К-205 turbine generat-ing unit, st. No.10 based on Ovation hardware and software package
Verkhniy Tagil SDPP2012
Introduction of automated control, regulation and protection system for R-3,15-1.28/0.2P drive turbine on the base of PCS 7 hardware and software pack-age (Siemens)
Novo-Kemerovo CHP
2012
Upgrading of TGM-84 B boiler unit, st. No.10 includ-ing installation of new AMAKS gas blocks
Kazan CHP-12012
DCS for the boiler unit based on the hardware and software package (Siemens)
Tatneft Neftekhimservis OJSC
2012
Introduction of the frequency-regulated drive system at water supply pumping units in the south-western and north-eastern parts (Naberezhnye Chelny)
Chelnyvodokanal CJSC
2011
Automatic Frequency and Active Power Regulation System for 11 power units per 200 MW st. no. 2, 3, 4, 5, 6, 7, 8, 9, 10, 11,12 based on Ovation hardware and software package (Emerson)
Zainsk SDPP
2004-2011
Engineering that creates advantages78
Upgrading of 6 kV generator switchgear No.2 equipment and electric power equipment of the water boiler house
Kazan CHP-1 2010
Rehabilitation of Central Substation, Southern Substation including installation UPK-TS equipment (design, installation, adjustment)
Kazan electricalnetworks
2010
Rehabilitation of electrical equipment at power plants (circuit breakers)Replacement of MV-220kV 296 circuit breaker, Unit No.6 for SF-6 circuit breaker including replacement of disconnectors (Moscow CHP-23)
Moscow CHP-23 2010
Rehabilitation of UNITROL 1000 excitation system for turbine generating units TG-1 and TG-2
Sealtek CJSC 2010
Upgrading of GSP-900-100094 type generator, improvement of excitation systems for the backup exciter No.1
Territorial Generating Company-16 OJSC
2010
Upgrading of 110 kV closed switchgear including in-stallation of SF-6 circuit breakers and microproces-sor protections of the cells Nos. 9, 10, disconnec-tors, current transformers of the cell No. 36 (TAP-1) (2nd startup package - the cell No.10, 3, the startup package - the cell No.36)
Territorial Generating Company-16 OJSC
2010
Projects Corporate customer Date
ELECTRICAL ENGINEERING
Construction of 500 kV “new generation” electrical substation in Alabuga free economic zone
Yelabuga ElectricNetworks
2012-2013
Rehabilitation of 500 kV Kinderi Substation (Kazan) Kazan electrical networks 2012-2013
Upgrading of the voltage regulator system for hydraulic generators No.1-16
Nizhnekamsk HPP 2012
Construction, erection and pre-commissioning work: A turbine of Unit st. No.12 Upgrading of the turbine generating unit including replacement of culverts, the brush contact unit and the thyristor excitation system
Zainsk SDPP 2012
Construction, erection and pre-commissioning work for 110 kV open switchgear. Upgrading of Zapadnaya cells, 1,2 of the electric network at Kazan CHP-2
Kazan CHP-2 2012
Rehabilitation 220 kV open switchgear at 220/110/35/6 kV Pismyanka Substation, construc-tion of 2-circuit overhead transmission line (split of 220 kV Uzlovaya-Abdrakhmanovo-Bugulma over-head transmission line with overhang to Pismyanka Substation) for power supply of Electric Metallurgi-cal Plant (TatSteel CJSC).
Bugulma electricalnetworks
2011
www.ker-eng.com 79
RE
FE
RE
NC
E L
IST
Projects Corporate customer Date
Installation of protections from single-phase fault, units 6, 7, 8 of the gas turbine for Penza Branch of Territorial Generating Company-6 OJSC (design, installation, adjustment)
Territorial Generating Company-6 OJSC
2010
Rehabilitation 110/35/10 kV Nurlat-NovayaSubstation with 110-35-10 kV overhang
Chistopol electrical networks
2010
Rehabilitation of KSO-10 kV power equipment chambers in Sewage pumping station-10 (design, installation, adjustment)
Water supply, sewerage and power facilities OJSC
2010
Upgrading of turbine generating units, st. No.2, 3, 5-12 including introduction of the partial discharge monitoring system in the stator winding
Zainsk SDPP 2010
Upgrading of 110 kV open switchgear including replacement of circuit breakers for SF6 for micro-processor protection (cells Nos.1, 2, 4)
Naberezhnye Chelny CHP 2010
Rehabilitation of existing automatic devices for un-loading at overloads of 220 kV overhead transmis-sion lines (Kinderi Substation) and implementation of automatic devices for unloading at overloads of 220 kV overhead transmission lines (Zelenodolsk Substation) (design, installation, adjustment)
Volga Electrical Networks 2010
Rehabilitation of equipment at 500 kV open switch-gear (Kinderi Substation) including replacement of TT-500 kV (design, installation, adjustment)
Kazan electricalnetworks
2010
Technical re-equipping of 6 kV switchgear and control gear (27 cells)
Nizhnekamsk HPP 2009
Upgrading of 110 kV open switchgear including installation of current measuring devices and coupling capacitors
Nizhnekamsk CHP 2009
Major repairs of VVB 220 kV switches, 220 kVdisconnect switches, 35 kV air blast switches
500 kV BugulmaSubstation
2009
Major repairs of the earthing circuit9 substations of Bugulma Electrical Networks
2009
Major repairs of electric equipment at 35 kV open switchgear and 6 kV closed switchgear
Mikulino Substation 2009
Major overhaul with installation of new remote control systems
Substation of Nizh-nekamsk electrical net-works, Bugulma electrical networks, Almetyevsk electrical networks, Naberezhnye Chelny electrical networks
2009
Maintenance of remote control systems
Substation of Nizh-nekamsk electrical net-works, Bugulma electrical networks, Almetyevsk electrical networks
2009
Engineering that creates advantages80
ENERGOTECHNOLOGICAL AUDIT
EXPERIENCE OF INTERNATIONAL PROJECTS
Projects Corporate customer Date
Technical survey and development of construction specifi cations and tender documents
CHP at the oil refi nery plant (Aden,Republic of Yemen)
2010
Development of the feasibility study for replace-ment and development of generating capacities
MAEK Kazatomprom LLP 2010
Integrated service “Consultant Expert”: expert ex-amination development of the project — tendering process in the interests of the Customer — selection of a Contractor — rehabilitation support — facility commissioning — turnkey operation
CHP of PakSteelSteelworks (Pakistan)
2007-2009
Integrated survey of power equipment and consult-ing services for upgrading of the existing CHP with the purpose to bring performance up to design capacity
CHP of PakSteelSteelworksPakistan Steel (Pakistan)
2007
Integrated survey of power equipment Fria CHP (Guinea) 2007
EXPERIENCE IN RUSSIAN PROJECTS (BRIEF EXTRACTION FROM THE REFERENCE LIST)
Projects Corporate customer Date
Integrated survey of Nizhny Novgorod SDPP named after Vinter including consideration of the Electric Plant upgrading variants
Ost West Capital LLC 2009-2010
Energy survey of the electric part of Saphyan OJSC enterprise including development of new power supply circuit solutions for a new production line, development of the energy certifi cate
Sakhyan OJSC 2009-2010
Diagnostics of technical devices at 110/10/6kV Substation, main step down substation-1
Southern Branch of Gasprom Energo OJSC
2009
Thermovision inspection 500 kV, 220 kV overhead transmission line
Volga Main Power Net-works, Branch of Federal Grid Company of Unifi ed Energy Systems OJSC
2009
Integrated survey of 35kV overhead transmission lines including thermovision inspection and inspec-tion of the technical state of the construction part of the overhead transmission line poles
Northern Caucasus Branch of Gasprom Energo OJSC
2009
Technical inspection of condensate pipelineHelium Plant, Kargaly CHP, South Ural Branch of Gasprom Energo OJSC
2009
Energy auditSouth Ural Branch of Gasprom Energo OJSC
2009
Energy inspectionKrasnoselskiy Jewellery Works
2008
Technical auditTPP 40-160 of the Indus-trial Logistics PackageSevernoye Domodedovo
2008
Development of standards of harmful emissions from boilers st. Nos.1-16
Nizhnekamsk CHP-1 2008
www.ker-eng.com 81
RE
FE
RE
NC
E L
ISTКомплексное обследование
электротехнического оборудованияПредприятия МЭС Волги 2007
Экспертиза промышленной безопасности горелочных устройств блоков к/а типа ПК-47 ст.№№3,4 Заинской ГРЭС
Заинская ГРЭС 2007
Разработка электронной схемы теплоснабжения района, города, предприятия с оптимизацией режимов работы теплосети и загрузки оборудования генерирующих мощностей
Тепловые сети городов и населенных пунктов Татарстана
2007
Комплексное обследование электротехнического оборудования
МЭС Волги 2007
Двухтопливный генератор на базе двигателя «КАМАЗ»
Новая разработка с целью выхода на рынок малой генерации
2007
Выявление технического состояния и условий эксплуатации тепловой изоляции энергоблока ст. № 6 (дубльблок) с составлением паспортов
Кармановская ГРЭС 2006
Обследование технического состояния и паспортизация тепловой изоляции, обмуровки основного оборудования и трубопроводов энергоблока ст. № 5
ОАО «Каширская ГРЭС-4»
2006
Энергетическое обследование ООО «Завод Эластик» 2006
Расчет и оптимизация работы теплосети от единого источника
Тепловые сети городов и населенных пунктов
2006
Паспортизация тепловой изоляции котлоагрегата ТП-87, турбоагрегата ПТ-60-130 с отнесенным к ним оборудованием – энергоблок ст.№ 3
Ижевская ТЭЦ-2 2005
Энергетическое обследование Котельная ВНИИР 2005
Экспертиза промышленной безопасности деаэратора высокого давления
Нижегородская ГРЭС 2005
Энергетическое обследование
Альметьевское ЛПУМГ ООО «Таттрансгаз», котельная ОАО «Казанский лен»
2004
Экспертиза промышленной безопасности котлов, сосудов
Сормовская ТЭЦ, Агрокомбинат «Майский»
2004
Экспертиза промышленной безопасности котлов, сосудов
Нижегородская ГРЭС, АПК «Казанский лен»
2003
Энергетическое обследование«Сантехприбор», ОАО «Камаз»
2002
Разработка нормативов вредных выбросов в атмосферу от котлов ст.№№1-16
Нижнекамская ТЭЦ-1 2001
Экспертиза промышленной безопасности котлов
Новочебоксарская ТЭЦ-3 2001
Projects Corporate customer Date
Engineering that creates advantages82
Primary, repeated surveys (energy audit) of enter-prises’ power utilities. Tatenergo OJSC
9 enterprises of Grid Com-pany OJSC, 9 enterprises of Generating Company OJSC, enterprises of Heat Distribution Company OJSC
2001-2009
Technical diagnostics and inspection of boiler metalwork
Cheboksary CHP-2, Naberezhnye Chelny Card-board and Paper Mill
2000
Technical diagnostics of boilers, economizersBoiler houses at Kazan Concrete Goods Plants
1999
Performance adjustment of DKVР-10/13 type boil-ers, st. No.2
Minnebayevo GasProcessing Plant
1998
Technical diagnostics of boilers, economizersBoiler house of Teks OJSC, Dubniki Brewery
1997
Thermovision inspection of chimneys Nos.1, 2, the boiler unit st. No.5. Finding of leakages of turbines st. No.4, 5 into the vacuum system with a halogen leak detector
CHP at Novolipetsk Metal-lurgical Combine OJSC
1996
Commissioning trials of PTVM180 boiler, st. No.2
Azino-2 District Boiler House, Kazan Heating NetworksTatenergo OJSC
1994
Development if parameter charts for operation of DKVР-10/13, DKVР-6,5/13 type boilers at the industrial boiler house
Kazan Slaughtering and Meat Processing Plant OJSC
1992
Operational tests of boilers at industrial boiler houses
Scientifi c Production Asso-ciation named after Lenin, Zarya Confectionary Plant
1991
Projects Corporate customer Date
Engineering that creates advantages86
Welcome to cooperation!Welcome to cooperation!
www.ker-eng.com
KER-ENGINEERINGKER-ENGINEERINGGROUP OF COMPANIESGROUP OF COMPANIESKER-ENGINEERING GROUP OF COMPANIES
KER-ENGINEERING GROUP OF COMPANIES
KER-ENGINEERING LLC
Yamashev av., 37b, Kazan,
Republic of Tatarstan, Russia, 420080
tel.: +7 (843) 557-62-05,
fax: +7 (843) 557-62-07
www.ker-eng.com
BRANCHES
TATNIPIENERGOPROM
(Kazan)
tel.: +7 (843) 557-62-05,
fax: +7 (843) 557-62-07
KER-AVTOMATIKA
(Naberezhnye Chelny)
tel.:+7 (8552) 39–53–54,
fax: +7 (8552) 39–42–78
ENGINEERING CENTRE
ENERGOPROGRESS
(Kazan)
tel.: +7 (843) 519-37-59,
fax: +7 (843) 544-17-92
KER-NALADKA
(Kazan)
tel.: +7 (843) 299-43-58,
fax: +7 (843) 299-51-17
REPRESENTATIVE OFFICE IN MOSCOW
tel.: (495) 737-08-64