+ All Categories
Home > Automotive > Keros General Motors

Keros General Motors

Date post: 30-Jul-2015
Category:
Upload: calstart
View: 1,247 times
Download: 1 times
Share this document with a friend
Popular Tags:
5
Workplace Charging: Filling a Critical Infrastructure Gap July 31, 2012 Alex Keros Mngr, Advanced Vehicle and Infrastructure Policy
Transcript
Page 1: Keros General Motors

Workplace Charging: Filling a Critical Infrastructure Gap

July 31, 2012

Alex Keros Mngr, Advanced Vehicle and Infrastructure Policy

Page 2: Keros General Motors

GM’s Line-up of Plug-in Vehicles:

Chevrolet Volt

EREV (2010)

Cadillac ELR EREV

(Timing to be announced)

Electric Vehicle and Charging| General Motors

Chevrolet Spark

BEV (2013)

GM Workplace Installation Examples • GM Global Headquarters (Renaissance Center, Detroit) • Detroit-Hamtramck Assembly Plant (includes Solar) • Brownstown Battery Assembly Plant • GM Tech Center

o VEC (Solar) o AEC (Solar) o Design Studios o R&D o Service Operations o Company Vehicle Operations (Solar)

• Bowling Green Assembly Plant (Solar) • Lordstown Complex (Solar) • Parma Metal Center (Solar) • Baltimore Transmission Plant (includes Solar) • Milford Proving Grounds (includes Solar) • Customer Care & Aftersales, Service Parts Organization • Advanced Technical Centers

o Palo Alto, CA o Torrance, CA o Honolulu, HI o Honeoye Falls, NY o Washington DC

Public

Workplace

Residential

120V =

grid-friendly, easy

240V =

faster-charging

Page 3: Keros General Motors

3

PEV Charging Installations | GM Workplace

Detroit-Hamtramck (MI) Assembly Plant Company Vehicle Operations (MI) GM Headquarters

Warrant Tech Center (MI) Adv. Vehicle Center (VA) Dealerships (including CA)

Page 4: Keros General Motors

4

PEV Charging Installations | Torrance, CA

Advanced Technology Center & Advanced Technology Vehicle Center

Page 5: Keros General Motors

Recommended