    KEY PERFORMANCE AREA

    [Democracy and Governance]

    PRIORITY ISSUE 2 Improved relations

    OBJECTIVE/s

    1. municipal staff and councillors involved in relationship building activities at least 4 time per annum.

    2. relationship building with external stakeholders at least 4 times per annum.

    3. information dissemination at ward and municipal level

    4. KwaDukuza as an organisation well positioned and marketed through newsletters and radio slots.

    STRATEGY Team building and communication strategy

    PROJECTS PROJECT VALUE

    1. municipal staff and councillor team building

    2. Develop a newsletter and radio communication

    3. New corporate image

    4. inter-ward games programme

    R80,000.00

    R80,000.00

    R100,000.00

    R100,000.00

    2

  • 7/31/2019 Key Performance Area1

    3/26

    KEY PERFORMANCE AREA

    [Social and Economic Development]

    PRIORITY ISSUE 3 Develop the Economy

    OBJECTIVE/s

    3.1. Job Creation 1. encourage sustainable economic development and job creation, 2. retain and expand existing

    business and investments, 3. attract new investment, 4. Implement procurement policy, 5. shared vision around

    economic cluster, 5. develop KwaDukuzas tourism products.

    3.2. Poverty and unemployment 1. household access to sustainable income equal to breadline income, 2.

    eradicate poverty, 3. identify the marginalized amongst the poorest of the poor, 4. reduce the number of

    unemployed and dependency ratio, 5. create employment opportunities through councils procurement policies, 6.

    effective communication of employment opportunities, 7. skills development, 8. opportunities in the informal

    sector.

    3.3. Economic development and growth 1. create an enabling environment for economic investment anddevelopment and growth in KwaDukuza, 2. maximise opportunities presented within the cluster economy

    STRATEGY

    3.1 Job Creation 1. promote new areas for investment, 2. skills development for SMMEs, 3. Develop human

    capital, 4. urban efficiency programme, 5. marketing KwaDukuza, 6. develop tourism products to become SAs

    no. 1 tourist destination, 7. north coast cluster, 8. tourism development

    3.2. Poverty and Unemployment 1. SMME development, 2. community economic development, 3. prioritise

    knowledge and learning, 4. empower KwaDukuza neighbourhoods.3.3. Economic Development and growth 1. create institutional structures in KwaDukuza, 2. KwaDukuza

    Agenda 2010 investment strategy, 3. North Coast Cluster, 4. Business retention and expansion

    PROJECTS

    PROJECT VALUE

    3

  • 7/31/2019 Key Performance Area1

    4/26

  • 7/31/2019 Key Performance Area1

    5/26

    KEY PERFORMANCE AREA

    [Institutional Transformation]

    PRIORITY ISSUE 4 Improved Service Delivery

    OBJECTIVE Institutionalise the Batho Pele principles in delivering of services by the KwaDukuza Municipality

    STRATEGYInvestigate alternative service delivery options inclusive of internal service delivery, corporatisation of service

    delivery and outsourcing of service delivery

    PROJECTS PROJECT VALUE

    1. Improve perceptions switch board, reception and enquiries, central registry, stores supply and

    mechanical workshop productivity

    2. Communication between departments finalisation of staff structures

    3. Corporate image, Performance Management System and MIS

    R100,000.00

    R325,000.00

    R1,000,000.00

    5

  • 7/31/2019 Key Performance Area1

    6/26

    KEY PERFORMANCE AREA

    [Infrastructure and Services]

    PRIORITY ISSUE 5 Health / HIV-AIDS

    OBJECTIVE/s

    5.1. improve access to quality primary health care

    5.2. reduce the impact of HIV/Aids by facilitating all HIV/Aids activities

    5.3. TB immunization coverage increase

    5.4. Reduce cholera cases

    5.5. improve environmental health services

    5.6. vector control services improve

    5.7. increase TB cure rate

    STRATEGY

    5.1. provide a range of clinic facilities

    5.2. Establish local HIV/Aids forum, testing and counselling and information centre

    5.3. Awareness and publicity

    5.4. health education campaigns and distribution of disinfectants

    5.5. extend environmental health services to the rural communities

    5.6. extend vector control service to rural areas

    5.7. strengthen D.O.T. supervision and education

    PROJECTS PROJECT VALUE

    1. employ clinic staff and purchase a mobile clinic

    2. HIV/Aids awareness boards, project co-ordination and counsellors employ

    R800,000.00

    R450,000.00

    6

  • 7/31/2019 Key Performance Area1

    7/26

    3. awareness and publicity campaigns and visitation programme

    4. collect regular water samples and testing, education programme and disinfectant distribution

    5. Employ environmental health officers and vehicle

    6. employ vector control staff

    7. co-ordinate the D.O.T. support system, awareness campaigns and compliance to TB treatment

    R50,000.00

    R50,000.00

    R300,000.00R150,000.00

    R50,000.00

    7

  • 7/31/2019 Key Performance Area1

    8/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 6 Electricity service provision

    OBJECTIVE

    1. To ensure that all citizens have an electricity service connection

    2. to provide an acceptable level of lighting to all major roads, sports fields and public open spaces

    3. to upgrade the MV network and substations to allow for natural expansion of demand and anticipated new

    development

    4. to upgrade the low voltage network to allow for natural expansion of demand and new developments

    STRATEGY

    1.1. upgrading of MV network, LV network and installation of BEC units

    2.1. determine major roads, sports fields, establish existing levels and install acceptable standard

    3.1. ensure good quality of supply and service, enhance safety of system and operation and support new

    developments

    4.1. ensure good quality of supply and service, enhance safety of system and operation and support new

    developments

    8

  • 7/31/2019 Key Performance Area1

    9/26

    PROJECTS PROJECT VALUE

    Electrification Projects

    1.1 electrification projects

    1.2 Electrification Projects private township projects

    lighting

    2.1 lighting - extend street light network

    2.2 upgrade existing lighting

    2.3 sport field extent network lighting

    MV Network

    3.1 upgrade MV network3.2 contingency upgrades

    3.3 upgrade substations

    3.4 capacity upgrades

    LV network

    4.1 Shakaville / Lindelani

    4.2 Stanger upgrade

    4.3 Shakaskraal upgrade

    4.4 Salt Rock upgrade

    4.5 Ballito upgrade

    R3,38 million grants 2002/3

    R520,000 own funds 2002/3

    R9,34 million

    R1,594,510 @ 5 years

    R488,000 @ 5 years

    R210,000 per annum

    R1,34 million @ 3 yearsR200,000 per annum

    R100,000 @ 2 years

    R10,6 million @ 5 years

    R40,000 @ year 1

    R75,000 @ 1 year

    R120,000 @ 1 year

    R344,000 @ 3 years

    R960,000 @ 5 years

    9

  • 7/31/2019 Key Performance Area1

    10/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 7 Sanitation service delivery

    OBJECTIVEEnsure that all citizens of KwaDukuza have reasonable access to adequate sanitation services within a reasonable

    time frame

    STRATEGY Planning, construction, connection, renewal and upgrade of sanitation services

    PROJECTS PROJECT VALUE

    CMIP 70-80% Own 20-30%

    1. Mdebeni Housing

    2. Darnall, Zinkwazi and Siyembezi

    3. Dendethu, New Guelderland

    4. Driefontein

    5. Tinley Manor, Umhlali, Tafeni and Fox Hill, Shakashead

    6. Ballito, Zimbali, Compensation, Willard, Salt Rock, Chakas Rock, Umhlali, Thompsons Bay and

    Sheffield

    7. Shakaskraal, Etete (urban)

    8. Nkobongo9. Etete *(rural), Groutville and Mgigimbe

    10. Aldenville

    11. Melville Thembeni

    12. Mbekamuzi

    13. Blythedale Beach

    R3 million

    R1,35 million

    R4,06 million

    R4,12 million

    As per Siza investment plan

    As per Zisa investment plan

    As per Zisa investment plan

    As per Zisa investment planR17,5 million

    R3,1 million

    R9,5 millionR4,07 million

    R12,5 million Council funds

    10

  • 7/31/2019 Key Performance Area1

    11/26

    14. Glenhills

    15. Ntshawini

    16. KwaDukuza Central

    17. Groutville

    18. Stanger Heights

    19. Doesberg

    20. Shakaville, Mbozamo

    21. Gledhow

    R2,4 million developer

    R2,7 million

    R1,35 million homeownersR2,1 million

    R240 per saddle homeowners

    R2,1 million

    R0,09 million

    R240 per saddle - homeowners

    11

  • 7/31/2019 Key Performance Area1

    12/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 8 Potable water provision

    OBJECTIVE Ensure that all citizens of KwaDukuza have reasonable access to potable water within a reasonable time frame

    STRATEGY Plan, construct, connect, renew and upgrade potable water services

    PROJECTS PROJECT VALUE

    CMIP 70-80 %, Own 20-30%

    1. Mdebeni Housing2. Darnall, Zinkwazi and Siyembezi

    3. Dendethu, New Guelderland

    4. Driefontein

    5. Tinley Manor, Umhlali, Tafeni and Fox Hill, Shakashead

    6. Ballito, Zimbali, Compensation, Willard, Salt Rock, Chakas Rock, Umhlali, Thompsons Bay

    and Sheffield

    7. Shakaskraal, Etete (urban)

    8. Nkobongo,k Shakaskraal

    9. Etete *(rural), Groutville and Mgigimbe

    10. Aldenville11. Melville Thembeni

    12. Mbekamuzi

    13. Blythedale Beach

    14. Glenhills

    15. Ntshawini

    R4 million CMIP - developerR0,9 million

    R2,7 million

    R0,29 million

    As per Siza investment plan

    As per Siza investment plan

    As per Siza investment plan

    As per Siza investment plan

    R9,2 million

    R2,4 millionR2,1 million Umgeni water

    R2,2 million Umgeni water

    R850 per connection homeownerR1,8 million

    R0,36 million Umgeni water

    12

  • 7/31/2019 Key Performance Area1

    13/26

    16. KwaDukuza central

    17. Groutville

    18. Stanger Heights

    19. Doesberg

    20. Shakaville, Mbozamo

    21. Gledhow

    R850 per connection homeownr

    R0,78 million Umgeni Water

    R850 per connection homeownrR165000 council

    R687000

    R850 per connection homeownr

    13

  • 7/31/2019 Key Performance Area1

    14/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 9 Roads and storm water

    OBJECTIVEEnsure all citizens of KwaDukuza have reasonable access to roads and transportation systems within reasonable

    time frame

    STRATEGY Plan, construct, develop, maintain road and storm water services

    PROJECTS PROJECT VALUE

    CMIP 70-80%, Own 20-30%1. Mdebeni Housing

    2. Darnall, Zinkwazi and Siyembezi

    3. Dendethu, New Guelderland

    4. Driefontein

    5. Tinley Manor, Umhlali, Tafeni and Fox Hill, Shakashead6. Ballito, Zimbali, Compensation, Willard, Salt Rock, Chakas Rock, Umhlali, Thompsons Bay and

    Sheffield

    7. Shakaskraal, Etete (urban)

    8. Nkobongo,k Shakaskraal

    1, 2, 5, 7, 8, 10, 11, 12, 13, 15,

    16, 19, 20 - R135/m2 road

    construction and R300 per meter

    stormwater installation

    3, 4, 9 R20 per m2 road

    construction and R50/m storm

    water

    6 R300/m stormwater and

    R500/m2 road construction

    14

  • 7/31/2019 Key Performance Area1

    15/26

    9. Etete *(rural), Groutville and Mgigimbe

    10. Aldenville

    11. Melville Thembeni

    12. Mbekamuzi

    13. Blythedale Beach

    14. Glenhills

    15. Ntshawini

    16. KwaDukuza central17. Groutville

    18. Stanger Heights

    19. Doesberg Stanger Manor and Lindelani

    20. Shakaville, Mbozamo

    21. Gledhow

    To be determined

    To be determined

    To be determined

    15

  • 7/31/2019 Key Performance Area1

    16/26

    KEY PERFORMANCE AREA

    [Social and economic development]

    PRIORITY ISSUE 10 Community Safety

    OBJECTIVE

    1. establish and maintain a working mechanism to facilitate safer town principles

    2. ensure KwaDukuza residents have access to emergency services

    3. work with other agencies in an attempt to reduce the crime rate

    4. register and license motor vehicles in user friendly manner

    5. Ensure a communication centre for KwaDukuza emergency services integrated with an internal

    communication system

    6. Marine safety/ life guards and beach amenities service provision

    7. traffic and by-law enforcement

    STRATEGY

    1.1. crime prevention strategy, safer town principles operational links with other service providers and crime

    analysis

    2.1. risk analysis of entire area, equipment need and maintenance programme, and coordination and

    communication links maintain

    3.1. promote community awareness, high visibility, vehicle checkpoints

    4.1. provide service within friendly atmosphere one stop shop

    5.1. combine facilities and obtain and establish a single emergency number for KwaDukuza and marketing

    6.1. involvement of stakeholders to ensure a high level of service provision to the satisfaction of tourists andusers of services

    7.1. ensure compliance of by-laws of KwaDukuza and traffic law enforcement

    PROJECTS PROJECT VALUE

    1.1. marketing safer town priciples R52,000.00

    16

  • 7/31/2019 Key Performance Area1

    17/26

    1.2. implement crime prevention strategy

    1.3. peruse township developments

    1.4. coordination of role players

    1.5. support to CPF structures

    1.6. operational links with SAPS and other stakeholders

    1.7. crime analysis

    2.1. Risk analysis2.2. additional equipment and maintenance

    2.3. training

    2.4. community volunteers

    2.5. ambulance services coordination

    2.6. bulk transporters and hazardous chemicals

    2.7. petronet pipeline

    2.8. fire legislation

    2.9. Disaster management plan

    3.1. community awareness and participation in combating crime

    3.2. high visibility patrols3.3. sporadic low visibility patrols

    3.4. regular vehicle check points

    3.5. decrease response times to crimes in progress

    3.6. qualification programme of officers

    3.7. analyse crime statistics

    4.1. motor vehicle registration

    4.2. print survey questionnaires

    4.3. conduct surveys

    4.4. vehicle test centre tests

    4.5. print survey questionnaire

    4.6. conduct surveys

    4.7. drivers license testing print questionnaires

    4.8. conduct surveys

    4.9. parking administration investigation

    R300,000.00

    R0.0

    R0.0R0.0

    R4,000.00

    R0.0

    R5,000.00R0.0

    R20,000.00

    R10,000.00

    R0.0

    R0.0

    R0.0

    R6,000.00R0.0

    R5,000.00

    R0.0R0.0

    R0.0

    R0.0

    R400,000.00

    R0.0

    R115,000.00

    R4,000.00R2,000.00

    R3,000.00

    R4,000.00R2,000.00

    R4,000.00

    R2,000.00

    R0.0

    17

  • 7/31/2019 Key Performance Area1

    18/26

    4.10. public transport facilities investigation

    4.11. parking legislation

    4.12. car guard industry

    4.13. commuter shelter PPP advert

    4.14. amenity signs and technical services

    4.15. locality info signs

    4.16. norm for road marking standards

    4.17. road safety education4.18. upgrading of road traffic signs

    5.1. upgrade communications system

    5.2. establish emergency communications system in outlying areas

    5.3. promote usage of emergency communication system

    5.4. feedback to emergency callers

    6.1. Voluntary life savers clubs

    6.2. basic water safety courses

    6.3. service standards for beach amenities investigate

    6.4. commercialisation of swimming beaches6.5. launch site investigation

    6.6. monitor commercial vessels

    6.7. tourist satisfaction surveys

    6.8. beach patrols and marine and sea shore education and legislation compliance

    7.1. Drivers education

    7.2. parking legislation enforcement

    7.3. scholar patrols

    7.4. recover outstanding fines

    7.5. Trafman surveys

    7.6. By-law patrols

    7.7. infringement complaints

    7.8. new by-laws

    R10,000.00

    R10,000.00

    R7,000.00R1,000.00

    R50,000.00

    R30,000.00

    R0.0

    R25,000.00R100,000.00

    R150,000.00

    R0.0

    R5,000.00

    R10,000.00

    R15,000.00

    R0.0

    R2,000.00

    R50,000.00R0.0

    R0.0

    R10,000.00

    R25,000.00

    R3,000.00

    R0.0

    R120,000.00R43,000.00

    R5,000.00

    R0.0R0.0

    R6,000.00

    18

  • 7/31/2019 Key Performance Area1

    19/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 11 Human Settlement Development Programme

    OBJECTIVEBuild 2500 houses per annum for next 10 years and 2000 new housing opportunities per annum for next 10 years.

    To have given access to land to the prioritised land reform areas by 2003

    STRATEGY

    1. slums clearance and squatter control programme2. green fields development programme

    3. rural housing projects

    4. land reform and land restitution

    5. welfare housing6. Extended Benefit scheme

    7. Hostels redevelopment programme

    PROJECTS PROJECT VALUE

    19

  • 7/31/2019 Key Performance Area1

    20/26

    Slums clearance

    1. Groutville priority 1 UCC - 1735

    2. Steve Biko - 1983. Aldinville - 1250

    4. Dube Village Toll - 700

    5. Dube Village Station - 910

    6. Shayamoya phases 1 & 2 - 1985

    7. Shakashead 200 (585 beneficiaries)

    8. Groutville Mnyundwini - 1000

    9. Groutville Ethafeni - 780

    10. Etete - 1300

    11. Nkobongo move people to Shayamoya

    12. Mpongomongweni - 500

    13. Velaphi Lodge 50 included in Mbozamo and Ext 36

    Green fields development programme

    1. Etete - 12352. Shakashead slums clearance support programme 400

    3. Extension 36 300 Green Fields in lieu of slums clearance

    4. Shakaville Buffer - 800

    5. Thornhill farm - 280

    6. Gaza Strip 167

    7. Siyembezi 584 + 1000

    Rural housing projects

    1. Bulwer Farm Gumede

    2. Mgigimbe - 2903. Nonoti mouth - 150

    4. Mdlebeni - 1000

    R28 million

    R3.2 million

    R25 million

    R14 million

    R18.2 million

    R39.7 millionR11.7 million

    R20 million

    R15.6 million

    R26 million

    R10 million

    R19.1 million

    R8 million

    R6 million

    R16 million

    R5.6 million

    R33.4 million

    R3.17 million

    R2.03 millionR3 million

    R20 million

    20

  • 7/31/2019 Key Performance Area1

    21/26

    5. Sakamkhanya Nonoti West -

    6. Driefontein and Isinqobile - 1200

    7. Mbuyane8. Nyatikazi

    9. Springfield Estate

    Land reform and land restitution

    1. Chief Albert Luthuli Land Reform Upgrade Project 34002. New Guelderland

    3. Lot 14, 15 and 16

    4. Etete East - 800

    5. Sakhamkhanye

    6. Ohlange

    7. Kwatwele

    Welfare housing

    1. Radiyat Road old age home

    2. Doctors for life AIDS orphanage

    3. RA Moodley Old Age Home4. Rocky Park Old Age

    Extended Benefit scheme

    1. Rocky Park - 143

    2. Protea Heights - 200

    3. Glenhills 670 houses 400 land

    4. 101 Flats - 101

    5. 196 Flats - 1966. Shakaville 99 year lease 1000

    7. Northlands Park

    Hostels Development programme

    1. Mens hostel

    2. Womens hostel

    3. family units

    R8.4 million

    R5 million

    R5.6 million

    R10.73 million

    R15 million

    R5.03 million

    R7.6 millionR14.7 million

    R7.5 million

    21

  • 7/31/2019 Key Performance Area1

    22/26

    8. Lindelani Extension 46 575 sites

    9.

    22

  • 7/31/2019 Key Performance Area1

    23/26

    KEY PERFORMANCE AREA

    [Financial Management]

    PRIORITY ISSUE 12 Credit Control

    OBJECTIVE

    Develop and implement a credit control policy and procedure to enable council to set targets for debt collection,

    and taking the indigent into account, ad by applying the principles of Batho Pele.

    Meet the minimum requirements as specified in the National Key Performance Indicators determined for local

    government.

    STRATEGY

    Provide a transparent framework within which the council can collect all moneys due for services delivered,

    and by doing so, ensure Customer care in delivering the service.

    Develop and implement an Indigent policy

    PROJECTS PROJECT VALUE

    1. Credit control policy

    2. customer care and Batho Pele

    3. indigent policy

    23

  • 7/31/2019 Key Performance Area1

    24/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 13 Upgrading of existing infrastructure

    OBJECTIVEMaintaining and upgrading existing infrastructure to ensure that design life of asset is realised

    STRATEGY

    1. CMIP2. Council assets

    3. Public Works Programme

    PROJECTS PROJECT VALUE

    CMIP

    1. New Black Top Roads

    2. Priority Area 1: roads and water

    3. Groutville water reticulation

    4. extension of sewer trunk Ext. 46

    5. Lot 14 Trunk sewer6. Upgrade of sewer trunk northern areas

    7. upgrade of sewer trunk central area

    1. 8.5 million CMIP / 2.0 million Council

    2. 2.9 million CMIP / 0.6 million Council

    3. 0.5 million CMIP / 0.1 million Council

    4. 0.8 million CMIP / 0.2 million Council

    5. 0.9 million CMIP / 0.2 million Council6. 0.5 million CMIP / 0.2 million Council

    7. 0.7 million CMIP / 0.3 million Council

    24

  • 7/31/2019 Key Performance Area1

    25/26

    8. upgrade of sewer pumping station and rising main southern area

    9. Lindelani water mains

    10. gravity water mains Warrenton to Ext 4611. Doesberg water supply

    12. Duplicate Stanger Manor Reservoir and rising main

    13. Steve Biko Housing (Bus route and water mains)

    Council Projects1. Upgrade of existing community halls

    2. upgrade of existing tarred roads

    3. improvements to stormwater drainage

    4. resurface gravel roads

    5. extension and upgrade of sewer mains

    6. upgrade of sewer treatment works

    7. upgrade of water treatment works8. replacement of water meters

    9. upgrading of existing water mains

    10. upgrading of security fencing to reservoirs

    National Public Works Programme and Council

    1. New and upgrade of sports facilities

    2. new community halls

    3. commuter shelters

    8. 1.8 million CMIP / 0.78 million Council

    9. 0.42 million CMIP / 0.08 million Council

    10. 1.3 million CMIP / 0.24 million Council11. 0.75 million CMIP / 0.15 million Council

    12. 3.0 million CMIP / 0.6 million Council

    13. 0.6 million CMIP / 0.1 million Council

    1. 0.5 million

    2. 10.0 million

    3. 2.0 million

    4. 1.0 million

    5. 2.9 million

    6. 1.0 million

    7. 4.0 million8. 0.2 million

    9. 1.5 million

    10. 0.85 million

    1. 3.25 million

    2. 3.5 million

    3. 0.5 million

    25

  • 7/31/2019 Key Performance Area1

    26/26

    KEY PERFORMANCE AREA

    [infrastructure and services]

    PRIORITY ISSUE 14 Regional Solid Waste

    OBJECTIVE Provide adequate solid waste disposal airspace for the KwaDukuza sub-region for the next 50 years

    STRATEGY Develop a new sub-regional solid waste disposal site within 10 km radius of KwaDukuza by ways of a PPP

    PROJECTS PROJECT VALUE

    1. Conclude a PPP with successful bidder in respect of KwaDukuza GLB + landfill site on farm

    KwaMsimbithi

    2. Earmark window areas identified as suitable for landfill purposes as such in I D P spatial development

    frameworks

    26