Key Performance Measures, Evaluation Plans, and Work Plan

Date post: 17-Jan-2016
Category:
Upload: vaughn
View: 25 times
Download: 0 times
Share this document with a friend
Description:
Key Performance Measures, Evaluation Plans, and Work Plan. Shelley Kuklish Epidemiologist Arizona Nutrition Network. Session Objectives. By the end of this session, participants will be able to: - PowerPoint PPT Presentation
Popular Tags:
52
Key Performance Measures, Evaluation Plans, and Work Plan Shelley Kuklish Epidemiologist Arizona Nutrition Network
Transcript
Page 1: Key Performance Measures, Evaluation Plans,   and Work Plan

Key Performance Measures, Evaluation Plans,

and Work Plan

Shelley Kuklish

Epidemiologist

Arizona Nutrition Network

Page 2: Key Performance Measures, Evaluation Plans,   and Work Plan

Session Objectives

By the end of this session, participants will be able to:

1. Complete the Key Performance Measures, Evaluation Plans, and Work Plan Sections of the application

2. Write S.M.A.R.T. objectives

3. Write succinct action steps

4. Identify an evaluation plan for each objective

Page 3: Key Performance Measures, Evaluation Plans,   and Work Plan

Application

• It is recommended that you:– Complete Work Plan (Appendix B) before

completing Key Performance Measures and Evaluation Plans on the “Project Overview” sheet

Page 4: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 5: Key Performance Measures, Evaluation Plans,   and Work Plan

Housekeeping

• We will be working on a ‘sample’ work plan one step at a time.

• Goal is that you leave here with at least one objective, one action step and one evaluation plan for that objective.– Can be used as an example for writing the rest of your FY10

work plan

• During the practice, Network staff will walk around to help as necessary.

• Be polite and tolerant of other’s opinions. – The goal of this training is to teach you HOW to write your work

plan, not WHAT you are doing to teach SNAP-ED.

Page 6: Key Performance Measures, Evaluation Plans,   and Work Plan

Work Plan

Page 7: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 8: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 9: Key Performance Measures, Evaluation Plans,   and Work Plan

Writing Objectives

Page 10: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 11: Key Performance Measures, Evaluation Plans,   and Work Plan

Goals vs. Objectives

• A GOAL is:– A broad statement of intent– Non-specific, non-measurable

– Example:• Increase the proportion of SNAP recipients and

eligibles aged two years and older who meet dietary recommendations for fruit and vegetable consumption.

Page 12: Key Performance Measures, Evaluation Plans,   and Work Plan

Goals vs. Objectives

• An OBJECTIVE is:– A realistic target for the program– Answers: Who will do how much of what by

when?

– Example:• By the end of the class series, 50% of low income

3rd grade students participating in the FVMM classes will report an increase in fruit and vegetable consumption.

Page 13: Key Performance Measures, Evaluation Plans,   and Work Plan

S.M.A.R.T. Objectives

• S.M.A.R.T. objectives are:– Specific

– Measurable

– Achievable

– Relevant

– Time Bound

Page 14: Key Performance Measures, Evaluation Plans,   and Work Plan

• Specific • Measurable• Achievable• Relevant• Time Bound

• What are you going to do, with or for whom?– Focus on results, not

how they are achieved.

Page 15: Key Performance Measures, Evaluation Plans,   and Work Plan

• Specific

• Measurable• Achievable• Relevant• Time Bound

• Is the objective measurable?– Quality– Resources– Quantity– Time

Page 16: Key Performance Measures, Evaluation Plans,   and Work Plan

• Specific • Measurable

• Achievable• Relevant• Time Bound

• Can you achieve this objective? – Set objective after

considering the baseline

– Keep objectives within reach

• Is this objective realistic?– Can we do this?– Why are we doing

this?

Page 17: Key Performance Measures, Evaluation Plans,   and Work Plan

• Specific • Measurable• Achievable

• Relevant• Time Bound

• Is this objective logical as it relates to SNAP-Ed goals?

Page 18: Key Performance Measures, Evaluation Plans,   and Work Plan

• Specific • Measurable• Achievable• Relevant

• Time Bound

• What is the timeframe for this objective? – For the Network

purposes, the time frame generally is by September 30, 2010

Page 19: Key Performance Measures, Evaluation Plans,   and Work Plan

Objectives Apply to 3 Areas

• Process (Operational)

• Impact (Knowledge)

• Outcome (Behaviors)

Page 20: Key Performance Measures, Evaluation Plans,   and Work Plan

Process Objectives(Operational)

• Tells what you are doing and how you will do it– Tracks participants, interactions and activities– Example:

• By September 30, 2010 at least 5,000 Fun Food News will be distributed to SNAP-Ed participants at community events.

Page 21: Key Performance Measures, Evaluation Plans,   and Work Plan

Impact Objectives(Knowledge)

• Tells how you will change attitudes and knowledge– Example:

• By the end of the class series, 80% of low income 3rd grade students participating in the BBB classes will increase their knowledge of activities that help build strong bones.

Page 22: Key Performance Measures, Evaluation Plans,   and Work Plan

Outcome Objectives(Behavior)

• Tells what the long term implications of your program will be. – Example:

• By the end of the class series, 50% of low income 3rd grade students participating in the FVMM classes will report an increase in fruit and vegetable consumption.

Page 23: Key Performance Measures, Evaluation Plans,   and Work Plan

Easy Way to Write a SMART Objective

• Answer the following question:– Who will do– How much– Of What– By When?

• Example:– By the end of the class series, 50% of low income 3rd

grade students participating in the FVMM classes will report an increase in fruit and vegetable consumption.

Page 24: Key Performance Measures, Evaluation Plans,   and Work Plan

Your Turn!Write An Objective Statement

• Make sure that it meets the SMART requirements– Specific – Measurable– Achievable– Relevant– Time Bound

• Answer the following questions:– Who will do– How much– Of What– By When?

Page 25: Key Performance Measures, Evaluation Plans,   and Work Plan

By the end of the class series, 50% of low income 3rd grade students

participating in the FVMM classes will report an increase in fruit and vegetable consumption.

(FVMM survey baseline 48%)

By September 30, 2010, teach the importance of eating fruits and

vegetables through the FVMM classes to at least 500 low-income 3rd grade

students.

Page 26: Key Performance Measures, Evaluation Plans,   and Work Plan

Writing Action Steps

Page 27: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 28: Key Performance Measures, Evaluation Plans,   and Work Plan

Action Steps vs Objectives

• Action Step– Focus on the activities– Provide the ‘How’

• Objective– Focuses on the results– Provide the ‘What’

Page 29: Key Performance Measures, Evaluation Plans,   and Work Plan

Action Steps

– Should work towards the objective.– Should provide how you will attain your

objective.– Be brief and succinct.

ObjectivesObjectives

Act

ion

Ste

ps

Act

ion

Ste

ps

Page 30: Key Performance Measures, Evaluation Plans,   and Work Plan

Example:

Objective: – By the end of the class series, 50% of low

income 3rd grade students participating in the FVMM classes will report an increase in fruit and vegetable consumption.

Action Step: – 1.Teach FVMM classes to low income 3rd

grade students in 18 schools.– 2. Conduct pre-/post-surveys

Page 31: Key Performance Measures, Evaluation Plans,   and Work Plan

Your Turn!Write an Action Step

• Using the objective statement you wrote in section 1, write at least 1 action step for this objective.

• Remember:– Action steps should work towards the objective.– Should provide how you will attain your objective.– Be brief and succinct.

Page 32: Key Performance Measures, Evaluation Plans,   and Work Plan

By the end of the class series, 50% of low income 3rd grade students

participating in the FVMM classes will report an increase in fruit and vegetable consumption.

(FVMM survey baseline 48%)

Coordinate with 18 schools to conduct FVMM classes.

Meet with teachers to schedule FVMM classes.

Teach FVMM classes to low income 3rd grade students in 18 schools.

Conduct pre/post-test evaluations.

By September 30, 2011, teach the importance of eating fruits and vegetables

through the FVMM classes to at least 500 low-income 3rd grade

students.

Teach FVMM classes to low income 3rd grade students in 18 schools.

Page 33: Key Performance Measures, Evaluation Plans,   and Work Plan

Writing Evaluation Plans

Page 34: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 35: Key Performance Measures, Evaluation Plans,   and Work Plan

Evaluation Measures

• Formative – Collects data for improvement of

program/processes

• Process – Evaluates that the program is being delivered

as planned

• Impact/Outcome – Measure change in knowledge, attitudes or

behaviors

Page 36: Key Performance Measures, Evaluation Plans,   and Work Plan

Formative Evaluation

• Formative research is conducted before a program is designed and implemented, or while a program is being conducted.

• It helps you:– Decide on and describe your target audience, – Understand the needs of the audience and the factors

which influence their behavior– Helps you to design programs, services, and products

to address those needs.

Page 37: Key Performance Measures, Evaluation Plans,   and Work Plan

Examples of Formative Evaluation

• Needs assessments

• Focus group discussions

• In-depth interviews

• Market assessments

• Teacher evaluations

• Pilot programs where content of nutrition education is tested and evaluated, etc.

Page 38: Key Performance Measures, Evaluation Plans,   and Work Plan

Process Evaluation

• Process evaluation focuses on how the program operates, the services it delivers, and the function it carries out.

• It addresses whether the program was implemented and is providing services as intended.

Page 39: Key Performance Measures, Evaluation Plans,   and Work Plan

Examples of Process Evaluation

• Tracking:– Number of materials distributed – Number of clients viewing a food

demonstration – Number of classes held – Number of participants reached

Page 40: Key Performance Measures, Evaluation Plans,   and Work Plan

Outcome/Impact Evaluation

• An outcome or impact evaluation assess the change in knowledge or behaviors as a result of a particular program or intervention.

• The goal of an outcome or impact evaluation is to learn how effective the intervention was in changing the target populations' attitudes, awareness, and behaviors.

Page 41: Key Performance Measures, Evaluation Plans,   and Work Plan

Examples of Outcome/Impact Evaluation

• Impact– Pre-/post-test showing an increase in

knowledge

• Outcome– Pre-/post-surveys showing an improvement in

self-reported behaviors

• Point-in-time surveys, tracked over time

Page 42: Key Performance Measures, Evaluation Plans,   and Work Plan

Example:

• Objective: – By the end of the class series, 50% of low income 3rd

grade students participating in the FVMM classes will report an increase in fruit and vegetable consumption.

• Action Steps: – 1. Teach FVMM classes to low income 3rd grade

students in 18 schools.– 2. Conduct pre/post-test evaluations.

• Evaluation Plan:– Conduct pre- and post-surveys using FVMM

consumption survey. (Baseline 48%)

Page 43: Key Performance Measures, Evaluation Plans,   and Work Plan

Baselines

• Clearly defined starting point from where implementation begins, improvement is measured, or comparison is made

• The first data point for your evaluation– Allows you to create achievable objectives by

providing a starting point.– Allows for tracking trends over time.

Page 44: Key Performance Measures, Evaluation Plans,   and Work Plan

Evaluation Plans Should Tie Directly to The Objective

• Process objective=process evaluation– Example:

• Objective: Teach FVMM curriculum to 1,000 students in FY 2010• Evaluation: Track number of students participating via attendance

records

• Impact objective=impact evaluation– Example:

• Objective: 5th graders increasing knowledge of osteoporosis prevention

• Evaluation: Pre/Post-test measuring knowledge

• Outcome objective=outcome evaluation– Example:

• Objective: 3rd graders increasing fruit and vegetable consumption• Evaluation: Pre/Post-test measuring consumption

Page 45: Key Performance Measures, Evaluation Plans,   and Work Plan

Your Turn!Write An Evaluation Plan

• Remember:– Evaluation plans tie to the OBJECTIVE– Process objective=process evaluation– Impact objective=impact evaluation– Outcome objective=outcome evaluation

Page 46: Key Performance Measures, Evaluation Plans,   and Work Plan

By the end of the class series, 50% of low income 3rd grade students

participating in the FVMM classes will report an increase in fruit and vegetable consumption.

(FVMM survey baseline 48%)

Teach FVMM classes to low income 3rd grade students in 18 schools.

Conduct pre/post-test evaluations.Conduct pre- and post- surveys using FVMM consumption survey

Coordinate with 18 schools to conduct FVMM classes.

Meet with teachers to schedule FVMM classes.

Track number of students using attendance records

Teach FVMM classes to low income 3rd grade students in 18 schools.

By September 30, 2011, teach the importance of eating fruits and vegetables

through the FVMM classes to at least 500 low-income 3rd grade

students.

Page 47: Key Performance Measures, Evaluation Plans,   and Work Plan

Things to Note

• You can include evaluation plans for each action step, however at least ONE evaluation plan must directly apply to the objective.

Page 48: Key Performance Measures, Evaluation Plans,   and Work Plan

Project Overview

Page 49: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 50: Key Performance Measures, Evaluation Plans,   and Work Plan
Page 51: Key Performance Measures, Evaluation Plans,   and Work Plan

Appendix F

• Send in samples of each evaluation tool used for impact/outcome evaluations

• Stephanie will give you more information in her presentation.

Page 52: Key Performance Measures, Evaluation Plans,   and Work Plan

Questions? Comments?

Thank You!Shelley Kuklish602-364-1736

[email protected]