+ All Categories
Home > Documents > KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May...

KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May...

Date post: 01-Nov-2020
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
54
Sales Division / Apr. 2018 KHAN Reference List
Transcript
Page 1: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

Sales Division / Apr. 2018

KHAN Reference List

Page 2: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

CONTENTS

1. BROWNFIELD WORK

2. CARRY OVER WORK

3. HOOK-UP & COMMISSIONING

4. COMMISSIONING

5. MC (MECHANICAL COMPLETION)

6. MODIFICATION

7. PIPELINE / PIPE LAYING

8. MODULE FABRICATION

9. PRODUCT FABRICATION

10. POWER SUPPLY

11. ENGINEERING

12. CONTROL SYSTEM

13. RELOCATION SERVICE

Page 3: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

3

* Reference Summary (1/2)

NO. CONTENTS PROJECT NAME

1 BROWNFIELD WORK 4

2 CARRY OVER WORK 9

3 HOOK-UP & COMMISSIONING 4

4 COMMISSIONINGCommissioning 43

51Commissioning Procedure 8

5 MC (MECHANICAL COMPLETION) 17

6 MODIFICATION 58

7PIPELINE 10

PIPE LAYING 14

8MODULE

FABRICATION

Aluminum Helideck 6

26

Aluminum Outfitting 4

Electrical Substation 2

Aluminum Warming Room & Toilet

House1

Derrick Assembly 11

Burner Boom Fabrication &

Construction2

Page 4: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

4

* Reference Summary (2/2)

NO. CONTENTS PROJECT NAME

9 PRODUCT FABRICATION 1

10 POWER SUPPLY 2

11 ENGINEERING 79

12 CONTROL SYSTEM

Emergency Shutdown System (ESDS) 96

287

Ship Shore Communication Link

System (SSCLS)14

Trim and List Indication System (T/L) 96

Field Instrument 58

Fire and Gas Emergency Shutdown

System (F&G ESD System)2

Operating Manual for LNGC 21

13 RELOCATION SERVICE 122

Total 684 References Listed

* Projects are listed in the order of the most recent delivery.

Page 5: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

5

1. Brownfield Work

NO.PERIOD

CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Oct. 2017 OngoingPOSCO

Daewoo

Myanmar SHWE MEG

Regeneration System Replacement

Disassemble of Old MEG Regenerator

Piping, Structure, Installation, Commissioning

2 June 2014 Oct. 2016 Chevron

Mafumeira Sul Project HUC,

On/Offshore Commissioning &

Start-up

Onshore Pre-Commissioning

Work Pack Development

Offshore Hook-Up Work

Commissioning Assistance

3 May 2015 Feb. 2016 ONHP

Prirazlomnaya OIFP

Offshore Ice-proof Fixed Platform

Revamping

Drilling Complex Modernization

Front-End Engineering Design

Equipment List Development

4 July 2012 July 2015 Chevron

Chevron EGP3B Production

Platforms Modifications &

Installation

Job Card Development

Design & Shop Drawing Review

Marine Engineering

Procurement

Hook-up and Commissioning

Mobilization of Marine spread

Page 6: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

6

2. Carry Over Work

NO.PERIOD

OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Feb. 2016 Jan. 2018 Statoil TechnipMartin Linge

Carry Over Work Phase-2

Site Survey, Planning, Mobilization, Materials

Management & Procurement

E&I, Painting, Scaffolding, Insulation, Piping

2 May 2016 Dec. 2017Petronas

Carigali

UZMA

Engineering

Petronas Carigali

Kinanbalu NAG Phase-II

Gas Compressor Module

Carry Over Work

Job Card Development, Reviewing of Detail

Design & Shop Drawing / As-Built Drawing,

Onshore Fabrication, Procurement & Logistics

for Installation Works

3 Feb. 2017 Aug. 2017 StatoilKCA

DEUTAK

Statoil CAT-J Carry Over

Work Phase-2

Site Survey, Planning, Mobilization, Materials

Management & Procurement

E&I, Painting, Scaffolding, Insulation, Piping

4 Aug. 2014 July 2017 INPEXSBM

Offshore

INPEX Ichthys FPSO

Turret Carry Over Work

Phase-1, 2

Phase-1 : Work Pack & Job Card Preparation

Phase-2 : Supply of Nylon Pads, HVAC Ducting

Fabrication, Site Queries

5 Dec. 2015 June 2017 SHELLSBM

Offshore

SHELL Prelude FLNG

Turret Carry Over Work

Phase-1, 2

Phase-1 : Job Card Development, Project

Completion System, Material Preparation

Phase-2 : Execution of Work Pack & Job Card

(Planning / Scheduling / Mobilizing)

6 Sep. 2015 Dec. 2016 SHELL Technip

SHELL Prelude FLNG

MEG Module Carry Over

Work Phase-2

Site Survey, Planning, Mobilizing, Materials

Management & Procurement

Work Pack Development and Execution of

Carry Over Work Packs

7 July 2014 May 2016 BP HHIBP Clair Ridge Topside

Module Construction Work

FPSO & Platform Construction Work in E&I,

Pipe, Mech., Structure, Paint, Scaffolding,

HVAC

Page 7: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

7

2. Carry Over Work

NO.PERIOD

OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

8 Oct. 2013 Dec. 2015 BP HHIBP Quad 204 Turret Carry

Over Work, Phase -1, 2

Phase-1 : Site Survey, Work Pack

Preparation, Job Card Issue

Phase-2 : Execution of Work Pack & Job Card

9 May 2013 June 2013 BP BP

BP Quad 204 Water

Injection Pump Skids Carry

Over Work

Loading / Unloading, Installation / Assembly

Work, E&I, Piping, Machinery, Punch Clear,

Fabrication(Outfitting)

Page 8: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

8

3. Hook-Up & Commissioning

NO.PERIOD

OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Mar. 2017 Dec. 2017Petronas

Carigali

UZMA

Engineerin

g

Petronas Carigali

Kinanbalu NAG Phase-II

Gas Compressor Module

Hook-Up & Commissioning

Onshore Preparation, Reviewing of Detail

Design & Shop Drawing / As-Built Drawing,

Onshore Fabrication, Procurement &

Logistics for Installation Works, Hook up &

Commissioning after Shut-Down Period,

Mobilization of Marine spread

2 June 2014 Oct. 2016 Chevron DSME

Mafumeira Sul Project

HUC, On/Offshore

Commissioning & Start-up

Onshore Pre-Commissioning, Work Pack

Development, Offshore Hook-Up Work,

Commissioning Assistance

3 Feb. 2016 May 2016 Petronas PBJVPetronas FLNG #1

Onshore Preparation

Providing Technical Knowledge,

Assistance on Development of Plans and

Procedures / Work Pack / Job Card

4 Oct. 2014 Apr. 2016 BP BP

BP Quad 204 & Clair

Ridge Onshore/Offshore

Commissioning

Electrical/Mechanical/Instrument and Control

Commissioning, Flushing and Cleaning,

Preservation Support

Page 9: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

9

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Aug. 2016 Ongoing Japan Marine United JMU LNG LNG ship JMU (Japan)

2 Oct. 2015 Ongoing Seadrill West libra Drillship DSME

3 June 2015. Ongoing Seadrill West Aquila Drillship DSME

4 Apr. 2015 Ongoing Vantage Cobalt Explorer Drillship DSME

5 Mar. 2016 Apr. 2017 Mitsubishi Heavy Industries AIDA #2 Perla Cruise ship MHI

6 Feb. 2016 Feb. 2017 Maersk Invincible Drillship DSME

7 Mar. 2016 June 2016 ADMA-OPCO SARB Package 4 E-house KOSPEC

8 Oct. 2015 May 2016 Sonangol Sonangol Quenguela Drillship DSME

9 Aug. 2015. Mar. 2016 Songa Offshore Enabler #4 Semi-Rig DSME

10 June 2015. Mar. 2016 Sonangol Sonangol Libongos Drillship DSME

11 Mar. 2015 Mar. 2016 Mitsubishi Heavy Industries AIDA #1 Prima Cruise shipMHI (Nagasa

ki, Japan)

12 Aug. 2015. Dec. 2015 Songa Offshore Encourage Semi-Rig DSME

13 May 2015. Nov. 2015 Atwood Admiral Drillship DSME

14 Mar. 2015 Sep. 2015 Transocean Thalasse Drillship DSME

15 Apr. 2014 June 2015 Songa Offshore Equinox #1 Semi-Rig DSME

16 Apr. 2014 Sep. 2014 Diamond Offshore Diamond Ultra Deep–water Drillship #4 Drillship HHI

17 Jan. 2014 Aug. 2014 Noble Noble Drillship #4 Drillship HHI

18 July 2012 July 2015 Chevron EGP Phase 3B Platform Nigeria

Page 10: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

10

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

19 July 2013 May 2014 Exxon Mobil Arkutun DagiFixed

PlatformDSME

20 Nov. 2013 Mar. 2014 Diamond Offshore Diamond Ultra Deep –water Drillship #3 Drillship HHI

21 Nov. 2012 Feb. 2014 Fred Olsen Energy Fred Olsen Drillship #1 Drillship HHI

22 Jan. 2013 Jan. 2014 Atwood Advantage #1 Drillship DSME

23 Jan. 2012 Jan. 2014 Diamond Offshore Diamond Ultra Deepwater Drillship #1 Drillship HHI

24 Jan. 2013 Dec. 2013 Transocean Edward Drillship #1 Drillship DSME

25 May 2013 Sep. 2013 Diamond Offshore Diamond Ultra Deepwater Drillship #2 Drillship HHI

26 Jan. 2012 July 2013 Vantage Tungsten Explorer Drillship DSME

27 May 2012 Jan. 2013 Transocean GSF- High island Jack UpDRY DOCK

(Dubai )

28 Apr. 2012 Aug. 2012 KNOC Panama Zhambyl Rig ERSAI

29 May 201 July 2012 Corporative Grupo-R Grupo-R GVA7500 Rig DSME

30 Feb. 2012 Apr. 2012 Odebrecht ODN #2 Drillship DSME

31 June 2011 Apr. 2012 Odebrecht ODN #1 Drillship DSME

32 Jan. 2011 Apr. 2012 Vantage TMT 2 (Dragon Quest) Drillship DSME

33 Sep. 2010 June 2011 Technip H6001 OPS PLV STX Dalian

34 Oct. 2010 May 2011 Odebrecht NORBE IX Drillship DSME

35 Jan. 2011 Apr. 2011 SeaDrill West Pegasus Rig Jurong

36 Dec. 2009 Feb. 2011 Vantage Sea Dragon Rig Jurong

Page 11: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

11

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

37 Apr. 2010 Nov. 2010 Vantage TMT 1 (Platinum Explorer) Drillship DSME

38 Sep. 2009 Aug. 2010 Transocean Discoverer India Drillship DSME

39 June 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME

40 Dec. 2008 July 2009 Transocean Discoverer Americas Drillship DSME

41 May 2008. Mar. 2009 Transocean Discoverer Clear Leader Drillship DSME

42 May 2008 Jan. 2009 Seadrill West Aquarius Rig DSME

43 Feb. 2008 Oct. 2008 Seadrill West Hercules Rig DSME

Page 12: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

12

2) COMMISSIONING PROCEDURE

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Apr. 2014 May 2016 STX MOG F1006 FSO STX

2 June 2012 Feb. 2014 DSME South Nemba Auxiliary Fixed Platform DSME

3 Sep. 2012 May 2013 DSME Allseas Pieter ScheltePlatform,

Pipe LayingDSME

4 Nov. 2011 Jan. 2013 DSME Heerema AegirPipe Laying

VesselDSME

5 Apr. 2008 Aug. 2008 Transocean Discover Americas Drillship DSME

6 Nov. 2011 July 2008 Odfjell Deepsea Atlantic Rig DSME

7 Sep. 2007 Mar. 2008 Transocean Discoverer Clear Leader Drillship DSME

8 Feb. 2007 Dec. 2007 Seadrill West Hercules/Aquarius Rig DSME

4. Commissioning

Page 13: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

13

5. Mechanical Completion

NO.PERIOD

CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Dec. 2015 June 2017 SBM Shell Prelude FLNG Supervising of MCTopside / Hullside MC Inspection Completion,

Punch Control

2 Feb. 2015 June 2017 SHI / Shell Shell Prelude FLNG Punch Clearance Hull part Punch Clearance of E&I, Structure

3 Oct. 2016 Mar. 2017 Maersk Maersk XLE4 MC11 Work Packs including IT Equipment

Installation

4 Nov. 2015 Mar. 2017 Technip Technip Martin Linge Punch Clearance Pipeline QC inspection, MC of Piping Work

5 Aug. 2016 Oct. 2016 Transocean GSS Transocean Conqueror MC Cable Pulling & Sensor Installation

6 May 2016 Oct. 2016 KNPG Kinabalu KNPG MC MC Inspection Completion, Punch Control

7 July 2016 Aug. 2016 Diamond Ocean Great White MC F.O cable installation

8 Mar. 2016 June 2016 Songa Offshore Songa #2 Enabler Post Delivery Work 10 Work Packs including MC of Wire Line

9 Nov. 2014 June 2016 ABBElectrical Substation SARB Package 4

MCMC Inspection Completion, Punch Control

10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage Post Delivery Work 9 Work Packs including MC of Wire Line

11 Oct. 2015 Nov. 2015 Transocean Transocean_Thalassa MC MC of Wire line Tower & etc.

12 Oct. 2015 Nov. 2015 Maersk Maersk #3 Venturer MC Sea Fixing / Accumulator Rack Installation

13 Aug. 2015 Dec. 2015 Songa Offshore Songa #2 Endurance Post Delivery Work 8 Work Packs including MC of Wire Line

14 June 2015 Nov. 2015 BP BP Quad 204 Hydro Test & FlushingHydrostatic Test & Oil Flushing & Chemical

Clean

15 June 2015 Oct. 2015 Songa Offshore Songa #1 Equinox Post Delivery Work 8 Work Packs including MC of Wire Line

16 Oct. 2014 Dec. 2015 BP BP Quad 204 Topside PunchMC of ULL & Topside Lighting System /

R.P(240V) System

17 Oct. 2013 Nov. 2015 BP BP Quad 204 & Clair Ridge Punch Work MC of E&I, Pipe, Structure

Page 14: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

14

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Oct. 2017 Dec. 2017 RNT Transocean GSS Development Driller I Semi-Sub Las Palmas

2 Mar. 2017 Aug. 2017 Statoil Cat-J 1 & 2 Jack-up SHI

3 July 2016 Mar. 2017 Maersk Drilling XL Enhanced-4 Jack-up DSME

4 June 2016 Oct. 2016 Transocean Deepwater Conqueror Drillship DSME

5 Mar. 2016 Aug. 2016 Diamond Ocean Great White Semi-Sub HHI

6 Mar. 2016 July 2016 Songa Offshore Enabler Semi-Sub DSME

7 Dec. 2015 Dec. 2015 Transocean Proteus Drillship DSME

8 Sep. 2015 Nov. 2015 Transocean Thalassa Drillship DSME

9 Dec. 2015 Mar. 2016 Songa Offshore Encourage Semi-Sub DSME

10 Aug. 2015 Dec. 2015 Songa Offshore Endurance Semi-Sub DSME

11 June 2015 Oct. 2015 Songa Offshore Equinox Semi-Sub DSME

12 Oct. 2014 Apr. 2015 Maersk Drilling Voyager Drillship SHI

13 Feb. 2015 Mar. 2015 Ocean Rig Apollo Drillship SHI

14 Feb. 2015 Feb. 2015 Seadrill West Carina Drillship SHI

15 Mar. 2014 Nov. 2014 Seadrill West Saturn Drillship SHI

16 Sep. 2014 Sep. 2014 ODFJELL Deepsea Aberdeen Semi-Sub DSME

17 Sep. 2014 Sep. 2014 Seadrill West Jupiter Drillship SHI

18 Apr. 2014 Sep. 2014 Atwood Oceanics Achiever Drillship DSME

19 Mar. 2014 Sep. 2014 Seadrill West Neptune Drillship SHI

20 Mar. 2014 June 2014 Maersk Drilling Venturer Drillship SHI

Page 15: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

15

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

21 Apr. 2014 June 2014 Noble Sam Croft Drillship HHI

22 Mar. 2014 June 2014 Maersk Drilling Valiant Drillship SHI

23 Mar. 2014 Apr. 2014 Ocean-Rig Athena Drillship SHI

24 Feb. 2014 Apr. 2014 Maersk Drilling Viking Drillship SHI

25 Jan. 2014 Feb. 2014 Atwood Advantage Drillship DSME

26 Jan. 2014 Feb. 2014 Ocean-Rig Skyros Drillship SHI

27 Oct. 2013 Nov. 2013 Seadrill West-Tellus Drillship SHI

28 Aug. 2013 Oct. 2013 Ocean-Rig Mylos Drillship SHI

29 July 2013 Aug. 2013 PDC Khamsin Drillship SHI

30 May 2013 June 2013 Vantage Drilling Tungsten Explorer Drillship DSME

31 Oct. 2011 Dec. 2012 Ocean Rig AS Ocean Rig Mykonos Drillship SHI

32 Apr. 2012 May 2012 STENA STENA DrillMAX Drillship SHI

33 Mar. 2012 May 2012 Vantage Drilling Vantage #2 Dragonquest Drillship DSME

34 Apr. 2011 May 2012 Ocean Rig AS Ocean Rig Olympia Drillship SHI

35 Nov. 2011 Jan. 2012 Odfjell Drilling AS Odfjell Deep Sea Metro II Drillship HHI

36 May 2011 Jan. 2012 Odfjell Drilling AS ODFJELL Deep Sea Metro I Drillship HHI

37 Sep. 2011 Oct. 2011 Korea National Oil Company Doo Sung Rig Semi-Sub DSME

38 July 2011 Aug. 2011 Ocean Rig AS OCEAN RIG #3 Poseidon Drillship SHI

39 Oct. 2010 May 2011 Pacific Drilling Bora Drillship SHI

40 Apr. 2010 May 2011 Schahin #2 Sertao Drillship SHI

Page 16: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

16

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

41 Oct. 2010 Apr. 2011 COSL Pioneer Semi-SubYantai Raffles

Shipyard

42 Jan. 2010 Feb. 2011 Schahin #1 Cerrado Drillship SHI

43 Nov. 2010 Dec. 2010 Vantage Platinum Explorer Drillship DSME

44 May 2010 Dec. 2010 BP Skarv FPSO FPSO SHI

45 Sep. 2010 Nov. 2010 Transocean Deapwater Champion Drillship HHI

46 Aug. 2010 Sep. 2010 Transocean Discoverer India Drillship DSME

47 July 2010 Sep. 2010 ODFJELL Deapsea Stavanger Semi-Sub DSME

48 July 2010 Sep. 2010 Ensco Deepocean Clarion Drillship SHI

49 July 2009 Apr. 2010 Transocean Discoverer Inspiration Drillship DSME

50 July 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME

51 Aug. 2009 Sep. 2009 PETROSERV S/A Victoria Semi-Sub DSME

52 Mar. 2009 Sep. 2009 Transocean Discoverer Americas Drillship DSME

53 July 2009 Aug. 2009 Stena Drilling Drill Max Drillship SHI

54 May 2009 Aug. 2009 Petrobras Petrobras 10000 Drillship SHI

55 Jan. 2009 Mar. 2009 Seadrill West Eminence Semi-Sub SHI

56 Dec. 2008 Feb. 2009 Seadrill West Aquarius Semi-Sub DSME

57 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME

58 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME

59 Dec. 2008 Dec. 2008 ODFJELL Deepsea Atlantic Semi-Sub DSME

Page 17: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

17

7. Pipeline / Pipe Laying

NO. YEAR CONTRACTOR OWNER PROJECT WORK TRADE FACILITIES COUNTRY

1 2014 HHI SEC Jeddah Power Plant A/G Piping Power Plant Saudi Arabia

2 2014 HHIPTB (Partnerships Tech.

Bureau)Az Zour North Power Plant Storage Tank Power Plant Kuwait

3 2014 SCnTMAROC PHOSPHORE

SA. (OCP)

Jorf Lasfar ODI Fertilizer Plant

P2&P5A/G Piping Fertilizer Plant Morocco

4 2013 DWECMAROC PHOSPHORE

SA. (OCP)

Jorf Lasfar ODI Fertilizer Plant P1

&P3A/G Piping Fertilizer Plant Morocco

5 2013 HDECMaaden Bauxite

& AluminaMaaden Alumina Refinery A/G Piping Alumina Plant Saudi Arabia

6 2012 KITO NIOC SP 17/18/19 Pipeline Construction Gas Pipeline Iran

7 2012 DOT TASDIT, IOEC Reshadat Pipeline Construction Gas Pipeline Iran

8 2012 KITO NIOC, POGC SP 19 Pipeline Construction Gas Pipeline Iran

9 2011 HHI MOGE, DAEWOO SHWE Pipeline Construction Gas Pipeline Myanmar

10 2011 HHI RAS GAS Bazan Pipeline Construction Gas Pipeline Qatar

1) PIPELINE

2) PIPE LAYING

NO.PERIOD

CLIENT PROJECT NAME PIPE METHODSTART DELIVERY

1 Apr. 2012 Oct. 2012 KOCKOC-1 Onshore Pipeline Project

(Kuwait)

48″ x 12.7mmt x 39km24″ x 14.3m

mt x 39km24″ x 11.1mmt x 39kmAutomatic

2 Apr. 2011 Aug. 2011 IOECForoozan Offshore Pipeline Project

(Iran)24″ x 14.3mmt x 103km Automatic

Page 18: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

18

7. Pipeline / Pipe Laying

2) PIPE LAYING

NO.PERIOD

CLIENT PROJECT NAME PIPE METHODSTART DELIVERY

3 Apr. 2011 July 2011 PTT Offshore Gas Spur Lines (Thailand)24″ X 15.9mmt x 38km28″ X

17.5mmt x 48kmAutomatic

4 Nov. 2010 Mar. 2011 IOCL Pardip SPM Project (India) 48″ x 22.2mmt x 71km Automatic

5 Sep. 2009 May 2010 Hyundai E&C Colombo Port Expansion (Sri Lanka) 36″ x 15.6mmt x 9km Manual

6 Feb. 2009 Sep. 2009 HHI / COOEC Bohai Bay Pipeline (China)12″ x 12.7mmt x 98km12″ x

14.3mmt x 19kmAutomatic

7 Aug. 2008 Dec. 2008 HHI / CNOOC Shanghai LNG (China 36″ x 20.6mmt x 36km Automatic

8 Mar. 2008 Aug. 2008 HHI / SK EnergySK Crude Oil Unloading System

Relocation (Korea)42″ 25 4mmt x 10km Automatic

9 Jan. 2007 Mar. 2007 HHI / TOTAL Indonesia Sisi Nubi Pipeline Project (Indonesia)16″ x 20.6mmt x 6.2km22″ x 24.3m

mt x 15.2km26″ 27 5mmt x 33kmAutomatic

10 June 2006 Dec. 2006HHI/Perusahaan

Gas NegaraPGN Gas Pipeline (Indonesia) 32″ x 23.9mmt x 155km Automatic

11 July 2006 Nov. 2006 HHI / KOC KOC Crude Export Facilities (Korea) 56″ x 25.4mmt x 71km Automatic

12 Apr. 2006 July 2006 HHI / KNOC Rong Doi Pipeline Project (Vietnam) 18″ x 15.9mmt x 58km Automatic

13 Sep. 2005 Feb. 2006HHI / PTT

Public Company Ltd

PTT Third Transmission Pipeline

(Thailand42″ x 23.9mmt x 120km Automatic

14 Sep. 2004 Apr. 2005 HHI / CNOOC Chunxiao Gas Pipeline Project (China)28″ x 15.9mmt x 225km16″ x 11mm

t x 12km8″ x 9.5mmt x 63km

Automatic &

Manual

Page 19: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

19

8. Module Fabrication

1) ALUMINUM HELIDECK

2) ALUMINUM OUTFITTING

NO.PERIOD

CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Aug. 2016 Ongoing MA SHI Johan Sverdrup Assembly, Piping, E&I installation, Outfitting

2 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project

Handrail: 2,400m

Stair: 350m

Platform: 31.5 Ton

3 Dec. 2013 Sep. 2014 MA HHI BP Clair Ridge ProjectExternal Walkway:16 Ton

Stair Tower: North / South

4 July 2013 June 2014 MA SHI Valemon ProjectStair Tower: East / West

Handrail: 1,000 m

NO.PERIOD

CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Mar. 2016 Aug. 2016 MA HHI HESS E&P Bergading Project Assembly, Piping, E&I installation, Outfitting

2 Sep. 2015 Mar. 2016 MA SHI Statoil Mariner FSU Assembly, Piping, E&I installation, Outfitting

3 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project Assembly, Piping, E&I installation, Outfitting

4 June 2014 Aug. 2014 MA DSME Dong Project Assembly, Piping, E&I installation, Outfitting

5 Feb. 2014 Mar. 2014 MA HHI BP Clair Ridge Project Assembly, Piping, E&I installation, Outfitting

6 Dec. 2013 Feb. 2014 MA HHI Sea Drill West Mira Project COW (Heat Tracing, Piping, E&I)

Page 20: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

20

3) ELECTRICAL SUBSTATION

NO.PERIOD

CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Nov. 2014 June 2016 ABB HDECSARB Package 4

Project

Engineering, Procurement , Construction,

Pre-commissioning & Commissioning

assistance, Abu Dhabi Site Work

2 July 2014 Nov. 2014 ABBSamsung

C&TKNPC - CFP Project Project

Procurement , Construction, Pre-

commissioning & Commissioning Assistance,

Kuwait Site Work

4) ALUMINUM WARMING ROOM & TOILET HOUSE

NO. DELIVERY CLIENT PROJECT NAME SCOPE OF WORK

1 Feb. 2014 BP DSM Warming Room & Toilet House

Basic drawing for all disciplines

Detail drawing for all disciplines

Shop drawing for all disciplines

Fabrication & Installation, Architecture, HVAC, E&I,

Procurement, Delivery, Management

8. Module Fabrication

Page 21: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

21

5) DERRICK ASSEMBLY

NO. DELIVERY CLIENT PROJECT NAME

1 Mar. 2015 Maersk Drilling Maersk Drilling Voyager

2 Jan. 2011 Pacific drilling Pacific bora

8. Module Fabrication

NO.PERIOD

CLIENT EPC PROJECT NAMESTART DELIVERY

1 Nov. 2014 Mar. 2015 NOV DSME ENSCO #11

2 Nov. 2014 Mar. 2015 NOV DSME Atwood # 4

3 June 2014 Nov. 2014 NOV SHI Slot for SHI # 2

4 May 2014 Sep. 2014 NOV HHI Noble # 5

5 Apr. 2014 Aug. 2014 NOV SHI Slot for SHI # 1

6 Feb. 2014 June 2014 NOV HHI Main Project MM CS 60

7 Nov. 2013 Mar. 2014 NOV HHI Atwood # 3

8 Sep. 2013 Mar. 2014 NOV HHI Transocean Harsh Environment SEM

9 Oct. 2013 Feb. 2014 NOV HHI Fred Olsen # 2

10 Apr. 2013 Aug. 2013 NOV HHI Rowan # 2

11 Apr. 2013 Aug. 2013 NOV HHI Diamond # 3

6) BURNER BOOM FABRICATION & CONSTRUCTION

Page 22: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

22

9. Product Fabrication

NO.PERIOD

CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Oct. 2017

Ongoing

(2 years

+ 1 year extension)

DSMETCO FGP

Weidmuller TPA JB SupplySupply of Instrument Junction Box

Page 23: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

23

10. Power Supply

NO.PERIOD

CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Sep. 2017

Ongoing

(5 years

+ 5 years extension)

Myanmar Kayin State Kawkareik 4.5MW IPPEPCC + Operation

Diesel Bunkering

2 Oct. 2016Ongoing

(10 years)Myanmar Kayin State Kayinseikgyi 4.5MW IPP

EPCC + Operation

Diesel Bunkering

1) IPP(Independent Power Producer) Project

Page 24: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

24

11. Engineering

NO. Year Client Project Name Work Description

1 2017 Marine Aluminium Johan Sverdrup Detail Engineering for Aluminum Outfitting Package

: Access Platform, Stair Tower, Handrail etc.

2 2017 Posco DaewooShwe Gas Platform

MEG Regeneration System ModificationDetail Engineering for MEG Regeneration System Modification

3 2017 SBM INPEX Ichthys FPSO Detail Engineering for Turret Cofferdam

4 2017 DSME INPEX Ichthys FPSO Feasibility Study for Temporary Power Supply :

Structure, E&I, Fire fighting, Piping

5 2017 MODECFSO MV17

Mooring Legs ReplacementDetail Engineering for Sheave Block of Mooring Line

6 2017 Maersk Drilling XL Enhanced-4 (Jack-Up)

On-boarded Work : from South Korea to Norway (2 months)

39 Work Packages & Carry Over Work : Accommodation

Modification, Derrick Protection, Mud Sampling Unit Installation

7 2016 Transocean Deepwater Conqueror (Drillship)

On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System

Installation

8 2016 Songa Offshore Enabler (Semi-Sub)

On-boarded Work : from South Korea to Norway (3 months)

13 Work Packages & Carry Over Work : MWOCS System

Installation, EL. LOGGING & WIRE LINE System Installation,

Moonpool X-mas Tree Stack-up Guide Modification

9 2016 KRISO Mining System Structure for Riser Pipe Support : Piping System & Elec. System

10 2016 Diamond Ocean Great White (Semi-Sub)

On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : IT Cable Installation, ML &

MWD System Installation

11 2016 Transocean Proteus (Drillship)

On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System

Installation

Page 25: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

25

NO. Year Client Project Name Work Description

12 2016Yangon Electricity

Supply Co.30MW FSPP

Technical Specification, Basic Design Engineering, General

Arrangement, Process Flow Diagram

13 2016Yangon Electricity

Supply Co.

Myanmar IPP

Containerized Power Plant Package

Technical Specification, Basic Design Engineering, General

Arrangement, Process Flow Diagram

14 2016PT Jaya Samudra

Karunia Shipping

30/60/100MW BMPP

Barge Mounted Power Plant

Technical Specification, Basic Design Engineering, Process Flow

Diagram

15 2016PT Jaya Samudra

Karunia Shipping

15k LNG FSRU

(Floating Storage Regasification Unit)

Technical Specification, Basic Design Engineering, General

Arrangement, Process Flow Diagram, Equipment Sizing,

Calculation

16 2016PT Jaya Samudra

Karunia Shipping

26k LNG FSRU

(Floating Storage Regasification Unit)

Technical Specification, Basic Design Engineering, General

Arrangement, Process Flow Diagram, Equipment Sizing,

Calculation

17 2015 Transocean Thalassa (Drillship)

On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System

Installation

18 2015 Songa Offshore Encourage (Semi-Sub)

On-boarded Work : from South Korea to Norway (3 months)

13 Work Packages & Carry Over Work : MWOCS System

Installation, EL. LOGGING & WIRE LINE System Installation,

Moonpool X-mas Tree Stack-up Guide Modification

19 2015 Songa Offshore Endurance (Semi-Sub)

On-boarded Work : from South Korea to Norway (3 months)

13 Work Packages & Carry Over Work : MWOCS System

Installation, EL. LOGGING & WIRE LINE System Installation,

Moonpool X-mas Tree Stack-up Guide Modification

20 2015 Songa Offshore Equinox (Semi-Sub)

On-boarded Work : from South Korea to Norway (3 months)

13 Work Packages & Carry Over Work : MWOCS System

Installation, EL. LOGGING & WIRE LINE System Installation,

Moonpool X-mas Tree Stack-up Guide Modification

11. Engineering

Page 26: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

26

NO. Year Client Project Name Work Description

21 2015 Maersk Drilling Voyager (Drillship)

On-boarded Work : from South Korea to Norway (3 months)

21 Work Packages & Carry Over Work : Mud Sampling System

Installation, N2 Generator System Installation, Galley & Mess

Room Modification

22 2015 Ocean Rig Apollo (Drillship)

On-boarded Work : from South Korea to Singapore (1 month)

1 Work Package & Carry Over Work : Mud Sampling System,

Electric SWBD Modification

23 2015 Seadrill West Carina(Drillship)51 Work Packages & Carry Over Work : Installation of Frank Han

dling System, Dryer System, Vacuum UNIT

24 2014 Maersk Drilling Venturer (Drillship)

On-boarded Work : from South Korea to Norway (3 months)

21 Work Packages & Carry Over Work : Mud Sampling System

Installation, N2 Generator System Installation, Galley & Mess

Room Modification

25 2014 Odfjell Drilling AS Deepsea Aberdeen (Semi-Sub)

On-boarded Work

Work Packaging & Carry Over Work : Mud Sampling System

Installation, Fork Lift Way Protection, WROV

26 2014 Seadrill West Jupiter (Drillship)

On-boarded Work

25 Work Packages & Carry Over Work : Office Modification, 2nd

Mini Trip Tank Addition & Fill-up Line, Mud Sampling System

Installation

27 2014 Seadrill West Saturn (Drillship)

On-boarded Work

25 Work Packages & Carry Over Work : ROV SOW, Expro

IWOCS, ML/MWD/LWD SOW

28 2014 Seadrill West Neptune (Drillship)

On-boarded Work

35 Work Packages & Carry Over Work, Mud Cuttings Dryer Equi

pment Package, Drawing Works Access Platforms, ML/MWD/

LWD SOW

11. Engineering

Page 27: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

27

NO. Year Client Project Name Work Description

29 2014 Atwood Oceanics Achiever (Drillship)

On-boarded Work

Work Packaging & Carry Over Work : Mud Cuttings Dryer

Equipment Package

30 2014 Noble Sam Croft (Drillship)

On-boarded Work

Work Packaging & Carry Over Work : ML/MWD/LWD System,

ADCP Installation

31 2014 Maersk Drilling Valiant (Drillship)

On-boarded Work

20 Work Packages & Carry Over Work : Riser Monitoring

System, Modification of Base Oil Line, Drawing Works Enclosure

Fabrication and Installation of Access Hatches

32 2014 Ocean Rig Athena (Drillship) Work Packaging & Carry Over Work : Pure Vacuum Chemical Unit

33 2014 Maersk Drilling Viking (Drillship)

24 Work Packages & Carry Over Work : Bulk Mud System,

Extension Deck For Hydro Workshop, 2nd BOP Access Tower

Manufacturing

34 2014 Atwood Oceanics Advantage (Drillship)

On-boarded Work

Work Packaging & Carry Over Work : Mud Cuttings Dryer

Equipment Package, LP Mud System, Mud Logging Unit

35 2014 Ocean Rig Skyros (Drillship)

On-boarded Work

Work Packaging & Carry Over Work : Foam Skid, Mud Sieving

System

36 2014 DSME LNG FPSO Topside Engineering Topside Dynamic Engineering Model Development

37 2014 Petronas / Samsung LNG FPSO Functional Analysis ICSS Functional Analysis & Control Narratives

38 2014 Kuwait Oil Company WARA PMP OTS WARA PMP OTS Development and Delivery

39 2013 KOGAS AKKAS B.V. AKKAS Gas Development Project Steady State Simulation and Heat & Material Balance

40 2013 IOOC Sirri Gas Compression Facilities Basic Design & P&ID Modification

11. Engineering

Page 28: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

28

NO. Year Client Project Name Work Description

41 2013 Saudi Aramco HOUT Onshore Gas Facilities Project Planning and Management

42 2013 Saudi Aramco HOUT Onshore Gas Facilities Project Planning and Management

43 2013 BP Quad204 FPSO Functional AnalysisICSS (Integrated Control & Safety System) Design &

Functional Analysis for Topside and Hull

44 2013 Oman Oil Company in Oman Musandam Gas Plant OTS MGP OTS Development and Delivery

45 2012 STX in ChinaCargo (Iran Sand) Loading Design &

AnalysisFEED and Interface engineering

46 2012 Petrobras and MODEC UUED DOM Gas project Shell PDC in Nigeria Design & Heat & Material Balance

47 2012 New Zealand Shipping / STXCargo (Iron Sand) Loading Design &

AnalysisCargo Loading Design

48 2012 KOMERI Lump-Sum-Turn-Key Project LNG FPSO Topside FEED & MPDS Development

49 2012 IOOC Hengam Technical Safety & Mechanical

Spec.For Three (3) Wellhead Platforms

50 2011 TOTAL and MODEC Kaombo FPSO FEED and Interface engineering

51 2011 Petrobras and MODEC OSX FPSO Marine FEED, Engineering Study and Analysis

52 2011 Shell and Hanjin DC Platform Project Planning and Management

53 2011Abu Dhabi Gas Development

and Samsung EngineeringSGD in UAE Dynamic Engineering Study

54 2011 GASCO and GS Engineering NGL4 in UAE Dynamic Engineering Study

55 2011 KOC and SK Engineering BS-132 in Kuwait Dynamic Engineering Study

56 2010 LNG Carrier Machinery Operation Manual Cargo System Operation Manual

11. Engineering

Page 29: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

29

NO. Year Client Project Name Work Description

57 2010 COSL Pioneer (Semi-Sub)

On-boarded Work : from China to Norway (3 months)

13 Work Packages & Carry Over Work : Burner Boom & Piping

Installation, ROV Hatch, Electric Heat Tracing System

58 2010 Pacific Drilling Bora (Drillship)

Quay Side Work

50 Work Packages & Carry Over Work : New Centrifuge Platform Inst

allation, N2 Generator Installation, Cables for 3rd Party Units

59 2010 Transocean Deapwater Champion (Drillship)

On-boarded Work : from South Korea to Singapore( 2 weeks)

1 Work Package & Carry Over Work : ML & MWD System

Installation

60 2010 Vantage Drilling Platinum Explorer (Drillship)Work Packaging & Carry Over Work : ROV SOW, Expro IWOCS,

Mud Sampling System Installation

61 2010 Odfjell Drilling AS Deapsea StavangerWork Packaging & Carry Over Work : Mud Sieving System, MWD/ML

System, ROV

62 2010 Transocean Discoverer India (Drillship)

On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System

Installation

63 2010 Ensco Deepocean Clarion (Drillship)Work Packaging & Carry Over Work : Mud Cuttings Dryer Equipment

Package, ML/MWD/LWD SOW

64 2010 BP Skarv FPSOWork Packaging & Carry Over Work : ROV SOW, Expro IWOCS,

Mud Sampling System Installation

65 2010 Schahin #2 Sertao (Drillship)Work Packaging & Carry Over Work : MI-SWACO Equipment Packag

e, ML/MWD/LWD SOW

66 2010 Schahin #1 Cerrado (Drillship)Work Packaging & Carry Over Work : Mud Cuttings Dryer Equipment

Package, ML/MWD/LWD SOW

67 2010 Transocean Discoverer Luanda (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System Installation

11. Engineering

Page 30: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

30

NO. Year Client Project Name Work Description

68 2010 Transocean Discoverer Inspiration (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System Installation

69 2009 BMPP SARGAS & DSME Basic Design & FEED

70 2009 LNG FPSO DSME LNG FPSO Refrigerant Compressor CCC Design

71 2009Agbami FPSO in

Nigeria OffshoreChevron & DSME Dynamic Engineering Study & PTS

72 2009 PETROSERV S/A Victoria (Semi-Sub) 1 Work Package & Carry Over Work : ML & MWD System Installation

73 2009 Stena Drilling Drill Max (Drillship) Work Package & Carry Over Work : Mud Sieving System

74 2009 Petrobras Petrobras 10000 (Drillship)

On-boarded Work

25 Work Package & Carry Over Work : Office Modification, 2nd Mini

Trip Tank Addition & Fill-up Line, Mud Sampling System Installation

75 2009 Transocean Discoverer Americas (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)

1 Work Package & Carry Over Work : ML & MWD System Installation

76 2009 Seadrill West Eminence (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment

Package, ML/MWD/LWD SOW

77 2008 Odfjell Drilling AS Deepsea Atlantic (Semi-Sub)Work Package & Carry Over Work : Mud Sieving System, MWD/ML

System, ROV

78 2008 Seadrill West Aquarius (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment

Package, ML/MWD/LWD SOW

79 2008 Seadrill West Hercules (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment

Package, ML/MWD/LWD SOW

11. Engineering

Page 31: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

31

12. Control System

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Dec. 2017 Ongoing KOGAS SN2234 75K LNGC SHI

2 Dec. 2017 Ongoing KOGAS SN2233 75K LNGC SHI

3 June 2016 Ongoing MBK SN2148 (With KSB & Rockwell) 174K LNGC SHI

4 June 2016 Ongoing MBK SN2149 (With KSB & Rockwell) 174K LNGC SHI

5 June 2016 Ongoing MBK SN2150 (With KSB & Rockwell) 174K LNGC SHI

6 May 2016 Ongoing FLEX LNG SN2107 (With KSB & Rockwell) 174K LNGC SHI

7 May 2016 Ongoing FLEX LNG SN2108 (With KSB & Rockwell) 174K LNGC SHI

8 July 2015 Mar. 2018 SK SN2154 (With KSB & Rockwell) 174K LNGC SHI

9 July 2015 Feb. 2018 SK SN2153 (With KSB & Rockwell) 174K LNGC SHI

10 July 2015 Dec. 2017 SK SN2081 (With KSB & Rockwell) 180K LNGC SHI

11 July 2015 July 2017 SK SN2080 (With KSB & Rockwell) 180K LNGC SHI

12 Oct. 2014 Sep. 2016 NYK H2633 173K LNGC HHI

13 Mar. 2015 June 2016 HYPROC H2814 172K LNGC HHI

14 Mar. 2015 June 2016 HYPROC H2813 172K LNGC HHI

15 Oct. 2013 June 2016 BGT SN2079 174.9K LNGC SHI

16 Oct. 2013 Feb. 2016 BGT SN2078 174.9K LNGC SHI

17 Oct. 2013 Jan. 2016 BGT SN2077 174.9K LNGC SHI

18 Oct. 2013 Nov. 2015 BGT SN2076 174.9K LNGC SHI

19 Jan. 2013 June 2015 DYNAGAS H2567 162K LNGC HHI

20 Jan. 2013 Mar. 2015 DYNAGAS H2566 162K LNGC HHI

1) EMERGENCY SHUTDOWN SYSTEM (ESDS)

Page 32: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

32

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

21 Dec. 2012 July 2014 OSC H2584 162K LNGC HHI

22 June 2012 June 2014 DYNAGAS H2565 162K LNGC HHI

23 June 2012 June 2014 DYNAGAS H2558 162K LNGC HHI

24 June 2012 Apr. 2013 DYNAGAS H2556 155K LNGC HHI

25 June 2012 Apr. 2013 DYNAGAS H2557 155K LNGC HHI

26 June 2012 Apr. 2013 DYNAGAS H2580 155K LNGC HHI

27 Sep. 2009 Mar. 2010 BRUNEI H2277 147K LNGC DSME

28 June 2009 Dec. 2009 BRUNEI H2273 147K LNGC DSME

29 Jan. 2009 July 2009 KNUTSEN H2269 145K LNGC DSME

30 Jan. 2009 July 2009 KNUTSEN H2274 145K LNGC DSME

31 Sep. 2008 Mar. 2009 KNUTSEN H2267 145K LNGC DSME

32 July 2008 Jan. 2009 TMT H2268 145K LNGC DSME

33 July 2008 Jan. 2009 TMT H2278 145K LNGC DSME

34 July 2008 Jan. 2009 QGTC MARSHALL H2286 210K LNGC DSME

35 July 2008 Jan. 2009 KNUTSEN H2275 145K LNGC DSME

36 May 2008 Nov. 2008 PENINSULAR H2224 83K LPGC DSME

37 Mar. 2008 Sep. 2008 MARAN GAS H2320 83.8K LPGC DSME

38 Mar. 2008 Sep. 2008 QGTC MARSHALL H2284 210K LNGC DSME

39 Feb. 2008 Aug. 2008 QGTC MARSHALL H2283 210K LNGC DSME

40 Nov. 2007 May 2008 QGTC H2265 216K LNGC DSME

12. Control System

1) EMERGENCY SHUTDOWN SYSTEM (ESDS)

Page 33: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

33

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

41 Nov. 2007 May 2008 QGTC H2266 216K LNGC DSME

42 Sep. 2007 Mar. 2008 MARAN GAS H2319 83.8K LPGC DSME

43 Aug. 2007 Feb. 2008 MARAN GAS H2318 83.8K LPGC DSME

44 Aug. 2007 Feb. 2008 QGTC H2257 216K LNGC DSME

45 Aug. 2007 Feb. 2008 QGTC H2264 216K LNGC DSME

46 July 2007 Jan. 2008 PENINSULAR H2323 83K LPGC DSME

47 July 2007 Jan. 2008 QGTC MARSHALL H2285 210K LNGC DSME

48 June 2007 Dec. 2007 QGTC H2256 216K LNGC DSME

49 June 2007 Dec. 2007 KLC H2261 150K LNGC DSME

50 Mar. 2007 Sep. 2007 PENINSULAR H2322 83K LPGC DSME

51 Feb. 2007 Aug. 2007 SOVCOM H2241 145K LNGC DSME

52 Feb. 2007 Aug. 2007 J5 H2253 200K LNGC DSME

53 Feb. 2007 Aug. 2007 BP S 297 155K LNGC HHI

54 Jan. 2007 July 2007 PENINSULAR H2321 83K LPGC DSME

55 Jan. 2007 July 2007 TEEKAY H1780 155K LNGC HHI

56 Jan. 2007 July 2007 TEEKAY S 298 155K LNGC HHI

57 Dec. 2006 June 2007 J5 H2252 200K LNGC DSME

58 Nov. 2006 May 2007 EXMAR H2316 83.8K LPGC DSME

59 Nov. 2006 May 2007 J5 H2251 200K LNGC DSME

60 Oct. 2006 Apr. 2007 BP H1778 155K LNGC HHI

1) EMERGENCY SHUTDOWN SYSTEM (ESDS)

12. Control System

Page 34: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

34

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

61 Oct. 2006 Apr. 2007 BP H1779 155K LNGC HHI

62 Sep. 2006 Mar. 2007 J5 H2250 200K LNGC DSME

63 Sep. 2006 Mar. 2007 KLC H2260 150K LNGC DSME

64 Sep. 2006 Mar. 2007 EXMAR H2315 83.8K LPGC DSME

65 Aug. 2006 Feb. 2007 SOVCOM H2242 145K LNGC DSME

66 July 2006 Jan. 2007 J5 H2249 200K LNGC DSME

67 July 2006 Jan. 2007 QGTC H2255 216K LNGC DSME

68 July 2006 Jan. 2007 HMM H1903 150K LNGC HHI

69 July 2006 Jan. 2007 MARAN GAS H2317 83.8K LPGC DSME

70 June 2006 Dec. 2006 TRIO H1730 155K LNGC HHI

71 June 2006 Dec. 2006 PSM H2248 200K LNGC DSME

72 Mar. 2006 Sep. 2006 PSM H2247 200K LNGC DSME

73 Feb. 2006 Aug. 2006 OSG H1792 216K LNGC HHI

74 Jan. 2006 July 2006 PSM H2246 200K LNGC DSME

75 Jan. 2006 July 2006 OSG H1606 216K LNGC SHI

76 Dec. 2005 June 2006 OSG H1791 216K LNGC HHI

77 Nov. 2005 May 2006 PSM H2245 200K LNGC DSME

78 Oct. 2005 Apr. 2006 DYNACOM H1719 155K LNGC HHI

79 Oct. 2005 Apr. 2006 OSG H1605 216K LNGC SHI

80 Aug. 2005 Feb. 2006 TRIO H1729 155K LNGC HHI

1) EMERGENCY SHUTDOWN SYSTEM (ESDS)

12. Control System

Page 35: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

35

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

81 July 2005 Jan. 2006 TEEKAY H2240 145K LNGC DSME

82 July 2005 Jan. 2006 BP H1777 155K LNGC HHI

83 July 2005 Jan. 2006 DYNACOM H1734 155K LNGC HHI

84 July 2005 Jan. 2006 DYNACOM H1748 155K LNGC HHI

85 May 2005 Nov. 2005 NYK H1563 147K LNGC SHI

86 May 2005 Nov. 2005 NYK H1564 147K LNGC SHI

87 Mar. 2005 Sep. 2005 TSAKOS H1754 155K LNGC HHI

88 Feb. 2005 Aug. 2005 KNUTSEN H2236 155K LNGC DSME

89 Feb. 2005 Aug. 2005 TEEKAY H2238 155K LNGC DSME

90 Nov. 2004 May 2005 TMT H2233 145K LNGC DSME

91 Aug. 2004 Feb. 2005 BERGESEN H2224 145K LNGC DSME

92 July 2004 Jan. 2005 TEEKAY H2239 145K LNGC DSME

93 July 2004 Jan. 2005 TRIO H1728 155K LNGC HHI

94 Feb. 2004 Aug. 2004 BERGESEN H2223 145K LNGC DSME

95 Dec. 2003 June 2004 BERGESEN H2222 145K LNGC DSME

96 Nov. 2002 May 2003 BERGESEN H2221 145K LNGC DSME

1) EMERGENCY SHUTDOWN SYSTEM (ESDS)

12. Control System

Page 36: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

36

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Feb. 2009 Aug. 2009 TMT H2278 174K LNGC DSME

2 July 2008 Nov. 2008 TMT H2268 174K LNGC DSME

3 Apr. 2008 Oct. 2008 HMM H1903 155K LNGC HHI

4 Dec. 2007 June 2008 STX PAN-OCEAN N193 150K LNGC HANJIN

5 Sep. 2007 Mar. 2008 KLC H2260 150K LNGC DSME

6 Aug. 2007 Dec. 2007 KLC H2261 150K LNGC DSME

7 Apr. 2007 Oct. 2007 STX PAN-OCEAN N192 150K LNGC HANJIN

8 Feb. 2007 Aug. 2007 SOVCOM H2241 145K LNGC DSME

9 Aug. 2006 Feb. 2007 SOVCOM H2242 145K LNGC DSME

10 Apr. 2006 Oct. 2006 DYNACOM H1734 155K LNGC HHI

11 Sep. 2005 Mar. 2006 DYNACOM H1719 155K LNGC HHI

12 Aug. 2005 Dec. 2005 DYNACOM H1748 155K LNGC HHI

13 Feb. 2005 Aug. 2005 TSAKOS H1754 155K LNGC HHI

14 Feb. 2005 Aug. 2005 KNUTSEN H2236 145K LNGC DSME

2) SHIP SHORE COMMUNICATION LINK SYSTEM (SSCLS)

12. Control System

Page 37: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

37

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

1 Feb. 2017 CHEVRON H2069 160K LNGC SHI

2 Feb. 2017 CHEVRON H2070 160K LNGC SHI

3 Apr. 2015 CHEVRON H1942 160K LNGC SHI

4 June 2014 CHEVRON H1941 160K LNGC SHI

5 Mar. 2014 CHEVRON H1920 160K LNGC SHI

6 Mar. 2014 CHEVRON H1921 160K LNGC SHI

7 Jan. 2012 BAHAMAS H1813 160K LNGC SHI

8 Nov. 2011 BAHAMAS H1812 160K LNGC SHI

9 Oct. 2011 BAHAMAS H1811 160K LNGC SHI

10 Sep. 2011 BAHAMAS H1810 160K LNGC SHI

11 Feb. 2010 QGTC H2286 216K LNGC DSME

12 Feb. 2010 BRUNEI H2277 147K LONGC DSME

13 Nov. 2009 QGTC H2285 216K LNGC DSME

14 Oct. 2009 KNUTSEN H2274 170K LNGC DSME

15 Oct. 2009 KNUTSEN H2275 173K LNGC DSME

16 Oct. 2009 BRUNEI H2273 147K LONGC DSME

17 Aug. 2009 QGTC H2284 216K LNGC DSME

18 July 2009 KNUTSEN H2269 170K LNGC DSME

19 June 2009 SHELL NW SANDERING 147K LNGC SHELL

20 June 2009 EXMAR H2272 150K LNGC DSME

21 June 2009 QGTC H2283 216K LNGC DSME

3) TRIM AND LIST INDICATION SYSTEM (T/L)

12. Control System

Page 38: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

38

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

22 Mar. 2009 QGTC H1754 263K LNGC SHI

23 Mar. 2009 KNUTSEN H2267 170K LNGC DSME

24 Jan. 2009 QGTC H1753 263K LNGC SHI

25 Jan. 2009 TMT H2278 170K LNGC DSME

26 Jan. 2009 TMT H2268 170K LNGC DSME

27 Dec. 2008 QGTC H1752 263K LNGC SHI

28 Dec. 2008 KOTC H5290 PC(AFRAMAX) DSME

29 Nov. 2008 QGTC H1751 263K LNGC SHI

30 Oct. 2008 SHELL H2174 173K LNGC HHI

31 Sep. 2008 EXMAR H2271 150K LNGC DSME

32 Aug. 2008 EXMAR H2270 150K LNGC DSME

33 Aug. 2008 ILTC H1686 155K LNGC SHI

34 Aug. 2008 QGTC H1726 263K LNGC SHI

35 May 2008 QGTC H1697 263K LNGC SHI

36 May 2008 BERGESEN H2259 156K LNGC DSME

37 May 2008 QGTC H2265 216K LNGC DSME

38 May 2008 QGTC H2266 216K LNGC DSME

39 Apr. 2008 BERGESEN H2258 156K LNGC DSME

40 Apr. 2008 QGTARGASIII H1696 217K LNGC SHI

41 Mar. 2008 QGTC H1695 263K LNGC SHI

42 Feb. 2008 QGTC H1694 263K LNGC SHI

3) TRIM AND LIST INDICATION SYSTEM (T/L)

12. Control System

Page 39: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

39

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

43 Feb. 2008 QGTC H2257 216K LNGC DSME

44 Feb. 2008 QGTC H2264 216K LNGC DSME

45 Jan. 2008 DYNACOM H1734 155K LNGC HHI

46 Jan. 2008 HMM H1903 150K LNGC HHI

47 Dec. 2007 TEEKAY H1643 216K LNGC SHI

48 Dec. 2007 KLC H2261 150K LNGC DSME

49 Dec. 2007 QGTC H2256 216K LNGC DSME

50 Nov. 2007 SOVCOM H.2241 145K LNGC DSME

51 Oct. 2007 SHELL H2173 173K LNGC HHI

52 Oct. 2007 QGTC H1677 263K LNGC SHI

53 Oct. 2007 K-LINE H1634 153K LNGC SHI

54 Sep. 2007 QGTC H2255 216K LNGC DSME

55 Aug. 2007 J5 H2253 216K LNGC DSME

56 Aug. 2007 QGTC H1676 263K LNGC SHI

57 Aug. 2007 BERGESEN H2232 145K LNGC DSME

58 July 2007 K-LINE H1620 153K LNGC SHI

59 June 2007 SHELL H2172 173K LNGC HHI

60 June 2007 TEEKAY H1646 216K LNGC SHI

61 June 2007 QGTC H1675 263K LNGC SHI

62 June 2007 J5 H2252 216K LNGC DSME

63 May 2007 SOVCOM H.2242 145K LNGC DSME

3) TRIM AND LIST INDICATION SYSTEM (T/L)

12. Control System

Page 40: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

40

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

64 May 2007 J5 H2251 216K LNGC DSME

65 May 2007 EXMAR H2263 150K LNGC DSME

66 Apr. 2007 TEEKAY H1645 216K LNGC SHI

67 Apr. 2007 KLC H2260 150K LNGC DSME

68 Apr. 2007 PRONAV H2248 216K LNGC DSME

69 Mar. 2007 J5 H2250 216K LNGC DSME

70 Mar. 2007 K-LINE H1619 153K LNGC SHI

71 Feb. 2007 TEEKAY H1644 216K LNGC SHI

72 Feb. 2007 PRONAV H2247 216K LNGC DSME

73 Feb. 2007 J5 H2249 216K LNGC DSME

74 Jan. 2007 EXMAR H2254 150K LNGC DSME

75 Dec. 2006 BERGESEN H2231 145K LNGC DSME

76 Nov. 2006 PRONAV H2246 216K LNGC DSME

77 Oct. 2006 PRONAV H2245 216K LNGC DSME

78 Aug. 2006 GOLAR H2244 145K LNGC DSME

79 June 2006 MARANGAS H2243 145K LNGC DSME

80 June 2006 KOTC H5289 PC(AFRAMAX) DSME

81 May 2006 TEEKAY H2240 145K LNGC DSME

82 May 2006 KOTC H5269 PC(AFRAMAX) DSME

83 Mar. 2006 BERGESEN H2230 145K LNGC DSME

84 Feb. 2006 BERGESEN H2229 145K LNGC DSME

3) TRIM AND LIST INDICATION SYSTEM (T/L)

12. Control System

Page 41: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

41

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

85 Jan. 2006 TEEKAY H2239 145K LNGC DSME

86 Dec. 2005 TEEKAY H2238 145K LNGC DSME

87 Nov. 2005 KRISTEN H2236 145K LNGC DSME

88 Sep. 2005 EXMAR H2237 138K LNGC DSME

89 2005 TMT H2233 145K LNGC DSME

90 2005 GOLAR H2234 145K LNGC DSME

91 2005 KRISTEN H2235 145K LNGC DSME

92 2005 KRISTEN H2228 145K LNGC DSME

93 2004 EXMAR H2208 138K LNGC DSME

94 2004 EXMAR H2218 138K LNGC DSME

95 2004 GOLAR H2226 145K LNGC DSME

96 2004 KRISTEN H2227 145K LNGC DSME

3) TRIM AND LIST INDICATION SYSTEM (T/L)

12. Control System

Page 42: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

42

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

1 Jan. 2012 BAHAMAS H1813 160K LNGC SHI

2 Nov. 2011 BAHAMAS H1812 160K LNGC SHI

3 Oct. 2011 BAHAMAS H1811 160K LNGC SHI

4 Sep. 2011 BAHAMAS H1810 160K LNGC SHI

5 Mar. 2009 TSAKOS H1754 155K LNGC SHI

6 Mar. 2009 SCI H5300 319K COT DSME

7 Feb. 2009 EXMAR H2272 150K LNGC DSME

8 Feb. 2009 EXMAR H2272 150K LNGC DSME

9 Jan. 2009 QGTC H2286 216K LNGC DSME

10 Dec. 2008 QGTC H1753 263K LNGC SHI

11 Dec. 2008 QGTC H2285 216K LNGC DSME

12 Nov. 2008 QGTC H1752 263K LNGC SHI

13 Oct. 2008 QGTC H1751 263K LNGC SHI

14 Oct. 2008 QGTC H2284 216K LNGC DSME

15 Sep. 2008 QGTC H2283 216K LNGC DSME

16 Sep. 2008 EXMAR H2271 150K LNGC DSME

17 Aug. 2008 EXMAR H2270 150K LNGC DSME

18 July 2008 QGTC H1726 263K LNGC SHI

19 May 2008 SCI H5299 319K COT DSME

20 May 2008 QGTC H2265 216K LNGC DSME

21 May 2008 QGTC H2266 216K LNGC DSME

4) FIELD INSTRUMENT

12. Control System

Page 43: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

43

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

22 Apr. 2008 QGTC H1697 263K LNGC SHI

23 Mar. 2008 QGIII H1696 209K LNGC SHI

24 Feb. 2008 QGTC H1695 263K LNGC SHI

25 Feb. 2008 QGTC H2264 216K LNGC DSME

26 Feb. 2008 QGTC H2257 216K LNGC DSME

27 Jan. 2008 QGTC H1694 263K LNGC SHI

28 Dec. 2007 QGTC H2256 216K LNGC DSME

29 Dec. 2007 KLC H2261 145K LNGC DSME

30 Nov. 2007 QGTC H1677 263K LNGC SHI

31 Oct. 2007 EXMAR H2263 150K LNGC DSME

32 Sep. 2007 QGTC H1676 263K LNGC SHI

33 Sep. 2007 QGTC H2255 216K LNGC DSME

34 July 2007 QGTC H1675 263K LNGC SHI

35 Apr. 2007 TEEKAY H1646 216K LNGC SHI

36 Apr. 2007 TEEKAY H1645 216K LNGC SHI

37 Apr. 2007 KLC H2261 145K LNGC DSME

38 Jan. 2007 TEEKAY H1644 216K LNGC SHI

39 Dec. 2006 PRONAV H2248 216K LNGC DSME

40 Nov. 2006 EXMAR H2254 150K LNGC DSME

41 Nov. 2006 TEEKAY H1643 216K LNGC SHI

42 Oct. 2006 DYNACOM H1734 155K LNGC HHI

4) FIELD INSTRUMENT

12. Control System

Page 44: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

44

NO. PERIOD CLIENT PROJECT NAME TYPE YARD

43 Sep. 2006 PRONAV H2247 216K LNGC DSME

44 Aug. 2006 OSG H1792 216K LNGC HHI

45 July 2006 PRONAV H2246 216K LNGC DSME

46 July 2006 OSG H1791 216K LNGC HHI

47 June 2006 OSG H1606 216K LNGC SHI

48 May 2006 PRONAV H2245 216K LNGC DSME

49 Apr. 2006 OSG H1605 216K LNGC SHI

50 Apr. 2006 DYNACOM H1719 155K LNGC HHI

51 Jan. 2006 DYNACOM H1748 155K LNGC HHI

52 Jan. 2006 TEEKAY H2240 145K LNGC DSME

53 Oct. 2005 TEEKAY H2239 145K LNGC DSME

54 Aug. 2005 KNUTSEN H2236 145K LNGC DSME

55 Aug. 2005 TEEKAY H2238 145K LNGC DSME

56 June 2005 EXMAR H2208 138K LNGC DSME

57 June 2005 EXMAR H2218 138K LNGC DSME

58 June 2005 EXMAR H2237 138K LNGC DSME

4) FIELD INSTRUMENT

12. Control System

Page 45: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

45

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Nov. 2013 Ongoing SONANGOL H3620 Drillship DSME

2 Nov. 2013 Ongoing SONANGOL H3621 Drillship DSME

5) FIRE AND GAS EMERGENCY SHUTDOWN SYSTEM (F&G ESD SYSTEM)

12. Control System

Page 46: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

46

6) OPERATING MANUAL FOR LNGC

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Feb. 2018 Ongoing Golar SN2189 LNG FSRU SHI

2 Aug. 2016 Ongoing SK SN2153 ME-GI LNGC SHI

3 Aug. 2016 Ongoing SK SN2154 ME-GI LNGC SHI

4 Mar. 2010 Ongoing Golar HN2024 LNG RV SHI

5 Mar. 2010 Ongoing Golar HN2056 DFDE LNGC SHI

6 Aug. 2016 Aug. 2017 SK SN2080 XDF LNGC SHI

7 Aug. 2016 Aug. 2017 SK SN2081 XDF LNGC SHI

8 June 2014 Sep. 2016 BW SN2118 LNG FSRU SHI

9 June 2014 Mar. 2016 BW SN2074 LNG FSRU SHI

10 Mar. 2014 Apr. 2015 SeaRiver Maritime XNB003 Crude oil Tanker APSI(Aker Philadelphia

Shipyard Inc.)11 Nov. 2013 Apr. 2015 SeaRiver Maritime XNB002 Crude oil Tanker

12 Mar. 2010 May 2016 Golar HN2031 LNG FSRU SHI

13 Mar. 2010 Jan. 2015 Golar HN2048 DFDE LNGC SHI

14 Mar. 2010 Nov. 2014 Golar HN2047 DFDE LNGC SHI

15 Mar. 2010 June 2014 Golar HN2055 LNG FSRU SHI

16 Mar. 2010 May 2014 Golar HN2027 DFDE LNGC SHI

17 Mar. 2010 Jan. 2014 Golar HN2023 DFDE LNGC SHI

18 Mar. 2010 Dec. 2013 Golar HN2022 DFDE LNGC SHI

19 Mar. 2010 Nov. 2013 Golar HN2021 DFDE LNGC SHI

20 Mar. 2010 Nov. 2013 Golar HN2026 DFDE LNGC SHI

21 Mar. 2010 Apr. 2011 ELCANO S3008 DFDE LNGC STX

12. Control System

Page 47: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

47

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

1 Ongoing Aker Solutions STATOIL Johan Svedrup Platform General Relocation Service, Accommodation SHI

2 Ongoing ADMA-OPCO NASR pkg-2 Platform Accommodation HHI

3 Ongoing Seadrill Seadrill General Relocation Service, Accommodation DSME

4 Ongoing CMA CGM CMA CGM Container General Relocation Service, Accommodation HHI

5 Dec. 2017 Aker Offshore Partner STATOIL Mariner Platform Office Rental SHI

6 Dec. 2017 Sovcomflot Gazprom FSRU Accommodation HHI

7 Sep. 2017 INPEX INPEX Ichthys FPSO Manpower, Procurement DSME

8 Sep. 2017 Emerson Shell Prelude FLNGGeneral Relocation Service, Accommodation, Manpower,

Logistics, ProcurementSHI

9 Sep. 2017 SBM Offshore INPEX Ichthys FPSOGeneral Relocation Service, Accommodation, Manpower,

Logistics, ProcurementDSME

10 Sep. 2017 Emerson Shell Prelude FLNG General Relocation Service SHI

11 Sep. 2017 Technip TOTAL Martin Linge Platform Commissioning, Procurement SHI

12 Sep. 2017 Emerson TOTAL Martin Linge Platform General Relocation Service, Accommodation, Procurement SHI

13 Sep. 2017 Statoil STATOIL Mariner Platform General Relocation Service, Accommodation DSHI

14 Apr. 2017 Dana Petroleum DANA Western Isles FPSO General Relocation Service, Accommodation, ManpowerChina

COSCO

15 Apr. 2017 MDE STATOIL Johan Svedrup Platform Accommodation SHI

16 Feb. 2017 Emerson Bergading Complex General Relocation Service, Accommodation HHI

17 June 2017 MHWirth STATOIL Mariner Platform General Relocation Service, Accommodation, Manpower DSME

13. Relocation Service

Page 48: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

48

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

19 Dec. 2016 SHI Ocean Rig #9 Manpower SHI

20 Aug. 2016 SONGA Offshore Songa #1, Songa #2 Drill Rig Commissioning, Manpower DSME

21 June 2016 Emerson Statoil Platform Gina KrogGeneral Relocation Service, Accommodation, Manpower,

Logistics, ProcurementSHI

22 June 2016 Emerson Petronas FLNGGeneral Relocation Service, Accommodation, Logistics,

ProcurementDSME

23 June 2016 MHwirth STATOIL Gina Krog Platform General Relocation Service, Accommodation DSME

24 Apr. 2016 BP International BP Quad 204 FPSO Manpower, Procurement, Commissioning HHI

25 Apr. 2016 BP International BP Clair Ridge Platform Manpower, Procurement, Commissioning HHI

26 Apr.2016 Foxboro Malaysia Baronia CPP General Relocation Service HHI

27 Apr. 2016Trisystems

EngineeringBaronia CPP General Relocation Service HHI

28 Apr. 2016 Omega Integration Baronia CPP General Relocation Service HHI

29 Mar. 2016 Technip Dong energy Hejre Platform General Relocation Service, Accommodation, Procurement DSME

30 Feb. 2016 DSME Statoil Platform Gina Krog Manpower DSME

31 Feb. 2016 Transocean Transocean Thalassa Manpower, Procurement DSME

32 Feb. 2016 Vantage Vantage Tungsten Explorer Manpower, Procurement DSME

33 Dec. 2015 MHWirth Songa #1,#2,#3,#4 Manpower DSME

34 Dec. 2015 DSME Chevron South Nemba Auxiliary Manpower, Commissioning, Procurement DSME

35 Dec. 2015 HANWHA E&C Yanbu 2 Power and Water Manpower Yabu, Saudi

36 Sep. 2015 TOTAL TOTAL Moho Nord TLP Manpower HHI

13. Relocation Service

Page 49: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

49

13. Relocation Service

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

37 Aug. 2015 DIAMOND Offshore DIAMOND Ultra Deep-water Drillship Manpower, Commissioning, Procurement HHI

38 June 2015 SONGA Offshore Songa #1 Drill Rig Manpower, Commissioning, Procurement DSME

39 Apr. 2015 ONHP (Gazprom) Prirazlomnaya OIFP Engineering service, Procurement HHI

40 Apr. 2015 Maersk Drilling Maersk Voyager Drillship Manpower, Logistics, Procurement DSME

41 Mar. 2015 Ocean Rig Ocean Rig Apollo Drillship Manpower, Logistics, Procurement SHI

42 Feb. 2015 Seadrill SEADRILL West Carina Drillship Manpower, Procurement DSME

43 Jan. 2015 Fred Olsen Energy Fred Olsen Drillship #1 Manpower, Commissioning, Procurement HHI

44 Nov. 2014 Seadrill Seadrill West Saturn Drillship Manpower, Procurement DSME

45 Nov. 2014 Transocean Transocean Edward Drillship #1 Manpower, Procurement DSME

46 Oct. 2014 STX MOG F1006 Manpower, Procurement STX

47 Sep. 2014 Atwood ATWOOD Achiever Drill Rig Manpower, Procurement DSME

48 Sep. 2014 Odfjell ODFJELL Deepsea AberdeenGeneral Relocation Service, Manpower, Logistics,

Procurement, Shipping AgentDSME

49 Sep. 2014 Diamond Offshore Diamond Drillship #4 Manpower, Commissioning, Procurement HHI

50 Sep. 2014 Seadrill SEADRILL West Neptune Manpower, Logistics, Procurement HHI

51 Aug. 2014 Noble Noble Drillship #4 Manpower, Commissioning, Procurement HHI

52 June 2014 Noble Noble Sam Croft Drill Rig Manpower, Commissioning, Procurement HHI

53 June 2014 Maersk Drilling Maersk Valiant / Venturer Drill Rig Manpower, Logistics, Procurement DSME

54 June 2014 Golar LNGC Engineering-Operation Manual, Manpower SHI

55 May 2014 Exxonmobil EXXON Arkutun Dagi Platform Manpower, Procurement DSME

56 Apr. 2014 Ocean Rig OCEAN RIG Athena Drillship Manpower, Logistics, Procurement DSME

Page 50: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

50

13. Relocation Service

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

57 Apr. 2014. Maersk Drilling MAERSK Viking Rig Manpower, Logistics, Procurement DSME

58 Mar. 2014 Diamond Offshore Diamond Drillship #3 Manpower, Commissioning HHI

59 Feb. 2014 Atwood ATWOOD Advantage Drillship Manpower, Logistics, Procurement DSME

60 Feb. 2014 Fred Olsen Energy Fred Olsen Drillship #1 Manpower, Commissioning HHI

61 Feb. 2014 Ocean Rig Ocean Rig Skyros Manpower, Logistics, Procurement SHI

62 Feb. 2014 DSME Chevron South Nemba Auxiliary Manpower, Commissioning, Procurement DSME

63 Jan. 2014 Diamond Offshore Diamond Drillship #1Accommodation, Manpower, Commissioning,

Logistics, ProcurementHHI

64 Jan. 2014 Allseas Allseas Pieter Schelte H3401General Relocation Service, Manpower, Commi

ssioning, Procurement, LogisticsDSME

65 Dec. 2013 Transocean Transocean Edward Drillship #1 Manpower, Commissioning DSME

66 Nov. 2013 Seadrill Seadrill West Tellus Drillship Manpower, Logistics, Procurement SHI

67 Sep. 2013 Diamond Offshore Diamond Drillship #2 Manpower, Commissioning HHI

68 Aug. 2013 Pacific Drilling Pacific Drilling Khamsin Drillship Manpower, Logistics, Procurement SHI

69 July 2013 Vantage Vantage Tungsten Explorer Drill Rig Manpower, Commissioning DSME

70 June 2013 Chevron Chevron EGP Phase 3B Platform Manpower, Commissioning DSME Nigeria

71 2013.06 Vantage Vantage Tungsten Explorer drillship Manpower, Logistics, Procurement DSME

72 May 2013 DSME Allseas Pieter Schelte Manpower, Commissioning DSME

73 Mar. 2013 Chevron Chevron H6051 SNX Manpower, Commissioning DSME

74 Jan. 2013 Transocean Transocean GSF- High island Manpower, CommissioningDry Dock

World (Dubai)

75 Jan. 2013 Ocean Rig Ocean Rig Mylos Drillship Manpower, Logistics, Procurement SHI

Page 51: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

51

13. Relocation Service

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

76 Jan. 2013 DSME Heerema Aegir Manpower, Commissioning DSME

77 Dec. 2012 Ocean Rig Ocean Rig #4 Mykonos Manpower, Commissioning DSME

78 Oct. 2012 Heerema Heerema H3402 Manpower, Commissioning DSME

79 Oct. 2012 KOC KOC-1 Onshore Pipeline Project Manpower Kuwait

80 Aug. 2012 KNOC KNOC Panama Zhambyl Manpower, Commissioning ERSAI LLC.

81 July 2012 DSME Drilling Simulator Manpower DSME

82 July 2012 GRUPO-R Grupo-R GVA7500 Manpower, Commissioning DSME

83 May 2012 Ocean Rig Ocean Rig #2 Olympia Manpower, Procurement HHI

84 May 2012 Vantage Vantage Dragon Quest Manpower, Procurement Jurong Singapore

85 May 2012 Stena Drill Stena Ice Max Drillship Manpower, Procurement SHI

86 Apr. 2012 Odebrecht Odebrecht ODN #1, ODN #2 Manpower, Commissioning DSME

87 Apr. 2012 Vantage TMT 2 Dragon Quest Manpower, Commissioning DSME

88 Jan. 2012 Odfjell Odfjell Deep Sea Metro I Manpower, Logistics, Procurement, Shipping Agent DSME

89 Jan. 2012 Odfjell Odfjell Deep Sea Metro II Manpower, Procurement DSME

90 Aug. 2011 Ocean Rig Ocean Rig #3 Poseidon Manpower SHI

91 July 2011 PTT PTT Offshore Gas Spur Lines Manpower Thailand

92 June 2011 Technip H6001 OPS Manpower, Commissioning STX (Dalian)

93 May 2011 Odebrecht Odebrecht Norbe IX Manpower, Commissioning DSME

94 May 2011 Schahin Schahin #2 Sertao Engineered Product & Material Supply SHI

95 May 2011 Pacific Drilling Pacific Drilling Bora Manpower, Logistics, Procurement SHI

96 Apr. 2011 Seadrill Seadrill West Pegasus Manpower, Commissioning Jurong Singapore

Page 52: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

52

13. Relocation Service

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

97 Mar. 2011 IOCL Paradip SPM Project ManpowerIndian Oil

Corporation

98 Feb. 2011 Schahin SCHAHIN #1 CerradoManpower, Logistics, Procurement, Shipping

AgentSHI

99 Feb. 2011 Vantage Vantage Sea Dragon Commissioning, Manpower Jurong Singapore

100 Jan. 2011 KNOC KNOC Doo Sung Rig Modification, Manpower DSME

101 Dec. 2010 Vantage Vantage Platinum Explorer Manpower, Logistics, Procurement DSME

102 Dec. 2010 BP BP Skarv FPSO Manpower, Procurement SHI

103 Nov. 2010 Transocean Transocean Deepwater Champion Manpower, Logistics, Procurement HHI

104 Nov. 2010 Vantage TMT 1 (PLATINUM EXPLORER) Manpower, Commissioning DSME

105 Sep. 2010 ENSCO DS-4 ENSCO Deep Ocean Clarion Manpower, Procurement SHI

106 Sep. 2010 Odfjell Odfjell Deepsea Stavanger Manpower, Logistics, Procurement DSME

107 Aug. 2010 Transocean Transocean Discoverer India Manpower, Logistics, Procurement DSME

108 May 2010 Hyundai E&c Colombo Port Expansion Manpower HHI

109 Apr. 2010 Transocean Transocean Discoverer Inspiration Manpower, Logistics, Procurement DSME

110 Mar. 2010 Transocean Transocean Discoverer Luanda Manpower, Commissioning DSME

111 Sep. 2009 HHI / COOEC Bohai Bay Pipeline ManpowerHHI /

China COOEC

112 Aug. 2009 Petrobras Petrobras 10000 Drillship Manpower, Procurement SHI

113 Aug. 2009 Petroserv Petroserv Victoria Drillship Manpower, Procurement DSME

114 July 2009 Transocean Transocean Discoverer Americas Manpower, Commissioning DSME

115 Mar. 2009 Transocean Transocean Discoverer Clear Leader Manpower, Commissioning DSME

116 Mar. 2009 Stena Drill Stena DrillMAX Manpower, Procurement DSME

Page 53: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

53

13. Relocation Service

NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD

117 Mar. 2009 Seadrill Seadrill West Eminence Manpower, Procurement SHI

118 Feb. 2009 Seadrill Seadrill West Aquarius, West Hercules Manpower, Logistics, Procurement DSME

119 Aug. 2008 Transocean Transocean Discoverer Americas Manpower, Commissioning DSME

120 July 2008 Odfjell Odfjell Deepsea Atlantic Manpower, Commissioning DSME

121 Mar. 2008 Transocean Transocean Discoverer Clear Leader Manpower, Commissioning DSME

122 Dec. 2007 Seadrill Transocean West Hercules/Aquarius Manpower, Commissioning DSME

Page 54: KHAN Reference List...7 Mar. 2016 June 2016 ADMA -OPCO SARB Package 4 E house KOSPEC 8 Oct. 2015 May 2016 Sonangol Quenguela Drillship DSME 9 Aug. 2015. Mar. 2016 Songa Offshore Enabler

Thank You!

Q&A

Jae Seok, Choi / VP / Head of Sales Div.

E-mail : [email protected]

Phone : +82-(0)55-639-7702

CONTACT

KHAN Co., Ltd., 4th Fl., KHAN Building B, 915

Aju-dong, Geoje-Si, Gyeongsangnam-do, Korea

Tel: +82-(0)55-639-7600

Fax: +82-(0)55-639-7700

Http://www.khan-offshore.com

ADDRESS

54


Recommended