Presentation on
Accidents in Steel Gas Pipe Line
INDRAPRASTHA GAS LIMITED
1st Accident
Date: 1st June 2006 at 9.00 hrsTotal Hours of interruption: 648 Location : at Adchini junction Affected section of pipe line : Sarojini Nagar flyover to Laddo Sarai CNG StationAffected Length: 6.8 kmDiameter: 6’’Reason : 3rd party Damage( by D.K Enterprises on (contractor of BSES) during laying of cable).
Cause : Negligence of BSES, Reamer of HDD Machine hit steel line due to trenchless activities.
There was gas leakage. No. of CNG Stations affected: 1 No. of DTC Depot affected : 0 No. of R.O affected : 0 No. of FRS affected : 0
Date: 19th July 2006 at 12.30 hrs Total Hours of interruption: 154.3 Location : near Mukherjee Nagar drain Affected section of pipe line : Dheerpur
CNG Station to Chattersal CNG Station Affected Length: 7.8 km Diameter: 4" Reason : 3rd party Damage( by DDA
during construction of bridge)
2nd Accident
Cause : pipe line get punctured due to piling work, negligent effect of DDA authorities, securities had made aware about location prior to 4 days of damage.
There was gas leakage. No. of CNG Stations affected: 5 No. of DTC Depot affected :2 No. of R.O affected :1 No. of FRS affected :0
Date: 6th December 2006 at 12.40 hrs Location : Ghazipur Drain Crossing Total Hours of interruption: 257.2
Affected section of pipe line : Gail P/L TO Mayur Vihar PH-I CNG
Affected Length: 0.6 km Diameter: 4" Reason :3rd party Damage (by Flood &
Irrigation Deptt due to rupture of IGL’’s pipe line).
3rd Accident
Cause : Due to Dredging work during cleaning of drain by JCB.
There was gas leakage. No. of CNG Stations affected:1 No. of DTC Depot affected :0 No. of R.O affected :0 No. of FRS affected :0 Remedies : The damaged portion was being
at the depth of approx 7 m inside the flowing drain. Repair was not possible at all.
For this an alternate line was passed.
Date: 14th May 2008 at 16.30 hrs Diameter: 4 Affected Length: 7.1 km Affected section of pipe line :S.V-4
(Gail) To Okhla PH-I CNG Station Total Hours of interruption: 17.5 Reason :3rd party Damage (by DJB)
4th Accident
Cause : Negligence of DJB during boring.
There was gas leakage. No. of CNG Stations affected:2 No. of DTC Depot affected :2 No. of R.O affected :1 No. of FRS affected :0
Date: 2th jan 2009 at 17.00 hrs Diameter: 4" Affected Length: 3.36 km Affected section of pipe line : SGTN-II
To Siddhu Petrol Pump Total Hours of interruption: 49.5 Reason : 3rd party damage (by PWD)
5th Accident
Cause: During building of flyover , pockline machine hit the steel pipe line.
Only Dent, no gas leakage. No. of CNG Stations affected: 3 No. of DTC Depot affected :1 No. of R.O affected :1 No. of FRS affected :0
Date: 9th June 2009 at 15.45 hrs Diameter: 6"&4" Affected Length: 28 km Affected section of pipe line :
Complete East Delhi Pipeline Section (S.V-1Ghazipur to Loni Road)
Total Hours of interruption: 11.45 Reason :3rd party Damage ( by PWD)
6th Accident
Cause : During building of flyover , Piling machine hit the steel pipe line.
No. of CNG Stations affected: 8 No. of DTC Depot affected :3 No. of R.O affected :6 No. of FRS affected :1
Date: 22th Aug 2009 at 9.15 hrs Diameter: 6“ Affected Length: 4.5 km Affected section of pipe line :T-Point
West Enclave to Rohini Mega CNG Station.
Total Hours of interruption: 218.45 Reason : : Uncontrolled Error ( Damage
by Power Cable)
7th Accident
Cause : High tension wire fell in the the Budhvihar drain and Surge pass to underlying steel pipe line.
No. of CNG Stations affected:1 No. of DTC Depot affected : 0 No. of R.O affected : 1 No. of FRS affected : 0
Date: 23th june 2010 at 16.30 hrs Total Hours of interruption: 26
Affected section of pipe line :Jassa Singh Park to Saksham Petrol Pump
Affected Length: 1.443km Diameter: 4" Reason : operational error ( by MDPE
Project )
8th Accident
Cause : There was a bend connecting 1 m pipe line to 3 m pipe line. Drawing was not checked and HDD reamer hit 3 m line joint.
No. of CNG Stations affected:0 No. of DTC Depot affected :0 No. of R.O affected :1 No. of FRS affected :0 Suggestions : Check through both
locator and drawing.
Date: 10th May 2011 at 14.00 hrs Diameter: 4” Affected Length: 1.4 km Affected section of pipe line : Kalka ji
DTC Depot to Okhla Ph-1 CNG station Total Hours of interruption: 82 Reason : operational error( improper
line laying practice)
9th Accident
Cause : Damage due to Corrosion/incorrect laying of pipeline in DJB valve chamber, pipe line rest over water line valve stem for 8 years and also due to differential aeration.
No. of CNG Stations affected:1 No. of DTC Depot affected :0 No. of R.O affected :0 No. of FRS affected :0
Date: 23th May 2012 at 0.00 hrs Location :Kapashera Chawk( Near
Police Station Diameter: 12" Affected Length: 2.8 km Total Hours of interruption: 32 Reason : 3rd party Damage( by BUCON
Reamer of HDD knocked already newly operational 12” line).
10th Accident
Cause: HDD Calibration was not correct. HDD was working on 4.5m instead of 5 m and till that date IGL don't have drawing. Locator gave incorrect reading.
There was gas leakage. No. of CNG Stations affected:1 No. of DTC Depot affected :0 No. of R.O affected :2 No. of FRS affected :0
Date: 28th Oct 2012 at 00.45 hrs Diameter: 4 Affected section of pipe line :Burari to
Chattrasal CNG Station Affected Length: 11.65 km Total Hours of interruption: 15.25 Reason : 3rd party Damage( by Model
Town Market Association).
11th Accident
During placing a tent there someone took a thick nail and hit the pipe line and there was gas leakage.
No. of CNG Stations affected:3 No. of DTC Depot affected :2 No. of R.O affected :3 No. of FRS affected :0
Date: 10th may 2013 at 7.30 hrs Diameter:4“ Affected section of pipe line : From Up-
Gate to Ashiram Batra R.O. Affected Length: 7.97 km Total Hours of interruption: 27.1 Reason :3rd party Damage (by Vishwa
Infra on the contract of DJB for laying of sewer line of dia 1.5 m).
12th Accident
Cause : Pipe Line was hit during laying of sever line by MTBM( Micro tunnel Boring Machine)
Information was not provided. No. of CNG Stations affected:3 No. of DTC Depot affected :2 No. of R.O affected :3 No. of FRS affected :0
Date: 2th Jan 2014 at 15.00 hrs Location : NH-24 CNG Station Diameter: 4" Affected Length: 6.4 km Total Hours of interruption: 20 Reason : Damage by Puncture of
dielectric material of Insulating Joint at NH-24 CNG station due to electric surge.
13th Accident
There was a fire at CNG station. High pressure leakage occurred. No. of CNG Stations affected:0 No. of DTC Depot affected :2 No. of R.O affected :3 No. of FRS affected :1
Date: 3th Feb 2014 at 17.50 hrs Location : Burari chawk Diameter: 4" Affected section of pipe line :Burari
chawk To Sai R.O. Affected Length: 0.6 km Reason :Operational error (by PWD
during construction of Mukarba Wazirabad elevated road)
14th Accident
Cause : Wrong offsets in drawing and locator couldn’t locate because of its depth(13 m)
according to drawing, offset of line was 11 m, clearance was provided to the contractor 17 m, piling activity was done at 23 m.
No. of CNG Stations affected:0 No. of DTC Depot affected:0 No. of R.O affected :2 No. of FRS affected :0 Findings : locator can’t locate below 5
m
Following are the reasons for the Damages:
3rd Party damage due to excavation by DTL, DDA, PWD, DJB etc.
Operational Errors like improper working of locator, not to check drawings etc.
Un controlled errors / time independent like puncture of dielectric material, due to electric surge.
Analysis Of Damages
Total no. of Damages : 14 No. Of Damages by 3rd Party Damage :
8 No. Of Damages due to Operational
errors : 4 No. Of damages due to un
controlled/time independent :2
Accidents in past
57%29%
14%
3rd Party DamageOperational Errorsuncontrolled/time independent
Reasons of Damages
To Rectify operational errors Calibration of the equipments to be done on
timely basis.( not followed till now) Check the certificates of HDD operator and
Tracker. All pipeline fittings and accessories should
be checked and operational life time of all should be decided.
Check drawings and locator both during the construction work.
Suggestions
Drawings should be properly checked by zonal in charge after laying of steel line by contractor.
The hydrostatically tested pipes should be retested by nitrogen gas before charging the line.
Protective measures from Electric installation( Neoprene sheets, RCC blocks, Minimum distance should be maintained).
Proper communication with BSES and other agencies.
Uncontrolled/Time independent error
Proper patrolling of pipeline by patrolling guard. Reporting by patrolling guard is very important,
train and test patrolling guard. Intimation should be given to the various
authorities like DJB , DTL, BSES, MCD, DDA, etc prior to construction work.
Depute IGL representative on 3rd party work specifically on HDD REAMER,PILLING, JCB, BORING.
Markers should be properly maintained near steel gas line with contact no. provided so that 3rd party could contact before excavation.
To Rectify 3rd party damage errors
Thank you