+ All Categories
Home > Documents > Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown...

Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown...

Date post: 14-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
27
Kick-Off Workshop 10/19/2017
Transcript
Page 1: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

Kick-Off Workshop

10/19/2017

Page 2: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Agenda

• About the Downtown Kingsport Master Plan• Team Introductions• Process• Schedule• Website + Survey• Existing Conditions Report• Activities

Page 3: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

About the Plan

• The Downtown Kingsport Master Plan will become an official policy document of the City to facilitate the direction, type, location, and scale of new development and associated downtown improvements for the next ten years.

• The plan will include components of traditional downtown master plans with a heavy emphasis on:• Public improvements and streetscape upgrades.• Demonstrating a path forward for the existing downtown Academic

Village• Creating a vision to reinforce and magnify Kingsport’s downtown role as

the economic and cultural heart of the community. • Consensus building

Page 4: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Team Introductions

Planning + Landscape Architecture + Architecture

Economic Analysis

Transportation + Connectivity

Page 5: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Process

Page 6: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Schedule

• 3-day Visioning WorkshopNovember 28-30, 2018

• Draft Plan PresentationJanuary 11, 2018

Page 7: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Website

www.downtownkingsportplan.com

Page 8: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Survey

Page 9: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

Existing Conditions

Page 10: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Kingsport At-a-Glance

52,8982016 Population

26%Baby Boomer Population

21%Millennials

19%Gen X

21%Under age 18

44.3%Median Age

39%Households have children

$37,465Median Household Income

25%Bachelor’s Degree or Higher

Page 11: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Kingsport At-a-Glance

Top 3 IndustriesEducation/healthcare,

manufacturing, and retail

86%Drive to Work

>1%Take transit or can walk to

work

44%Employed residents work in

Kingsport

$582Median Rent

$135,700Median Home Value

63%Owner-Occupied Housing

65%Housing Units are Single-

Family

65%Houses built before 1980

Page 12: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Previous + Ongoing Plans

• Kingsport Gateways / City Development Plan

• KMTPO Long Range Plan• KMTPO Bicycle & Pedestrian

Plan• Midtown Transformation

Plan• Proposed Main Street design

+ Survey

Page 13: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Existing Zoning

Page 14: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Existing Land Use

Page 15: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Future Land Use

Page 16: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Known Vacant Properties

Page 17: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Ownership

Page 18: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Properties with buildings at least 50 years old

Page 19: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Community Facilities

Page 20: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Parking

Page 21: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

SidewalksGreenbelt: ~0.5 miles

Greenbelt: ~0.6 miles

Page 22: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Greenbelt: ~0.5 miles

Greenbelt: ~0.6 miles

Bike & Pedestrian Plan

Page 23: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Key Findings

• Zoning is extremely permissive towards downtown development

• Little to no residential in the study area• Strong urban core and sidewalk system, but development

quickly becomes more sprawl-like as one moves away from it

• No major environmental constraints• A lot of surface parking that can be redeveloped• Academic Village will present a unique opportunity for

downtown

Page 24: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

ActivitiesWe want to hear what you think!

Page 25: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Needs + Opportunities (:20)

Directions:1. Split yourselves into groups at tables2. Each group will get a set of handouts that will ask you to list

the needs and opportunities relating to:• Land use• Transportation• Housing• Economic Development• Architectural and Landscape Design

3. Assign a spokesperson for your group to present your findings

Page 26: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Areas of Improvement (:20)

Directions:1. Each group will have a map, pens and markers, and stickers.

Use the stickers to tell us what needs improvement, and where opportunities exist to create new greenspace.

Building Improvements

Streetscape Improvements

New Greenspace

Miscellaneous Ideas

2. For “Miscellaneous Ideas,” list out your idea(s) on the map3. Elect a spokesperson for your group to present your findings

Page 27: Kick-Off Workshop 10/19/2017€¦ · 10/09/2017  · Kick-Off Workshop 10/19/2017. downtown kingsport master plan Agenda •About the Downtown Kingsport Master Plan •Team Introductions

downtown kingsport master plan

Next Steps

• Take input from this meeting, and begin to craft ideas• Develop goals for the plan based on tonight’s input• Visioning Workshop

• 3 day event• Presentation on economic development topics• Begin Design• Open house• Final presentation


Recommended