Kilcullen Local Area Plan 2014–2020 Phlean Cheantar Aitiuil Kilcullen November 2014
Transcript
  • Kilcullen Local Area Plan 2014–2020

    Phlean Cheantar Aitiuil Kilcullen

    November 2014

  • Includes Ordnance Survey Ireland data reproduced under OSi

    Licence number 2004/07 CCMA / Kildare County Council

    Unauthorised reproduction infringes Ordnance Survey

    Ireland and Government of Ireland

    Copyright © Ordnance Survey Ireland, 2014

    Irish Water

    From January 2014 , Irish Water as the public water utility provider, will be responsible for operating and providing

    public water and waste water services in Ireland. Irish Water will operate as an independent State owned subsidiary

    within the Bord Gáis Éireann Group. References therefore to the water services authority in the LAP will be

    construed as references to Irish Water.

  • Table of Contents

    ParT aIntroduction and Context

    1.0 Introduction 5

    1.1 LocalAreaPlansStatusandProcess 5

    1.2 StrategicEnvironmentalAssessment 6

    1.3 AppropriateAssessment 6

    1.4 StrategicFloodRiskAssessment(SFRA) 6

    2.0 Kilcullen Historic Development and Urban Context 7

    2.1 KilculleninaNationalContext 8

    2.2 KilculleninaRegionalContext 8

    2.3 KilculleninaCountyContext 10

    3.0 TownProfileTownFunctionandRole 10

    3.1 Population 11

    3.2 HouseholdSizeandProfile 12

    3.3 AgeprofileofKilcullen 13

    3.4 ResidentialProfile&NewUnitTarget 14

    3.5 Economy 15

    3.6 TownCentre 16

    3.7 Transportation 16

    3.8 EnvironmentandRecreation 16

    3.9 Education 16

    4.0 Key challenges facing the town 17

    5.0 Future Development Strategy 17

    ParT BPolicies and Objectives

    6.0 Introduction 20

    6.1 CompliancewiththeCoreStrategy 22

    6.2 EconomicDevelopment 25

    6.3 Retail 28

    6.4 TownCentre 30

    6.5 UrbanDesignGuidance 34

    6.6 MovementandTransport 44

    6.7 WaterDrainageandEnvironmentalServices 51

    6.8 EnergyandCommunications 58

    6.9 Education,CommunityandCulturalFacilities 59

    6.10 Architectural,ArchaeologicalandNaturalHeritage 60

    6.11 RecreationandAmenity 69

    ParT CLand Use Zoning

    7.0 Land Use Zoning Objectives 72

    7.1 ZoningMatrix 75

    7.2 ApplicationofZoningPolicy 75

    7.3 DefinitionofTerms 75

  • List of Tables

    Table 1:KilcullenPopulationandRateofChange 11

    Table 2:HouseholdSizeandProfile 12

    Table 3:AgeProfileofKilcullen 13

    Table 4:KilcullenHousingUnitTarget2014–2020 14

    Table 5:LandRequirementstomeettheunittarget 15

    Table 6:KilcullenLabourForceBreakdown 15

    Table 7:KilcullenEmploymentBreakdown 15

    Table 8:ProfileofexistingschoolsinKilcullen 17

    Table 9:KilcullenHousingUnitProjection 22

    Table 10:SitesidentifiedforResidentialDevelopment 23

    Table 11:IndicativeResidentialDensities 23

    Table 12:RecordofProtectedStructures(Kilcullen) 60

    Table 13:SitesandMonumentsRecord 61

    Table 14: LandUseZoningObjectives 73

    Table 15:LandUseZoningMatrix 77

    List of Maps

    Map 1:MovementObjectivesMapKilcullen 49

    Map 2: StrategicFloodriskAssessment 55

    Map 3:NaturalandBuildingHeritage 63

    Map 3a:NaturalandBuildingHeritageTownCentre 64

    Map 4: GreenInfrastructure 67

    Map 5:LandUseZoningObjectives 79

    List of Figures

    Figure 1:KilcullenStrategicContext 7

    Figure 2:KilculleninthecontextoftheGreaterDublinArea 9

    Figure 3:KilcullenPopulationGrowth 11

    Figure 4:KilcullenHouseholdprofile 12

    Figure 5:KilcullenAgeProfile 13

    Figure 6:1837OrdnanceSurveyIreland 31

    Figure 7: MainStreetGroundFloorUsesOctober2013 33

    Figure 8: GeorgianShopfrontonMainStreet 35

    Figure 9: MacariTakeawayonMainStreet 35

    Figure 10:AerialPhotoofMartandAdjoiningLands 36

    Figure 11: ViewofMartSitetotheSouth 38

    Figure 12:MartOffices 38

    Figure 13:MartCharacterArea–IndicativeLayout 39

    Figure 14:AerialPhotoofNeighbourhoodEdgeLands 40

    Figure 15:ViewtotheNorthoftheNeighbourhoodCharacterArea 42

    Figure 16:NeighbourhoodEdgeCharacterArea–IndicativeLayout 43

  • Part a: Introduction and C

    ontextPart aIntroduction and Context

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 5

    1.0 Introduction

    TheKilcullenLocalAreaPlan2014–2020hasbeen

    preparedinaccordancewiththerequirementsand

    provisionsofthePlanningandDevelopmentAct2000,as

    amended.Itsetsoutanoverallstrategyfortheproper

    planningandsustainabledevelopmentofKilculleninthe

    contextoftheKildareCountyDevelopmentPlan

    2011–2017andtheRegionalPlanningGuidelinesforthe

    GreaterDublinArea2010–2022.Itisalsoinformedby

    MinisterialGuidelinespublishedpursuanttoSection28

    ofthePlanningandDevelopmentAct2000asamended,

    togetherwithEUrequirementsregardingStrategic

    EnvironmentalAssessmentandAppropriateAssessment.

    ThisPlanissetoutinawrittenstatementwith

    accompanyingmaps.Itcomprises:

    •Part a: Introduction and Context

    Outlinesthesocial,economicandplanningcontext

    forthetown,settingtheframeworkfortheplan’s

    policiesandobjectives.

    •Part B: Policies and Objectives

    Setsoutspecificpoliciesandobjectivesfortheplan

    relatingtohousing,economicdevelopment,retail,

    tourism,urbandesign,etc.

    •Part C: Mapped Objectives

    Setsoutobjectivesintheplanwhichcanbemapped

    includinglandusezoning,sitespecificobjectivesfor

    roadimprovements,naturalandbuiltheritage,

    protectedviews,designbriefs,etc.Thewritten

    statementshalltakeprecedenceoverthemapsshould

    anydiscrepancyarisebetweenthem.Inthefull

    interpretationofallobjectivesforKilcullen,itis

    essentialthatboththeCountyDevelopmentPlan

    (CDP)andtheLocalAreaPlan(LAP)arereadin

    tandem.Whereconflictingobjectivesarisebetween

    theCDPandtheLAP,theobjectivesoftheCDPshall

    takeprecedence.Itshouldbenotedthatthegeneral

    developmentmanagementstandardsapplicabletothis

    LAParecontainedintheCountyDevelopmentPlan.

    1.1 Local area Plans Status and Process

    Sections18–20ofthePlanningandDevelopmentAct

    2000,asamended,providethataLocalAreaPlan

    (LAP)maybepreparedinrespectofanyareawhicha

    PlanningAuthorityconsiderssuitable,inparticularfor

    areaswhichrequireeconomic,physicalandsocial

    renewalandforareaslikelytobethesubjectoflarge-

    scaledevelopmentwithinthelifetimeoftheplan.

    Alocalareaplanshallbemadeinrespectofanarea

    which:

    •Isdesignatedasatowninthemostrecentcensusofpopulation,otherthanatowndesignatedasa

    suburborenvironsinthatcensus,

    •Hasapopulationinexcessof5,000and

    •Issituatedwithinthefunctionalareaofaplanningauthoritywhichisacountycouncil.

    The2011censusindicatedthatKilcullenhadatotal

    populationof3,473personsandisdesignatedatown.

    Thetown’sstatusasaModerateSustainableGrowth

    TownintheRegionalPlanningGuidelinesforthe

    GreaterDublinArea(RPGs)justifiestheneedfora

    LocalAreaPlan.ThisLAPwasadoptedattheCouncil

    Meetingon20thOctober2014andtakeseffectfrom

    November16th2014.Theplanshallceasetohave

    effectattheexpirationof6yearsfromthatdate

    unlessthisperiodisextendedbyresolutionin

    accordancewithSection19(1)(d)ofthePlanningand

    DevelopmentActs2000–2014.

    aim: To establish a framework for the physical, socio economic, cultural and recreational development of Kilcullen in a planned, co-ordinated and sustainable manner in order to conserve and enhance the established tradition and intrinsic character of the town.

  • // Kilcullen Local Area Plan6

    1.2 Strategic Environmental assessment

    StrategicEnvironmentalAssessment(SEA)istheformal

    systematicevaluationofthelikelysignificant

    environmentaleffectsofimplementingaplanor

    programmebeforeadecisionismadetoadopttheplan

    orprogramme.TheSEADirective(2001/42/EC),was

    transposedintoIrishLawthroughtheEuropean

    Communities(EnvironmentalAssessmentofCertain

    PlansandProgrammes)Regulations2004(SINo435of

    2004)asamendedbytheEuropeanCommunities

    (EnvironmentalAssessmentofCertainPlansand

    Programmes)(Amendment)Regulations2011(S.INo.

    200of2011)andthePlanningandDevelopment

    (StrategicEnvironmentalAssessment)Regulations2004

    (SINo436of2004)asamendedbythePlanningand

    Development(StrategicEnvironmentalAssessment)

    (Amendment)Regulations2011(S.I.No.201of2011).

    InaccordancewithArticle13AofthePlanningand

    Development(StrategicEnvironmentalAssessment)

    Regulations2004,aScreeningAssessmentwas

    preparedfortheKilcullenLocalAreaPlanandsentto

    theEnvironmentalAuthorities1.Adeterminationwas

    madethatafullStrategicEnvironmentalAssessment

    wasnotrequiredinthiscase.

    1 FollowingreceiptsofcorrespondencefromtheEnvironmentalAuthorities.

    1.3 appropriate assessment

    ThepurposeofAppropriateAssessment(AA)ofland

    useplansistoensurethatprotectionoftheintegrity

    ofEuropeansitesisapartoftheplanningprocessata

    regionalandlocallevel.TherequirementforAAof

    plansorprojectsisoutlinedinArticle6(3)and(4)of

    theEuropeanCommunities(1992)CouncilDirective

    92/43/EEContheconservationofnaturalhabitats

    andofwildfaunaandflora(“HabitatsDirective”).

    LocalAreaPlansarescreenedforanypotential

    impactonareasdesignatedasNatura2000sites.In

    anycasewhere,followingscreening,itisfoundthat

    theplanmayhaveanimpact,afull‘appropriate

    assessment’mustbecarriedout.

    TheKilcullenLocalAreaPlan2014–2020was

    screenedforAppropriateAssessmentofNatura2000

    sites.ItconcludedthattheKilcullenLAPwillnot

    havesignificanteffectsontheNatura2000network

    andaStage2AppropriateAssessmentwasnot

    required.

    1.4 Strategic Flood risk assessment (SFra)

    Undersection28ofthePlanningandDevelopment

    Act2000,asamended,theDoEHLGpublished

    guidelinesentitled‘‘PlanningSystemsandFloodRisk

    ManagementGuidelinesforPlanningAuthorities

    (November,2009).Theseguidelinesrequireplanning

    authoritiestointroducefloodriskassessmentasan

    integralandleadingelementintheplanmaking

    process.Thepreparationofthisplanwassubjectof

    StrategicFloodRiskAssessment(SFRA).TheSFRA

    hasrecommendedthatdevelopmentproposalsfora

    numberofareaswithintheplanboundarybethe

    subjectofsitespecificfloodriskassessment

    appropriatetothenatureandscaleofthe

    developmentbeingproposed(refertoMapNo.2)

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 7

    2.0 Kilcullen Historic Development and Urban Context

    KilcullenderivesitsnamefromCillCuillinn,the

    ChurchoftheHollyandwasanimportantcrossing

    pointoftheriverLiffeyfromMedievaltimes.The

    townofficiallyknown,mappedandrecordedas

    KilcullenBridgedevelopedafter1319whenabridge

    wasconstructedacrosstheRiverLiffey.Evenaslate

    atthe18thcenturythenewsettlementwasmainlyon

    theeasternbankoftheLiffey.Thetownfurther

    expandedintheearly19thcenturyandin1837the

    officialtownareacomprisedoneprincipalstreetof

    112buildingschieflyonthewesternbankoftheLiffey.

    Thetowndevelopedalongthestreetleadingtothe

    bridgewhichexpandedtothenorthandsouthinthe

    19thand20thCentury.

    Thetownexpandedwestofthetowncentreinthe

    latterpartofthe20thcenturywiththedevelopmentof

    theMartSiteontheNewbridgeroadandtheLink

    BusinessParkontheNaasroadnorthofthetown.

    Today,Kilcullenisabusyanddiversetownwitha

    mixofservicesincludingshops,restaurants,cafes,

    barsandcommunityfacilities.Themostrecent

    residentialdevelopmentsinthetownhavebeen

    developedtothesouth-westofthetownin

    Castlemartinadjacenttheschoolsandeastofthetown

    atRiversideManorandHillcrest.TheM9Motorway

    actsasanaturalbarriertoexpansiontothewestofthe

    townandCastlemartinDemesnewillconstrain

    developmenttothenorthwest.KilcullenBusiness

    Campuswasdevelopedsouthofthetowncentreinthe

    earlypartofthelastdecadewhiletheLinkBusiness

    Parkwasdevelopedtothenorthofthetown.Both

    businessparksarenotoperatingatfullcapacity.

    Figure 1: Kilcullen Strategic Context

    The Curragh

    Rice Course

    4.8Ha

    Legend :

    Railway

    Regional Roads

    M7 / M9

    Heritage site

    Zoned Area

    Rivers / Canals / Lakes

    Built Footprint

    Open Space / Stud Farms

    National Roads (N78)

    Protected Areas

  • // Kilcullen Local Area Plan8

    Kilcullen

    Thereareanumberofnaturalandman-made

    constraintswhichhaveinfluencedthehistoric

    developmentofthetown.TheseincludetheRiverLiffey

    flowingsoutheasttonorthwestofthetownand

    CastlemartinDemesneandtheM9tothewestofthe

    town.Beyondtheimmediateareaswithinthetown

    boundaryliesDunAilinnetothesouth,anancient

    ceremonialsiteonthehillofKnockaulin,

    Brannockstowntotheeast,AthgarvanandtheCurragh

    tothewestandNaastothenorth.Theplaniscognisant

    ofthelocalcontextandenvironmentallandscapeand

    topographyinwhichthetownislocated.

    2.1 Kilcullen in a National Context

    TheNationalSpatialStrategy(NSS)waspublishedin

    December2002andoutlinesa20-yearplanning

    frameworkforIrelanddesignedtoachieveabetter

    balanceofsocial,economic,physicaldevelopmentand

    populationgrowthbetweencentres.UndertheNSS,

    thetownsofNaas/Newbridge/Kilcullenare

    categorisedasaPrimaryDevelopmentCentre.The

    Strategystipulatesthatthesecentresneedtoaimata

    populationlevelthatsupportsself-sustaininggrowth,

    butwhichdoesnotunderminethepromotionof

    criticalmassinotherregions.PrimaryDevelopment

    Centresmusttakeaccountofwiderconsiderations,

    forexample,theirrelationshipwithDublin.The

    strategyalsoreferstoKilcullen’slocationona

    nationaltransportcorridor,theM9Motorway.

    2.2 Kilcullen in a regional Context

    TheRegionalPlanningGuidelinesfortheGreater

    DublinArea2010–2022(RPGs)setouttheplanned

    directionforgrowthwithintheGreaterDublinArea

    upto2022bygivingregionaleffecttonational

    planningpolicyundertheNationalSpatialStrategy

    (NSS).KilcullenislocatedintheMid-EastRegionand

    isdesignatedintheRPGsasbeingaModerate

    SustainableGrowthTown.

    ThesettlementstrategyoftheKildareCounty

    DevelopmentPlan2011–2017isconsistentwiththe

    RPGsinitsdesignationofKilcullenasaModerate

    SustainableGrowthtown.Kilcullen’sroleisto

    developinaselfsufficientmannerreducing

    commutinglevelsandensuringsustainablelevelsof

    housinggrowth,providingafullrangeoflocal

    servicesadequatetomeetlocalneedsatdistrictlevel

    andforsurroundingruralareas.

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 9

    Figure 2: Kilcullen in the context of the Greater Dublin Area

  • // Kilcullen Local Area Plan10

    2.2.1 Retail Planning Guidelines

    TheRetailPlanningGuidelinesforPlanning

    AuthoritieswerepublishedbytheDepartmentofthe

    Environment,HeritageandLocalGovernmentin

    December2000andupdatedinJanuary2005and

    againinApril2012.TheRetailPlanningGuidelines

    provideacomprehensiveframeworktoguidelocal

    authoritiesbothinthepreparationofdevelopment

    plansandtheassessmentofapplicationsforplanning

    permissionsandtoassistretailersanddevelopersin

    formulatingdevelopmentproposals.

    2.2.2 Retail Strategy for Greater Dublin Area

    2008–2016

    ThemainaimoftheRetailStrategyfortheGreater

    DublinAreaistoinformthestatutoryplanning

    processandtoensurethatadequateprovisionismade

    forretaildevelopment.Thestrategyprovides

    indicativeadviceonthescopeandneedforretailfloor

    spaceandhow,inaccordancewithsustainable

    planningitshouldbeallocated.TheRetailStrategy

    forCountyKildareissetwithinthecontextofthe

    RetailStrategyfortheGreaterDublinArea.

    KilcullenisidentifiedasaHinterlandareaTier2

    Level3SubCountyTownCentrealongwithSallins

    andMonasterevin.TheCDPdetailsthattheretail

    potentialofKilculleniscloselylinkedwithitsrole

    withintheCounty’sdesignatedPrimaryand

    SecondaryDynamicClustersanditsproximitytothe

    higherordercentresofNaas,NewbridgeandKildare

    Townrespectively.Itsproximitytoothercentreshas

    detractedfromitspotentialtodevelopintoamoreself

    sustainingTier2Level3TownCentreintheCounty

    RetailHierarchy.Inaddition,thePlanalsonotesthat

    thepopulationofthetownhasincreasedbutretail

    servicesfloorspacehasnotkeptpacewiththeneeds

    ofthetownanditscatchmentarea.Itisanobjective

    oftheCDPthatthispositionisaddressedoverthe

    periodofthePlanandbeyond.TheKilcullenLocal

    AreaPlanprovidestheframeworktoaddressthis

    issue.

    2.3 Kilcullen in a County Context

    TheCountyDevelopmentPlansetsouttheoverall

    strategyfortheproperplanningandsustainable

    developmentofCountyKildareovertheperiod

    2011–2017.ThePlanhasacriticalroletoplayin

    ensuringthattheneedsoffuturepopulationgrowth

    areplannedfor.TheCDPaimstodirectpopulation

    growthintotheMetropolitanurbanareasofthe

    countybutalsointokeytownsandvillagesinthe

    hinterlandareaincludingNaas,Newbridge,Athy,

    Kildare,MonasterevinandKilcullen.Significantnew

    economicdevelopmentispromotedwithindefined

    economicclusterssuchasHinterlandtowns

    mentionedabove.TheCDPalsoemphasisestheneed

    toprotectthebuiltheritage,uniquelandscape,

    naturalheritageandbiodiversityofthecountyfor

    theirintrinsicvalueandasresourcesforthetourist

    economyofthefuture.

    ThedesignationofKilcullenasaModerate

    SustainableGrowthTownisreinforcedintheCDP

    settlementstrategywiththetownbeingtargetedfor

    consolidatedgrowth.

    3.0 TownProfile

    Kilcullentownisprimarilyaservicecentreforeast

    andsouthKildare.Since2002,Kilcullenhas

    experiencedasignificantincreaseinpopulation.The

    majorityofdevelopmenthasbeenresidentialin

    natureoccurringtothesouthwestandnorthofthe

    towncentreandcomprisingprivatehousingestates

    withsomeapartmentdevelopment.Demandfor

    residentialunitswaslargelyattributedtoits

    proximitytolargetownslikeNaasandNewbridge

    andtheM9,togetherwiththeheritageandamenities

    qualitiesofthetownanditsenvirons.

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 11

    3.1 Population

    ThepopulationofKilcullenisrecordedintheCSO

    CensusofPopulation(2011)as3,473persons,an

    increaseofover16%onthe2,985personsrecordedin

    the2006CensusofPopulation.Thepopulationof

    Kilcullendeclinedverymarginallybetween1981and

    2002howeveritexperiencedasignificantincrease

    between2002and2006whenthepopulationdoubled

    inashortperiod.Thishighlightsthelevelof

    developmentunderconstructioninthetownatthe

    time.ThepopulationofKilcullenrepresents1.6%of

    thecountypopulationof210,312persons.(CSO2011).It

    shouldbenotedthatlimiteddevelopmenthastaken

    placeinKilcullensincethecensusundertakenin2006.

    Figure 3: Kilcullen Population Growth

    0

    2,000

    1,500

    1,000

    500

    2,500

    3,000

    3,500

    4,000

    Census Year

    Popu

    latio

    n

    1981 1986 1991 1996 2002 2006 2011

    Source: CSO Small Area Population Statistics

    Table 1: Kilcullen Population and Rate of Change

    Census Population Percentage Growth

    1981 1537 3%

    1986 1,715 2.5%

    1991 1,664 -1%

    1996 1,604 -1%

    2002 1,483 -7.5%

    2006 2,985 101%

    2011 3,473 16%

    Source: Census of population

  • // Kilcullen Local Area Plan12

    3.2 HouseholdSizeandProfile

    1,242householdswererecordedinthe2011Censusin

    Kilcullen.Thetown’saveragehouseholdsizeof2.83

    personsishigherthanthenationalaverageof2.73

    persons.Abreakdownofthefamilyunitsizeshows

    Kilcullenispredominantlymadeupoftwoandfour

    personfamilies.Thesefiguresaregreaterthanthe

    nationalaveragesuggestingalargenumberofyoung

    familiesresideinthetown.

    Table 2:HouseholdSizeandProfile

    Family unit size 2 3 4 5 6+ Total

    Total No. of Households 387 214 250 75 39 965

    % of Total Households Kilcullen 40% 22% 25% 8% 4% 100%

    National Average (%) 35% 24% 22% 13% 7% 100%

    Source 2011 Census of Population

    Figure 4:KilcullenHouseholdprofile

    0%

    5%

    25%

    20%

    15%

    10%

    30%

    35%

    40%

    45%

    Kilcullen

    Household Size

    % o

    f Tot

    al H

    ouse

    hold

    s

    National Average

    2 3 4 5 6+

    Source: Census 2011

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 13

    3.3 AgeprofileofKilcullen

    Kilcullentraditionallyhasaveryyoungpopulation.

    The2002censusshowedthat38%ofthetown’s

    populationwasagedbetween20and44yearsofage.

    The2006censusindicatedthatalmost45%ofthe

    town’spopulationwasagedbetween20and44years

    visavis40%forthestateasawhole.The2011census

    revealedasimilartrendwith39%ofthepopulationin

    the25–44bracketcomparedtothe32%averagefor

    thestate.

    Table 3:KilcullenAgeProfile

    age bracket Population % of total population National average 2011 %

    0–14 946 27% 21%

    15–24 332 10% 12%

    25–44 1,363 39% 32%

    45–64 566 16% 23%

    65+ 266 8% 12%

    Total 3,473 100% 100%

    Source Census 2011

    Figure 5:KilcullenAgeProfile

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    45%

    40%

    35%

    0-14

    Kilcullen

    15-24 25-44 45-64 65+

    Age Categories

    % o

    f Tot

    al P

    opul

    atio

    n

    National Average

    Source: Census 2011

  • // Kilcullen Local Area Plan14

    Thequantumoflandrequiredtomeettheunittarget

    of709unitswillbedependentonthelocationand

    densityofdevelopment.Thelocationandnatureof

    differentlandusezoningswillallowfordifferent

    residentialdensities.Forinstanceanew

    neighbourhoodzoningonacentralbrownfieldsite

    willallowforhigherdensitydevelopment(e.g.30per

    ha)comparedtoanedgeoftownsitewithlower

    densitystandards(e.g.25unitsperha).

    Table5setsoutthequantumoflandsrequiredto

    meetthe709unittargetdependingontheaverage

    densitiesused.ThisPlanretainssignificantareasof

    landspreviouslyzonedforresidentialpurposesinthe

    2008localareaplan.Allresidentiallandspreviously

    zonednotrequiredtofulfilthetargetof709have

    beenre-zonedtomoreappropriatelandusesinorder

    tocomplywiththecorestrategyoftheCDP.

    3.4 ResidentialProfile&NewUnitTarget

    ResidentialprovisioninKilcullenisdistributed

    evenlybetweennorthandsouthofthetowncentre.

    Recentresidentialdevelopmenthasoccurredtothe

    southwestandeastofthetown,namelyCastlemartin

    andRiversideManor.Thetypeofresidential

    developmentvariesfromdetachedhousesonthe

    outskirtsofthetown,toribbondevelopmentalong

    theapproachroads,tohousingestatesofvarying

    designsanddensitiesaroundthetowncentre.

    Inlinewiththetown’spositionintheCounty

    SettlementStrategyandtheRegionalPlanning

    Guidelines,theresidentialunitallocationfor

    KilcullenoverthelifetimeoftheCDP2011–2017is

    470units(Table4below).Kilcullenisprojectedto

    accommodate1.7%oftheresidentialunitgrowth

    allocatedintheRPGsintheperiod2016–2022.The

    RPGshaveallocatedanannualtargetof3,122units

    forthecountyovertheperiod2016–2022,therefore

    1.7%equatestoanadditional53unitsperyearwhich

    issubsequentlyaddedtothe2017housingunittarget.

    The2020HousingUnittargetisbasedonthe

    provisionof629residentialunitsovertheperiod

    2006–2017.Atotalof56residentialunitshavebeen

    constructedovertheperiod2006–2011resultingina

    targetof573unitsovertheremainingperiod2014–

    2020.Asadvocatedinthe‘DevelopmentPlan

    GuidelinesforPlanningAuthorities’issuedbythe

    DepartmentoftheEnvironmentHeritageandLocal

    Government(2007),overzoningofuptoonehalfis

    acceptabletoensuringthathousingtargetsaremet.

    Allowinganadditional50%overzoningtheLAP

    targetincreasesto860units.Regardmustalsobehad

    tothe151un-builtunitswithvalidpermission

    currentlyinexistence.Takingthesepermissionsaway

    fromtheLAPtargetleavesaremainingtargetof709

    unitsfortheplanperiod.

    Table 4: Kilcullen Housing Unit Target 2014–2020

    TIMEFraME UNITTARGET CALCULATIONDETAILS

    2006–2017 470 = Circa 1.7% of the overall county unit target for 2006–2017 ( being 27,982 units)

    2017–2020 159 = 1.7 % of the annual county target for the period of 2016–2022 (being 1.7% of 3,122 units = 159 (53 * 3 years)

    2006–2020 629 = The 2006–2017 unit target + the 2017–2020 target

    2014- 2020 573 = 629 (2006–2020 target) – 56 units (total units built from 2006–2012)

    2014–2020 860 Additional 50% over-provision (573 + 287= 860)

    2014- 2020 709 = 860 units (2013–2019 target) – 151 units with valid Planning Permissions

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 15

    Table 5: Land Requirements to meet the unit target

    2014–2020UnitTarget 25 units per ha 35 units per ha 45 units per ha

    709 28ha 20ha 16ha

    3.5 Economy

    The2006and2011censusresultsindicatedthatthere

    wasa15%decreaseinthenumberofpeopleworking

    inthetownoverthatfiveyearperiod.Thetotallabour

    forceaged15yearsandoverinKilcullenaccordingto

    theCensusin2011was2,527.Ofthisfigure,some

    1,392personsconstitutedthelabourforce,the

    remainderbeingstudents,retired,thoselookingafter

    afamilymember/homeetc.Theresultsindicatethat

    justunderhalfofthepopulation,40%areindicatedto

    beatwork,withjust10%unemployed.Thisindicates

    thatthelevelofunemploymenthasdoubledsince

    2006whenthenumberofpersonsoutofworkwas

    just5%.Table6illustratesthelabourforce

    breakdownforKilcullen.Itshouldbenotedthata

    largeproportionofthetown’spopulationisof

    workingage.ItisevidentfromTable8thatalarge

    proportionoftheworkforceinKilcullenisemployed

    inhighskilledjobsinCommerceandTradeand

    ProfessionalServices.

    Table 6: Kilcullen Labour Force Breakdown

    Total Labour Force 2,527 (100%)

    At work 1,392 (55%)

    Lookingforfirstregularjob 16 (1%)

    Unemployed 307 (12%)

    Student 202 (8%)

    Looking after home/family 266 (11%

    Retired 235 (9%)

    Unable to work due to permanent sickness / disability 82 (3%)

    Other 27 (1%)

    Source Census 2011

    Table 7: Kilcullen Employment Break down

    Employment Type 2011 No 2011 % National Average %

    Agriculture, Forestry and Fishing 42 1.2% 5%

    Building and Construction 84 2.4% 5%

    Manufacturing 198 5.7% 12%

    Commerce and Trade 398 11.4% 25%

    Transport and Communications 117 3.3% 8%

    Public Administration 105 3% 6%

    Professional Services 275 7.9% 24%

    Other 173 4.9% 15%

    Source: Census 2011

  • // Kilcullen Local Area Plan16

    3.6 Town Centre

    Kilcullen’stowncentrecomprisesareasnorthand

    southoftheRiverLiffey.Thetown’sstreetpattern

    reflectsitshistoricaldevelopment.TheM9actsasa

    naturalbarriertoexpansiontothewestofthetown

    andCastlemartinDemesneconstrainsdevelopmentto

    thenorthwest.

    Thetowncentrehasexperiencedverylittle

    developmentoverrecentyears.TheMarketSquare

    developmentisthemostnotableadditiontothetown

    centreandwasconstructedpriortotheadoptionof

    the2008LAP.Itcomprisesamixedusedevelopment

    ofapartments,officesandrestaurantandretailunits

    onthegroundfloor.Thereisahighlevelofvacancyin

    thetown.Howeverthisismoreconcentratedinthe

    northernareaofthetown.Therearefurther

    underutilisedbacklandsitescapableofre-

    developmentoffMainStreetincludingthemartsite

    ontheNewbridgeroad.

    3.7 Transportation

    KilcullenislocatedontheRiverLiffey,38kmfrom

    Dublin,10kmfromNaasand6kmfromNewbridge.

    Trafficcongestionhadbeenamajorproblemin

    Kilcullenuntilthebypass(M9)relieveditslightly.

    Trafficlevelsthroughthetowncentrearestill

    increasingandthisisanissuetheCouncilwillseekto

    address.Theprovisionofanadditionalcrossingofthe

    RiverLiffeyremainsanobjectiveofthisPlanwhich

    seekstoalleviateincreasingtrafficlevelsand

    facilitateserviceexpansionofthetown.Giventhe

    downturnintheeconomy,itislikelythatthiswill

    remainalongertermobjective.Intermsofpublic

    transport,arangeofpublicandprivatebusroutes

    serviceKilcullen.BothBusEireannandJJ

    Kavanaghsoperateanumberofexpressservicesto

    DublinandAthydaily.Atpresentthemainbusstops

    areattheHideoutpublichouseandoutsidetheCross

    andPassionConventinthetowncentre.

    3.8 Environment and recreation

    TheRiverLiffeyisoneofthetown’sprime

    recreationalandenvironmentalassets.The

    maintenanceoftheenvironmentalqualityoftheriver

    andthedevelopmentofamenityfacilitiesforwalking

    andcyclingisimportant.

    3.9 Education

    Kilcullenhasoneprimaryschoolandonepost-

    primaryschoolwhichprovidetheeducational

    facilitiesforthetownandthesurroundinghinterland.

    Table8indicatesthepupilno.sforbothschools.

  • Part a: Introduction and C

    ontext

    Part a: Introduction and Context 17

    Table 8:ProfileofexistingschoolsinKilcullen

    NameEnrolment No.

    2012/13

    Primary St Brigids 509

    Post-primary Cross and Passion College

    685

    Source: DoES.

    TheCrossandPassionpostprimaryschoolwas

    grantedplanningpermissionforanumberofpre-

    fabricatedclassroomsinrecentyearsandhasbeen

    approvedfundingfromtheDepartmentofEducation

    andSkillsforanextensiontotheschool.

    4.0 Key challenges facing the town

    TheKilcullenLocalAreaPlanhasacriticalroleto

    playinensuringthattheneedsofthefuture

    populationisplannedfor.Howeverthereareanumber

    ofkeychallengesthatneedtobeaddressedincluding:

    (i) Ensuringthattheplanningframeworkforthe

    townisestablishedsothatKilcullencan

    accommodateitspopulationtargetinorderfor

    thetowntobeadriverofbalanceddevelopment

    withinthecountyandtheregion.

    (ii) Protectingthebuiltandnaturalheritageand

    biodiversityofthetownfortheirintrinsicvalue

    andasresourcesforthepopulationofthetown

    andthetouristeconomyofthefuture.

    (iii) PromotingKilcullenasaselfsufficienttownby

    encouragingexistingbusinessesinthetown

    centrewhilesupportingappropriatenew

    development.

    (iv) Ensuringtheavailabilityoflocalemployment

    opportunities,communityandcommercial

    servicesandrecreationandamenityfacilitiesfor

    theexistingandfuturepopulationofKilcullen.

    (v) Facilitatingtheupgradingofinfrastructurein

    theareatherebyfacilitatingemploymentand

    residentialdevelopment.

    (vi) Facilitatingthedevelopmentofeducational/

    communityfacilitiesforanexpanding

    population.

    (vii) Supportingthere-useoflandandbuildings,

    particularlythroughbacklanddevelopmentand

    regenerationoftowncentresites.

    (viii)Promotingasustainabletransportsystemanda

    networkoflinkagesincludingtheprovisionof

    roads,footpaths,cyclelanes,publictransport

    infrastructureandpromotinginterconnectivity

    betweenmodesthroughtheimplementationof

    theprinciplessetoutintheDesignManualfor

    UrbanRoadsandStreets(2013).

    (ix) Minimisingtheimpactoffuturedevelopmenton

    thelocalenvironmentbyensuringthatall

    developmentembracesagreeninfrastructure

    strategy.

    5.0 Future Development Strategy

    ThestrategyforthefuturedevelopmentofKilcullenis

    basedontheprinciplesestablishedinthepreviousLAP

    in2008andtheframeworkprovidedbytheRegional

    PlanningGuidelines2010–2022andtheKildareCounty

    DevelopmentPlan2011–2017.Itprovidesablueprintfor

    thedevelopmentofKilcullenTownfortheperiod

    2014–2020,settingoutavisionforthearea,specifying

    thetype,amountandqualityofdevelopmentneededto

    achievethatvisionwhileseekingtoprotectand

    enhancetheenvironmentandamenities.

    Thevisionforthetownistobuildonthestrengthsof

    Kilcullenandtoprovideafocusedapproachto

    planningforfuturedevelopmentinacoherent

    sustainablefashion.ItisenvisagedthatKilcullenwill

    continuetogrowovertheshorttomediumtermto

    achieveacriticalmasswhichwillsupport

    competitiveness,sustainabilityandcreate

    opportunitiesforlocaleconomicdevelopment.The

    developmentofthetownwillbecomplementedbya

    rangeofresidential,employment,recreational,

    community,retailandeducationalfacilities

    appropriateforatownofitssize.

  • // Kilcullen Local Area Plan18

    The strategic direction for the future development of Kilcullen will focus on:

    1. EconomicDevelopment

    ThisLAPseekstoconsolidateandenhanceKilcullen’s

    rolewhichistosupporttheprimaryeconomicgrowth

    clusterofNaasandNewbridge.Keytothiswillbe

    supportingtheexistingindustrialandmanufacturing

    enterprisesinthetownandfacilitatingopportunities

    forexpansionandincreasedemployment.

    2. TownCentreConsolidation

    Itiscriticalthattheprimacyofthetowncentreasthe

    commercialheartofKilcullenismaintained.

    Developmentwhichunderminesthevitalityand

    viabilityofthetowncentrewillnotbepermitted.

    Protectingandprovidingresidentialaccommodation

    withinthetowncentrewillbepromoted.

    3. PlanningforResidentialExpansion

    ThePlanensuresthesupplyofsuitablyzonedlandto

    accommodatethefuturegrowthofKilculleninline

    withitsdesignationintheRegionalPlanning

    GuidelinesasaModerateSustainableGrowthTown.

    Muchofthelandzonedforresidentialpurposesunder

    the2008LAPremainszonedinthisPlan.ThePlan

    alsosupportstheprovisionofservicesandamenities

    forthetown’sresidents.

    4. RetailDevelopment

    Kilcullenhasalimitedretailandserviceoffer.Itis

    thereforecriticalthattheretailbaseofthetown

    expandswithintheidentifiedtowncentretobecome

    moreselfsufficient.Designbriefsforkeysiteswithin

    thetownareoutlined.Itisimportantthatnewretail

    andmixedusedevelopmentscomplywiththegeneral

    principlesofthedesignbriefsinordertopreservethe

    townasathrivingcommercialareasetwithinahigh

    qualitybuiltenvironment.

    5. ProtectionoftheNaturalandBuiltHeritage

    Protectionandenhancementoftheunique

    architecturalandarchaeologicalheritageofthetown

    isparamount.Theretentionofvernacularbuildings

    ontheMainStreetwillensurethecharacterofthe

    townremainsintact.

  • Part B: Policies and ObjectivesPart B

    Policies and Objectives

  • // Kilcullen Local Area Plan20

    6.0 Introduction

    Thissectionoutlinesspecificpoliciesandobjectives

    oftheCountyCouncilwithregardtothedevelopment

    oflandwithintheboundaryoftheLocalAreaPlan.

    TheoverarchingpoliciesandobjectivesoftheCounty

    DevelopmentPlan(orasmaybeamended)willalso

    applytodevelopmentwithintheLocalAreaPlan

    boundary.

    SpecificpoliciesandobjectivesapplicabletoKilcullen

    aresetoutinthispartofthePlaninordertofacilitate

    integratedlandusedevelopmentinamannerthatwill

    promotetheproperplanningandsustainable

    developmentofthetown.Keyissuesincludehousing

    provision,economicdevelopment,towncentre

    development,movementandtransport,infrastructure

    provision,communityandculturaldevelopments

    togetherwithnaturalandbuiltheritage.

    (i) CompliancewiththeCoreStrategytoachieve

    SustainableGrowth

    ToensurethatthefuturedevelopmentofKilcullenis

    inaccordancewiththeCoreStrategyoftheKildare

    CDP2011–2017,theplanprovidesforthezoningof

    landsforresidentialandemploymentuses.

    Aframeworkisalsoestablishedforthetown’s

    sustainablegrowththroughtheincorporationof

    policiesinrelationtodensity,housingmix,

    communitydevelopmentandnewhousingprovision.

    (ii) Enterprise,IndustryandEconomic

    Development

    Kilcullenhasalimitedamountofenterpriseand

    employmentopportunitiestoservethelocal

    population.AsaModerateSustainableGrowthTown,

    Kilcullenmustsupportandenhanceenterpriseand

    industrytomeetlocalneedsatdistrictlevelandfor

    surroundingruralareas.ThisLAPseekstoencourage

    localemploymentopportunities,identifypotentialfor

    inwardinvestmentandenhancethetourismeconomy.

    Toachievethis,theplansetsoutpoliciesand

    objectivesthatbuildonthetown’sretailandheritage

    strengthstocreateauniquetourismdestination.

    (iii) RetailandTownCentreUses

    Kilcullenhaswitnessedsmallscalebutimportant

    retaildevelopmentinrecentyears.Itsproximityto

    higherordercentresofNaasandNewbridgehas

    hindereditspotentialtodevelopintoamoreself

    sustainingtownintermsofretailing.Itisrecognised

    thatthereisaneedtocarefullyplanandmanage

    futureretailandnon-retailservicesinthetownto

    furtherstrengthentheretailoffertoprotectand

    enhancethetown’suniquecharacterwhilepromoting

    economicvitalityandviability.TheLAPisinformed

    bytheDraftKildareCountyRetailStrategy2008–

    2016whichwaspublishedin2010.

    Opportunitiesexistforthere-useandregenerationof

    landandbuildings.Encouraginghighqualitydesign

    andfacilitatinganappropriatemixofuseswillalso

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 21

    helptoensurethatthetowncentreprovidesasuitable

    focusforcreatingsustainablecommunities.The

    protectionofbuiltheritageandtheintegrationand

    linkageofnewretaildevelopmentswiththeexisting

    urbanform/layoutarealsokeyobjectives.

    (iv) UrbanDesignandTownCentreDevelopment

    Kilcullen’stownscapequalitiesarederivedfromits

    historicurbanstructure.Anurbandesignanalysisof

    theexistingtownscapeissetoutinthePlantogether

    withpoliciesandobjectivesspecifictothefuture

    developmentofthetown.

    Designbriefshavebeenpreparedforthefollowing

    areas:

    •ThemartandadjoininglandsontheNewbridgeRoad.

    •LandsbetweenRiversideManorandtheMainStreet.

    Thesedesignbriefshavebeenpreparedtoassistinthe

    planningprocessbysettingoutbroaddesign

    parametersforthefuturedevelopmentoftheseareas.

    Eachbriefisindicativeonly.

    (v) MovementandTransport

    Theimprovementoftransportationinfrastructurein

    Kilcullenisakeyrequirementforthesustainable

    developmentofthetown.Integratedlanduseand

    transportationplanningisrequiredtofurthersupport

    andencouragemoresustainablemodesoftravel.The

    plansetsspecificpoliciesforlocalimprovementsin

    andaroundthetowncentreandobjectivestosecure

    routesforlongtermroadsinfrastructure.

    (vi) Water,DrainageandEnvironmentalServices

    Theadequacyofwater,drainageandenvironmental

    servicesisnecessarytofacilitatethesustainable

    developmentofthetown.Theseissuesareaddressed

    invariouspoliciesandobjectivestoprovidefor

    sufficientwater,wastewaterandwaterdrainage

    infrastructuretoservicethepredictedrequirements

    ofthetownovertheplanperiodandbeyond.While

    capacityissuesattheOsberstownWastewater

    TreatmentPlantareoutsidethescopeofthisLAP,

    policiesandobjectivesinrelationtotheupgradeof

    thelocalfoulnetworkareincluded.Relevant

    legislativeobligationsinrelationtoenvironmental

    requirementsarealsosetoutincludingpoliciesand

    objectivesrelatingtofloodrisk.

    (vii) EnergyandCommunications

    Thedevelopmentofamoresustainableapproachto

    energyuse,powergenerationandenergyefficiencyin

    allsectorsisvitaltoreducegreenhousegasemissions.

    Thisincludesfocusingonimprovingenergy

    efficiency.

    (viii)Educational,CommunityandCultural

    Theprovisionofeducationandcommunityfacilities

    tosupporttheprojectedpopulationlevelsofKilcullen

    isrecognised.Policiesandobjectivesarealsosetout

    tofacilitatetheprovisionofadditionalcommunity

    facilitiesinthetown.

    (ix) ArchitecturalandArchaeologicalHeritage

    Theprotectionandenhancementofthebuiltheritage

    andstreetscapeinKilcullenisoneofthecore

    objectivesofthisplan.Policiesandobjectivesseekto

    protect,preserveandenhancethetown’sarchaeology,

    builtheritageandtownscapequalities.

    (x) NaturalHeritageandBiodiversity

    Theimportanceofgreeninfrastructureisrecognised

    andisbasedondetailedhabitatmappingofthearea.

    Theplanmapsanddescribesgreeninfrastructurein

    Kilcullenincludingrelevantpoliciesforitsprotection

    andenhancement.

    (xi) Recreation,AmenityandOpenSpace

    Theimportanceofexistingamenitiesinthetown

    suchastheRiverLiffey,theValleycommunitypark,

    andtheKilcullenCommunityCentrearerecognised.

    Theplanoutlinesclearobjectivestoexpandand

    enhancetheprovisionofthesekeyassets.Routesare

    alsoidentifiedforrecreationandtourismuseandto

    increasepermeabilitywithinandaroundthetown.

  • // Kilcullen Local Area Plan22

    6.1 Compliance with the Core Strategy

    ThelevelofresidentialzonedlandsintheKilcullen

    LocalAreaPlan2008exceededthedemandsoverthe

    lifeofthatplan.Residentiallandshavebeenzonedfor

    theperiodofthisPlanincompliancewiththeCore

    StrategyoftheKildareCDP2011–2017(CDP).Inthis

    regard,12hahavebeenzonedfromresidentialto

    agriculturalandopenspaceandamenityuses.

    6.1.1 Housing

    Thenumberofhouseholdsinthetownhasincreased

    from1,040in2006to1,242in2011(Census2011).The

    mostrecentdevelopmenthastakenplacesouthwest

    oftheRiverLiffey,eastoftheM9Motorway

    approximately1.2kmfromthetowncentrein

    Castlemartin.Thetypeandscaleofresidential

    developmentinKilcullenispredominantlysingle

    storeyandtwostorey,terraced,semi-detachedand

    detachedhousing.Inmorerecentyearsapartment

    schemeshavebeendevelopedinthetowncentreand

    landsadjacenttothetowncentre.

    6.1.2 New Housing Units Target

    AsoutlinedinPartA(Section3.4)atotalof709new

    residentialunitsarerequiredinKilcullenduringthe

    period2014–2020.Inlightofthistarget,theCounty

    SettlementStrategyrecognisesthatthe2008

    KilcullenLAPsignificantlyover-zonedlandsfor

    residentialuse.Thisplanhasrezonedsomeofthese

    residentiallandsbasedontheprinciplesofthe

    sequentialapproach.2

    2 ThesequentialapproachassetoutintheDepartment’s‘DevelopmentPlanGuidelines’(2007)specifiesthatzoningshallextendoutwardsfromthecentreofanurbanarea,withundevelopedlandsclosesttothecoreandonpublictransportroutesbeinggivenpreference,encouraginginfillopportunities,andthatareastobezonedshallbecontiguoustoexistingzoneddevelopmentlands.

    Followingareviewof:

    •buildingcompletionssincethepreviousplan;

    •currentvalidplanningpermissionsand

    •uncommittedresidentialzonedlandssince2008;

    Landsinexcessofthoserequiredtocomplywiththe

    corestrategyhavebeenrezonedtoalternativeuses.

    Residentialsiteshavebeenidentifiedbasedontheir

    committedstatusandthelocationofthe

    uncommittedlandsinaccordancewiththeprinciples

    ofthesequentialapproachi.e.developingfromthe

    towncentreouttowardstheedge.

    Table 9: Kilcullen Housing Unit Projection

    2006 Population 2,985

    2011 Census population 3,473

    2006–2020 residential unit target 629

    Residential Unit completions since 2006

    56

    Valid Residential grants of permission 151

    Unit capacity of uncommitted zoned land Kilcullen LAP 2008 LAP

    826

    New zoned land capacity 703

    6.1.3 Housing Location and Density

    Table10identifiesthelocation,sitesizeandunit

    potentialforeachofthesitesdesignatedfornew

    residentialexpansiontolargelymeettheremaining

    unittargetof709unitsovertheplanperiod.Thesites

    identified,forthemostpart,arelocatedinthetown

    centreandontheedgeoftheestablishedurbanarea

    ofthetown.Thesitesintotalprovidec35haofland

    fornewresidentialdevelopmentwiththepotentialto

    deliver703units.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 23

    Location Zoning Site area (ha)UnitsPermitted(p)orEstimate

    (based on 15–30 units/ha)

    1 C Logstown road north C 1.5 38

    2 C Logstown road south C 5.5 110

    3 C Logstown C 2.5 50

    4 C Market Square road C 4.8 110 (p)

    5 C Main Street C 1.3 33

    6 A Newbridge road A 6.6 80

    7 A Naas road A 0.82 41(p)

    8 Naas road3 C 3 45

    9 Naas road4 C 3.4 51

    10 C Nicholastown C 4.4 88

    11 New Abbey Road A 1.9 57

    Total 35.42 703

    3 Note:Giventhegradientofsiteandlocationonedgeofsettlement,lowerdensitiesareapplied.Proposeddwellingsshallhaveregardtopatternofdevelopmentintheimmediatevicinityandgradientofsite.Inthisregarddwellingsshallberestrictedtosinglestoreydwellingsonly.

    4 Asperfootnote1above.

    Atotalof11siteshavebeenzonedfornewresidential

    developmentwithinthelifetimeofthisplan.

    Inadditiontotheselands,theexistingresidential/

    infillandtowncentrezoningsprovidesopportunities

    forawidenumberofusesincludingresidential

    developmentasappropriate.Generallyhigher

    densitieswillbeconsideredintowncentrelocations

    withmediumtolowerdensitiesbeingconsideredat

    outersuburbanandgreenfieldsites.

    Table 11: Indicative Residential Densities

    Location for New Residential Development General Density Parameters

    TownCentreandBrownfieldsites Site specific Higher densities generally promoted e.g. 50 units per ha

    At strategic locations including public transport nodes and town centre area.

    50 units per ha

    InnerSuburban/Infill Site specific

    OuterSuburban/Greenfield,Generally new residential zoning areas.

    30–50 units per ha

    Outer Edge of Urban-Rural transition 20–35 units per ha

    Source: CDP 2011–2017

    Source: DoEHLG Guidelines for Planning Authorities on ‘Sustainable Residential Development in Urban Areas (2009).

    Table 10:SitesidentifiedforResidentialDevelopment

  • // Kilcullen Local Area Plan24

    ItisthepolicyoftheCouncil:

    HP1: TofacilitatedevelopmentinKilculleninline

    withitsdesignationasaModerateSustainable

    GrowthTownintheRPGsandtheCDPandto

    ensurethatdevelopmentreflectsthecharacter

    oftheexistingandhistorictownintermsof

    structure,pattern,scale,designandmaterials

    withadequateprovisionofopenspace.

    HP2: Toencourageappropriatedensitiesfornew

    housingdevelopmentindifferentlocationsin

    thetownwhilerecognisingtheneedto

    protectexistingresidentialcommunitiesand

    theestablishedcharacterofthetownand

    surroundingarea.

    HP3: Torefusepermissionforresidential

    developmentonzonedopengreenspacesand/or

    onlandswhicharedesignatedaspublicspace.

    HP4: Torequireapplicationsforresidential

    development(over20units),todemonstrate

    theprovisionofanappropriatemixof

    dwellingtypeshavingregardtothefollowing:

    •thenatureoftheexistinghousingstockandexistingsocialmixinthearea;

    •thedesirabilityofprovidingformixedcommunities;

    •provisionofarangeofhousetypesandtenures;

    •theneedtoprovideachoiceofhousingsuitabletoallagegroupsandpersonsat

    differentstagesofthelifecycleand

    •theneedtocaterforspecialneedsgroups.

    HP5: Torestrictapartmentdevelopmentsgenerally

    totowncentrelocations.Onlyinexceptional

    circumstanceswillapartmentsbeconsidered

    outsidethetowncentre.Apartmentswillnot

    bepermittedwherethereisanover

    concentrationofthistypeofdevelopment.

    Higherdensityschemeswillonlybe

    consideredwheretheyexhibitahigh

    architecturaldesignstandardcreatingan

    attractiveandsustainablelivingenvironment.

    HP6: Tofacilitateandco-operateintheprovisionof

    communityservicesincluding,inparticular,

    localservices,schools,crèchesandother

    educationandchildcarefacilitiesintandem

    andinthevicinityofallnewandexisting

    residentialdevelopment

    HP7: Tofacilitatetheprovisionofpurposebuilt

    dwellingsforthosewithspecialneeds,

    includingprovisionfortheneedsofthe

    elderly,personswithphysicaldisabilitiesand

    personswithlearningdisabilitiesandin

    conjunctionwithothervoluntarybodiesand

    theprivatesector.

    HP8: Torequireapplicationsforresidential

    developmentsover25units,todemonstrate

    howtheproposedincreaseinpopulationwill

    beaccommodatedintermsofeducation

    provision.5

    6.1.4 Housing in the Agricultural zone

    Theprimaryaimfortheagriculturalzonein

    Kilcullenistopreservetheexistingagriculturaluse

    oftheareaszonedforthispurposeandtoprevent

    urbangenerateddevelopmentwhichwouldinterfere

    withtheoperationoffarming/bloodstockorrural

    resourcebasedenterprise.

    TheSustainableRuralHousing–Guidelinesfor

    PlanningAuthorities(2005)setoutprinciples

    regardingthesitinganddesignofnewdwellingsin

    ruralareas,theprotectionofwaterquality,the

    provisionofasafemeansofaccessandthe

    conservationofsensitiveareas.Withinthe

    agriculturalzoneinKilcullen,housingwillbe

    confinedtopeoplewithagenuinehousingneedand

    whocandemonstratethattheycomplywiththe

    relevantcategoryoflocalneedoutlinedintheCounty

    DevelopmentPlan2011–2017(orasmaybeamended).

    5 GuidelinesfromtheDepartmentofEnvironment,HeritageandLocalGovernmentandDepartmentofEducationindicatethat12%and8.5%ofapopulationatanytimeisassumedtobeofprimaryandsecondarygoingagerespectively.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 25

    ItispolicyoftheCouncil:

    HP9: Tostrictlymanagetheprovisionofoneoff

    housinginlandszonedas‘I: Agricultural’ .

    Limitedoneoffhousingwillbepermittedin

    thiszonesubjecttocompliancewiththerural

    housingpolicyassetoutintheKildareCounty

    DevelopmentPlan2011–2017(orasamended).

    Documentaryevidenceofcompliancewiththis

    policymustbesubmittedaspartoftheplanning

    application,includingaseparatestatementby

    theapplicantontheneedtoresideinthearea.

    HP10: Toensurethat,notwithstandingcompliance

    withpolicyHP9,applicantscomplywithall

    othernormalsitinganddesignconsiderations.

    HP11: Toprotectthephysical,environmental,

    naturalandheritageresourcesofthe

    agriculturalzones.

    HP12: Tofacilitateworkingfromhomesubjectto

    relevantplanningcriteriaandtheprotection

    oftheresidentialamenityofneighbouring

    properties.

    ItisanobjectiveoftheCouncil:

    HPO1:TosecuretheimplementationoftheKildare

    LocalAuthoritiesHousingStrategy2011–2017

    oranysubsequentamendmenttoorreviewof

    theStrategy.

    HPO2:Topromoteahighstandardofarchitecturein

    thedesignofnewhousingdevelopmentsand

    toencourageavarietyofhousetypes,sizes

    andtenuretocaterfortheneedsofthe

    populationandfacilitatethecreationof

    balancedintegratedcommunities.

    6.2 EconomicDevelopment

    Inordertomaintainavibrantandattractivetownanda

    sustainablecommunity,oneofthekeyissuesforany

    towniseconomicdevelopment.Employment

    opportunitiesarevitalforatowntogrowandprosper

    andinanincreasinglycompetitivemarketandchanging

    economicclimate,itisimportantfortownstotake

    advantageofanyuniqueassetorspecialistexpertise.

    KilcullenisidentifiedintheCDPasforminga

    supportingroletothePrimaryEconomicGrowth

    ClusterofNaasandNewbridge.Thesecentresareto

    developinamutuallydependentwaysothatthe

    amenitiesandeconomiesofthewholeclusterare

    greaterthanthesumoftheindividualparts.

    6.2.1 ExistingEconomicProfileoftheTown

    Ensuringtheviabilityofexistingemployersand

    attractingnewemploymentopportunitiestoKilcullen

    isvitalforthetowntogrowandfulfilitsroleaspartof

    thePrimaryEconomicGrowthCluster.The2011

    Censusnotedthatapproximately70%ofthepopulation

    inKilcullenworkedoutsidethearea.Thedominant

    categoriesofemploymentofthedaytimeworking

    population(residentandnon-resident)ofKilcullenwere

    professionalservicesfollowedbycommerceandtrade.

    Kilcullenhasamixedvarietyofemploymenttypes

    withinitsboundary.Therearesomesignificant

    employersinthetownincludingMurphySurvey

    SolutionsintheKilcullenBusinessCampusinthe

    southofthetown,KaymedinKilcullenIndustrial

    estateontheNaasroadandtheMartandschools

    operatingofftheNewbridgeroad.TheMartoperates

  • // Kilcullen Local Area Plan26

    onceaweekandbringsaninfluxofpeopleintothe

    towncentreeveryWednesday.TheLinkBusiness

    ParkontheNaasRoadisunderutilisedwith

    approximately15unitsvacantinNovember2013.

    6.2.2 Strategy for Economic Development,

    Tourism and Employment

    ThefocusonemploymentgenerationinKilcullenisto

    buildonthepotentialroleofthetownasaplacetolive,

    work,visitandenjoy.Keytotheeconomicdevelopment

    ofKilcullenwillbeitsabilitytobuildonitsstrategic

    locationofftheM9whichisanopportunitytosecure

    significantfutureinvestmentwithinthetown.Ensuring

    theviabilityofexistingemployersandattractingnew

    employmentopportunitiestoKilcullenisvitalforthe

    towntogrowandprosper.TheRiverLiffeywhichflows

    throughthetownisalsoafeatureofthetownthatshould

    beexploitedforitstourismandrecreationalpotential.

    Thelongtermstrategyforthetowniscentredonthe

    followingobjectives:

    •Promotingtheuseanddevelopmentofemploymentlandstoensurethedeliveryofemployment

    opportunitiesinappropriatelocationswithrespect

    tostrategicaccessandresidentialareas;

    •Consolidatingcommercialandretaildevelopmentintheexistingtowncentre;

    •Encouragingtouristlinkageswithinthetownandtoencouragespinoffdevelopments;

    •Creatingopportunitiesforcultural,socialandcommunitydevelopmentfacilitatingpassiveand

    activeleisureactivitiesthatmaximisethepotential

    oftheheritageandamenityfeatures;

    •Encouragetheappropriateredevelopmentofthemartsiteandadjoininglandsthroughtheprovision

    ofamixofemployment,residentialandcommunity

    uses,highqualitypublicrealmandopenspacesand

    abuiltenvironmentthatcomplementstheexisting

    fabricofthetown.

    6.2.3 FactorsinfluencingEmploymentCreation

    Anumberofkeylandusefactorscaninfluencethe

    futureeconomicpotentialofanarea.Theseinclude

    theavailabilityofzonedland,availabilityof

    infrastructureandqualityoflifeconsiderations

    Availability of Zoned Land

    ThisPlanidentifies24haoflandforTownCentreand

    24haoflandsforLightIndustrial/Industrialand

    Warehousingpurposes.TheCouncilwillensurethat

    sufficientlandiszonedtoallowfortheprovisionofa

    suitableemploymentmix.Whileemploymentcanbe

    facilitatedintheoryonallzonedlands,thereisa

    specificfocusonlandszonedTownCentreand

    IndustrialandWarehousing.Nofurtherlandwas

    zonedforemploymentpurposesinthisplangiventhe

    availabilityofundevelopedlightindustrial/industrial

    andwarehousinglandsinthetown.Anumberof

    area’soflandzonedIndustrialandWarehousinghave

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 27

    beenre-zonedgiventheirlocationontheperipheryof

    thetownsurroundedbyagriculturallyzonedlandand

    theavailabilityofmoreappropriatelylocatedlandsat

    moreestablished,accessibleandsustainablelocations

    inthetown.Appropriatelyzonedemploymentlands

    aresituatedonthenorthernedgeandsouthernedges

    ofthetownwithconvenientaccesstothetown

    centre,residentialareasandtheM9.

    Infrastructure

    Adequateinfrastructureisessentialtofacilitatefuture

    economicactivityinthetown.Thisincludeswater

    services,effectiveroadandpublictransportnetworks,

    energy,telecommunications,wastemanagement,

    education,sportsandothercommunityfacilities.

    KilcullenisservedbytheOsberstownWastewater

    TreatmentPlantinNaas.Thisfacilityisnearing

    capacityandwillbeupgradedaspartoftheUpper

    LiffeyValleyRegionalSewerageScheme.Itisenvisaged

    thattheupgradeupto130,000populationequivalent

    (PE)willbecompletedinthesecondhalfof2016subject

    toappropriateapprovalsandfundinginplace.

    Quality of life

    Qualityoflifeconsiderationsarekeycomponentsin

    encouragingfutureeconomicdevelopment.Makinga

    townattractivetobothfirmsandtheiremployeesisakey

    factorinasuccessfuleconomicdevelopmentstrategy.

    Specificactionstoimprovequalityoflifeinclude:

    •Providinghighqualityresidentialdevelopmentswithsupportingsocialandcommunityfacilities;

    •Ensuringavibranttowncentrewithahighqualitypublicrealm;

    •Creatinganattractiveurbanenvironmenttoencouragethelabourforcetoresideinthetown;

    •Ensuringtheappearanceofdevelopmentcomplementsexistingenvironmentsandisofthe

    highestquality;

    •Increasingandimprovingtherangeofrecreational,amenityandculturalfacilities.

    ItisthepolicyoftheCouncil:

    ED1: Topromoteenterprisecreationopportunities

    andinitiatives,inlinewiththedesignationof

    Kilcullenashavingasupportingroletothe

    PrimaryEconomicGrowthTown/Clusterof

    NaasandNewbridge.

    ED2: Topromoteandfacilitatesynergybetween

    heritage,retailandtourismdevelopmentsthat

    enhancestheeconomicprofileofKilcullentown.

    ED3: Toengagewithexistingemployersand

    potentialnewemployersincreatingand

    fosteringenterpriseandresearchand

    developmentinthetown.

    ED4: Tofacilitatethesustainabledevelopmentof

    commercial,office,incubatorunits,light

    industrialandwarehousingdevelopmenton

    appropriatelyzonedandservicedlandsin

    co-operationwithrelevantdevelopment

    agencies.

    ED5: TopromotetheLinkBusinessPark(Hlands)

    ontheNaasroadandtheKilcullenBusiness

    Campus(H)southofthetowncentreas

    appropriatelocationstodevelopemployment

    usesappropriatetoitslandusezoning.

    ItisanobjectiveoftheCouncil:

    EDO1:Toensurethatsufficientandsuitablelandis

    zonedforemploymentgeneratingusesin

    Kilcullen.Suchlandwillnormallybe

    protectedfrominappropriatedevelopment

    thatwouldprejudiceitslongterm

    developmentfortheseuses.

    6.2.6 Tourism Development

    Tourismhasanimportantroletoplayintheeconomic

    developmentofKilcullen.Thetownislocatedina

    picturesquesettingontheRiverLiffeywherethe

    bridgeservesasafocalpointinthetown.Thebridge

    wasoriginallyconstructedinthe14thcenturyandhas

    beenrenovatedsignificantlysincethen.Thetownis

    accessiblefromtheM9corridorandiswithinan

    hoursdrivefromDublin.Itisservedbyanationalbus

  • // Kilcullen Local Area Plan28

    network.DunAílinnelocatedsouthofthetown

    boundaryisoneofIreland’sfourkeypre-christian

    settlementsites.Thisceremonialhillfortlocatedon

    thehillofCnocAilinnehasbeenselectedasoneofthe

    RoyalSitesofIreland.Thetownhall/heritagecentre

    inthetownexhibitshistoricaldisplaysofDunAilinne

    andotherattractionsinthelocalarea.Thetownhasa

    veryactiveheritagegroupandtidytown’sgroup.

    TheRiverLiffeyisanaturalresourcewithsignificant

    naturalbeautywhichcanbemaximisedforwater

    sportsandfishing.TheLiffeyatKilcullenisknownfor

    troutanglingandtheNorthKildareTroutandSalmon

    AnglersAssociation(TSAA)managesfishingrights

    fromHarristownthroughtothetowncentre.The

    CanoeClubisveryactiveinthetownandopenedanew

    clubhouseadjacenttotheRiverLiffeyintheMarket

    Squarein2008.Inadditiontotheseattractions,

    Kilcullenisknownforhavinganumberofpopularbars,

    restaurantsandcafes.TheCamphillCommunityFarm,

    caféandshopisanotableattractioninthetownandis

    locatedbesidethebridgeinthecentreofthetown.

    AnopportunityexistsforKilcullentocapitalise

    furtheronitstourismstrengthsandtoseektodraw

    additionalvisitornumberstothetownand

    surroundingareas.Anyexpansionandfuture

    provisionoftourismwithinKilcullenshould

    complementtheoverallcharacterofthearea.

    ItisthepolicyoftheCouncil:

    T1: Toimprovethevisitorexperiencetothetown

    andtocooperatewithallstakeholdersand

    appropriateagenciesinpromotingtourism

    andsecuringtouristbasedenterprisesand

    facilitiesinthetown.

    T2: Tocapitaliseonpotentialtouristincomeby

    seekingto:

    •Promoteexistingaccommodationandnewaccommodationchoicesinthetown.

    •ImprovethepromotionandmarketingofKilcullenasatourismdestination(in

    particularattractionssuchasDunAilinne/

    CamphillFarm/RiverLiffey).

    T3: Toencourageandfacilitatethedevelopment

    ofstronglinkagesbetweentourismand

    communityfacilitieswithinthetown.

    T4: Tosupporttheprovisionofappropriate

    signagealongexistingheritageandtourism

    walkingroutesinKilcullen.

    ItisanobjectiveoftheCouncil:

    TMO1: Tofacilitateandguidewhereappropriatethe

    developmentofadditionalattractionsand

    facilitieswithinthetowninordertoincrease

    tourismgeneratedexpenditure.

    TMO2: Toco-operatewithtourismandamenity

    groupsinthetowntoimprovethe

    environmentofthetown.

    6.3 retail

    Retailprovisionisakeyelementofeconomicself

    sufficiencyandhasanimportantroletoplayinthe

    futuredevelopmentofthesocialandeconomiclifeof

    atown.Itisrecognisedthatthetowncentreneedsto

    expanditsretailofferandexistingretailoutletsneed

    toincreasetheirprofileinordertoretainretailspend

    inthetown.

    6.3.1 RetailProfileofKilcullen

    TheDraftCountyRetailStrategypublishedin2010,

    highlightsKilcullen’sretailfloorspaceaslimited.Itis

    widelydistributedaroundthetowncentreandas

    suchthetowndoesnothaveadefinedCoreRetail

    Area.Kilcullenisthetwelfthlargestsettlementinthe

    countywithitspopulationincreasingfrom2,985in

    2006to3,473in2011andaccountingfor1.7%ofthe

    county’spopulationin2011.Thesizeofthetownis

    mirroredinitspositionintheretailhierarchyforthe

    county.Kilcullen’stotalfloorspacein2009was

    1803m²net,comprising1104m²convenience

    floorspaceand699m²comparison.Thesefigures

    excludevacantfloorspace.Thisisa53%increasein

    totalfloorspacesincethe2001GreaterDublinArea

    (GDA)RetailStrategy.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 29

    The2001GDAsurveystatedthatKilcullenhadno

    vacantretailfloorspace.Howeverthishas

    significantlychangedintheinterimwithmuchofthe

    retailunitsbuiltinrecentyearsbeingvacant.The

    2009healthcheckcarriedoutintheDraftCounty

    KildareRetailStrategynotednineunitsvacantinthe

    towncentre.Asurveyoflandusesandvacancylevels

    inthetowncentrewascarriedoutaspartofthisplan

    review.Thisidentifiedavacancylevelof15units

    withinthetowncentrein2013.

    Whilethetowncentreisidentifiedashavingalimited

    retailandservicesoffer,itisabusyanddiversesmall

    townwithamixofservicesincludingbusiness

    services,restaurants,cafes,bars,communityfacilities

    andalivestockmart.Theretailofferwasimproved

    withtheconstructionoftheMarketSquare

    developmentwhichisamixedusedevelopment

    comprisingapartments,restaurants,officesandretail

    unitsonthegroundfloor.Themainshopsinthetown

    areEurosparandNolansbutchersinthesouthofthe

    townandCentrainthenorthernareaofthetown.

    6.3.2 Strategy for developing the Town’s Retail

    Profile.

    Thestrategyfordevelopingthetown’sretailprofileis

    centredonencouragingandfacilitatingmixeduse

    towncentredevelopmentthroughthedevelopment

    andregenerationofsitesontheMainStreetandon

    towncentrelands.Thehighlevelsofvacancyonthe

    MainStreetshouldbeaddressedbypromotingthe

    occupationofexistingvacantcommercialand

    residentialunitsinthetowncentre.ThisPlan

    identifiesadevelopmentopportunitysiteonthe

    NewbridgeRoad.Itisenvisagedthatthiswillprovide

    foramixofusesincludingretailing,commercialand

    residentialwithlinksprovidedbackontotheMain

    Street/establishedtowncentrearea.

    ItisthepolicyoftheCouncil:

    R1: Toencouragethedevelopmentoftheretail

    andserviceroleofKilcullenasaself

    sustainingcentreinaccordancewiththe

    policiescontainedintheCountyDevelopment

    Plan,theRetailPlanningGuidelines2012,

    DraftCountyRetailStrategy2010andany

    futureRetailPlanningGuidelinesorstrategy

    thatmaybeissuedduringthelifeofthisplan.

    R2: Toencourageandfacilitatethedevelopment

    ofacombinedanduniqueheritage,retailing

    andtourismexperiencewithinthetownand

    toencouragestronglinkagesbetweenthese

    attractions.

    R3: Toworkwithandencouragelandowners,

    retailers,anddevelopmentintereststorealise

    thepotentialofvacantsites/landsinKilcullen.

    R4: Tofacilitatetheneedsofexistingandgrowing

    residentialareasthroughanetworkofsmall

    localandneighbourhoodcentres.Alllocaland

    neighbourhoodcentresshallcomplement

    ratherthandetractordisplaceretailorother

    activitiesfromthetowncentre.Large-scale

    convenienceformatcentreswillnotbe

    permittedinneighbourhoodresidentialareas.

    ItisanobjectiveoftheCouncil

    RO1: Toreinforcethetowncentreasthepriority

    locationfornewretaildevelopment,with

    qualityofdesignandintegration/linkage

    withintheexistingurbanform/layoutbeing

    fundamentalprerequisites.

  • // Kilcullen Local Area Plan30

    RO2: Toencourageandfacilitatethere-useand

    regenerationoftowncentrederelict/brown

    fieldlandandbuildingsforretailandother

    towncentreuses,havingregardtothe

    SequentialApproachoutlinedintheRetail

    PlanningGuidelines.

    6.4 Town Centre

    Kilcullenowesitsorigintobeingthefirstlocationto

    haveabridgebuiltovertheRiverLiffeyinthe14th

    century.Firstbuiltin1310,thesixarchbridgeover

    theLiffeywaslastreconstructedc.1850and

    renovatedandwidenedintheearly1970’s,the

    upstreamfaceismodernwhileifviewingfromthe

    downstreamthehistoricformisvisible.Thetown

    comprisesoneMainStreetwithafewconnecting

    roads.TheMainStreetslopesfromOldKilcullenand

    theAthyRoaddowntotheRiverLiffeyandrisesback

    upagainmoresteeplytoHillcrestinthenorthofthe

    town.WhileKilcullentowncentreisacharmingarea,

    regenerationandconservationofthetowncentrearea

    areimportantobjectivesovertheperiodoftheplan.

    Inordertomaintainthecharacterofthetowncentre,

    developmentandgrowthwillbemanagedand

    coordinatedwiththeemergingroleofthetown.In

    thisregard,bestpracticeprinciplesascontainedin

    theCountyDevelopmentPlan2011–2017(orasmaybe

    amended)togetherwiththedetaileddesign

    considerationsasoutlinedinthissectionwillinform

    thefuturedevelopmentofthetown.

    6.4.1 Townscape Analysis

    Thefollowingsectionsconsiderthetowncentrein

    termsof:

    •Legibility,functionandimage

    •Builtformandvisualappropriateness

    •Publicopenspace

    •Transportlinksandmovement

    •Landuseandactivity

    Thesecriteriaprovidethebackgroundtoinformthe

    urbandesignguidanceforthefuturedevelopmentof

    thetowncentre.

    6.4.2 Legibility, Function and Image

    Kilcullenisacompacttowndefinedbyonelongmain

    streetrunningfromHillcrestinthenorthofthetown

    centretothejunctionoftheR413Athgarvan/

    BrannockstownroadandR448Athyroadinthesouth.

    Thetowncentrehasextendedmarginallywestofthis

    toincludelandsontheNewbridgeroadandlandseast

    oftheMainStreetbutgenerallystillretainsits

    historicallayoutdatingbacktotheearly19thcentury.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 31

    Thetowncentreitselfisanattractiveandvibrant

    placewithawellmaintainedurbanfabricandamixof

    uses.HistoricallytheMainStreetsouthofthebridge

    wasthemainshoppingareainthetownandthisstill

    remainsthesame.However,thereisalackofactive

    frontagesalongstretchesofMainStreetwithsome

    rundownandvacantpremises.Itisimportantthat

    thesebuildings/sites,whichformakeyelementofthe

    town’sstreetscapeandcharacter,arerestoredand

    reinvigoratedwithappropriateusesthatsecuretheir

    longtermintegrityandbeneficialuse.Underutilised

    sitesandbuildingsaredetrimentaltotheoverall

    imageofthetown.Theyalsorepresentanunrealised

    opportunityforurbanrenewalandinvestmentthat

    wouldassistincreatingacriticalmassofpopulation

    andserviceswithinthetowncentreinordertosecure

    itslongtermvitalityandviability.

    Theimageofthetowncoreiscrucialtoitsvitalityand

    thereforeplaysanimportantparttowardsthesuccess

    ofthetowncentre.TheMainStreetsouthofthe

    bridgepresentsapositiveimagewithadiverserange

    ofretailunits.Howevertheareanorthofthetown

    providesapoorqualitypublicrealmwhichdetracts

    fromtheimageofthetown.Thisareaofthetownhas

    thepotentialtostrengthentheimageofthetownand

    increasefootfallinthisareaoftheMainStreet.

    6.4.3 Built Form and Visual Appropriateness

    Urbangraincanbedefinedasthepatternandformof

    buildings,plotsandblockswithinurbanareas6.Afine

    grainisprevalentinthehistoriccentreofKilcullen.Plots

    withinthetowncentreparticularlyalongMainStreet

    aredeepplotswithnarrowfrontagesontothestreet.

    Kilcullenisfortunateinthatmostofthe

    developmentsthathaveoccurredonMainStreethave

    notalteredthetraditionalbuildingplotsandblocks.

    6 Incaseswherethereisadensepatternwithmultipleplots/buildingsfrontingastreet,theurbangrainisdefinedasfine.Thetermloosegrainisappliedwherethebuildingplotislargerandthebuiltformsmaller.

    Figure 6: 1837 Ordnance Survey Ireland

  • // Kilcullen Local Area Plan32

    6.4.4 Public Open Space

    Kilcullenhasareasonableprovisionofpublicopen

    spaceforpassiveandactiverecreationalpurposes

    includingtheValleyRiversideWalkeastofKilcullen

    bridge,CamphillCommunityFarmwestofKilcullen

    bridgeandthelandssurroundingtheKilcullen

    communitycentrewestofthetowncentrewhich

    providesforavarietyofsportsandactivities.The

    CommunityCentrealsoprovidesforachildren’s

    playground.Thereishowever,alackofconnectivity

    betweenthepublicopenspacesandresidentialareas.

    Connectivitybetweentheseopenspacesshouldbe

    improvedtoenablegreaterpermeabilitythroughout

    thetown.

    6.4.5 Transport Links and Movement

    Trafficcongestionhadbeenanissueinthetownuntil

    thebypass(M9)wasopenedin2009.TheM9relieved

    congestionslightly.However,trafficlevelsinthetown

    continuetorise.Themorningandafternoonpeaks

    arelargelyduetothetransportofchildrentoand

    fromschool.Censusresultsindicatethatfew

    children/studentsarewalkingtoschool.Thedesign

    briefforthelandsontheNewbridgeRoadpresentsan

    opportunitytoimprovepermeabilitywithinthetown

    centreandcreatealinkagefromtheNewbridgeRoad

    totheMainStreet.Thiswouldfacilitateimproved

    connectivityfromtheresidentialareasinthenorthof

    thetowntotheschoolsandcommunityfacilitieson

    theNewbridgeRoad.

    6.4.6 Land use and activity

    Thepredominantusesinthetowncentreinclude

    retailing,financialandprofessionalservices,cafes

    andpublichouses.Therearealsoanumberof

    residencesinthetowncentre,manyofwhicharepart

    ofthetraditionalstreetscape.Itisimportantthatthe

    towncentreremainsanattractiveplacetolivein

    ordertomaintainbeneficialusesthroughouttheday

    andnight.Anincreaseinretailprovisionwithinthe

    towncentreinparticularMainStreetisnecessaryto

    ensurethevitalityandviabilityofthetowncentre

    andreinforcetheimportanceofMainStreetasa

    retaildestination.Figure7identifiesusesalongMain

    Street.Stretchesofthestreetaredominatedby

    bookmakers,cafesandoffices,manyofthesehave

    restrictedopeninghourswhichimpactsonthe

    vitalityofthearea.

    6.4.7 Strategy for the Town Centre

    ThevisionforKilcullentowncentreistocreatea

    vibrantandbustlingtownwithadiversemixof

    activities.Thiscanbeachievedbydevelopingvacant

    andunderutilisedsitesinthetowncentreand

    enhancingthephysicalenvironmentandstreetscapeof

    theexistingtowncore.Theoverallaimofthestrategy

    willbetoachieveaflexibleandrealisticframeworkfor

    growthwhilefacilitatingappropriatedevelopment,

    regenerationandphysicalimprovementofthetown.

    TheregenerationofKilcullentowncentreisacomplex

    processofadaptationofexistingurbanareasand

    preservationofareasofhistoricalsignificance,with

    expansionareasforlongertermdevelopment.

    Thestrategyforthetowncentreareaisto:

    •Promotetheregenerationandappropriatereuseofvacant/underutilised/derelictstructuresandsites.

    •Provideguidancetomanagechangeinthetownthatbalancesadaptation,preservationand

    expansion.

    •Encouragetheuseofupperfloorswithinthetowncentreforbothresidentialandcommercial

    purposes.

    ItisthepolicyoftheCouncil:

    TC1: ToreinforcetheMainStreetasavibranttown

    centrewithadiversemixofusesandto

    consolidatethetowncentreareaswhich

    surroundMainStreet.

    TC2: Toprovideforsustainableurbanexpansion

    areasbyprioritisingthedevelopmentof

    derelict/brownfieldandkeyinfill/gapsites.

    TC3: Topromoteandencouragehighqualityurban

    designandtoimprovetheimageofthetown

    byenhancingthephysicalenvironmentand

    streetscape.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 33

    Figure 7: Main Street Ground Floor Uses October 2013

    Church(Cath)

    Presbytery

    HallTown

    Credit

    Livestock

    Library

    Union

    Kilcullen

    Residential

    Vacant

    Derelict

    Bank-Bookmakers

    Retail

    Offices

    Pub-Restaurants-Takeaway

    Hairdressers / Barbers / Beauticians

    Kilcullen Bridge

    Legend

  • // Kilcullen Local Area Plan34

    TC4: Torelievetrafficcongestionwithinthetown

    centrebyimprovingpermeability.

    TC5: Tostrengthenandformaliseexistingroutes

    withinthetownaswellascreatingnewlinkages

    alongwhichdevelopmentcantakeplace.

    TC6: Toencourageandfacilitatethere-useand

    regenerationofderelictlandandbuildings

    withinandaroundthetowncentreandin

    particularvacantfloorspaceontheMain

    Street

    ItisanobjectiveoftheCouncil:

    TCO1:Toencourageandfacilitatethere-useand

    regenerationofderelict/brownfieldlandand

    buildingsforretailandothertowncentre

    uses,havingregardtothesequentialapproach

    outlinedintheRetailPlanningGuidelines.

    TCO2:Tofacilitatethedevelopmentofappropriately

    scaledretailandmixedusedevelopmentin

    themartandadjoininglandsonthe

    NewbridgeRoadidentifiedintheUrban

    DesignBrief(Section6.5.4)

    TCO3:Tosafeguardtheimportantarchitecturaland

    streetscapeheritageoftheTownCentrearea.

    6.5 UrbanDesignGuidance

    Thissectionsetsoutthegeneralapproachtoguide

    growthandmanagechangeinthetowncentreto

    strengthentheMainStreetinordertocreatealively

    urbancorewithadiversityofuses.

    Inadditiontheurbandesignguidanceseekstosetout

    guidingprinciplesforthedevelopmentoftwokey

    areas,theMartAreaandadjoininglandsandareas

    adjoiningtheMarketSquare.Thisisrequiredinorder

    toprovideasustainableurbanexpansionarea

    increasingpermeabilityandlinkagewiththetown

    core.

    6.5.1 Strengthen Main Street

    Adiversityofshopsandbusinessesarerequiredto

    ensurethevitalityofthetowncentre.Thegreaterthe

    mixofshopsandservicesthegreatertheattractionof

    thetowncentre.

    Inordertoensurethevitalityandviabilityofthe

    towncentreitisenvisagedthatanyadditionalnew

    retailsunitsalongtheMainStreetofthetowncentre

    beofafinegrainwithactivefrontages7.Apartfrom

    restaurantsandbars,non-retailactivitiesshouldbe

    locatedonupperfloorssothatretailfrontageis

    maintainedatstreetlevel.Whereretailactivities

    operateonlyduringofficehours(i.e9am-5pm

    MondaytoFriday)suchasbanks,theirpresenceon

    thestreetscapeshouldbelimitedwith3no.active

    frontageunitswherefeasible,asdescribedabove

    eitherside.

    6.5.2 Shopfronts

    MainStreethassomenoteworthyexamplesof

    shopfronts.Howeverthemainstreethasexperienced

    somedeteriorationandneglectresultinginvacancy

    rateswithpoorshopfronts.

    Shopfrontscanhaveasignificantimpactontheimage

    ofthetownandthequalityofthepublicdomain.Itis

    proposedto:

    •Promoteandencouragehighqualityshopfrontdesign

    •Encouragetheretention,sensitiverepairandre-useoftraditionalshopfronts

    •Reducevisualclutterbyremovingandpreventingtheintroductionofpoorqualitysignage

    ReferenceshouldbemadetotheKildareShopfront

    Guidelinespublishedin2013.

    7 ForthepurposeofthePlanactivefrontageunitsaredefinedashavingopeninghoursthatincludetheweekendtoencourageactivityoutsidebusinesshours.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 35

    Figure 8: Georgian Shopfront on Main Street

    The above image is an example of a traditional shopfront on the Main Street which has been sensitively restored.

    Figure 9: Macari Takeaway on Main Street

    The above image illustrates a poor quality shopfront through the use of inappropriate materials and colours.

  • // Kilcullen Local Area Plan36

    ItisthepolicyoftheCouncil:

    TCS1: TostrengthentheMainStreetbyencouraging

    adiversityofshopsandbusinessestoimprove

    thevitalityofthetowncentre.

    TCS2: Toimprovethequalityofthetown’s

    streetscapeby:

    •Promotingandencouraginghighqualityshopfrontdesign.

    •Encouragingtheretention,sensitiverepairandre-useoftraditionalshopfronts.

    •Reducingvisualclutterbyremovingandpreventingtheintroductionofpoorquality

    signage.

    TCS3: Toencourageresidentialusesinthetown

    centrethroughsuchinitiativesas‘Livingover

    theShop’.

    TC4: Tolimitthepresenceofnonactiveretail

    frontagesontheMainStreet.

    6.5.4 Urban Design Briefs

    Indicativedesignbriefshavebeenpreparedforthe

    MartSiteandadjoininglandsontheNewbridgeRoad

    andlandsnorthoftheRiverLiffeyadjacentRiverside

    Manor.Theseareindicativeandillustratehowthe

    areascouldbedeveloped.Thedesignguidancesets

    outbroaddesignparametersforthedevelopmentof

    thesitesincludingmovement,thelocationandtypeof

    developmentblocks,buildingfrontageandcivic

    spaces.Theseplansshouldbeusedtoinformthemore

    detailedlayoutanddesignproposalswithineachsite.

    Whilealldrawingsindicatethattheproposalsare

    indicativeonly,theyarenonethelessimportantin

    settingabroadframeworkforfuturedevelopment.A

    detaileddesignstatement,explaininghowany

    Figure 10: Aerial Photo of Mart and Adjoining Lands

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 37

    proposeddevelopmentaddressestherelevantdesign

    briefandallrelevantdevelopmentmanagement

    standards(assetoutinChapter19oftheKildare

    CountyDevelopmentPlan2011–2017,orany

    subsequentplan),shallbesubmittedaspartofany

    planningapplicationonthesesites.

    6.5.4.1 Expansion Area – The Mart and adjoining

    lands

    TheMartcharacterareaislocatedalongthe

    NewbridgeRoadandcurrentlycomprisesthe

    KilcullenCattleMartandgreenfieldlands.Thisarea

    maywellbedevelopedbeyondtheperiodofthisplan.

    Thisurbanblockiscirca6.6hainarea.Thecharacter

    areacontainstheMartbuilding,Europsar

    supermarketandcarparktotheeastofthesitearea,a

    carrepairsunittotherearofthesiteandagricultural

    landtothewestoftheMartbuilding.

    Vision

    Giventhelocationofthesiteinthetowncentreandon

    anapproachroadtothetown,itiscriticalthatfuture

    developmentfacilitatestheexpansionofthetown

    centrewithinahighqualitybuiltenvironment.The

    landholdingcomprisesanumberofdifferent

    landownerssoitisrecognisedthatalllandsmaynotbe

    developedtogether.Thedesignbriefthereforeprovides

    anoverallstrategywithinwhichexistingusesare

    recognisedandallowingindividuallandownerstoset

    outproposalsforfuturedevelopmentwithinaclearly

    definedcontext.

    Thelandsareboundedtotheeastbytheproposed

    boulevard,tothewestbytherearofthebuildings

    whichfrontMainStreetandtothenorthbya

    proposednewstreet(forminganinterfacebetween

    MainStreetandtheproposedboulevard).Itis

    envisagedthatthelandscanaccommodateamixof

    usesincludingcommercialemploymentuses,

    communityaswellasresidentialuses,whichmay

    includeanelementoflive/workunits.Usespermitted

    inthisareainclude:

    •Commercial/Retail

    •Officesandsmallbusinessunits

    •Residential/Live/workunits

    •CommunityFacilities

    Built Form

    Developmentshouldbeprovidedintheformofclearly

    definedblockswithsemi-privateenclosedcourtyard

    typeopenspaces,carparking,rearaccessand

    communalspaces.Wherecarparkingisrequiredit

    shouldbeplacedtotherearofbuildingsorinprivate

    courtyardsprovidedthroughoutthecharacterarea.

    Thestreetsinthischaracterareawillbefrontedby

    buildingsgenerally2–3storeysinheight.Amixof

    housingandofficeswilloverlooktheadjacentstreets

    andlandscapedcourtyards.Dwellingswithinthis

    characterareashallcontainanappropriatemixof

    typologies,unitsizesandtenancies,inaccordance

    withnationalguidanceandChapter19Development

    ManagementStandardsKildareCountyDevelopment

    Plan2011–2017(orasamended).

    Flexiblefrontageswillbeincorporatedintobuildings

    atgroundfloorleveltoallowconversionfrom

    residential,retail,office,workspaceorcommunity

    usestomeetfutureneedsandrespondtomarket

    opportunities.

    Connectivity and Movement

    Increasingpermeabilitythroughtothisareaiscritical

    totowncentreexpansion.Aboulevardstreetwith

    vehicularandsharedsurfacesshallconnectthe

    NewbridgeRoadtotheMainStreet.Pedestrianlinks

    willincreasepermeabilityandenhancetheopen

    spacenetwork.Anumberofneighbourhoodstreets

    willalsofacilitatepedestrianmovementthroughout

    thecharacterarea.

  • // Kilcullen Local Area Plan38

    Figure 11: View of Mart Site to the South

    Figure 12:MartOffices

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 39

    Figure 13: Mart Character Area – Indicative Layout

    The MartArea 6.6ha

    Dwellings per ha/acre c.30 units per hectare

    Residential development 40%

    Commercial development 50%

    Community development 10%

    Courtyard Building Height 2–3 Storeys

    Perimeter Building Height 2 -3 Storeys

    Landmark Building Height 3 Storeys

    Plot Ratio Maximum 1.5

    Site Coverage Maximum 66%

  • // Kilcullen Local Area Plan40

    The Mart Character Area: Key Issues•Residentialandcommercialbuildingswilltypifythebuiltformcomprisingofbuildings2–3storeysin

    heightfollowingaperimeterblock/courtyardform.

    •Qualitypublicrealmisachievedusingahighstandardofqualityfinishesandtreatments.

    •Allpublicspacesaretobelinkedbyaclearfullypermeablepedestrianandcyclistnetwork.

    •Designandlayoutofthecharacterareawillincorporateprinciplesofpassivesurveillancetoencourageacommunityatmosphereandtodiscourageanti-socialbehaviour,byoverlookedopenspace/cycleway/

    pedestrianroutes.

    •Privateandpublicareaswillbeclearlydelineated.Privateareasaretobeprotectedfromdirectoverlookingandpublicareaswillbeeasilyaccessibleandoverlooked.

    •Buildingswillbepositionedtoprovidetransparencyandglimpsesofthepublicandsemi-publicspacesdefinedbythem.

    •Developmentonboundaryedgesshallbesimilarinscaleandnaturetoexistingdevelopmentandprovidefortheprotectionofexistingresidentialamenitiesminimisingoverlookingandvisualintrusion.

    •DevelopmenttotherearoradjacenttoexistingbuiltformwillhaveregardtotherelevantstandardsoutlinedintheCountyDevelopmentPlan.

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 41

    6.5.4.2 Neighbourhood Edge – Lands east of the

    Main Street

    Thischaracterareaislocatedtotheeastofthemain

    streetandcomprisesanareaof2.5ha.Thecharacter

    areacompriseslandszonedA:TownCentreandC:

    NewResidentialinthisPlan.Theareacomprisestwo

    separateblocks,BlockAconsistsofamixofusesand

    iszonedTowncentrewhileBlockBisgreenfieldin

    naturewithnodevelopmentonsiteandiszonednew

    residential.

    Thelandsrisesfromsouthtonorthandareaccessed

    fromtheMainStreetandtheroadleadingfromthe

    MarketSquare.Thecharacterarealandsarebounded

    tothenorthbytheNaasroad,tothesouthbythe

    accessroadservingtheadjacenthousingestateof

    RiversideManor,totheeastbyRiversideManor

    housingdevelopmentwhichconsistsoflargedetached

    andsemi-detachedhousingandtothewestbythe

    MainStreetanddevelopedtowncentrelands.

    Vision

    Thevisionforthisareaistoexpandtheresidential

    areaintheeasternquarterofthetownandtoopenup

    backlandareastofacilitateimprovedpermeability

    andconnectivitytotheMainStreet.Thecharacter

    areaincludingbothBlockAandBlockBcomprisesa

    numberofdifferentlandownerssoitisrecognised

    thatalllandsmaynotbedevelopedtogether.The

    designbriefthereforeoutlinesanoverallstrategy

    withinwhichexistingusesarerecognisedandallows

    individuallandownerstosetoutproposalswithina

    clearlydefinedcontext.Theselandswillcomprise

    residentialandmixedusedevelopment.

    Figure 14: Aerial Photo of Neighbourhood Edge Lands

  • // Kilcullen Local Area Plan42

    Built Form

    BlockA

    Developmentinthetowncentreareashallbe

    perimeterblock/courtyardinformwithaquality

    publicrealm.Thedevelopmentblockswithinthis

    areashallcompriseactivefrontagesatgroundfloor

    withresidentialunitsonupperlevelsprovidingmixed

    usedevelopments/schemesincludingcommunity

    uses.Pocketparksshallbeincorporatedintothe

    layouttoprovideamenityforresidents.Development

    totherearoforadjacenttotheexistingbuiltform

    shallhaveregardtotheamenityofthesebuildings.

    BlockB

    Developmentintheresidentialareashouldbeofthe

    perimeterblockstructureandshouldcompriseof

    semi-detachedanddetachedhousingwithanelement

    oftownhousesfacingtheMarketSquareapartment

    development.Theareaofthesitefrontingthelinear

    parkalongtheRiverLiffeywillhavethecapacityto

    absorblargerhousetypes.Developmentproposals

    shallcontainamixofunittypeswithdirectvehicular

    accesstodwellings.

    Alldevelopmentinthischaracterarea,bothBlocksA

    andB,shallbebetween2and2.5storey’sinheightin

    ordertocontributetothelessintensecharacterofthe

    area.Smallpocketparksormorelocalareasofpublic

    openspaceshouldbecreativelyincorporatedintothe

    housinglayoutandshouldbeoverlookedinorderto

    promotenaturalsurveillance.Thelandscapedesignof

    thesespacesshouldrespondtothevariousneedsof

    thecommunitybyprovidingforactiveandsupervised

    playinoverlookedareaswhilstensuringrelaxation

    andrecreationalspacesinquieterareas.

    Connectivity and Movement

    InordertofacilitatethedevelopmentofBlockB,the

    predominantlyresidentialelement,anadditionallink

    fromtheMainStreetwillberequiredforthisbriefto

    beachievable.Aboulevardstreetwithvehicularand

    sharedsurfacesshallconnecttheMainStreettoBlock

    B.AccessandpermeabilitythroughbothblocksAand

    Bshouldbevianeighbourhoodstreets.Anumberof

    neighbourhoodstreetsshallfacilitatepedestrian

    movementthroughouttheentirecharacterarea.

    Figure 15: View to the North of the Neighbourhood Character Area

  • Part B: Policies and Objectives

    Part B: Policies and Objectives 43

    Figure 16: Neighbourhood Edge Character Area – Indicative Layout

    Block AArea 1.2 ha

    Dwellings per ha/acre 25 – 30 units per hectare

    Plot Ratio Maximum 1.0

    Site Coverage Maximum 66%

    Mixed use development 100%

    Perimeter building Height

    2–2.5 storeys

    Block BArea 1.3 ha

    Dwellings per ha/acre 25 – 30 units per hectare

    Plot Ratio Maximum 1.0


Recommended