Kilcullen Local Area Plan 2014–2020
Phlean Cheantar Aitiuil Kilcullen
November 2014
Includes Ordnance Survey Ireland data reproduced under OSi
Licence number 2004/07 CCMA / Kildare County Council
Unauthorised reproduction infringes Ordnance Survey
Ireland and Government of Ireland
Copyright © Ordnance Survey Ireland, 2014
Irish Water
From January 2014 , Irish Water as the public water utility provider, will be responsible for operating and providing
public water and waste water services in Ireland. Irish Water will operate as an independent State owned subsidiary
within the Bord Gáis Éireann Group. References therefore to the water services authority in the LAP will be
construed as references to Irish Water.
Table of Contents
ParT aIntroduction and Context
1.0 Introduction 5
1.1 LocalAreaPlansStatusandProcess 5
1.2 StrategicEnvironmentalAssessment 6
1.3 AppropriateAssessment 6
1.4 StrategicFloodRiskAssessment(SFRA) 6
2.0 Kilcullen Historic Development and Urban Context 7
2.1 KilculleninaNationalContext 8
2.2 KilculleninaRegionalContext 8
2.3 KilculleninaCountyContext 10
3.0 TownProfileTownFunctionandRole 10
3.1 Population 11
3.2 HouseholdSizeandProfile 12
3.3 AgeprofileofKilcullen 13
3.4 ResidentialProfile&NewUnitTarget 14
3.5 Economy 15
3.6 TownCentre 16
3.7 Transportation 16
3.8 EnvironmentandRecreation 16
3.9 Education 16
4.0 Key challenges facing the town 17
5.0 Future Development Strategy 17
ParT BPolicies and Objectives
6.0 Introduction 20
6.1 CompliancewiththeCoreStrategy 22
6.2 EconomicDevelopment 25
6.3 Retail 28
6.4 TownCentre 30
6.5 UrbanDesignGuidance 34
6.6 MovementandTransport 44
6.7 WaterDrainageandEnvironmentalServices 51
6.8 EnergyandCommunications 58
6.9 Education,CommunityandCulturalFacilities 59
6.10 Architectural,ArchaeologicalandNaturalHeritage 60
6.11 RecreationandAmenity 69
ParT CLand Use Zoning
7.0 Land Use Zoning Objectives 72
7.1 ZoningMatrix 75
7.2 ApplicationofZoningPolicy 75
7.3 DefinitionofTerms 75
List of Tables
Table 1:KilcullenPopulationandRateofChange 11
Table 2:HouseholdSizeandProfile 12
Table 3:AgeProfileofKilcullen 13
Table 4:KilcullenHousingUnitTarget2014–2020 14
Table 5:LandRequirementstomeettheunittarget 15
Table 6:KilcullenLabourForceBreakdown 15
Table 7:KilcullenEmploymentBreakdown 15
Table 8:ProfileofexistingschoolsinKilcullen 17
Table 9:KilcullenHousingUnitProjection 22
Table 10:SitesidentifiedforResidentialDevelopment 23
Table 11:IndicativeResidentialDensities 23
Table 12:RecordofProtectedStructures(Kilcullen) 60
Table 13:SitesandMonumentsRecord 61
Table 14: LandUseZoningObjectives 73
Table 15:LandUseZoningMatrix 77
List of Maps
Map 1:MovementObjectivesMapKilcullen 49
Map 2: StrategicFloodriskAssessment 55
Map 3:NaturalandBuildingHeritage 63
Map 3a:NaturalandBuildingHeritageTownCentre 64
Map 4: GreenInfrastructure 67
Map 5:LandUseZoningObjectives 79
List of Figures
Figure 1:KilcullenStrategicContext 7
Figure 2:KilculleninthecontextoftheGreaterDublinArea 9
Figure 3:KilcullenPopulationGrowth 11
Figure 4:KilcullenHouseholdprofile 12
Figure 5:KilcullenAgeProfile 13
Figure 6:1837OrdnanceSurveyIreland 31
Figure 7: MainStreetGroundFloorUsesOctober2013 33
Figure 8: GeorgianShopfrontonMainStreet 35
Figure 9: MacariTakeawayonMainStreet 35
Figure 10:AerialPhotoofMartandAdjoiningLands 36
Figure 11: ViewofMartSitetotheSouth 38
Figure 12:MartOffices 38
Figure 13:MartCharacterArea–IndicativeLayout 39
Figure 14:AerialPhotoofNeighbourhoodEdgeLands 40
Figure 15:ViewtotheNorthoftheNeighbourhoodCharacterArea 42
Figure 16:NeighbourhoodEdgeCharacterArea–IndicativeLayout 43
Part a: Introduction and C
ontextPart aIntroduction and Context
Part a: Introduction and C
ontext
Part a: Introduction and Context 5
1.0 Introduction
TheKilcullenLocalAreaPlan2014–2020hasbeen
preparedinaccordancewiththerequirementsand
provisionsofthePlanningandDevelopmentAct2000,as
amended.Itsetsoutanoverallstrategyfortheproper
planningandsustainabledevelopmentofKilculleninthe
contextoftheKildareCountyDevelopmentPlan
2011–2017andtheRegionalPlanningGuidelinesforthe
GreaterDublinArea2010–2022.Itisalsoinformedby
MinisterialGuidelinespublishedpursuanttoSection28
ofthePlanningandDevelopmentAct2000asamended,
togetherwithEUrequirementsregardingStrategic
EnvironmentalAssessmentandAppropriateAssessment.
ThisPlanissetoutinawrittenstatementwith
accompanyingmaps.Itcomprises:
•Part a: Introduction and Context
Outlinesthesocial,economicandplanningcontext
forthetown,settingtheframeworkfortheplan’s
policiesandobjectives.
•Part B: Policies and Objectives
Setsoutspecificpoliciesandobjectivesfortheplan
relatingtohousing,economicdevelopment,retail,
tourism,urbandesign,etc.
•Part C: Mapped Objectives
Setsoutobjectivesintheplanwhichcanbemapped
includinglandusezoning,sitespecificobjectivesfor
roadimprovements,naturalandbuiltheritage,
protectedviews,designbriefs,etc.Thewritten
statementshalltakeprecedenceoverthemapsshould
anydiscrepancyarisebetweenthem.Inthefull
interpretationofallobjectivesforKilcullen,itis
essentialthatboththeCountyDevelopmentPlan
(CDP)andtheLocalAreaPlan(LAP)arereadin
tandem.Whereconflictingobjectivesarisebetween
theCDPandtheLAP,theobjectivesoftheCDPshall
takeprecedence.Itshouldbenotedthatthegeneral
developmentmanagementstandardsapplicabletothis
LAParecontainedintheCountyDevelopmentPlan.
1.1 Local area Plans Status and Process
Sections18–20ofthePlanningandDevelopmentAct
2000,asamended,providethataLocalAreaPlan
(LAP)maybepreparedinrespectofanyareawhicha
PlanningAuthorityconsiderssuitable,inparticularfor
areaswhichrequireeconomic,physicalandsocial
renewalandforareaslikelytobethesubjectoflarge-
scaledevelopmentwithinthelifetimeoftheplan.
Alocalareaplanshallbemadeinrespectofanarea
which:
•Isdesignatedasatowninthemostrecentcensusofpopulation,otherthanatowndesignatedasa
suburborenvironsinthatcensus,
•Hasapopulationinexcessof5,000and
•Issituatedwithinthefunctionalareaofaplanningauthoritywhichisacountycouncil.
The2011censusindicatedthatKilcullenhadatotal
populationof3,473personsandisdesignatedatown.
Thetown’sstatusasaModerateSustainableGrowth
TownintheRegionalPlanningGuidelinesforthe
GreaterDublinArea(RPGs)justifiestheneedfora
LocalAreaPlan.ThisLAPwasadoptedattheCouncil
Meetingon20thOctober2014andtakeseffectfrom
November16th2014.Theplanshallceasetohave
effectattheexpirationof6yearsfromthatdate
unlessthisperiodisextendedbyresolutionin
accordancewithSection19(1)(d)ofthePlanningand
DevelopmentActs2000–2014.
aim: To establish a framework for the physical, socio economic, cultural and recreational development of Kilcullen in a planned, co-ordinated and sustainable manner in order to conserve and enhance the established tradition and intrinsic character of the town.
// Kilcullen Local Area Plan6
1.2 Strategic Environmental assessment
StrategicEnvironmentalAssessment(SEA)istheformal
systematicevaluationofthelikelysignificant
environmentaleffectsofimplementingaplanor
programmebeforeadecisionismadetoadopttheplan
orprogramme.TheSEADirective(2001/42/EC),was
transposedintoIrishLawthroughtheEuropean
Communities(EnvironmentalAssessmentofCertain
PlansandProgrammes)Regulations2004(SINo435of
2004)asamendedbytheEuropeanCommunities
(EnvironmentalAssessmentofCertainPlansand
Programmes)(Amendment)Regulations2011(S.INo.
200of2011)andthePlanningandDevelopment
(StrategicEnvironmentalAssessment)Regulations2004
(SINo436of2004)asamendedbythePlanningand
Development(StrategicEnvironmentalAssessment)
(Amendment)Regulations2011(S.I.No.201of2011).
InaccordancewithArticle13AofthePlanningand
Development(StrategicEnvironmentalAssessment)
Regulations2004,aScreeningAssessmentwas
preparedfortheKilcullenLocalAreaPlanandsentto
theEnvironmentalAuthorities1.Adeterminationwas
madethatafullStrategicEnvironmentalAssessment
wasnotrequiredinthiscase.
1 FollowingreceiptsofcorrespondencefromtheEnvironmentalAuthorities.
1.3 appropriate assessment
ThepurposeofAppropriateAssessment(AA)ofland
useplansistoensurethatprotectionoftheintegrity
ofEuropeansitesisapartoftheplanningprocessata
regionalandlocallevel.TherequirementforAAof
plansorprojectsisoutlinedinArticle6(3)and(4)of
theEuropeanCommunities(1992)CouncilDirective
92/43/EEContheconservationofnaturalhabitats
andofwildfaunaandflora(“HabitatsDirective”).
LocalAreaPlansarescreenedforanypotential
impactonareasdesignatedasNatura2000sites.In
anycasewhere,followingscreening,itisfoundthat
theplanmayhaveanimpact,afull‘appropriate
assessment’mustbecarriedout.
TheKilcullenLocalAreaPlan2014–2020was
screenedforAppropriateAssessmentofNatura2000
sites.ItconcludedthattheKilcullenLAPwillnot
havesignificanteffectsontheNatura2000network
andaStage2AppropriateAssessmentwasnot
required.
1.4 Strategic Flood risk assessment (SFra)
Undersection28ofthePlanningandDevelopment
Act2000,asamended,theDoEHLGpublished
guidelinesentitled‘‘PlanningSystemsandFloodRisk
ManagementGuidelinesforPlanningAuthorities
(November,2009).Theseguidelinesrequireplanning
authoritiestointroducefloodriskassessmentasan
integralandleadingelementintheplanmaking
process.Thepreparationofthisplanwassubjectof
StrategicFloodRiskAssessment(SFRA).TheSFRA
hasrecommendedthatdevelopmentproposalsfora
numberofareaswithintheplanboundarybethe
subjectofsitespecificfloodriskassessment
appropriatetothenatureandscaleofthe
developmentbeingproposed(refertoMapNo.2)
Part a: Introduction and C
ontext
Part a: Introduction and Context 7
2.0 Kilcullen Historic Development and Urban Context
KilcullenderivesitsnamefromCillCuillinn,the
ChurchoftheHollyandwasanimportantcrossing
pointoftheriverLiffeyfromMedievaltimes.The
townofficiallyknown,mappedandrecordedas
KilcullenBridgedevelopedafter1319whenabridge
wasconstructedacrosstheRiverLiffey.Evenaslate
atthe18thcenturythenewsettlementwasmainlyon
theeasternbankoftheLiffey.Thetownfurther
expandedintheearly19thcenturyandin1837the
officialtownareacomprisedoneprincipalstreetof
112buildingschieflyonthewesternbankoftheLiffey.
Thetowndevelopedalongthestreetleadingtothe
bridgewhichexpandedtothenorthandsouthinthe
19thand20thCentury.
Thetownexpandedwestofthetowncentreinthe
latterpartofthe20thcenturywiththedevelopmentof
theMartSiteontheNewbridgeroadandtheLink
BusinessParkontheNaasroadnorthofthetown.
Today,Kilcullenisabusyanddiversetownwitha
mixofservicesincludingshops,restaurants,cafes,
barsandcommunityfacilities.Themostrecent
residentialdevelopmentsinthetownhavebeen
developedtothesouth-westofthetownin
Castlemartinadjacenttheschoolsandeastofthetown
atRiversideManorandHillcrest.TheM9Motorway
actsasanaturalbarriertoexpansiontothewestofthe
townandCastlemartinDemesnewillconstrain
developmenttothenorthwest.KilcullenBusiness
Campuswasdevelopedsouthofthetowncentreinthe
earlypartofthelastdecadewhiletheLinkBusiness
Parkwasdevelopedtothenorthofthetown.Both
businessparksarenotoperatingatfullcapacity.
Figure 1: Kilcullen Strategic Context
The Curragh
Rice Course
4.8Ha
Legend :
Railway
Regional Roads
M7 / M9
Heritage site
Zoned Area
Rivers / Canals / Lakes
Built Footprint
Open Space / Stud Farms
National Roads (N78)
Protected Areas
// Kilcullen Local Area Plan8
Kilcullen
Thereareanumberofnaturalandman-made
constraintswhichhaveinfluencedthehistoric
developmentofthetown.TheseincludetheRiverLiffey
flowingsoutheasttonorthwestofthetownand
CastlemartinDemesneandtheM9tothewestofthe
town.Beyondtheimmediateareaswithinthetown
boundaryliesDunAilinnetothesouth,anancient
ceremonialsiteonthehillofKnockaulin,
Brannockstowntotheeast,AthgarvanandtheCurragh
tothewestandNaastothenorth.Theplaniscognisant
ofthelocalcontextandenvironmentallandscapeand
topographyinwhichthetownislocated.
2.1 Kilcullen in a National Context
TheNationalSpatialStrategy(NSS)waspublishedin
December2002andoutlinesa20-yearplanning
frameworkforIrelanddesignedtoachieveabetter
balanceofsocial,economic,physicaldevelopmentand
populationgrowthbetweencentres.UndertheNSS,
thetownsofNaas/Newbridge/Kilcullenare
categorisedasaPrimaryDevelopmentCentre.The
Strategystipulatesthatthesecentresneedtoaimata
populationlevelthatsupportsself-sustaininggrowth,
butwhichdoesnotunderminethepromotionof
criticalmassinotherregions.PrimaryDevelopment
Centresmusttakeaccountofwiderconsiderations,
forexample,theirrelationshipwithDublin.The
strategyalsoreferstoKilcullen’slocationona
nationaltransportcorridor,theM9Motorway.
2.2 Kilcullen in a regional Context
TheRegionalPlanningGuidelinesfortheGreater
DublinArea2010–2022(RPGs)setouttheplanned
directionforgrowthwithintheGreaterDublinArea
upto2022bygivingregionaleffecttonational
planningpolicyundertheNationalSpatialStrategy
(NSS).KilcullenislocatedintheMid-EastRegionand
isdesignatedintheRPGsasbeingaModerate
SustainableGrowthTown.
ThesettlementstrategyoftheKildareCounty
DevelopmentPlan2011–2017isconsistentwiththe
RPGsinitsdesignationofKilcullenasaModerate
SustainableGrowthtown.Kilcullen’sroleisto
developinaselfsufficientmannerreducing
commutinglevelsandensuringsustainablelevelsof
housinggrowth,providingafullrangeoflocal
servicesadequatetomeetlocalneedsatdistrictlevel
andforsurroundingruralareas.
Part a: Introduction and C
ontext
Part a: Introduction and Context 9
Figure 2: Kilcullen in the context of the Greater Dublin Area
// Kilcullen Local Area Plan10
2.2.1 Retail Planning Guidelines
TheRetailPlanningGuidelinesforPlanning
AuthoritieswerepublishedbytheDepartmentofthe
Environment,HeritageandLocalGovernmentin
December2000andupdatedinJanuary2005and
againinApril2012.TheRetailPlanningGuidelines
provideacomprehensiveframeworktoguidelocal
authoritiesbothinthepreparationofdevelopment
plansandtheassessmentofapplicationsforplanning
permissionsandtoassistretailersanddevelopersin
formulatingdevelopmentproposals.
2.2.2 Retail Strategy for Greater Dublin Area
2008–2016
ThemainaimoftheRetailStrategyfortheGreater
DublinAreaistoinformthestatutoryplanning
processandtoensurethatadequateprovisionismade
forretaildevelopment.Thestrategyprovides
indicativeadviceonthescopeandneedforretailfloor
spaceandhow,inaccordancewithsustainable
planningitshouldbeallocated.TheRetailStrategy
forCountyKildareissetwithinthecontextofthe
RetailStrategyfortheGreaterDublinArea.
KilcullenisidentifiedasaHinterlandareaTier2
Level3SubCountyTownCentrealongwithSallins
andMonasterevin.TheCDPdetailsthattheretail
potentialofKilculleniscloselylinkedwithitsrole
withintheCounty’sdesignatedPrimaryand
SecondaryDynamicClustersanditsproximitytothe
higherordercentresofNaas,NewbridgeandKildare
Townrespectively.Itsproximitytoothercentreshas
detractedfromitspotentialtodevelopintoamoreself
sustainingTier2Level3TownCentreintheCounty
RetailHierarchy.Inaddition,thePlanalsonotesthat
thepopulationofthetownhasincreasedbutretail
servicesfloorspacehasnotkeptpacewiththeneeds
ofthetownanditscatchmentarea.Itisanobjective
oftheCDPthatthispositionisaddressedoverthe
periodofthePlanandbeyond.TheKilcullenLocal
AreaPlanprovidestheframeworktoaddressthis
issue.
2.3 Kilcullen in a County Context
TheCountyDevelopmentPlansetsouttheoverall
strategyfortheproperplanningandsustainable
developmentofCountyKildareovertheperiod
2011–2017.ThePlanhasacriticalroletoplayin
ensuringthattheneedsoffuturepopulationgrowth
areplannedfor.TheCDPaimstodirectpopulation
growthintotheMetropolitanurbanareasofthe
countybutalsointokeytownsandvillagesinthe
hinterlandareaincludingNaas,Newbridge,Athy,
Kildare,MonasterevinandKilcullen.Significantnew
economicdevelopmentispromotedwithindefined
economicclusterssuchasHinterlandtowns
mentionedabove.TheCDPalsoemphasisestheneed
toprotectthebuiltheritage,uniquelandscape,
naturalheritageandbiodiversityofthecountyfor
theirintrinsicvalueandasresourcesforthetourist
economyofthefuture.
ThedesignationofKilcullenasaModerate
SustainableGrowthTownisreinforcedintheCDP
settlementstrategywiththetownbeingtargetedfor
consolidatedgrowth.
3.0 TownProfile
Kilcullentownisprimarilyaservicecentreforeast
andsouthKildare.Since2002,Kilcullenhas
experiencedasignificantincreaseinpopulation.The
majorityofdevelopmenthasbeenresidentialin
natureoccurringtothesouthwestandnorthofthe
towncentreandcomprisingprivatehousingestates
withsomeapartmentdevelopment.Demandfor
residentialunitswaslargelyattributedtoits
proximitytolargetownslikeNaasandNewbridge
andtheM9,togetherwiththeheritageandamenities
qualitiesofthetownanditsenvirons.
Part a: Introduction and C
ontext
Part a: Introduction and Context 11
3.1 Population
ThepopulationofKilcullenisrecordedintheCSO
CensusofPopulation(2011)as3,473persons,an
increaseofover16%onthe2,985personsrecordedin
the2006CensusofPopulation.Thepopulationof
Kilcullendeclinedverymarginallybetween1981and
2002howeveritexperiencedasignificantincrease
between2002and2006whenthepopulationdoubled
inashortperiod.Thishighlightsthelevelof
developmentunderconstructioninthetownatthe
time.ThepopulationofKilcullenrepresents1.6%of
thecountypopulationof210,312persons.(CSO2011).It
shouldbenotedthatlimiteddevelopmenthastaken
placeinKilcullensincethecensusundertakenin2006.
Figure 3: Kilcullen Population Growth
0
2,000
1,500
1,000
500
2,500
3,000
3,500
4,000
Census Year
Popu
latio
n
1981 1986 1991 1996 2002 2006 2011
Source: CSO Small Area Population Statistics
Table 1: Kilcullen Population and Rate of Change
Census Population Percentage Growth
1981 1537 3%
1986 1,715 2.5%
1991 1,664 -1%
1996 1,604 -1%
2002 1,483 -7.5%
2006 2,985 101%
2011 3,473 16%
Source: Census of population
// Kilcullen Local Area Plan12
3.2 HouseholdSizeandProfile
1,242householdswererecordedinthe2011Censusin
Kilcullen.Thetown’saveragehouseholdsizeof2.83
personsishigherthanthenationalaverageof2.73
persons.Abreakdownofthefamilyunitsizeshows
Kilcullenispredominantlymadeupoftwoandfour
personfamilies.Thesefiguresaregreaterthanthe
nationalaveragesuggestingalargenumberofyoung
familiesresideinthetown.
Table 2:HouseholdSizeandProfile
Family unit size 2 3 4 5 6+ Total
Total No. of Households 387 214 250 75 39 965
% of Total Households Kilcullen 40% 22% 25% 8% 4% 100%
National Average (%) 35% 24% 22% 13% 7% 100%
Source 2011 Census of Population
Figure 4:KilcullenHouseholdprofile
0%
5%
25%
20%
15%
10%
30%
35%
40%
45%
Kilcullen
Household Size
% o
f Tot
al H
ouse
hold
s
National Average
2 3 4 5 6+
Source: Census 2011
Part a: Introduction and C
ontext
Part a: Introduction and Context 13
3.3 AgeprofileofKilcullen
Kilcullentraditionallyhasaveryyoungpopulation.
The2002censusshowedthat38%ofthetown’s
populationwasagedbetween20and44yearsofage.
The2006censusindicatedthatalmost45%ofthe
town’spopulationwasagedbetween20and44years
visavis40%forthestateasawhole.The2011census
revealedasimilartrendwith39%ofthepopulationin
the25–44bracketcomparedtothe32%averagefor
thestate.
Table 3:KilcullenAgeProfile
age bracket Population % of total population National average 2011 %
0–14 946 27% 21%
15–24 332 10% 12%
25–44 1,363 39% 32%
45–64 566 16% 23%
65+ 266 8% 12%
Total 3,473 100% 100%
Source Census 2011
Figure 5:KilcullenAgeProfile
0%
5%
10%
15%
20%
25%
30%
45%
40%
35%
0-14
Kilcullen
15-24 25-44 45-64 65+
Age Categories
% o
f Tot
al P
opul
atio
n
National Average
Source: Census 2011
// Kilcullen Local Area Plan14
Thequantumoflandrequiredtomeettheunittarget
of709unitswillbedependentonthelocationand
densityofdevelopment.Thelocationandnatureof
differentlandusezoningswillallowfordifferent
residentialdensities.Forinstanceanew
neighbourhoodzoningonacentralbrownfieldsite
willallowforhigherdensitydevelopment(e.g.30per
ha)comparedtoanedgeoftownsitewithlower
densitystandards(e.g.25unitsperha).
Table5setsoutthequantumoflandsrequiredto
meetthe709unittargetdependingontheaverage
densitiesused.ThisPlanretainssignificantareasof
landspreviouslyzonedforresidentialpurposesinthe
2008localareaplan.Allresidentiallandspreviously
zonednotrequiredtofulfilthetargetof709have
beenre-zonedtomoreappropriatelandusesinorder
tocomplywiththecorestrategyoftheCDP.
3.4 ResidentialProfile&NewUnitTarget
ResidentialprovisioninKilcullenisdistributed
evenlybetweennorthandsouthofthetowncentre.
Recentresidentialdevelopmenthasoccurredtothe
southwestandeastofthetown,namelyCastlemartin
andRiversideManor.Thetypeofresidential
developmentvariesfromdetachedhousesonthe
outskirtsofthetown,toribbondevelopmentalong
theapproachroads,tohousingestatesofvarying
designsanddensitiesaroundthetowncentre.
Inlinewiththetown’spositionintheCounty
SettlementStrategyandtheRegionalPlanning
Guidelines,theresidentialunitallocationfor
KilcullenoverthelifetimeoftheCDP2011–2017is
470units(Table4below).Kilcullenisprojectedto
accommodate1.7%oftheresidentialunitgrowth
allocatedintheRPGsintheperiod2016–2022.The
RPGshaveallocatedanannualtargetof3,122units
forthecountyovertheperiod2016–2022,therefore
1.7%equatestoanadditional53unitsperyearwhich
issubsequentlyaddedtothe2017housingunittarget.
The2020HousingUnittargetisbasedonthe
provisionof629residentialunitsovertheperiod
2006–2017.Atotalof56residentialunitshavebeen
constructedovertheperiod2006–2011resultingina
targetof573unitsovertheremainingperiod2014–
2020.Asadvocatedinthe‘DevelopmentPlan
GuidelinesforPlanningAuthorities’issuedbythe
DepartmentoftheEnvironmentHeritageandLocal
Government(2007),overzoningofuptoonehalfis
acceptabletoensuringthathousingtargetsaremet.
Allowinganadditional50%overzoningtheLAP
targetincreasesto860units.Regardmustalsobehad
tothe151un-builtunitswithvalidpermission
currentlyinexistence.Takingthesepermissionsaway
fromtheLAPtargetleavesaremainingtargetof709
unitsfortheplanperiod.
Table 4: Kilcullen Housing Unit Target 2014–2020
TIMEFraME UNITTARGET CALCULATIONDETAILS
2006–2017 470 = Circa 1.7% of the overall county unit target for 2006–2017 ( being 27,982 units)
2017–2020 159 = 1.7 % of the annual county target for the period of 2016–2022 (being 1.7% of 3,122 units = 159 (53 * 3 years)
2006–2020 629 = The 2006–2017 unit target + the 2017–2020 target
2014- 2020 573 = 629 (2006–2020 target) – 56 units (total units built from 2006–2012)
2014–2020 860 Additional 50% over-provision (573 + 287= 860)
2014- 2020 709 = 860 units (2013–2019 target) – 151 units with valid Planning Permissions
Part a: Introduction and C
ontext
Part a: Introduction and Context 15
Table 5: Land Requirements to meet the unit target
2014–2020UnitTarget 25 units per ha 35 units per ha 45 units per ha
709 28ha 20ha 16ha
3.5 Economy
The2006and2011censusresultsindicatedthatthere
wasa15%decreaseinthenumberofpeopleworking
inthetownoverthatfiveyearperiod.Thetotallabour
forceaged15yearsandoverinKilcullenaccordingto
theCensusin2011was2,527.Ofthisfigure,some
1,392personsconstitutedthelabourforce,the
remainderbeingstudents,retired,thoselookingafter
afamilymember/homeetc.Theresultsindicatethat
justunderhalfofthepopulation,40%areindicatedto
beatwork,withjust10%unemployed.Thisindicates
thatthelevelofunemploymenthasdoubledsince
2006whenthenumberofpersonsoutofworkwas
just5%.Table6illustratesthelabourforce
breakdownforKilcullen.Itshouldbenotedthata
largeproportionofthetown’spopulationisof
workingage.ItisevidentfromTable8thatalarge
proportionoftheworkforceinKilcullenisemployed
inhighskilledjobsinCommerceandTradeand
ProfessionalServices.
Table 6: Kilcullen Labour Force Breakdown
Total Labour Force 2,527 (100%)
At work 1,392 (55%)
Lookingforfirstregularjob 16 (1%)
Unemployed 307 (12%)
Student 202 (8%)
Looking after home/family 266 (11%
Retired 235 (9%)
Unable to work due to permanent sickness / disability 82 (3%)
Other 27 (1%)
Source Census 2011
Table 7: Kilcullen Employment Break down
Employment Type 2011 No 2011 % National Average %
Agriculture, Forestry and Fishing 42 1.2% 5%
Building and Construction 84 2.4% 5%
Manufacturing 198 5.7% 12%
Commerce and Trade 398 11.4% 25%
Transport and Communications 117 3.3% 8%
Public Administration 105 3% 6%
Professional Services 275 7.9% 24%
Other 173 4.9% 15%
Source: Census 2011
// Kilcullen Local Area Plan16
3.6 Town Centre
Kilcullen’stowncentrecomprisesareasnorthand
southoftheRiverLiffey.Thetown’sstreetpattern
reflectsitshistoricaldevelopment.TheM9actsasa
naturalbarriertoexpansiontothewestofthetown
andCastlemartinDemesneconstrainsdevelopmentto
thenorthwest.
Thetowncentrehasexperiencedverylittle
developmentoverrecentyears.TheMarketSquare
developmentisthemostnotableadditiontothetown
centreandwasconstructedpriortotheadoptionof
the2008LAP.Itcomprisesamixedusedevelopment
ofapartments,officesandrestaurantandretailunits
onthegroundfloor.Thereisahighlevelofvacancyin
thetown.Howeverthisismoreconcentratedinthe
northernareaofthetown.Therearefurther
underutilisedbacklandsitescapableofre-
developmentoffMainStreetincludingthemartsite
ontheNewbridgeroad.
3.7 Transportation
KilcullenislocatedontheRiverLiffey,38kmfrom
Dublin,10kmfromNaasand6kmfromNewbridge.
Trafficcongestionhadbeenamajorproblemin
Kilcullenuntilthebypass(M9)relieveditslightly.
Trafficlevelsthroughthetowncentrearestill
increasingandthisisanissuetheCouncilwillseekto
address.Theprovisionofanadditionalcrossingofthe
RiverLiffeyremainsanobjectiveofthisPlanwhich
seekstoalleviateincreasingtrafficlevelsand
facilitateserviceexpansionofthetown.Giventhe
downturnintheeconomy,itislikelythatthiswill
remainalongertermobjective.Intermsofpublic
transport,arangeofpublicandprivatebusroutes
serviceKilcullen.BothBusEireannandJJ
Kavanaghsoperateanumberofexpressservicesto
DublinandAthydaily.Atpresentthemainbusstops
areattheHideoutpublichouseandoutsidetheCross
andPassionConventinthetowncentre.
3.8 Environment and recreation
TheRiverLiffeyisoneofthetown’sprime
recreationalandenvironmentalassets.The
maintenanceoftheenvironmentalqualityoftheriver
andthedevelopmentofamenityfacilitiesforwalking
andcyclingisimportant.
3.9 Education
Kilcullenhasoneprimaryschoolandonepost-
primaryschoolwhichprovidetheeducational
facilitiesforthetownandthesurroundinghinterland.
Table8indicatesthepupilno.sforbothschools.
Part a: Introduction and C
ontext
Part a: Introduction and Context 17
Table 8:ProfileofexistingschoolsinKilcullen
NameEnrolment No.
2012/13
Primary St Brigids 509
Post-primary Cross and Passion College
685
Source: DoES.
TheCrossandPassionpostprimaryschoolwas
grantedplanningpermissionforanumberofpre-
fabricatedclassroomsinrecentyearsandhasbeen
approvedfundingfromtheDepartmentofEducation
andSkillsforanextensiontotheschool.
4.0 Key challenges facing the town
TheKilcullenLocalAreaPlanhasacriticalroleto
playinensuringthattheneedsofthefuture
populationisplannedfor.Howeverthereareanumber
ofkeychallengesthatneedtobeaddressedincluding:
(i) Ensuringthattheplanningframeworkforthe
townisestablishedsothatKilcullencan
accommodateitspopulationtargetinorderfor
thetowntobeadriverofbalanceddevelopment
withinthecountyandtheregion.
(ii) Protectingthebuiltandnaturalheritageand
biodiversityofthetownfortheirintrinsicvalue
andasresourcesforthepopulationofthetown
andthetouristeconomyofthefuture.
(iii) PromotingKilcullenasaselfsufficienttownby
encouragingexistingbusinessesinthetown
centrewhilesupportingappropriatenew
development.
(iv) Ensuringtheavailabilityoflocalemployment
opportunities,communityandcommercial
servicesandrecreationandamenityfacilitiesfor
theexistingandfuturepopulationofKilcullen.
(v) Facilitatingtheupgradingofinfrastructurein
theareatherebyfacilitatingemploymentand
residentialdevelopment.
(vi) Facilitatingthedevelopmentofeducational/
communityfacilitiesforanexpanding
population.
(vii) Supportingthere-useoflandandbuildings,
particularlythroughbacklanddevelopmentand
regenerationoftowncentresites.
(viii)Promotingasustainabletransportsystemanda
networkoflinkagesincludingtheprovisionof
roads,footpaths,cyclelanes,publictransport
infrastructureandpromotinginterconnectivity
betweenmodesthroughtheimplementationof
theprinciplessetoutintheDesignManualfor
UrbanRoadsandStreets(2013).
(ix) Minimisingtheimpactoffuturedevelopmenton
thelocalenvironmentbyensuringthatall
developmentembracesagreeninfrastructure
strategy.
5.0 Future Development Strategy
ThestrategyforthefuturedevelopmentofKilcullenis
basedontheprinciplesestablishedinthepreviousLAP
in2008andtheframeworkprovidedbytheRegional
PlanningGuidelines2010–2022andtheKildareCounty
DevelopmentPlan2011–2017.Itprovidesablueprintfor
thedevelopmentofKilcullenTownfortheperiod
2014–2020,settingoutavisionforthearea,specifying
thetype,amountandqualityofdevelopmentneededto
achievethatvisionwhileseekingtoprotectand
enhancetheenvironmentandamenities.
Thevisionforthetownistobuildonthestrengthsof
Kilcullenandtoprovideafocusedapproachto
planningforfuturedevelopmentinacoherent
sustainablefashion.ItisenvisagedthatKilcullenwill
continuetogrowovertheshorttomediumtermto
achieveacriticalmasswhichwillsupport
competitiveness,sustainabilityandcreate
opportunitiesforlocaleconomicdevelopment.The
developmentofthetownwillbecomplementedbya
rangeofresidential,employment,recreational,
community,retailandeducationalfacilities
appropriateforatownofitssize.
// Kilcullen Local Area Plan18
The strategic direction for the future development of Kilcullen will focus on:
1. EconomicDevelopment
ThisLAPseekstoconsolidateandenhanceKilcullen’s
rolewhichistosupporttheprimaryeconomicgrowth
clusterofNaasandNewbridge.Keytothiswillbe
supportingtheexistingindustrialandmanufacturing
enterprisesinthetownandfacilitatingopportunities
forexpansionandincreasedemployment.
2. TownCentreConsolidation
Itiscriticalthattheprimacyofthetowncentreasthe
commercialheartofKilcullenismaintained.
Developmentwhichunderminesthevitalityand
viabilityofthetowncentrewillnotbepermitted.
Protectingandprovidingresidentialaccommodation
withinthetowncentrewillbepromoted.
3. PlanningforResidentialExpansion
ThePlanensuresthesupplyofsuitablyzonedlandto
accommodatethefuturegrowthofKilculleninline
withitsdesignationintheRegionalPlanning
GuidelinesasaModerateSustainableGrowthTown.
Muchofthelandzonedforresidentialpurposesunder
the2008LAPremainszonedinthisPlan.ThePlan
alsosupportstheprovisionofservicesandamenities
forthetown’sresidents.
4. RetailDevelopment
Kilcullenhasalimitedretailandserviceoffer.Itis
thereforecriticalthattheretailbaseofthetown
expandswithintheidentifiedtowncentretobecome
moreselfsufficient.Designbriefsforkeysiteswithin
thetownareoutlined.Itisimportantthatnewretail
andmixedusedevelopmentscomplywiththegeneral
principlesofthedesignbriefsinordertopreservethe
townasathrivingcommercialareasetwithinahigh
qualitybuiltenvironment.
5. ProtectionoftheNaturalandBuiltHeritage
Protectionandenhancementoftheunique
architecturalandarchaeologicalheritageofthetown
isparamount.Theretentionofvernacularbuildings
ontheMainStreetwillensurethecharacterofthe
townremainsintact.
Part B: Policies and ObjectivesPart B
Policies and Objectives
// Kilcullen Local Area Plan20
6.0 Introduction
Thissectionoutlinesspecificpoliciesandobjectives
oftheCountyCouncilwithregardtothedevelopment
oflandwithintheboundaryoftheLocalAreaPlan.
TheoverarchingpoliciesandobjectivesoftheCounty
DevelopmentPlan(orasmaybeamended)willalso
applytodevelopmentwithintheLocalAreaPlan
boundary.
SpecificpoliciesandobjectivesapplicabletoKilcullen
aresetoutinthispartofthePlaninordertofacilitate
integratedlandusedevelopmentinamannerthatwill
promotetheproperplanningandsustainable
developmentofthetown.Keyissuesincludehousing
provision,economicdevelopment,towncentre
development,movementandtransport,infrastructure
provision,communityandculturaldevelopments
togetherwithnaturalandbuiltheritage.
(i) CompliancewiththeCoreStrategytoachieve
SustainableGrowth
ToensurethatthefuturedevelopmentofKilcullenis
inaccordancewiththeCoreStrategyoftheKildare
CDP2011–2017,theplanprovidesforthezoningof
landsforresidentialandemploymentuses.
Aframeworkisalsoestablishedforthetown’s
sustainablegrowththroughtheincorporationof
policiesinrelationtodensity,housingmix,
communitydevelopmentandnewhousingprovision.
(ii) Enterprise,IndustryandEconomic
Development
Kilcullenhasalimitedamountofenterpriseand
employmentopportunitiestoservethelocal
population.AsaModerateSustainableGrowthTown,
Kilcullenmustsupportandenhanceenterpriseand
industrytomeetlocalneedsatdistrictlevelandfor
surroundingruralareas.ThisLAPseekstoencourage
localemploymentopportunities,identifypotentialfor
inwardinvestmentandenhancethetourismeconomy.
Toachievethis,theplansetsoutpoliciesand
objectivesthatbuildonthetown’sretailandheritage
strengthstocreateauniquetourismdestination.
(iii) RetailandTownCentreUses
Kilcullenhaswitnessedsmallscalebutimportant
retaildevelopmentinrecentyears.Itsproximityto
higherordercentresofNaasandNewbridgehas
hindereditspotentialtodevelopintoamoreself
sustainingtownintermsofretailing.Itisrecognised
thatthereisaneedtocarefullyplanandmanage
futureretailandnon-retailservicesinthetownto
furtherstrengthentheretailoffertoprotectand
enhancethetown’suniquecharacterwhilepromoting
economicvitalityandviability.TheLAPisinformed
bytheDraftKildareCountyRetailStrategy2008–
2016whichwaspublishedin2010.
Opportunitiesexistforthere-useandregenerationof
landandbuildings.Encouraginghighqualitydesign
andfacilitatinganappropriatemixofuseswillalso
Part B: Policies and Objectives
Part B: Policies and Objectives 21
helptoensurethatthetowncentreprovidesasuitable
focusforcreatingsustainablecommunities.The
protectionofbuiltheritageandtheintegrationand
linkageofnewretaildevelopmentswiththeexisting
urbanform/layoutarealsokeyobjectives.
(iv) UrbanDesignandTownCentreDevelopment
Kilcullen’stownscapequalitiesarederivedfromits
historicurbanstructure.Anurbandesignanalysisof
theexistingtownscapeissetoutinthePlantogether
withpoliciesandobjectivesspecifictothefuture
developmentofthetown.
Designbriefshavebeenpreparedforthefollowing
areas:
•ThemartandadjoininglandsontheNewbridgeRoad.
•LandsbetweenRiversideManorandtheMainStreet.
Thesedesignbriefshavebeenpreparedtoassistinthe
planningprocessbysettingoutbroaddesign
parametersforthefuturedevelopmentoftheseareas.
Eachbriefisindicativeonly.
(v) MovementandTransport
Theimprovementoftransportationinfrastructurein
Kilcullenisakeyrequirementforthesustainable
developmentofthetown.Integratedlanduseand
transportationplanningisrequiredtofurthersupport
andencouragemoresustainablemodesoftravel.The
plansetsspecificpoliciesforlocalimprovementsin
andaroundthetowncentreandobjectivestosecure
routesforlongtermroadsinfrastructure.
(vi) Water,DrainageandEnvironmentalServices
Theadequacyofwater,drainageandenvironmental
servicesisnecessarytofacilitatethesustainable
developmentofthetown.Theseissuesareaddressed
invariouspoliciesandobjectivestoprovidefor
sufficientwater,wastewaterandwaterdrainage
infrastructuretoservicethepredictedrequirements
ofthetownovertheplanperiodandbeyond.While
capacityissuesattheOsberstownWastewater
TreatmentPlantareoutsidethescopeofthisLAP,
policiesandobjectivesinrelationtotheupgradeof
thelocalfoulnetworkareincluded.Relevant
legislativeobligationsinrelationtoenvironmental
requirementsarealsosetoutincludingpoliciesand
objectivesrelatingtofloodrisk.
(vii) EnergyandCommunications
Thedevelopmentofamoresustainableapproachto
energyuse,powergenerationandenergyefficiencyin
allsectorsisvitaltoreducegreenhousegasemissions.
Thisincludesfocusingonimprovingenergy
efficiency.
(viii)Educational,CommunityandCultural
Theprovisionofeducationandcommunityfacilities
tosupporttheprojectedpopulationlevelsofKilcullen
isrecognised.Policiesandobjectivesarealsosetout
tofacilitatetheprovisionofadditionalcommunity
facilitiesinthetown.
(ix) ArchitecturalandArchaeologicalHeritage
Theprotectionandenhancementofthebuiltheritage
andstreetscapeinKilcullenisoneofthecore
objectivesofthisplan.Policiesandobjectivesseekto
protect,preserveandenhancethetown’sarchaeology,
builtheritageandtownscapequalities.
(x) NaturalHeritageandBiodiversity
Theimportanceofgreeninfrastructureisrecognised
andisbasedondetailedhabitatmappingofthearea.
Theplanmapsanddescribesgreeninfrastructurein
Kilcullenincludingrelevantpoliciesforitsprotection
andenhancement.
(xi) Recreation,AmenityandOpenSpace
Theimportanceofexistingamenitiesinthetown
suchastheRiverLiffey,theValleycommunitypark,
andtheKilcullenCommunityCentrearerecognised.
Theplanoutlinesclearobjectivestoexpandand
enhancetheprovisionofthesekeyassets.Routesare
alsoidentifiedforrecreationandtourismuseandto
increasepermeabilitywithinandaroundthetown.
// Kilcullen Local Area Plan22
6.1 Compliance with the Core Strategy
ThelevelofresidentialzonedlandsintheKilcullen
LocalAreaPlan2008exceededthedemandsoverthe
lifeofthatplan.Residentiallandshavebeenzonedfor
theperiodofthisPlanincompliancewiththeCore
StrategyoftheKildareCDP2011–2017(CDP).Inthis
regard,12hahavebeenzonedfromresidentialto
agriculturalandopenspaceandamenityuses.
6.1.1 Housing
Thenumberofhouseholdsinthetownhasincreased
from1,040in2006to1,242in2011(Census2011).The
mostrecentdevelopmenthastakenplacesouthwest
oftheRiverLiffey,eastoftheM9Motorway
approximately1.2kmfromthetowncentrein
Castlemartin.Thetypeandscaleofresidential
developmentinKilcullenispredominantlysingle
storeyandtwostorey,terraced,semi-detachedand
detachedhousing.Inmorerecentyearsapartment
schemeshavebeendevelopedinthetowncentreand
landsadjacenttothetowncentre.
6.1.2 New Housing Units Target
AsoutlinedinPartA(Section3.4)atotalof709new
residentialunitsarerequiredinKilcullenduringthe
period2014–2020.Inlightofthistarget,theCounty
SettlementStrategyrecognisesthatthe2008
KilcullenLAPsignificantlyover-zonedlandsfor
residentialuse.Thisplanhasrezonedsomeofthese
residentiallandsbasedontheprinciplesofthe
sequentialapproach.2
2 ThesequentialapproachassetoutintheDepartment’s‘DevelopmentPlanGuidelines’(2007)specifiesthatzoningshallextendoutwardsfromthecentreofanurbanarea,withundevelopedlandsclosesttothecoreandonpublictransportroutesbeinggivenpreference,encouraginginfillopportunities,andthatareastobezonedshallbecontiguoustoexistingzoneddevelopmentlands.
Followingareviewof:
•buildingcompletionssincethepreviousplan;
•currentvalidplanningpermissionsand
•uncommittedresidentialzonedlandssince2008;
Landsinexcessofthoserequiredtocomplywiththe
corestrategyhavebeenrezonedtoalternativeuses.
Residentialsiteshavebeenidentifiedbasedontheir
committedstatusandthelocationofthe
uncommittedlandsinaccordancewiththeprinciples
ofthesequentialapproachi.e.developingfromthe
towncentreouttowardstheedge.
Table 9: Kilcullen Housing Unit Projection
2006 Population 2,985
2011 Census population 3,473
2006–2020 residential unit target 629
Residential Unit completions since 2006
56
Valid Residential grants of permission 151
Unit capacity of uncommitted zoned land Kilcullen LAP 2008 LAP
826
New zoned land capacity 703
6.1.3 Housing Location and Density
Table10identifiesthelocation,sitesizeandunit
potentialforeachofthesitesdesignatedfornew
residentialexpansiontolargelymeettheremaining
unittargetof709unitsovertheplanperiod.Thesites
identified,forthemostpart,arelocatedinthetown
centreandontheedgeoftheestablishedurbanarea
ofthetown.Thesitesintotalprovidec35haofland
fornewresidentialdevelopmentwiththepotentialto
deliver703units.
Part B: Policies and Objectives
Part B: Policies and Objectives 23
Location Zoning Site area (ha)UnitsPermitted(p)orEstimate
(based on 15–30 units/ha)
1 C Logstown road north C 1.5 38
2 C Logstown road south C 5.5 110
3 C Logstown C 2.5 50
4 C Market Square road C 4.8 110 (p)
5 C Main Street C 1.3 33
6 A Newbridge road A 6.6 80
7 A Naas road A 0.82 41(p)
8 Naas road3 C 3 45
9 Naas road4 C 3.4 51
10 C Nicholastown C 4.4 88
11 New Abbey Road A 1.9 57
Total 35.42 703
3 Note:Giventhegradientofsiteandlocationonedgeofsettlement,lowerdensitiesareapplied.Proposeddwellingsshallhaveregardtopatternofdevelopmentintheimmediatevicinityandgradientofsite.Inthisregarddwellingsshallberestrictedtosinglestoreydwellingsonly.
4 Asperfootnote1above.
Atotalof11siteshavebeenzonedfornewresidential
developmentwithinthelifetimeofthisplan.
Inadditiontotheselands,theexistingresidential/
infillandtowncentrezoningsprovidesopportunities
forawidenumberofusesincludingresidential
developmentasappropriate.Generallyhigher
densitieswillbeconsideredintowncentrelocations
withmediumtolowerdensitiesbeingconsideredat
outersuburbanandgreenfieldsites.
Table 11: Indicative Residential Densities
Location for New Residential Development General Density Parameters
TownCentreandBrownfieldsites Site specific Higher densities generally promoted e.g. 50 units per ha
At strategic locations including public transport nodes and town centre area.
50 units per ha
InnerSuburban/Infill Site specific
OuterSuburban/Greenfield,Generally new residential zoning areas.
30–50 units per ha
Outer Edge of Urban-Rural transition 20–35 units per ha
Source: CDP 2011–2017
Source: DoEHLG Guidelines for Planning Authorities on ‘Sustainable Residential Development in Urban Areas (2009).
Table 10:SitesidentifiedforResidentialDevelopment
// Kilcullen Local Area Plan24
ItisthepolicyoftheCouncil:
HP1: TofacilitatedevelopmentinKilculleninline
withitsdesignationasaModerateSustainable
GrowthTownintheRPGsandtheCDPandto
ensurethatdevelopmentreflectsthecharacter
oftheexistingandhistorictownintermsof
structure,pattern,scale,designandmaterials
withadequateprovisionofopenspace.
HP2: Toencourageappropriatedensitiesfornew
housingdevelopmentindifferentlocationsin
thetownwhilerecognisingtheneedto
protectexistingresidentialcommunitiesand
theestablishedcharacterofthetownand
surroundingarea.
HP3: Torefusepermissionforresidential
developmentonzonedopengreenspacesand/or
onlandswhicharedesignatedaspublicspace.
HP4: Torequireapplicationsforresidential
development(over20units),todemonstrate
theprovisionofanappropriatemixof
dwellingtypeshavingregardtothefollowing:
•thenatureoftheexistinghousingstockandexistingsocialmixinthearea;
•thedesirabilityofprovidingformixedcommunities;
•provisionofarangeofhousetypesandtenures;
•theneedtoprovideachoiceofhousingsuitabletoallagegroupsandpersonsat
differentstagesofthelifecycleand
•theneedtocaterforspecialneedsgroups.
HP5: Torestrictapartmentdevelopmentsgenerally
totowncentrelocations.Onlyinexceptional
circumstanceswillapartmentsbeconsidered
outsidethetowncentre.Apartmentswillnot
bepermittedwherethereisanover
concentrationofthistypeofdevelopment.
Higherdensityschemeswillonlybe
consideredwheretheyexhibitahigh
architecturaldesignstandardcreatingan
attractiveandsustainablelivingenvironment.
HP6: Tofacilitateandco-operateintheprovisionof
communityservicesincluding,inparticular,
localservices,schools,crèchesandother
educationandchildcarefacilitiesintandem
andinthevicinityofallnewandexisting
residentialdevelopment
HP7: Tofacilitatetheprovisionofpurposebuilt
dwellingsforthosewithspecialneeds,
includingprovisionfortheneedsofthe
elderly,personswithphysicaldisabilitiesand
personswithlearningdisabilitiesandin
conjunctionwithothervoluntarybodiesand
theprivatesector.
HP8: Torequireapplicationsforresidential
developmentsover25units,todemonstrate
howtheproposedincreaseinpopulationwill
beaccommodatedintermsofeducation
provision.5
6.1.4 Housing in the Agricultural zone
Theprimaryaimfortheagriculturalzonein
Kilcullenistopreservetheexistingagriculturaluse
oftheareaszonedforthispurposeandtoprevent
urbangenerateddevelopmentwhichwouldinterfere
withtheoperationoffarming/bloodstockorrural
resourcebasedenterprise.
TheSustainableRuralHousing–Guidelinesfor
PlanningAuthorities(2005)setoutprinciples
regardingthesitinganddesignofnewdwellingsin
ruralareas,theprotectionofwaterquality,the
provisionofasafemeansofaccessandthe
conservationofsensitiveareas.Withinthe
agriculturalzoneinKilcullen,housingwillbe
confinedtopeoplewithagenuinehousingneedand
whocandemonstratethattheycomplywiththe
relevantcategoryoflocalneedoutlinedintheCounty
DevelopmentPlan2011–2017(orasmaybeamended).
5 GuidelinesfromtheDepartmentofEnvironment,HeritageandLocalGovernmentandDepartmentofEducationindicatethat12%and8.5%ofapopulationatanytimeisassumedtobeofprimaryandsecondarygoingagerespectively.
Part B: Policies and Objectives
Part B: Policies and Objectives 25
ItispolicyoftheCouncil:
HP9: Tostrictlymanagetheprovisionofoneoff
housinginlandszonedas‘I: Agricultural’ .
Limitedoneoffhousingwillbepermittedin
thiszonesubjecttocompliancewiththerural
housingpolicyassetoutintheKildareCounty
DevelopmentPlan2011–2017(orasamended).
Documentaryevidenceofcompliancewiththis
policymustbesubmittedaspartoftheplanning
application,includingaseparatestatementby
theapplicantontheneedtoresideinthearea.
HP10: Toensurethat,notwithstandingcompliance
withpolicyHP9,applicantscomplywithall
othernormalsitinganddesignconsiderations.
HP11: Toprotectthephysical,environmental,
naturalandheritageresourcesofthe
agriculturalzones.
HP12: Tofacilitateworkingfromhomesubjectto
relevantplanningcriteriaandtheprotection
oftheresidentialamenityofneighbouring
properties.
ItisanobjectiveoftheCouncil:
HPO1:TosecuretheimplementationoftheKildare
LocalAuthoritiesHousingStrategy2011–2017
oranysubsequentamendmenttoorreviewof
theStrategy.
HPO2:Topromoteahighstandardofarchitecturein
thedesignofnewhousingdevelopmentsand
toencourageavarietyofhousetypes,sizes
andtenuretocaterfortheneedsofthe
populationandfacilitatethecreationof
balancedintegratedcommunities.
6.2 EconomicDevelopment
Inordertomaintainavibrantandattractivetownanda
sustainablecommunity,oneofthekeyissuesforany
towniseconomicdevelopment.Employment
opportunitiesarevitalforatowntogrowandprosper
andinanincreasinglycompetitivemarketandchanging
economicclimate,itisimportantfortownstotake
advantageofanyuniqueassetorspecialistexpertise.
KilcullenisidentifiedintheCDPasforminga
supportingroletothePrimaryEconomicGrowth
ClusterofNaasandNewbridge.Thesecentresareto
developinamutuallydependentwaysothatthe
amenitiesandeconomiesofthewholeclusterare
greaterthanthesumoftheindividualparts.
6.2.1 ExistingEconomicProfileoftheTown
Ensuringtheviabilityofexistingemployersand
attractingnewemploymentopportunitiestoKilcullen
isvitalforthetowntogrowandfulfilitsroleaspartof
thePrimaryEconomicGrowthCluster.The2011
Censusnotedthatapproximately70%ofthepopulation
inKilcullenworkedoutsidethearea.Thedominant
categoriesofemploymentofthedaytimeworking
population(residentandnon-resident)ofKilcullenwere
professionalservicesfollowedbycommerceandtrade.
Kilcullenhasamixedvarietyofemploymenttypes
withinitsboundary.Therearesomesignificant
employersinthetownincludingMurphySurvey
SolutionsintheKilcullenBusinessCampusinthe
southofthetown,KaymedinKilcullenIndustrial
estateontheNaasroadandtheMartandschools
operatingofftheNewbridgeroad.TheMartoperates
// Kilcullen Local Area Plan26
onceaweekandbringsaninfluxofpeopleintothe
towncentreeveryWednesday.TheLinkBusiness
ParkontheNaasRoadisunderutilisedwith
approximately15unitsvacantinNovember2013.
6.2.2 Strategy for Economic Development,
Tourism and Employment
ThefocusonemploymentgenerationinKilcullenisto
buildonthepotentialroleofthetownasaplacetolive,
work,visitandenjoy.Keytotheeconomicdevelopment
ofKilcullenwillbeitsabilitytobuildonitsstrategic
locationofftheM9whichisanopportunitytosecure
significantfutureinvestmentwithinthetown.Ensuring
theviabilityofexistingemployersandattractingnew
employmentopportunitiestoKilcullenisvitalforthe
towntogrowandprosper.TheRiverLiffeywhichflows
throughthetownisalsoafeatureofthetownthatshould
beexploitedforitstourismandrecreationalpotential.
Thelongtermstrategyforthetowniscentredonthe
followingobjectives:
•Promotingtheuseanddevelopmentofemploymentlandstoensurethedeliveryofemployment
opportunitiesinappropriatelocationswithrespect
tostrategicaccessandresidentialareas;
•Consolidatingcommercialandretaildevelopmentintheexistingtowncentre;
•Encouragingtouristlinkageswithinthetownandtoencouragespinoffdevelopments;
•Creatingopportunitiesforcultural,socialandcommunitydevelopmentfacilitatingpassiveand
activeleisureactivitiesthatmaximisethepotential
oftheheritageandamenityfeatures;
•Encouragetheappropriateredevelopmentofthemartsiteandadjoininglandsthroughtheprovision
ofamixofemployment,residentialandcommunity
uses,highqualitypublicrealmandopenspacesand
abuiltenvironmentthatcomplementstheexisting
fabricofthetown.
6.2.3 FactorsinfluencingEmploymentCreation
Anumberofkeylandusefactorscaninfluencethe
futureeconomicpotentialofanarea.Theseinclude
theavailabilityofzonedland,availabilityof
infrastructureandqualityoflifeconsiderations
Availability of Zoned Land
ThisPlanidentifies24haoflandforTownCentreand
24haoflandsforLightIndustrial/Industrialand
Warehousingpurposes.TheCouncilwillensurethat
sufficientlandiszonedtoallowfortheprovisionofa
suitableemploymentmix.Whileemploymentcanbe
facilitatedintheoryonallzonedlands,thereisa
specificfocusonlandszonedTownCentreand
IndustrialandWarehousing.Nofurtherlandwas
zonedforemploymentpurposesinthisplangiventhe
availabilityofundevelopedlightindustrial/industrial
andwarehousinglandsinthetown.Anumberof
area’soflandzonedIndustrialandWarehousinghave
Part B: Policies and Objectives
Part B: Policies and Objectives 27
beenre-zonedgiventheirlocationontheperipheryof
thetownsurroundedbyagriculturallyzonedlandand
theavailabilityofmoreappropriatelylocatedlandsat
moreestablished,accessibleandsustainablelocations
inthetown.Appropriatelyzonedemploymentlands
aresituatedonthenorthernedgeandsouthernedges
ofthetownwithconvenientaccesstothetown
centre,residentialareasandtheM9.
Infrastructure
Adequateinfrastructureisessentialtofacilitatefuture
economicactivityinthetown.Thisincludeswater
services,effectiveroadandpublictransportnetworks,
energy,telecommunications,wastemanagement,
education,sportsandothercommunityfacilities.
KilcullenisservedbytheOsberstownWastewater
TreatmentPlantinNaas.Thisfacilityisnearing
capacityandwillbeupgradedaspartoftheUpper
LiffeyValleyRegionalSewerageScheme.Itisenvisaged
thattheupgradeupto130,000populationequivalent
(PE)willbecompletedinthesecondhalfof2016subject
toappropriateapprovalsandfundinginplace.
Quality of life
Qualityoflifeconsiderationsarekeycomponentsin
encouragingfutureeconomicdevelopment.Makinga
townattractivetobothfirmsandtheiremployeesisakey
factorinasuccessfuleconomicdevelopmentstrategy.
Specificactionstoimprovequalityoflifeinclude:
•Providinghighqualityresidentialdevelopmentswithsupportingsocialandcommunityfacilities;
•Ensuringavibranttowncentrewithahighqualitypublicrealm;
•Creatinganattractiveurbanenvironmenttoencouragethelabourforcetoresideinthetown;
•Ensuringtheappearanceofdevelopmentcomplementsexistingenvironmentsandisofthe
highestquality;
•Increasingandimprovingtherangeofrecreational,amenityandculturalfacilities.
ItisthepolicyoftheCouncil:
ED1: Topromoteenterprisecreationopportunities
andinitiatives,inlinewiththedesignationof
Kilcullenashavingasupportingroletothe
PrimaryEconomicGrowthTown/Clusterof
NaasandNewbridge.
ED2: Topromoteandfacilitatesynergybetween
heritage,retailandtourismdevelopmentsthat
enhancestheeconomicprofileofKilcullentown.
ED3: Toengagewithexistingemployersand
potentialnewemployersincreatingand
fosteringenterpriseandresearchand
developmentinthetown.
ED4: Tofacilitatethesustainabledevelopmentof
commercial,office,incubatorunits,light
industrialandwarehousingdevelopmenton
appropriatelyzonedandservicedlandsin
co-operationwithrelevantdevelopment
agencies.
ED5: TopromotetheLinkBusinessPark(Hlands)
ontheNaasroadandtheKilcullenBusiness
Campus(H)southofthetowncentreas
appropriatelocationstodevelopemployment
usesappropriatetoitslandusezoning.
ItisanobjectiveoftheCouncil:
EDO1:Toensurethatsufficientandsuitablelandis
zonedforemploymentgeneratingusesin
Kilcullen.Suchlandwillnormallybe
protectedfrominappropriatedevelopment
thatwouldprejudiceitslongterm
developmentfortheseuses.
6.2.6 Tourism Development
Tourismhasanimportantroletoplayintheeconomic
developmentofKilcullen.Thetownislocatedina
picturesquesettingontheRiverLiffeywherethe
bridgeservesasafocalpointinthetown.Thebridge
wasoriginallyconstructedinthe14thcenturyandhas
beenrenovatedsignificantlysincethen.Thetownis
accessiblefromtheM9corridorandiswithinan
hoursdrivefromDublin.Itisservedbyanationalbus
// Kilcullen Local Area Plan28
network.DunAílinnelocatedsouthofthetown
boundaryisoneofIreland’sfourkeypre-christian
settlementsites.Thisceremonialhillfortlocatedon
thehillofCnocAilinnehasbeenselectedasoneofthe
RoyalSitesofIreland.Thetownhall/heritagecentre
inthetownexhibitshistoricaldisplaysofDunAilinne
andotherattractionsinthelocalarea.Thetownhasa
veryactiveheritagegroupandtidytown’sgroup.
TheRiverLiffeyisanaturalresourcewithsignificant
naturalbeautywhichcanbemaximisedforwater
sportsandfishing.TheLiffeyatKilcullenisknownfor
troutanglingandtheNorthKildareTroutandSalmon
AnglersAssociation(TSAA)managesfishingrights
fromHarristownthroughtothetowncentre.The
CanoeClubisveryactiveinthetownandopenedanew
clubhouseadjacenttotheRiverLiffeyintheMarket
Squarein2008.Inadditiontotheseattractions,
Kilcullenisknownforhavinganumberofpopularbars,
restaurantsandcafes.TheCamphillCommunityFarm,
caféandshopisanotableattractioninthetownandis
locatedbesidethebridgeinthecentreofthetown.
AnopportunityexistsforKilcullentocapitalise
furtheronitstourismstrengthsandtoseektodraw
additionalvisitornumberstothetownand
surroundingareas.Anyexpansionandfuture
provisionoftourismwithinKilcullenshould
complementtheoverallcharacterofthearea.
ItisthepolicyoftheCouncil:
T1: Toimprovethevisitorexperiencetothetown
andtocooperatewithallstakeholdersand
appropriateagenciesinpromotingtourism
andsecuringtouristbasedenterprisesand
facilitiesinthetown.
T2: Tocapitaliseonpotentialtouristincomeby
seekingto:
•Promoteexistingaccommodationandnewaccommodationchoicesinthetown.
•ImprovethepromotionandmarketingofKilcullenasatourismdestination(in
particularattractionssuchasDunAilinne/
CamphillFarm/RiverLiffey).
T3: Toencourageandfacilitatethedevelopment
ofstronglinkagesbetweentourismand
communityfacilitieswithinthetown.
T4: Tosupporttheprovisionofappropriate
signagealongexistingheritageandtourism
walkingroutesinKilcullen.
ItisanobjectiveoftheCouncil:
TMO1: Tofacilitateandguidewhereappropriatethe
developmentofadditionalattractionsand
facilitieswithinthetowninordertoincrease
tourismgeneratedexpenditure.
TMO2: Toco-operatewithtourismandamenity
groupsinthetowntoimprovethe
environmentofthetown.
6.3 retail
Retailprovisionisakeyelementofeconomicself
sufficiencyandhasanimportantroletoplayinthe
futuredevelopmentofthesocialandeconomiclifeof
atown.Itisrecognisedthatthetowncentreneedsto
expanditsretailofferandexistingretailoutletsneed
toincreasetheirprofileinordertoretainretailspend
inthetown.
6.3.1 RetailProfileofKilcullen
TheDraftCountyRetailStrategypublishedin2010,
highlightsKilcullen’sretailfloorspaceaslimited.Itis
widelydistributedaroundthetowncentreandas
suchthetowndoesnothaveadefinedCoreRetail
Area.Kilcullenisthetwelfthlargestsettlementinthe
countywithitspopulationincreasingfrom2,985in
2006to3,473in2011andaccountingfor1.7%ofthe
county’spopulationin2011.Thesizeofthetownis
mirroredinitspositionintheretailhierarchyforthe
county.Kilcullen’stotalfloorspacein2009was
1803m²net,comprising1104m²convenience
floorspaceand699m²comparison.Thesefigures
excludevacantfloorspace.Thisisa53%increasein
totalfloorspacesincethe2001GreaterDublinArea
(GDA)RetailStrategy.
Part B: Policies and Objectives
Part B: Policies and Objectives 29
The2001GDAsurveystatedthatKilcullenhadno
vacantretailfloorspace.Howeverthishas
significantlychangedintheinterimwithmuchofthe
retailunitsbuiltinrecentyearsbeingvacant.The
2009healthcheckcarriedoutintheDraftCounty
KildareRetailStrategynotednineunitsvacantinthe
towncentre.Asurveyoflandusesandvacancylevels
inthetowncentrewascarriedoutaspartofthisplan
review.Thisidentifiedavacancylevelof15units
withinthetowncentrein2013.
Whilethetowncentreisidentifiedashavingalimited
retailandservicesoffer,itisabusyanddiversesmall
townwithamixofservicesincludingbusiness
services,restaurants,cafes,bars,communityfacilities
andalivestockmart.Theretailofferwasimproved
withtheconstructionoftheMarketSquare
developmentwhichisamixedusedevelopment
comprisingapartments,restaurants,officesandretail
unitsonthegroundfloor.Themainshopsinthetown
areEurosparandNolansbutchersinthesouthofthe
townandCentrainthenorthernareaofthetown.
6.3.2 Strategy for developing the Town’s Retail
Profile.
Thestrategyfordevelopingthetown’sretailprofileis
centredonencouragingandfacilitatingmixeduse
towncentredevelopmentthroughthedevelopment
andregenerationofsitesontheMainStreetandon
towncentrelands.Thehighlevelsofvacancyonthe
MainStreetshouldbeaddressedbypromotingthe
occupationofexistingvacantcommercialand
residentialunitsinthetowncentre.ThisPlan
identifiesadevelopmentopportunitysiteonthe
NewbridgeRoad.Itisenvisagedthatthiswillprovide
foramixofusesincludingretailing,commercialand
residentialwithlinksprovidedbackontotheMain
Street/establishedtowncentrearea.
ItisthepolicyoftheCouncil:
R1: Toencouragethedevelopmentoftheretail
andserviceroleofKilcullenasaself
sustainingcentreinaccordancewiththe
policiescontainedintheCountyDevelopment
Plan,theRetailPlanningGuidelines2012,
DraftCountyRetailStrategy2010andany
futureRetailPlanningGuidelinesorstrategy
thatmaybeissuedduringthelifeofthisplan.
R2: Toencourageandfacilitatethedevelopment
ofacombinedanduniqueheritage,retailing
andtourismexperiencewithinthetownand
toencouragestronglinkagesbetweenthese
attractions.
R3: Toworkwithandencouragelandowners,
retailers,anddevelopmentintereststorealise
thepotentialofvacantsites/landsinKilcullen.
R4: Tofacilitatetheneedsofexistingandgrowing
residentialareasthroughanetworkofsmall
localandneighbourhoodcentres.Alllocaland
neighbourhoodcentresshallcomplement
ratherthandetractordisplaceretailorother
activitiesfromthetowncentre.Large-scale
convenienceformatcentreswillnotbe
permittedinneighbourhoodresidentialareas.
ItisanobjectiveoftheCouncil
RO1: Toreinforcethetowncentreasthepriority
locationfornewretaildevelopment,with
qualityofdesignandintegration/linkage
withintheexistingurbanform/layoutbeing
fundamentalprerequisites.
// Kilcullen Local Area Plan30
RO2: Toencourageandfacilitatethere-useand
regenerationoftowncentrederelict/brown
fieldlandandbuildingsforretailandother
towncentreuses,havingregardtothe
SequentialApproachoutlinedintheRetail
PlanningGuidelines.
6.4 Town Centre
Kilcullenowesitsorigintobeingthefirstlocationto
haveabridgebuiltovertheRiverLiffeyinthe14th
century.Firstbuiltin1310,thesixarchbridgeover
theLiffeywaslastreconstructedc.1850and
renovatedandwidenedintheearly1970’s,the
upstreamfaceismodernwhileifviewingfromthe
downstreamthehistoricformisvisible.Thetown
comprisesoneMainStreetwithafewconnecting
roads.TheMainStreetslopesfromOldKilcullenand
theAthyRoaddowntotheRiverLiffeyandrisesback
upagainmoresteeplytoHillcrestinthenorthofthe
town.WhileKilcullentowncentreisacharmingarea,
regenerationandconservationofthetowncentrearea
areimportantobjectivesovertheperiodoftheplan.
Inordertomaintainthecharacterofthetowncentre,
developmentandgrowthwillbemanagedand
coordinatedwiththeemergingroleofthetown.In
thisregard,bestpracticeprinciplesascontainedin
theCountyDevelopmentPlan2011–2017(orasmaybe
amended)togetherwiththedetaileddesign
considerationsasoutlinedinthissectionwillinform
thefuturedevelopmentofthetown.
6.4.1 Townscape Analysis
Thefollowingsectionsconsiderthetowncentrein
termsof:
•Legibility,functionandimage
•Builtformandvisualappropriateness
•Publicopenspace
•Transportlinksandmovement
•Landuseandactivity
Thesecriteriaprovidethebackgroundtoinformthe
urbandesignguidanceforthefuturedevelopmentof
thetowncentre.
6.4.2 Legibility, Function and Image
Kilcullenisacompacttowndefinedbyonelongmain
streetrunningfromHillcrestinthenorthofthetown
centretothejunctionoftheR413Athgarvan/
BrannockstownroadandR448Athyroadinthesouth.
Thetowncentrehasextendedmarginallywestofthis
toincludelandsontheNewbridgeroadandlandseast
oftheMainStreetbutgenerallystillretainsits
historicallayoutdatingbacktotheearly19thcentury.
Part B: Policies and Objectives
Part B: Policies and Objectives 31
Thetowncentreitselfisanattractiveandvibrant
placewithawellmaintainedurbanfabricandamixof
uses.HistoricallytheMainStreetsouthofthebridge
wasthemainshoppingareainthetownandthisstill
remainsthesame.However,thereisalackofactive
frontagesalongstretchesofMainStreetwithsome
rundownandvacantpremises.Itisimportantthat
thesebuildings/sites,whichformakeyelementofthe
town’sstreetscapeandcharacter,arerestoredand
reinvigoratedwithappropriateusesthatsecuretheir
longtermintegrityandbeneficialuse.Underutilised
sitesandbuildingsaredetrimentaltotheoverall
imageofthetown.Theyalsorepresentanunrealised
opportunityforurbanrenewalandinvestmentthat
wouldassistincreatingacriticalmassofpopulation
andserviceswithinthetowncentreinordertosecure
itslongtermvitalityandviability.
Theimageofthetowncoreiscrucialtoitsvitalityand
thereforeplaysanimportantparttowardsthesuccess
ofthetowncentre.TheMainStreetsouthofthe
bridgepresentsapositiveimagewithadiverserange
ofretailunits.Howevertheareanorthofthetown
providesapoorqualitypublicrealmwhichdetracts
fromtheimageofthetown.Thisareaofthetownhas
thepotentialtostrengthentheimageofthetownand
increasefootfallinthisareaoftheMainStreet.
6.4.3 Built Form and Visual Appropriateness
Urbangraincanbedefinedasthepatternandformof
buildings,plotsandblockswithinurbanareas6.Afine
grainisprevalentinthehistoriccentreofKilcullen.Plots
withinthetowncentreparticularlyalongMainStreet
aredeepplotswithnarrowfrontagesontothestreet.
Kilcullenisfortunateinthatmostofthe
developmentsthathaveoccurredonMainStreethave
notalteredthetraditionalbuildingplotsandblocks.
6 Incaseswherethereisadensepatternwithmultipleplots/buildingsfrontingastreet,theurbangrainisdefinedasfine.Thetermloosegrainisappliedwherethebuildingplotislargerandthebuiltformsmaller.
Figure 6: 1837 Ordnance Survey Ireland
// Kilcullen Local Area Plan32
6.4.4 Public Open Space
Kilcullenhasareasonableprovisionofpublicopen
spaceforpassiveandactiverecreationalpurposes
includingtheValleyRiversideWalkeastofKilcullen
bridge,CamphillCommunityFarmwestofKilcullen
bridgeandthelandssurroundingtheKilcullen
communitycentrewestofthetowncentrewhich
providesforavarietyofsportsandactivities.The
CommunityCentrealsoprovidesforachildren’s
playground.Thereishowever,alackofconnectivity
betweenthepublicopenspacesandresidentialareas.
Connectivitybetweentheseopenspacesshouldbe
improvedtoenablegreaterpermeabilitythroughout
thetown.
6.4.5 Transport Links and Movement
Trafficcongestionhadbeenanissueinthetownuntil
thebypass(M9)wasopenedin2009.TheM9relieved
congestionslightly.However,trafficlevelsinthetown
continuetorise.Themorningandafternoonpeaks
arelargelyduetothetransportofchildrentoand
fromschool.Censusresultsindicatethatfew
children/studentsarewalkingtoschool.Thedesign
briefforthelandsontheNewbridgeRoadpresentsan
opportunitytoimprovepermeabilitywithinthetown
centreandcreatealinkagefromtheNewbridgeRoad
totheMainStreet.Thiswouldfacilitateimproved
connectivityfromtheresidentialareasinthenorthof
thetowntotheschoolsandcommunityfacilitieson
theNewbridgeRoad.
6.4.6 Land use and activity
Thepredominantusesinthetowncentreinclude
retailing,financialandprofessionalservices,cafes
andpublichouses.Therearealsoanumberof
residencesinthetowncentre,manyofwhicharepart
ofthetraditionalstreetscape.Itisimportantthatthe
towncentreremainsanattractiveplacetolivein
ordertomaintainbeneficialusesthroughouttheday
andnight.Anincreaseinretailprovisionwithinthe
towncentreinparticularMainStreetisnecessaryto
ensurethevitalityandviabilityofthetowncentre
andreinforcetheimportanceofMainStreetasa
retaildestination.Figure7identifiesusesalongMain
Street.Stretchesofthestreetaredominatedby
bookmakers,cafesandoffices,manyofthesehave
restrictedopeninghourswhichimpactsonthe
vitalityofthearea.
6.4.7 Strategy for the Town Centre
ThevisionforKilcullentowncentreistocreatea
vibrantandbustlingtownwithadiversemixof
activities.Thiscanbeachievedbydevelopingvacant
andunderutilisedsitesinthetowncentreand
enhancingthephysicalenvironmentandstreetscapeof
theexistingtowncore.Theoverallaimofthestrategy
willbetoachieveaflexibleandrealisticframeworkfor
growthwhilefacilitatingappropriatedevelopment,
regenerationandphysicalimprovementofthetown.
TheregenerationofKilcullentowncentreisacomplex
processofadaptationofexistingurbanareasand
preservationofareasofhistoricalsignificance,with
expansionareasforlongertermdevelopment.
Thestrategyforthetowncentreareaisto:
•Promotetheregenerationandappropriatereuseofvacant/underutilised/derelictstructuresandsites.
•Provideguidancetomanagechangeinthetownthatbalancesadaptation,preservationand
expansion.
•Encouragetheuseofupperfloorswithinthetowncentreforbothresidentialandcommercial
purposes.
ItisthepolicyoftheCouncil:
TC1: ToreinforcetheMainStreetasavibranttown
centrewithadiversemixofusesandto
consolidatethetowncentreareaswhich
surroundMainStreet.
TC2: Toprovideforsustainableurbanexpansion
areasbyprioritisingthedevelopmentof
derelict/brownfieldandkeyinfill/gapsites.
TC3: Topromoteandencouragehighqualityurban
designandtoimprovetheimageofthetown
byenhancingthephysicalenvironmentand
streetscape.
Part B: Policies and Objectives
Part B: Policies and Objectives 33
Figure 7: Main Street Ground Floor Uses October 2013
Church(Cath)
Presbytery
HallTown
Credit
Livestock
Library
Union
Kilcullen
Residential
Vacant
Derelict
Bank-Bookmakers
Retail
Offices
Pub-Restaurants-Takeaway
Hairdressers / Barbers / Beauticians
Kilcullen Bridge
Legend
// Kilcullen Local Area Plan34
TC4: Torelievetrafficcongestionwithinthetown
centrebyimprovingpermeability.
TC5: Tostrengthenandformaliseexistingroutes
withinthetownaswellascreatingnewlinkages
alongwhichdevelopmentcantakeplace.
TC6: Toencourageandfacilitatethere-useand
regenerationofderelictlandandbuildings
withinandaroundthetowncentreandin
particularvacantfloorspaceontheMain
Street
ItisanobjectiveoftheCouncil:
TCO1:Toencourageandfacilitatethere-useand
regenerationofderelict/brownfieldlandand
buildingsforretailandothertowncentre
uses,havingregardtothesequentialapproach
outlinedintheRetailPlanningGuidelines.
TCO2:Tofacilitatethedevelopmentofappropriately
scaledretailandmixedusedevelopmentin
themartandadjoininglandsonthe
NewbridgeRoadidentifiedintheUrban
DesignBrief(Section6.5.4)
TCO3:Tosafeguardtheimportantarchitecturaland
streetscapeheritageoftheTownCentrearea.
6.5 UrbanDesignGuidance
Thissectionsetsoutthegeneralapproachtoguide
growthandmanagechangeinthetowncentreto
strengthentheMainStreetinordertocreatealively
urbancorewithadiversityofuses.
Inadditiontheurbandesignguidanceseekstosetout
guidingprinciplesforthedevelopmentoftwokey
areas,theMartAreaandadjoininglandsandareas
adjoiningtheMarketSquare.Thisisrequiredinorder
toprovideasustainableurbanexpansionarea
increasingpermeabilityandlinkagewiththetown
core.
6.5.1 Strengthen Main Street
Adiversityofshopsandbusinessesarerequiredto
ensurethevitalityofthetowncentre.Thegreaterthe
mixofshopsandservicesthegreatertheattractionof
thetowncentre.
Inordertoensurethevitalityandviabilityofthe
towncentreitisenvisagedthatanyadditionalnew
retailsunitsalongtheMainStreetofthetowncentre
beofafinegrainwithactivefrontages7.Apartfrom
restaurantsandbars,non-retailactivitiesshouldbe
locatedonupperfloorssothatretailfrontageis
maintainedatstreetlevel.Whereretailactivities
operateonlyduringofficehours(i.e9am-5pm
MondaytoFriday)suchasbanks,theirpresenceon
thestreetscapeshouldbelimitedwith3no.active
frontageunitswherefeasible,asdescribedabove
eitherside.
6.5.2 Shopfronts
MainStreethassomenoteworthyexamplesof
shopfronts.Howeverthemainstreethasexperienced
somedeteriorationandneglectresultinginvacancy
rateswithpoorshopfronts.
Shopfrontscanhaveasignificantimpactontheimage
ofthetownandthequalityofthepublicdomain.Itis
proposedto:
•Promoteandencouragehighqualityshopfrontdesign
•Encouragetheretention,sensitiverepairandre-useoftraditionalshopfronts
•Reducevisualclutterbyremovingandpreventingtheintroductionofpoorqualitysignage
ReferenceshouldbemadetotheKildareShopfront
Guidelinespublishedin2013.
7 ForthepurposeofthePlanactivefrontageunitsaredefinedashavingopeninghoursthatincludetheweekendtoencourageactivityoutsidebusinesshours.
Part B: Policies and Objectives
Part B: Policies and Objectives 35
Figure 8: Georgian Shopfront on Main Street
The above image is an example of a traditional shopfront on the Main Street which has been sensitively restored.
Figure 9: Macari Takeaway on Main Street
The above image illustrates a poor quality shopfront through the use of inappropriate materials and colours.
// Kilcullen Local Area Plan36
ItisthepolicyoftheCouncil:
TCS1: TostrengthentheMainStreetbyencouraging
adiversityofshopsandbusinessestoimprove
thevitalityofthetowncentre.
TCS2: Toimprovethequalityofthetown’s
streetscapeby:
•Promotingandencouraginghighqualityshopfrontdesign.
•Encouragingtheretention,sensitiverepairandre-useoftraditionalshopfronts.
•Reducingvisualclutterbyremovingandpreventingtheintroductionofpoorquality
signage.
TCS3: Toencourageresidentialusesinthetown
centrethroughsuchinitiativesas‘Livingover
theShop’.
TC4: Tolimitthepresenceofnonactiveretail
frontagesontheMainStreet.
6.5.4 Urban Design Briefs
Indicativedesignbriefshavebeenpreparedforthe
MartSiteandadjoininglandsontheNewbridgeRoad
andlandsnorthoftheRiverLiffeyadjacentRiverside
Manor.Theseareindicativeandillustratehowthe
areascouldbedeveloped.Thedesignguidancesets
outbroaddesignparametersforthedevelopmentof
thesitesincludingmovement,thelocationandtypeof
developmentblocks,buildingfrontageandcivic
spaces.Theseplansshouldbeusedtoinformthemore
detailedlayoutanddesignproposalswithineachsite.
Whilealldrawingsindicatethattheproposalsare
indicativeonly,theyarenonethelessimportantin
settingabroadframeworkforfuturedevelopment.A
detaileddesignstatement,explaininghowany
Figure 10: Aerial Photo of Mart and Adjoining Lands
Part B: Policies and Objectives
Part B: Policies and Objectives 37
proposeddevelopmentaddressestherelevantdesign
briefandallrelevantdevelopmentmanagement
standards(assetoutinChapter19oftheKildare
CountyDevelopmentPlan2011–2017,orany
subsequentplan),shallbesubmittedaspartofany
planningapplicationonthesesites.
6.5.4.1 Expansion Area – The Mart and adjoining
lands
TheMartcharacterareaislocatedalongthe
NewbridgeRoadandcurrentlycomprisesthe
KilcullenCattleMartandgreenfieldlands.Thisarea
maywellbedevelopedbeyondtheperiodofthisplan.
Thisurbanblockiscirca6.6hainarea.Thecharacter
areacontainstheMartbuilding,Europsar
supermarketandcarparktotheeastofthesitearea,a
carrepairsunittotherearofthesiteandagricultural
landtothewestoftheMartbuilding.
Vision
Giventhelocationofthesiteinthetowncentreandon
anapproachroadtothetown,itiscriticalthatfuture
developmentfacilitatestheexpansionofthetown
centrewithinahighqualitybuiltenvironment.The
landholdingcomprisesanumberofdifferent
landownerssoitisrecognisedthatalllandsmaynotbe
developedtogether.Thedesignbriefthereforeprovides
anoverallstrategywithinwhichexistingusesare
recognisedandallowingindividuallandownerstoset
outproposalsforfuturedevelopmentwithinaclearly
definedcontext.
Thelandsareboundedtotheeastbytheproposed
boulevard,tothewestbytherearofthebuildings
whichfrontMainStreetandtothenorthbya
proposednewstreet(forminganinterfacebetween
MainStreetandtheproposedboulevard).Itis
envisagedthatthelandscanaccommodateamixof
usesincludingcommercialemploymentuses,
communityaswellasresidentialuses,whichmay
includeanelementoflive/workunits.Usespermitted
inthisareainclude:
•Commercial/Retail
•Officesandsmallbusinessunits
•Residential/Live/workunits
•CommunityFacilities
Built Form
Developmentshouldbeprovidedintheformofclearly
definedblockswithsemi-privateenclosedcourtyard
typeopenspaces,carparking,rearaccessand
communalspaces.Wherecarparkingisrequiredit
shouldbeplacedtotherearofbuildingsorinprivate
courtyardsprovidedthroughoutthecharacterarea.
Thestreetsinthischaracterareawillbefrontedby
buildingsgenerally2–3storeysinheight.Amixof
housingandofficeswilloverlooktheadjacentstreets
andlandscapedcourtyards.Dwellingswithinthis
characterareashallcontainanappropriatemixof
typologies,unitsizesandtenancies,inaccordance
withnationalguidanceandChapter19Development
ManagementStandardsKildareCountyDevelopment
Plan2011–2017(orasamended).
Flexiblefrontageswillbeincorporatedintobuildings
atgroundfloorleveltoallowconversionfrom
residential,retail,office,workspaceorcommunity
usestomeetfutureneedsandrespondtomarket
opportunities.
Connectivity and Movement
Increasingpermeabilitythroughtothisareaiscritical
totowncentreexpansion.Aboulevardstreetwith
vehicularandsharedsurfacesshallconnectthe
NewbridgeRoadtotheMainStreet.Pedestrianlinks
willincreasepermeabilityandenhancetheopen
spacenetwork.Anumberofneighbourhoodstreets
willalsofacilitatepedestrianmovementthroughout
thecharacterarea.
// Kilcullen Local Area Plan38
Figure 11: View of Mart Site to the South
Figure 12:MartOffices
Part B: Policies and Objectives
Part B: Policies and Objectives 39
Figure 13: Mart Character Area – Indicative Layout
The MartArea 6.6ha
Dwellings per ha/acre c.30 units per hectare
Residential development 40%
Commercial development 50%
Community development 10%
Courtyard Building Height 2–3 Storeys
Perimeter Building Height 2 -3 Storeys
Landmark Building Height 3 Storeys
Plot Ratio Maximum 1.5
Site Coverage Maximum 66%
// Kilcullen Local Area Plan40
The Mart Character Area: Key Issues•Residentialandcommercialbuildingswilltypifythebuiltformcomprisingofbuildings2–3storeysin
heightfollowingaperimeterblock/courtyardform.
•Qualitypublicrealmisachievedusingahighstandardofqualityfinishesandtreatments.
•Allpublicspacesaretobelinkedbyaclearfullypermeablepedestrianandcyclistnetwork.
•Designandlayoutofthecharacterareawillincorporateprinciplesofpassivesurveillancetoencourageacommunityatmosphereandtodiscourageanti-socialbehaviour,byoverlookedopenspace/cycleway/
pedestrianroutes.
•Privateandpublicareaswillbeclearlydelineated.Privateareasaretobeprotectedfromdirectoverlookingandpublicareaswillbeeasilyaccessibleandoverlooked.
•Buildingswillbepositionedtoprovidetransparencyandglimpsesofthepublicandsemi-publicspacesdefinedbythem.
•Developmentonboundaryedgesshallbesimilarinscaleandnaturetoexistingdevelopmentandprovidefortheprotectionofexistingresidentialamenitiesminimisingoverlookingandvisualintrusion.
•DevelopmenttotherearoradjacenttoexistingbuiltformwillhaveregardtotherelevantstandardsoutlinedintheCountyDevelopmentPlan.
Part B: Policies and Objectives
Part B: Policies and Objectives 41
6.5.4.2 Neighbourhood Edge – Lands east of the
Main Street
Thischaracterareaislocatedtotheeastofthemain
streetandcomprisesanareaof2.5ha.Thecharacter
areacompriseslandszonedA:TownCentreandC:
NewResidentialinthisPlan.Theareacomprisestwo
separateblocks,BlockAconsistsofamixofusesand
iszonedTowncentrewhileBlockBisgreenfieldin
naturewithnodevelopmentonsiteandiszonednew
residential.
Thelandsrisesfromsouthtonorthandareaccessed
fromtheMainStreetandtheroadleadingfromthe
MarketSquare.Thecharacterarealandsarebounded
tothenorthbytheNaasroad,tothesouthbythe
accessroadservingtheadjacenthousingestateof
RiversideManor,totheeastbyRiversideManor
housingdevelopmentwhichconsistsoflargedetached
andsemi-detachedhousingandtothewestbythe
MainStreetanddevelopedtowncentrelands.
Vision
Thevisionforthisareaistoexpandtheresidential
areaintheeasternquarterofthetownandtoopenup
backlandareastofacilitateimprovedpermeability
andconnectivitytotheMainStreet.Thecharacter
areaincludingbothBlockAandBlockBcomprisesa
numberofdifferentlandownerssoitisrecognised
thatalllandsmaynotbedevelopedtogether.The
designbriefthereforeoutlinesanoverallstrategy
withinwhichexistingusesarerecognisedandallows
individuallandownerstosetoutproposalswithina
clearlydefinedcontext.Theselandswillcomprise
residentialandmixedusedevelopment.
Figure 14: Aerial Photo of Neighbourhood Edge Lands
// Kilcullen Local Area Plan42
Built Form
BlockA
Developmentinthetowncentreareashallbe
perimeterblock/courtyardinformwithaquality
publicrealm.Thedevelopmentblockswithinthis
areashallcompriseactivefrontagesatgroundfloor
withresidentialunitsonupperlevelsprovidingmixed
usedevelopments/schemesincludingcommunity
uses.Pocketparksshallbeincorporatedintothe
layouttoprovideamenityforresidents.Development
totherearoforadjacenttotheexistingbuiltform
shallhaveregardtotheamenityofthesebuildings.
BlockB
Developmentintheresidentialareashouldbeofthe
perimeterblockstructureandshouldcompriseof
semi-detachedanddetachedhousingwithanelement
oftownhousesfacingtheMarketSquareapartment
development.Theareaofthesitefrontingthelinear
parkalongtheRiverLiffeywillhavethecapacityto
absorblargerhousetypes.Developmentproposals
shallcontainamixofunittypeswithdirectvehicular
accesstodwellings.
Alldevelopmentinthischaracterarea,bothBlocksA
andB,shallbebetween2and2.5storey’sinheightin
ordertocontributetothelessintensecharacterofthe
area.Smallpocketparksormorelocalareasofpublic
openspaceshouldbecreativelyincorporatedintothe
housinglayoutandshouldbeoverlookedinorderto
promotenaturalsurveillance.Thelandscapedesignof
thesespacesshouldrespondtothevariousneedsof
thecommunitybyprovidingforactiveandsupervised
playinoverlookedareaswhilstensuringrelaxation
andrecreationalspacesinquieterareas.
Connectivity and Movement
InordertofacilitatethedevelopmentofBlockB,the
predominantlyresidentialelement,anadditionallink
fromtheMainStreetwillberequiredforthisbriefto
beachievable.Aboulevardstreetwithvehicularand
sharedsurfacesshallconnecttheMainStreettoBlock
B.AccessandpermeabilitythroughbothblocksAand
Bshouldbevianeighbourhoodstreets.Anumberof
neighbourhoodstreetsshallfacilitatepedestrian
movementthroughouttheentirecharacterarea.
Figure 15: View to the North of the Neighbourhood Character Area
Part B: Policies and Objectives
Part B: Policies and Objectives 43
Figure 16: Neighbourhood Edge Character Area – Indicative Layout
Block AArea 1.2 ha
Dwellings per ha/acre 25 – 30 units per hectare
Plot Ratio Maximum 1.0
Site Coverage Maximum 66%
Mixed use development 100%
Perimeter building Height
2–2.5 storeys
Block BArea 1.3 ha
Dwellings per ha/acre 25 – 30 units per hectare
Plot Ratio Maximum 1.0