Table of Contents THE MECCA OF POWERFUL NETWORK
•Company Outline &
Milestones
•KINX’s Roles
& Service Features
Section 1
Company
Intro.
• IX Service Formation &
Roles
• IX Service Guide
• IDC Service Guide
•CDN Service Guide
• ixCloud Service Guide
Section 2
KINX Services
•KINX Peering Network
Status
•KINX Overseas Network
Status
•KINX Traffic Status
•KINX Member List
Section 3
KINX Networks
Section 4
KINX IDCs
•KINX IDC Status
•KINX IDC Locations
• Inside of KINX IDC
Section 5
IDC Construction
Proposal
•Proposal Background
•Main Achievements
• IDC Management Status
2000. 6.
2006. 5.
2006. 7.
1998. 7.
1999. 6.
2001. 4.
2001.11.
2003. 8.
2003. 9.
2004. 4.
2004. 4.
2004.10.
2007.11.
2007.12.
2008. 1.
2008. 2.
2009. 3.
2009. 4.
2009. 6.
2011. 2. Got listed on the KOSDAQ
2010. 1. Telkom Indonesia IX Interconnection
2010. 4. Microsoft IX Interconnection
2010. 7. Launched CDN services
2012. 8. Took over Nowcom CDN Division
2012. 9. Launched ixCloud service
Outline & Milestones
Company Name
CEO
HQ
Korea Internet Neutral eXchange (KINX) Inc.
Sun-young Lee
Established
Field of Business
Service URL
Internet Exchange, Technical Advice, Providing Internet Based Information
www.kinx.net www.kinx-idc.net 21F, Gangnam Bldg., Seocho-daero 396, Seocho-gu, Seoul, Korea
June 17, 2000
ISP business meeting to solve Korea Internet Interconnection problem (5 ISPs)
Opening KINX Management Center (16 ISPs)
Corporate Body Establishment (KINX Corporation)
KINX Network Main Center Expansion (Gangnam, Dogok)
Venture Enterprise Registration
F-ROOT Mirror DNS Server Interconnection
YAHOO IX Interconnection
M-ROOT Mirror DNS Server Interconnection
Selected as EBS scholastic test service node business
Science Technology Dept. General Award to celebrate 10k enterprise research lab establishment(hosted by KOITA)
Interconnection contract with NHN, leading portal site in Korea
Selected as supervisor for the Korea Internet Agency eNum demonstration service business development
Acquired Certification of Technology Innovation S&M Biz (The S & M Business Administration)
Awarded a Special Award of the 6th Information Security Awards Ceremony
Began Government Unified Data Center interaction service (Daejeon, Gwangju)
Establishment of memorandum of understanding for kr. Name server management (NIDA)
Began VoIP-IX service in partnership with Britain’s Xconnect
Certified as a Venture Company (KVCA)
Awarded Britain GTB Innovation Award
Unconstrained Peering Policy
Each ISP can choose its peering partner
voluntarily
Enhancing Internet Service Quality Direct connection through peering brings lower latency and faster Internet service
Saving Transit Cost
Bilateral peering can reduce transit cost
which takes up the biggest portion of
ISP spending
Saving Transit Fees
Enhanced Internet Service
Holding a Prominent Position
Unconstrained Peering Policy
Ease of Network Selection
Maintaining Competitive Position More stable services -compared to
disconnected ISPs - can be delivered
by maintaining improved network
performance. Ease of Network Selection
6 domestic carriers’ optical
termination points are located
in the center which enables
our tenants to choose its
provider by looking at each
ISP’s operation policy, price
and so on.
KINX’s Roles & Service Features
IX
Sole Carrier Neutral IX
Internet Business Success Partner
Cutting Edge Communication
Network
IX Service Formation & Role
KINX offers direct connection between ISPs, ISP and CP or any entity that has its own AS numbers and this helps our members save transit costs
KINX IX
CJ Helovision,
T-broad,
C&M,
Hyundai HCN
Smooth Supply of Contents KINX IDC
KINX IX
B ISP
USER
IDC A ISP
20% of Korea domestic traffic uses KINX network daily basis.
3,000,000 people – 30% of Internet users – in Korea use
Internet services through KINX network.
NHN,Kakao
Pandora TV
CDNetworks
Hyosung ITX
LG U+
DreamLine
Sejong Telecom
SKBB
This is a service that provides optimized environment and management
service required for operating service through the internet by providing a
separate space for customers within a data center.
Co-Location service will provide a super-speed network, an exclusive space,
service management and operation service in a fast and convenient way.
In addition, customers may operate service in a more efficient and stable
way through various value added services including backup, security and
monitoring.
Co-Location service can be used immediately upon basic server rack (an
exclusive space) and circuit speed of internet service determination.
Advantages of KINX IDC
KINX is an IX(Internet eXchange) – which is at the top of Internet network - specialized company. About 3 million users of the total domestic Internet subscribers are using internet through KINX backbone network of max. 160Gbps capacity. KINX is providing faster and more stable service to internet users through IDC service directly connected with IX positioned at the top of a large scale internet.
What is co-location?
KINX Backbone Area
L3 Router L3 Router
L2 Switch
Co-Location
Co-Location Area
L2 Switch L2 Switch
Service Formation
IDC Service Guide
Co-Location Co-Location
KINX – the only L2 based IX service provider in South Korea - offers optimal speed, stability and competitive
price backed by a massive CDN Farm that is directly connected to well-known domestic and international ISPs
KINX CDN
CDN Service Configuration
- High-Capacity Circuit
- Multiple Servers
- Multiple Server Farm
+ IX (Internet eXchage)
A connecting point that provides
connections between ISPs
+ Server Farm
A collection of computers servers
in IDC
IX + IDC Server Farm + IDC Server Farm
+ IDC Server Farm
+ CP (CONTENTS PROVIDER)
KINX CDN offers optimal speed, stability and competitive price backed by a massive CDN Farm.
KINX CDN
Download Service – Fast Delivery
- Designated service for large capacity file download
- Offering seamless download and customized download interface
- Applying to all sorts of files
- Providing various statistics
Streaming Service - Acceleration
- Sending video, music and other sorts of multi-media contents
- Fast progressive downloads & unicast streaming
- Easy synchronization and Safe data retrieval
Cache Service - Performance
- Enhancing webpage features and reducing traffic volume
- Reducing image loading time of online shopping websites
- Offering reliability by guaranteed high speed service
- 11 -
ix Cloud
Fast and Stable Network based on IX
KINX provides a fast and stable network at anytime and anywhere through the IX backbone which is directly connected to 42 domestic and international ISPs with max. 300Gbps speed.
Based on OpenStack which is participated by 180 companies globally
KINX-Cloud provides scalability as well as stable cloud environment based on OpenStack - a open source cloud computing platform - which is participated by 180 companies globally.
Quick & easy management supported by suitable service environment
Adding or removing servers or setting up applications can be done by only a few clicks. Real time monitoring is also available at anytime.
Server
IXCloud
User
KINX
KINX Cloud provides cloud server, cloud storage and CDN platform based on OpenStack
C&M(30G)
KISA(2G)
KTN(2G) Dreamline(10G)
NHN(20G)
Future & People(10G)
Smile Serve(10G)
Kakao(2G)
Pandora TV(10G)
KDDI Korea(10G)
CJ Hello-vision(40G) Samsung SDS (10G)
Tbroad(50G)
Hyosung ITX(20G) KINX (294G)
Hyundai HCN(10G)
KINX Peering Network Status
KOSCOM(1G)
Others(30G)
CDNetworks(25G)
LG U+(2G)
NexG(2G)
Member AS Number
KINX 9957
Sejong Telecom 9848
KDDI 10160
Dreamline 9457
Samsung SDS 6619
Ahn Lab 17876
Secho Cable 7562
i-net Tech 9712
Yahoo Korea 10310
Onse Telecom 4670
C&M DMC 10036
Nam-Incheon Broadcating 9976
NIDA (.KR DNS) 23599
KISA 9700
KOSCOM 9526
CDNetworks 38107
NexG 17877
T-broad 23563
NCIA (Daejeon) 17841
NCIA (Gwanghwamun)
Member AS Number
RGCOM 15412
Tmnet 4788
Telcom Indonesia 7713
Microsoft 12076
Witbe 15436
WIDE 7500
PACNET 10026
Reach 9581
Sprint 1239
BizNet 17451
Verizon Korea 703
Cluenet 38676
Samjeong Data 46010
Kakao 45991
NHN 23576
Smileserve 38700
LGT 17853
Areum Broadcasting 17608
KINX Peering Network Status
Reliance Global
SPRINT
PACNET
Verizon
PCCW
REACH
KINX Overseas Network Status
Overseas NETWORKS
KINX IDC
`Daily' Graph
(5 Minute Average)
`Monthly' Graph (2 Hour Average)
`Yearly' Graph (1 Day
Average)
Max Average Current
In 133.7 Gb/s (33.4%) 78.8 Gb/s (19.7%) 73.2 Gb/s (18.3%)
Out 133.8 Gb/s (3.1%) 78.8 Gb/s (19.7%) 73.1 Gb/s (18.3%)
Max Average Current
In 148.5 Gb/s (37.1%) 80.1 Gb/s (20%) 33.5 Gb/s (8.4%)
Out 148.4 Gb/s (37.1%) 80.1 Gb/s (20%) 33.5 Gb/s (8.4%)
Max Average Current
In 148.5 Gb/s (37.1%) 59.5 Gb/s (14.9%) 78.9 Gb/s (19.7%)
Out 148.4 Gb/s (37.1%) 59.5 Gb/s (14.9%) 78.9 Gb/s (19.7%)
KINX Traffic Status
ISPs
SOs
CPs
Government Organizations and etc.
Domestic Carriers
International Carriers
KINX Member List
CDN Members
Classification Main Features
Main Construction
Features
• aseismic structure that fulfills domestic standard
• Applying grounding method that follows international standard
• CCTV Monitoring
• Access control using individual security badge and fingerprint scanner
Network Infrastructure
• Dual Cable Tray : Cable Tray in Ceiling → Fiber, LAN, Communication Cable / Cable Tray under Floor → Power Cable (AC)
• Telecommunication fibers from 8 different domestic carriers
HVAC System
• Maintaining 22℃/45% of humidity/Operating a coolant pipe system(intensive cooling system supported by bunker nozzle)
• Cabling that detects water leakage
• Effective air conditioning system helped by access floor and ceiling-side cable tray
Power
• Power Capacity : for UPS 1,250KVA / 1,000KW * 1 unit
for HVAC system 1,250KVA / 1,000KW * 1 unit
• UPS : - Capacity : 400KVA * 2 units parallel operation - Back-up time : 1.5 hours
• Emergency power generation (Generator) : 2 units
(for UPS 1,000KW * 1 unit, for HVAC system 1,000KW * 1 unit) Latency time for automatic start : approx. 45 sec, supplying power for 5 hours (able to fill up the tank during operation)
• Grounding type : Class 1(High Voltage), Class 2(Transformer), Class 3(Distribution Panel)
N.O.C
• Professional staff on-site for 24/7
• Applying NMS and What’s Up to handle any emergency situation promptly
• Access control and member support / Providing MRTG data
KINX IDC Status
KINX has 3 IDCs in Seoul and 1 in Gyoungi-do to support our customers for stable IX collocation services.
Center #1
5F Daerim Acrotel 467-6 Dogok-dong Gangnam-gu, Seoul
Center #2
3F LG CNS 459-9 Gasan-dong Geumcheon-gu, Seou
Center #3
3F Hostway IDC 343-1 Yatap-dong Bundang-gu Seongnam-si Gyoungi-do
Center #4
2F Sangam IT Center B5-3 Digital Media City Sangam-dong Mapo-gu, Seoul
Center #1(Dogok)
Center #4(Sangam)
Center # 2(Gasan)
Center #3(Bundang)
KINX IDC Locations
Tel : 02) +82-2-526-0957 문의메일 : [email protected]
KINX IDC Locations
Inside of KINX IDC
N.O.C Fire Extinguisher /
Security Device
Gasan Center / Access Control Device
Cool Zone
Intensive Air-conditioning Containment Hot Zone
Meeting Room
Server Room / Outdoor Unit of Air-conditioner
Back Ground
It is important to have optimal operation environments for Data center with the solution that supports all the necessary requirements for IDC
Construction of O-TEL. Therefore KINX will make sure we build the perfect supporting systems consist of best personnel with excellent
engineering background and know-hows. We will support you to have successful Data Center construction.
■ Data Center that promise Availability / Stability / Expandability / Effectiveness / Economic Feasibility
■ Operation stability with optimal equipment and environments
■ Excellent back ground with Operation Know-How for IDC
Availability 24/365 Continuous Power Supply without fault Optimal Infra structure with redundancy
Secure Stability with ICT resources Secure Disaster prevention and inspection procedure Secure stability with Operational Know-How
Consider provision for Equipment, capability, functionality Layout that counts future expansion for the functionality
System that makes easy to maintain and operate. Compatibility with existing Data centers
Maximize Economical Feasibility from saving cost for operation, power and space
Stability
Expandability
Effectiveness
Economical Feasibility
Successful construction of O-TEL Data Center with
Continuous monitoring for stabilization
Time Frame
It is essential to have a team that works as one for Infra structure planning and construction. Also, needs well
planned schedule to construct optimal infra structure.
1. Preparation
- Vendor Selection
- Blueprint review
- Site Tour
- Preparation for
Specification,
Drawings
2. Construction 3. Completion 4. Transfer
- Order equipment,
Materials
- Construct as planned
in the planning
- QA and Final Test
- Completion
Inspection
- Completion Doc
- Completion
report
- Transfer facility
- Equipment operation
training
- Training and
operation support
Review and analysis of results and procedure for validity
Management for Schedule and Task
Business analysis, Planning, Construction, Test
Perf
orm
Ran
ge Detailed Schedule
Issue Construction planning
Drawing of DC, Specification
Inspection Check list
Trial run, Training planning
Our Strength with this proposal
1) Engineering side
Construct the infra structure with best technology
★ Experience with constructing KINX
★ Skilled engineers with large IDC infra in Korea
★ Proven technical back ground with Infra consulting for
Large IDC in Korea
★ Case study from various IDC, using this for successful
IDC construction
2) Business Side
Effective business management with well experienced
professionals
★ Accident free construction with professional with large
IDC planning and consulting experience
★ KINX has best engineers with certificate and operation
experience
★ Case study from various IDC and operator training with
Know-hows we have
Successful Data Center construction and Operation
Main Achievements
Construction and Expansion of KINX Dogok Center
Power Supply
- 22,9 KV / 8,250KVA
Generator (Capacity of Fuel Tank: for 12 hours of operation)
- Cummins 1,000KW * 2units : for servers and CRAC units
UPS( FULL LOAD : can support 30 minutes of back up power)
Main
Facilities
Stable infrastructure supported by seismic design and duplexing power configuration
Dogok Center 5th Floor - Construction
Dogok Center 3rd Floor - Expansion Seismic Design : 7.0
Total Space of 5th Floor: 872.16 m²(264 Pyeong)
- No. of RACK (19” Standard) : 341 EA
Total Space of 3rd Floor: 279 m²(84 Pyeong)
- No. of RACK (19” Standard) : 90 EA
Server R
oo
m
Main Achievements
Design Consulting of DR IDC
Consulting Scope Design Outline
Basement: 4 Levels, Ground: 13 Levels
Total Floor Area: 67,877㎡, 7 floors of server rooms (3,570㎡ per floor)
Duplex substation setup supporting 40MW power
Targeting PUE 1.7 and following Tier 3 standard
Applying new technology that reduces power consumption
12 F Machine Room + Cooling Tower
11 F Office Area
10 F IDC (1,000 Racks)
9 F IDC (1,000 Racks)
8 F IDC (1,000 Racks)
7 F IDC (1,000 Racks)
6 F IDC (1,000 Racks)
5 F IDC (1,000 Racks)
4 F IDC (1,000 Racks)
3 F Power Supplier, Generator, UPS, Batteries
2 F Power Supplier, Generator, UPS, Batteries
1 F Lobby & Other Convenient Facilities
B 1 Parking & Other Convenient Facilities
B 2 Parking
B 3 Parking
B 4 Parking &
Machine Room, Building Power Supplier
IDC Management Status
Accumulated Know-how from the experience of managing top-class IDCs in South Korea
KINX IDC LG CNS
HOSTWAY SKB IDC