+ All Categories
Home > Documents > Klarman Hall Presentation

Klarman Hall Presentation

Date post: 13-Apr-2018
Category:
Upload: branelle
View: 220 times
Download: 0 times
Share this document with a friend
77
COLLEGE OF ARTS & SCIENCES | HUMANITIES
Transcript
Page 1: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 1/77

COLLEGE OF ARTS & SCIENCES | HUMANITIES

Page 2: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 2/77

Presenters

• Gregg Crossett, CCM - Construction Manager

• Thomas King, PE, PMP - Director of CM

Page 3: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 3/77

Overview / Scope• Construct Klarman Hall, a 67,500 gross square foot addition to Goldwin

Smith Hall including an Atrium, 330-seat Auditorium, office and meetingspace and a new café. The new space will be connected to Goldwin Smith

Hall at the ground first and second floors.

• Construct site utilities, shoring and underpinning to permit excavation forconcrete foundations and slabs on grade. Construct steel superstructure,stone cladding and glass and aluminum curtainwall and store front; metal

framed skylights. Construct the atrium roof and facades to be installed byJosef Gartner USA as the single –source vendor.

• Construct interior finishes of drywall, stone and acoustic panels, glass and

aluminum windows and doors and wood doors. Floor finishes are carpetand colored polished concrete floor for Atrium.

• Pursue LEED Platinum certification.

Page 4: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 4/77

Budget

• Total Project Cost $62,700,000

• Construction Budget $43,792,000

Page 5: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 5/77

Project Team

Cornell University Facilities,Gregg Crossett, CM

Kris KimmelMEP & BIM Coordinator

Kris B. Kimmel ConstructionDrafting, Inc.

Part-time, as needed

NK Architects

Tammy Schickler, LEED AP

LEED Agent Sustainable Performance Consulting

Part-time, as needed DeAnna DeMark Project Administrator 

Full-time

Jason EdsallSenior Project Manager/Scheduler 

Full-time

Stephen WelliverExecutive Vice PresidentConstruction Executive

Part-time, as needed

Spike Fisk General Construction

SuperintendentFull-time

Brian Kenney, LEED AP

Project Estimator Part-time, as needed

Trade Contractors

Dave GombasSite Superintendent/Safety Full-time

Guy EldridgeSelf-Perform Superintendent 

Page 6: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 6/77

Communication Plan

Page 7: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 7/77

Page 8: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 8/77

Brief Review of Architectural FirmReplacement at Klarman

Page 9: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 9/77

Tracking & Controlling Costs

Change Management

Timely Processing of Architect/OwnerChanges

Importance of Labor Rates

Prompt Notification of Field Changes

Schedule Evaluation

Review & Verification of SubcontractorChanges

Page 10: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 10/77

CONSTRUCTION SCHEDULE

v0_-v1_-v4_ 

Page 11: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 11/77

Schedule

Page 12: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 12/77

Mobilize on Site

v00t3a6

Mid November 2013 VIEW LOOKING SOUTHWEST

SCHEDULE SEQUENCE

ENTRY GATE

Page 13: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 13/77

Mobilize on Site

ENTRY GATE

v00t3a6

Mid November 2013 VIEW LOOKING SOUTHWEST

SCHEDULE SEQUENCE

Page 14: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 14/77

Mobilize on Site

v10t3a6

Mid November 2013 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 15: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 15/77

Install Double Channel Lag Wall

MOBILEHYDRAULIC

BOOM CRANE

v10t3b0

Early December 2013 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 16: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 16/77

Excavate South to North

ROCK ±803’-9” 

v10t406

Early December 2013 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 17: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 17/77

Underpinning Complete

ROCK ±803’-9” 

v10t410

Early February 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

ROCK ±800’-0” 

Page 18: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 18/77

Establish South Rock Excavation

PIT ±782’ 

v10t416

Mid February 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

ROCK ±800’-0” 

Page 19: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 19/77

Concrete South to North

PIT ±775’ 

PIT ±782’ 

ROCK ±800’-0” 

80 TON MOBILEHYDRAULIC

BOOM CRANE

v10t420

Early March 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 20: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 20/77

Concrete South to North

PIT ±775’ 

v10t426

Mid March 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

80 TON MOBILEHYDRAULIC

BOOM CRANE

Page 21: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 21/77

Concrete South to North

PIT ±775’ 

v10t430

Early April 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

80 TON MOBILEHYDRAULIC

BOOM CRANE

Page 22: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 22/77

Finish South Concrete Basement

v10t436

Mid April 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 23: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 23/77

Begin North Foundation & Basement

v10t440

Early May 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Page 24: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 24/77

Finish Northernmost Foundations

v10t446

Mid May 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

h ll / l

Page 25: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 25/77

Pour North Wall / Close Ramp

v10t450

Early June 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

M bili S l C

Page 26: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 26/77

Mobilize Steel Crew

v10t456

Mid June 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

200 TONMOBILE LATTICE

BOOM CRANE

S t B t St l S th t N th

Page 27: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 27/77

Set Basement Steel South to North

v10t460

Early July 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

200 TONMOBILE LATTICE

BOOM CRANE

PARTIAL VIERENDEELTRUSS ASSEMBLY 

T B f Vi d l T

Page 28: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 28/77

Temporary Braces for Vierendeel Trusses

v10t466

Mid July 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

TEMPORARY BRACESFOR VT-1, VT-2, VT-3

TOP OUTSTEELFRAME

Commence Back p Walls

Page 29: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 29/77

Commence Backup Walls

v10t470

Early August 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Finish Steel | Commence Backup Walls

Page 30: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 30/77

Finish Steel | Commence Backup Walls

v10t476

Mid August 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Set Atrium Trusses

Page 31: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 31/77

Set Atrium Trusses

v10t480

Early September 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Mobilize Gartner Crew

Page 32: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 32/77

Mobilize Gartner Crew

v10t486

Mid September 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

POTAIN HDT 80

Stone Finishes at Gartner Connection Points

Page 33: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 33/77

Stone Finishes at Gartner Connection Points

v10t490

October 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

POTAIN HDT 80

Gartner Scope Begins at GSH Connection

Page 34: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 34/77

Gartner Scope Begins at GSH Connection

v10t4a0

November 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

POTAIN HDT 80

Atrium Glass

Page 35: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 35/77

 Atrium Glass

v10t4b0

December 2014 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

POTAIN HDT 80

Restore East Avenue to 2 Way Street

Page 36: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 36/77

Restore East Avenue to 2 Way Street

v10t500

Early January 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

3’-0” BUMP OUT

FENCE INSIDE CURB

CRANE 20’-0” SOUTHOF BUILDING CENTER 

East Avenue Gartner Scope

Page 37: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 37/77

East Avenue Gartner Scope

v10t510

February 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

CONSTRUCTIONENTRY POINT

Gartner Scope Complete

Page 38: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 38/77

Gartner Scope Complete

v10t520

March 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

CONSTRUCTIONENTRY POINT

Prepare East Avenue Garden for Finishes

Page 39: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 39/77

Prepare East Avenue Garden for Finishes

v10t546

May 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Sitewide Hardscape & Garden Granite Finish

Page 40: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 40/77

Sitewide Hardscape & Garden Granite Finish

v10t560

July 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Garden Walkway Finish

Page 41: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 41/77

y

v10t560

Mid July 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Prepare Gardens for Planting

Page 42: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 42/77

p g

v10t570

Early August 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Seeding & Sod

Page 43: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 43/77

g

v10t576

Mid August 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Project Complete

Page 44: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 44/77

j

v10t900

October 2015 VIEW LOOKING NORTHWEST

SCHEDULE SEQUENCE

Project Complete

SCHEDULE SEQUENCE

Page 45: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 45/77

v00t900

October 2015 VIEW LOOKING SOUTHWEST

SCHEDULE SEQUENCE

Page 46: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 46/77

SITE LOGISTICS

v10-v12

Worksite Logistics Phase 1

SITE LOGISTICS

Page 47: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 47/77

Site Fence

Crane

 Access Lane

Field Office

v01t430

Before 1 January 2015 VIEW LOOKING NORTHWEST

SITE LOGISTICS

Field Office Compound Phase 1

SCHEDULE SEQUENCE

Page 48: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 48/77

v40t420

Before 1 January 2015 VIEW LOOKING WEST

SCHEDULE SEQUENCE

Construction Waste Collection Center

Excav.

Staging

Welliver Field Office

Cornell Office

Subs

Gate

Worksite Logistics Phase 2

SITE LOGISTICS

Page 49: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 49/77

3’-0” Bump Out for Crane

Fence west of Curb

Field Office

v01t500

 After 1 January 2015 VIEW LOOKING NORTHWEST

SITE LOGISTICS

Field Office Compound Phase 2

SCHEDULE SEQUENCE

Page 50: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 50/77

v40t500

Before 1 January 2015 VIEW LOOKING WEST

SCHEDULE SEQUENCE

Construction Waste Collection Center

Klarman Hall

Staging

Welliver Field Office

Cornell Office

Subs

Gate

Page 51: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 51/77

RISK ASSESSMENT

v10-v12

Risk Assessment

Page 52: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 52/77

Risk Assessment

1. Work Adjacent to Historic GSH

Safe Egress Signage & Barricades

Noise / Dust Notice for noisy activities

Dust control on the jobsite Protect any air intakes

Protection of the Building Window Protection Settlement Monitoring Cornell – Existing Survey

Risk Assessment

Page 53: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 53/77

Risk Assessment

2. Building Excavation

Underpinning Start as Early as possible

Prepare for Unknowns

Mass Excavation Start over Winter Break 

Rock Excavation No Blasting within 20’ 

 Vibration Expectations

Existing Condition

EXCAVATION SECTIONS

Page 54: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 54/77

GOLDWIN SMITH HALL

EAST AVENUE 

±833’ 

±813’ 

v70t000

Today VIEW LOOKING SOUTH

Excavation to Rock 

EXCAVATION SECTIONS

Page 55: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 55/77

GOLDWIN SMITH HALL

CRANE

±833’ 

±800’ - 803’-9”  UnderpinningBank Retention

v70t416

February 2014 VIEW LOOKING SOUTH

Pit ExcavationEXCAVATION SECTIONS

Page 56: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 56/77

GOLDWIN SMITH HALL

CRANE

±833’ 

±800’ - 803’-9” 

±782’ SOUTH, 775’-9” NORTH v70t436

 April 2014 VIEW LOOKING SOUTH

Existing Condition

EXCAVATION SECTIONS

Page 57: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 57/77

GOLDWIN SMITH HALL

EAST AVENUE 

±833’ 

±813’ 

v71t000

Today VIEW LOOKING SOUTH

Excavation to Rock 

EXCAVATION SECTIONS

Page 58: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 58/77

CRANE

±775’-9” 

±800’-0” 

±833’ 

Underpinning

Dewatering

Bank Retention

v71t436

 April 2014 VIEW LOOKING SOUTH

Existing Condition

EXCAVATION SECTIONS

Page 59: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 59/77

±813’ STORMSEWER 

STORMSEWER 

 VAULT

GOLDWIN SMITH HALL

v72t000

Today VIEW LOOKING WEST

Pit Excavation

EXCAVATION SECTIONS

Page 60: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 60/77

GOLDWIN SMITH HALL

±800’-0” 

NORTH ±788’-7” (DEEPEST AT 775’-9”)

SOUTH ±792’-1” (DEEPEST AT 782’-1”)

Underpinningv72t436

 April 2014 VIEW LOOKING WEST

Risk Assessment

Page 61: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 61/77

3. Traffic Control

Lane Closure & Detour Maintenance of Signs and Signal Operation

Crosswalk  Possibly Adjust Location of Crosswalks for Visibility

Trucks Leaving Site Flag Person Control when

Trucks Leave Site

Traffic Restoration on 1/1/15 Crane Placement Inside

FenceENTRY GATE

Truck Route

i C i

SITE LOGISTICS

Page 62: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 62/77

Route 1

Route 2

v09t456

During ConstructionPLAN VIEW

Northbound East Avenue at South Crossing VEHICULAR CIRCULATION

Page 63: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 63/77

.

Before 1 January 2015 VIEW LOOKING NORTH

Southbound East Avenue at North Crossing VEHICULAR CIRCULATION

Page 64: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 64/77

.

Before 1 January 2015 VIEW LOOKING SOUTH

Southbound East Avenue at South Crossing VEHICULAR CIRCULATION

Page 65: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 65/77

.

Before 1 January 2015 VIEW LOOKING SOUTH

North Crossing at East Avenue

PEDESTRIAN CIRCULATION

Page 66: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 66/77

.

During Construction VIEW LOOKING WEST

Risk Assessment

Page 67: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 67/77

4. LEED Platinum Certification

Challenge: Achieving LEED Platinum Goal Project Administrator

LEED Action Plan Set Plan Early

Quarterly Updates on Status

Documentation Control

Risk Assessment

Page 68: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 68/77

4. LEED Platinum Certification

Construction Requirements Regional Materials

Recycled Materials

Waste Recycling

Indoor Air Quality

Risk Assessment

Page 69: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 69/77

5. Schedule

Challenge: Work during Winter Months &Specialty Materials Impact Schedule Long Lead Items

Structural Steel, Air Handlers, Stone, Gartner

Monthly Updates Subcontractor Buy – In

Impact Mitigation Prompt Recovery Plans

Risk Assessment

Page 70: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 70/77

6. BIM Coordination

Challenge: Coordinate concrete, steel, fireprotection, plumbing, HVAC & electrical trades.Non-traditional chase stack.

BIM Execution Plan  Architectural Model from 2D Documents

Trade Management

Engineer Involvement

Risk Assessment

Page 71: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 71/77

7. Stone Cladding

Challenge: Matching existing stone to anatural product within design expectations Testing

Stone Selection Potential Variations

Installation Handling & Hoisting Inside Building

Risk Assessment

Page 72: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 72/77

8. Enclosure Coordination

Scope Carefully Define Scope with Other Trades &

Gartner

Envelope Commissioning

Risk Assessment

Page 73: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 73/77

9. Site Constraints

Just in time delivery Risley Lot and Palm Road Staging

Risk Assessment

Page 74: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 74/77

10. Hoisting & Material Handling

Crane Placements for Various Stages Material Handling Plan After Enclosure

Risk Assessment

Page 75: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 75/77

GOLDWIN SMITH HALL

KLARMAN HALL

10. Hoisting & Material Handling

Risk Assessment

Page 76: Klarman Hall Presentation

7/23/2019 Klarman Hall Presentation

http://slidepdf.com/reader/full/klarman-hall-presentation 76/77

 Assumed Enabling Work 

Completion of Utility Relocation Roof Replacement Adjacent to Klarman

Questions