© Siemens AG 2007Page 1 Power Transmisson and DistributionPTD SOLAR
SOLAR ProjectsSIEMENS PTD M3 - Solar Projects
www.siemens.com/solar
© Siemens AG 2007Page 2 Power Transmisson and DistributionPTD SOLAR
Energy supply for the 21st century
Siemens Pictures of the Future
CREAVOLT - Liège
14/03/2008
2
© Siemens AG 2007Page 3 Power Transmisson and DistributionPTD SOLAR
CoC Solar Projects ~ provides turnkey, grid-connected solar power supply solutions to industry + energy customers providing support to regional Siemens offices in acquisition, execution and service of solar PV projects
�Competence: 10 year experience in photovoltaic (PV) projects;
�Engineering, Procurement & Contracting (EPC) of solar PV projects;
�Engineering, turnkey supply with service, monitoring and maintenance of solar power plants and execution with professional project management.
PTD M3 CoC Solar Projects –> EPC in solar PV
2006: 20 kWp HQ ABN-AMRO, NL2001: 2,3 MWp BIPV solar roof Floriade, NL 2005: 30 kWp HQ SHELL, NL
© Siemens AG 2007Page 4 Power Transmisson and DistributionPTD SOLAR
Solar Projects -> civil and electrical engineering
Solutions for solar PV system integration with civil and electrical engineering
Expertise and experience in construction, service and maintenance and life-cycle costs by active monitoring of reference projects and long-term service contracts
Proven and innovative Siemens PV applications:
� Ground based solar PV plants� Rooftop and Building Integrated PV� PV-facades and canopies
2007: 1 MWp landfill-covering solar plant Ecocesto/Falck, Rende, IT1996: 1 MWp Trade Fair, Munich, G
CREAVOLT - Liège
14/03/2008
3
© Siemens AG 2007Page 5 Power Transmisson and DistributionPTD SOLAR
Cash-flows
-120%
-100%
-80%
-60%
-40%
-20%
0%
20%
40%
60%
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20year
in %
Eq
uity
Solar PV market –> modern economic evaluation
Market stimulation with PV feed-in tariff (0,40-0,50 € / kWh) in: Germany, Spain, Italy, Greece, France, Belgium, Czech Republic,..
SPOT - Simple Pay-Out Time = 6 – 10 years, BUT; feed-in tariff is guaranteed by law for 15-20 years and limited O&M cost (0,05 € / kWh)
Business case with 25% equity investment:
� IRR – Internal Rate of Return > 15%
� attractive NPV – Net Present Value
� Σ Cash-flow = 400% of Equity investment
� ‘Fixed’ income year 10 - 20
2004: 200 kWp storage hall, G
© Siemens AG 2007Page 6 Power Transmisson and DistributionPTD SOLAR
Focus in professional grid-connected PV market
Grid connected solar power plants ~ 15%
� Ground-based PV and rooftop solar power plants
� Serving professional customers (industries / banks)
Grid connected PV-systems, non-residential ~ 60%
� Specialized in innovative and complex projects
� Custom solutions for industry customers and functional architecture (Totally Integrated Power –TIP)
Solar power on residential buildings ~ 25%
• Safe and comfortable solar roofs with SUNIT™
• Developers, builders and installers
CREAVOLT - Liège
14/03/2008
4
© Siemens AG 2007Page 7 Power Transmisson and DistributionPTD SOLAR
PV field
equipment roomDC
AC
InverterSPSPP SolarPV-WinCC
Modem
=~
Master Slave
grid
MV transformer
MV grid
=~
weather station
AC
DC
commissioningservice
Grid-connected solar PV system
PV generator conisting of solar panels, support structure and DC-
cabling
© Siemens AG 2007Page 8 Power Transmisson and DistributionPTD SOLAR
Ground-based solar power plants
� Energy production
� Fixed slope and orientation
Solar tracking systems
� Single or dual axis tracking systems
� Follow the sun to optimise yield
Solar sound barriers / solar canopies
� Use of infrastructure for PV
� Use public space for energy productionSIEMENS SolarParkTM – car park PV canopy
Solar power – on-grid infrastructure applications
CREAVOLT - Liège
14/03/2008
5
© Siemens AG 2007Page 9 Power Transmisson and DistributionPTD SOLAR
PublicNetwork
SolarPlant
Y
Y
Solar Plant
20
kV
0,4 kV
≈≈≈≈=
• 57.600 Solar panels• 62 acres surface area• 10 MegaWatt-Peak
Ground-Based Solar Power Plants
© Siemens AG 2007Page 10 Power Transmisson and DistributionPTD SOLAR
Solar PV at land-fill of biomass power plant
Solar plant at biomass Power Plant, Rende Italy
Customer: Ecocesto / Falck
1 MWp SHARP NU180
Custom galvanized steel support structures
3x340 kVA M/S/S
Yield 1,4 GWh per year
Order value: € 5 million
Commissioned: July 2007
CREAVOLT - Liège
14/03/2008
6
© Siemens AG 2007Page 11 Power Transmisson and DistributionPTD SOLAR
Solar power – on-grid building applications
Building Integrated PV systems (BIPV)� As outer skin (roof, façade or canopy)� Weather resistant skin (water/wind/sun/temperature)
Special appearance with PV � Esthetic and energetic designed� Sunscreen at buildings or sound barriers� Civil and electrical innovative solutions
Systems at flat roofs � Ballast / mounting (wind loads)� Roof loads and water tightening
Systems at sloped roofs (tiles/ sheeting)� Effective application at southern surfaces� Reliable methods with known and proven techniques
Integration
2000: 80 kWp province FL office, NL
2006: 80 kWp storage, Weimar G
© Siemens AG 2007Page 12 Power Transmisson and DistributionPTD SOLAR
The world’s largest BIPV - solar roof!
Solarroof Floriade, Netherlands
19.380 pieces SP120L; total power 2.300 kWp
Roof integrated aluminum greenhouse construction, 100x276 meter
Orientation SW-NE, tilt 18,5º, 85 roofs
2x2x400 kVA M/S, 2x2x300 kVA M/S SINVERT
Ordervalue: € 16,3 million + 10-year service contract
In operation: January 2002, yield 1,4 GWh per year
CREAVOLT - Liège
14/03/2008
7
© Siemens AG 2007Page 13 Power Transmisson and DistributionPTD SOLAR
Special BIPV- application
Roof integration at Oceanium, Blijdorp Zoo, Netherlands
3.400 pieces SP150L; total power 500 kWp
4 x 100 kVA central SINVERT inverter system
Order € 3,2 million + 20-year service contract with performance guarantee 20-year service
In use: November 2003
� PV for alternative power supply
� PV without batteries for basic load supply or peak load energy demand.
© Siemens AG 2007Page 14 Power Transmisson and DistributionPTD SOLAR
References: solar at industrial roofs
PV at production ALLTON, Berlin, Germany
total power 600 kWp, in 3 phases
45 kWp pilot in operation since december 2005
Special flat-roof ballast system
225 kWp commissioning in Juli 2007
100 kWp EW Fertigbau, Herbrechtingen, Germany (2005 )
CREAVOLT - Liège
14/03/2008
8
© Siemens AG 2007Page 15 Power Transmisson and DistributionPTD SOLAR
References: functional architecture
Industrial roofs (production halls, breweries,..);
Airports (building and permissies);
Football and sports venues;
Parking garages;
Schools;
Office buildings;
2006: 140 kWp Stadium Nürnberg, G
2005: 30 kWp SIEMENS A&D Fürth, G
2006: 20 kWp HQ ABN AMRO Amsterdam, NL
2001: 20 kWp office, NL
© Siemens AG 2007Page 16 Power Transmisson and DistributionPTD SOLAR
SIEMENS SUNIFTM – PV- façades solutions
For office buildings and functional architecture: ‘a PV appearance’
SIEMENS engineering product for plate-facades with PV-panels as cladding material
In operation since september 2007: 70 kWp PV-facade on waste-to-energy power plant, near Milan, IT
CREAVOLT - Liège
14/03/2008
9
© Siemens AG 2007Page 17 Power Transmisson and DistributionPTD SOLAR
References: solar at industrial roofs (1)
PV at production ALLTON, Berlin, Germany
total power 600 kWp, in 3 phases
45 kWp pilot in operation since december 2005
Special flat-roof ballast system
225 kWp commissioning in Juli 2007
100 kWp EW Fertigbau, Herbrechtingen, Germany (2005 )
© Siemens AG 2007Page 18 Power Transmisson and DistributionPTD SOLAR
References: solar at industrial roofs (2)
PV at production MOSCA, Waldbrunn, Germany
total power 330 kWp; in operation since 2007
Special support structure with roof penetration
CREAVOLT - Liège
14/03/2008
10
© Siemens AG 2007Page 19 Power Transmisson and DistributionPTD SOLAR
Thank you for your attention
PTD M3 CoC Solar Projects
SIEMENS NL, ETD EV Solar
www.siemens.com/solar
2007: PV canopy, SIEMENS, The Hague