Knowledge Centre- Defence Audit Group VII Dr. Ajeet Kumar Maurya Sunil Kumar Vandana Sharma Ippili Hemanth Kumar Md Shadab Presented on 06042019 Working of Army Base Workshop Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019 Regional Training Institute, Jammu Page 1 of 19
Transcript
Page 1: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Knowledge Centre- Defence Audit

Group VII

Dr. Ajeet Kumar MauryaSunil Kumar

Vandana Sharma Ippili Hemanth Kumar

Md ShadabPresented on 06‐04‐2019

Working of Army Base Workshop

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 1 of 19

Page 2: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

WORKING OF ARMY BASE WORKSHOP

Presented By:Dr. Ajeet Kumar Maurya

Sunil KumarVandana Sharma 

Ippili Hemanth KumarMd Shadab

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 2 of 19

Page 3: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

The Army base workshop (ABW)

• Responsible for major repairs and overhaul of weapons, vehicles and equipment.• To ensure battle worthiness of Indian Army at all the time.• Equipment in Zero Hour Zero Kilometer.There are 8 army base workshops:‐1. 505 ABW Delhi    2. 506 ABW Jabalpur(MP)3. 507 ABW Kankinara (WB)4. 508 ABW Allahabad (UP)5. 509 ABW Agra (UP)6. 510 ABW Meerut (UP)7. 512 ABW Pune (MH)8. 515 ABW Bengaluru (KR)

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 3 of 19

Page 4: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Organizational StructureMaster General of Ordnance (MGO)

Policy makers and Regulatory authority in respect of framing of overhaul Programme, interface with line 

directorates and EME authorities. Overall responsibility for maintenance of equipment of Indian 

Army 

Directors of General of Electronics and Mechanical Engineering (DGEME)

Maintenance/Upgrade of equipment held by Indian Army. The control over ABW’s is exercised through HQ Base Workshop 

Groups 

Director General of Ordnance Services (DGOS)Provision, procurement and storage of spares required for overhaul and 

maintenance through Ordnance Factories, DPSU’s and Trade

Line DirectoratesEquipment/Weapon Holders and 

distribution of target among Command headquarters

ABWsOverhauling

Agency

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 4 of 19

Page 5: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Classes of VehiclesClass A             Class B

Major Fighting Vehicles All Supporting military land vehicles

Armoured Fighting Vehicles (AFV), Infantry Combat Vehicles (ICV), Armoured Recovery Vehicles (ARV), Snow Vehicles

Tucks, Buses, Gypsys Cars and Jeeps

Vehicles Features Scania, Tatra, Kraz

Tank T‐90 (2002) the main stay of Armoured Corps

MBT Arjun (2004) An indigenously developed Tank with 120 mm rifled  bore gun. Critical in NBC war scenario

Tank T‐72 (1979) Main Tank of the Army. Fitted with 780 HP super charge engine and 125mm smooth bore gun

BMP‐II (1985) an Infantry Combat Vehicle (ICV) with amphibious capabilities and high degree of mobility and provides additional safety to Infantry soldiers

ARV WZT‐2 recovery vehicle for Tank T‐55 and its variants

Ever Observed Number Plates Of Military Vehicles?

-upward pointing arrow-followed by the last two digits of the year-The next is the base code, followed bthe serial number/vehicle number- Last Alphabet- Class‐ Star‐Rank of Officer

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 5 of 19

Page 6: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Audit Objective 1: Whether the ABWs were able to fulfil their role economically, efficiently and effectively?

Audit Design Matrix

Audit Question Audit Criteria Audit Evidence Data Collection Methodology

• Whether was there any Backlog of overhaul of equipment?

• Whether the overhaul targets were achieved by ABWs?

• Whether the testing facilities were available at ABWs?

• Whether the long range perspective plan was prepared by ABWs?

• Whether the creation of overhaul facilities and  induction of new equipment was done timely?

• Whether the ABWs were modernized from time to time?

Army Base Workshop Procedure.• Five Year Repair Programme framed by MGOs Branch at Army Headquarters.• Induction Pattern and Overhaul Cycle of the equipment inducted in Army.• Instructions, Standard Operating Procedures (SOPs), letters issued by DG EME,DGOS, HQ BWG.• Special Provision Review Directives, Technical Instructions, and Issue Procedureframed by DGOS for provisioning of spares.• Overhaul scales for spares framed by DGEME for overhaul of the equipment.

• Records Of All selected ABWs• Physical observations of workshops

•Entry Conference with Ministry of Defence•Collection of data through document analysis, response to audit queries, questionnaires, joint Physical Verifications, joint collection of samples and photographic evidence•User feedback on overhauled equipment 

Audit Objective 2: Whether infrastructure available at the ABWs was adequate and modernized timely?

Sample5 out of 8

(New Delhi, Agra, Meerut Kirkee, Banglore)

Period  2010‐11 to 2015‐16

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 6 of 19

Page 7: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Audit FindingsBacklog of overhaul of important class ‘A’ equipment

Non‐achievement of overhaul targets by ABWs• At ABW‐New Delhi, ranged between 60 to 83 per cent of original targets 

• At ABW‐Kirkee, ranging from 13 to 62 per cent

• At ABW‐Agra, 50 per cent in respect of Radar Fly Catcher and up to 60 per cent in respect of Radar TC Reporter

• ABW‐Meerut, HRV AV15 during 2014‐15 was merely 10 per cent of the original targets

949

928

912

939

980

892

72

124

72

121

145

90

0 200 400 600 800 1000 1200

2010‐11

2011‐12

2012‐13

2013‐14

2014‐15

2015‐16

BMP‐II and IIK

O. done O. Due

222

222

220

218

216

213

0

2

2

2

3

13

0 50 100 150 200 250

2010‐11

2011‐12

2012‐13

2013‐14

2014‐15

2015‐16

ARV WZT‐2

O. done O. Due

811

793

789

727

664

612

98

83

126

140

160

133

0 100 200 300 400 500 600 700 800 900

2010‐11

2011‐12

2012‐13

2013‐14

2014‐15

2015‐16

Tank T‐72

O. done O. Due

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 7 of 19

Page 8: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Inordinate delay in overhaul

‐Norm of 153 days‐Delayed up to 1512 days

BMPs ‐Norm of 30 days‐Delayed up to 308 days

UTD‐20Engine for BMP

‐Norm of 144 days‐Delayed up to 836 days

Tanks T‐72

Non‐availability of testing facilities at the ABWs

‐ ABWs did not have the requisite test facility‐ ‐The BMPs and Tanks T‐72 overhauled by ABWs were 

issued to user units without test firing 

Non‐existence of cost accounting system

‐Guidelines 30 per cent of the cost of new vehicle/engine

‐No cost accounting mechanism was in place in the

ABWs to ensure the cost effectiveness of the repairs 

and overhaulsDelay in Modernization of ABWs

‐ As per the 11th Army Plan (2007‐2012)– Proposal Costing Rs. 1781.44 crores‐ MGO proposed to prepare PDR for all 5 ABWs till Dec.2012‐ But final DPR by all submitted Sep. 2016‐ May 2016, MGO stated to complete the modernisation work till 2021‐22

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 8 of 19

Page 9: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Key Recommendations

• Ministry should formulate the overhaul policy for Class ‘B’ vehicles.• Original Equipment Manufacturer(OEM) prescribed test facilityshould be installed at the time of setting up of infrastructure foroverhaul.

• For augmenting availability of spares, constraints in the availability ofspare need to be identified and process of making available sparesthrough manufacturing or procurement need to be streamlined.

• Army Headquarters should lay out a time bound action plan formodernization of ABWs to overcome the problems due to vintage.

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 9 of 19

Page 10: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Key Recommendation• Ministry should expedite the Component Level Repair (CLR) projectfor supporting Tank T‐90 with repair facilities.

• Quality Index of Overhauled BMP tanks despite improvement during2015‐16 still remains low and needs to be further improved.

• For overhaul of vision devices , Ministry should review the scope andimplementation of Project Tulip for establishment of additionalfacilities at 512 ABW.

• Cost accounting system should be introduced in the workshops toensure optimum utilization of resources viz. man‐power, machinesand materials and to assess the cost effectiveness of overhauls.

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 10 of 19

Page 11: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Conclusion• The delayed overhaul, compounded by delay in issue of release orders and dispatch of the overhauled equipment to the unit. 

• Quality Index was far below the prescribed norms.• Lack of tests facilities and test equipments.• No Long Range Perspective Plan for creation of infrastructure.• Impact on the operational readiness • Present plant and machinery at ABWs was technologically inadequate.

• Non availability of spares in adequate range.

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 11 of 19

Page 12: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Current scenario

• Private firms to get entry into ABWs.• Privatisation is based on the recommendations of Lt. Gen. DB Shekatkar (Retd.) Committee.

• Dates set to privatise 4 ABWs by April 2019.• GOCO Model – Govt. Owned Contractor Operated.• 12000 employees across 8 ABWs‐ 75% civilian staff.• Issues and concerns related to privatisation:• Present plant and machinery• Collaborate with Original equipment manufacturer (OEM)

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 12 of 19

Page 13: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

References• https://en.wikipedia.org/wiki/515_Army_Base_Workshop• https://cag.gov.in/sites/default/files/audit_report_files/Report_36_of_2016_Union_Government_Defence_PA.pdf`

• https://cag.gov.in/sites/default/files/noddy_books/Report_36_of_2016_Union_Government_Defence_PA_noddy_0.pdf

• https://timesofindia.indiatimes.com/india/private‐firms‐get‐entry‐into‐army‐base‐workshops/articleshow/62330612.cms

Thanks

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 13 of 19

Page 14: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 14 of 19

Page 15: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 15 of 19

Page 16: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 16 of 19

Page 17: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 17 of 19

Page 18: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019

Regional Training Institute, Jammu Page 18 of 19

Page 19: Knowledge Centre- Defence Auditdirectorates and EME authorities. Overall responsibility for maintenance of equipment of Indian Army Directors of General of Electronics and Mechanical

Project Work - Direct Recruit AAO Induction Training from 01-02-2019 to 04-05-2019