06/01/14
2,200,000.00€
21/10/12
Vigo-España
EQUIPMENT
CLIENT:
SITE:
AMOUNT:
START DATE CAMPAIGN:
END DATE CAMPAIGN:
OPERATIONAL DAYS:
SCOPE OF WORKS:
Geophysicalsurveyusingthefollowingequipment:
-BathymetryMultibea-Sidescansonar.-Sub-bottomprofiler.Pinger.-Seismichighandlowresolution.-Magnetometryhighresolution.
Geotechnicalsurvey:
2boreholeusingdrillrigandcontinoussamplingupto30mbsf.
2CPTUindown-the-holeupto30mbsf.
DredgingInternational
ControlyProspeccionesIGEOTESTS.LhasbeencontractedbyDREDGINGINTERNATIONALtocarryoutageotechnicalsurveyinKuwaitforthenewrefineryproject.ThesitelocationisproposedatthewestsideoftheAl-ZourPowerPlantandthesouthwestendoftheTexacoOilFacilities.InthesouthwefindtheAlKhiranPearlCity.Toallowconstructionoftheplant,atotalof70millionm_ofsandneedstobedredgedandreclaimed.ForthisasandsearchcampaignhasbeensetupaspartofaSIB.ThiscomprisesseabedsurficialboreholesexecutedwithaSeabedMinidrill.
•1sondeotestificaciónhasta15m(instalaciondepiezom.yarqueta)•3sondeosatestificaciónhasta5m
MINIDRILL MDS-6000Dimensions: 7510x2400x2350 (l x w x h)Surface weight: 5600 kgSampler Diameter (mm): 120 int./146 ext .Sampler length (m): 6,0 mMax. water depth: 300 mThrust capacity: 35 kNElectrical power: 15kw/400VRefrigeration pump 60l/min - 50 barDrilling tool:bit widia
Totalde27presiómetrosentierra
Campañageotécnicamarinaconsistenteenlarealizaciónde:
SEA WAVETYPE: offshore tug / supply shipSIZE: 61 x 12 mDRAUGHT: 4,90 m
•8sondeosdestructivosc/presiómetroc/1,5m(endossondeoscaladode5m)hastacota-30m.Totalde108presiómetrosenmar
*Sondeosdestructivosconregistrodeparámetros*Detectarinstalacionesenterradas*30mldetuberiapiezométricay2arquetas.
30/08/2013
10Days
24/09/2013
Thetotalgeotechnicalsurveyswasperformedin30dayswiththePrepaparationphase,Mobilizationphase,Surveyperformacephaseoffshore(geotechnical)anddataprocesingphaseandtheinterpretationandreportingphase.
MARINE SPREADS
AlZour-Kuwait
217,000.00€
KNPC New Refinery Project Al Zour