ii
Konza Local Physical Development Plan - (2012-2030)Prepared by the Centre for Urban and Regional Planning, for the
Ministry of Information and Communication. The Plan is prepared under
supervision by the Director of Physical Planning, in accordance with
provisions of the Physical Planning Act Cap 286, Section 24(1), and
Legal Notice No 109 of 2010.
The Director of Physical Planning
Ministry of Lands
PO Box 45025, Nairobi - 00100, Kenya
Tel: +254 20718050
Fax: +254 41 2224411
http://www.lands.go.ke
The contents of this publication are protected by copyright.
Consequently, no use of this publication may be made for resale or for
any other commercial purpose whatsoever without prior permission in
writing from the copyright holder.
Any reproduction in whole or in part and in any form for educational or
non-profit purposes may be possible with special permission from the
Director of Physical Planning, provided acknowledgement of the source
is made. The KOTDA and the authors would appreciate receiving a copy
of any publication that uses this report as a source.
For bibliographic and reference purposes this publication should be
referred to as: DPP (2010), Konza LPDP 2012-2030. Director of
Physical Planning, Nairobi
2013, Director of Physical Planning
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
3/89
iii
The funding support for this Report was provided by the Government of
Kenyas Ministry of Information and Communications, through the
International Finance Corporation (IFC).
Ministry of Information and CommunicationsTeleposta Towers, Koinange St
PO Box 30025, Nairobi 00100, Kenya
Tel: +254 4920000/1
http://www.information.go.ke
The Centre for Urban and Regional Planning (CURP) made available its
diverse expertise (in-house and collaborating) and rich catalogue of
data sets towards the drafting and production of this plan and report.
The Centre for Urban and Regional Planning
Bruce House (Standard Street), 14th floor
PO Box 2908, Nairobi 00100, Kenya
Tel: +254 20 2244463
http://www.curp.or.ke
E-mail: [email protected]
The following organizations collaborated on this Report: Government of Kenya (GoK); Line Ministries and Departments H R & A Advisors, INC
SHoP Architects, OZ Architecture, Tetra Tech, Dalberg
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
4/89
iv
DisclaimerThe views expressed in this publication are not necessarily those of the
agencies cooperating in this project. The designations employed and
the presentations do not imply the expression of any opinionwhatsoever on the part of the Director of Physical Planning, or
cooperating agencies concerning the legal status of any country,
territory, city, or area of its authorities, or the delineation of its frontiers
or boundaries.
Mention of a commercial company or product in this report does not
imply endorsement by the Director of Physical Planning. The use of
information from this publication concerning proprietary products for
publicity or advertising is not permitted. Trademark names and symbols
are used in an editorial fashion with no intention of infringement ontrademark or copyright laws.
We regret any errors or omissions that may have been unwittingly
made.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
5/89
v
Table of ContentsList of Figures .......................................................................................................................... vii
Acronyms ................................................................................................................................ viii
EXECUTIVE SUMMARY ............................................................................................................. ix
CHAPTER ONE: INTRODUCTION .............................................................................................. 1
1.1 Preamble ........................................................................................................................ 11.2 Background .................................................................................................................... 1
1.3 Scope of work ................................................................................................................ 3
1.4 Description of Konza Site and Environs ....................................................................... 4
1.5 The Terms of Reference ................................................................................................ 6
1.6 Methodology .................................................................................................................. 6
1.8 Envisioning Konza techno city ...................................................................................... 7
1.9 Objectives ..................................................................................................................... 10
1.10 Guiding Principles...................................................................................................... 10
CHAPTER TWO: PLANNING CONTEXT .................................................................................. 11
2.1 Policy Context ............................................................................................................... 11
2.1.1 Vision 2030 ........................................................................................................... 112.1.2 Nairobi Metropolitan 2030 Strategy ................................................................... 11
2.1.3 National Land Policy ............................................................................................. 11
2.1.4 The Housing Policy ................................................................................................ 12
2.2 Legislative Context ...................................................................................................... 12
2.2.1 The Physical Planning Act .................................................................................... 12
2.2.2 Environmental Management and Coordination Act ........................................... 13
2.2.3 The Local Government Act ................................................................................... 13
2.2.4 The Urban Areas and Cities Act ........................................................................... 13
2.3 Institutional Framework .............................................................................................. 13
2.4 Geographical and Climatic Contexts .......................................................................... 14
2.4.1 Climatic Conditions ............................................................................................... 14
2.4.2 Locational Advantages ......................................................................................... 15
2.4.3 Locational challenges ........................................................................................... 17
2.4.4 Land Use ............................................................................................................... 17
2.4.5 Land Tenure .......................................................................................................... 18
2.5 Regional Population Dynamics ................................................................................... 20
2.5.1 Population structure ............................................................................................. 20
2.5.2 Peri-urban Settlements ........................................................................................ 21
2.5.3 Migration Trends ................................................................................................... 22
2.5.4 Gender Issues ....................................................................................................... 22
2.5.5 Synthesis of Population ........................................................................................ 22
CHAPTER THREE: SITUATION AND SITE ANALYSIS .............................................................. 24
3.1 Site analysis ................................................................................................................. 24
3.1.1 Shape, Size and topography ................................................................................ 25
3.1.2 Hydrology and Drainage ....................................................................................... 25
3.1.3 Geology and Soil ................................................................................................... 26
3.1.4 Vegetation and wildlife ......................................................................................... 26
3.1.5 Synthesis of site analysis ..................................................................................... 28
3.2 Population and Land Requirements .......................................................................... 28
CHAPTER FOUR: ALTERNATIVE DEVELOPMENT MODELS ................................................... 30
4.1 Alternative One: Radial Corridor ................................................................................. 31
4.1.1 Evaluation of Alternative One .............................................................................. 33
4.2 Alternative Two: Circuit Board .................................................................................. 34
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
6/89
vi
4.2.1 The Transportation System .................................................................................. 36
4.2.4 Evaluation of Alternative two (Circuit Board) ...................................................... 45
4.3 Alternative Three: The Stitch Model ........................................................................ 46
4.3.1 Evaluation of Alternative three ............................................................................ 47
4.3.2 Comparative evaluation of the three alternatives .............................................. 48
CHAPTER FIVE: PLAN PROPOSALS ....................................................................................... 495.1 Land Use Framework................................................................................................... 49
5.2 Site Structuring Elements ........................................................................................... 51
5.3 Land Use Zones ........................................................................................................... 52
5.3.1 Recreation and open space ................................................................................. 52
5.3.2 Transportation Strategy ........................................................................................ 54
5.3.3 Residential Zone ................................................................................................... 56
5.3.4 Commercial and Mixed Uses ............................................................................... 57
5.3.5 Education: University, Techno and Life Sciences ............................................... 58
5.3.6 Public Purpose and Utilities ................................................................................. 59
5.4 Land budget for the entire Konza ............................................................................... 60
5.6 Zoning Standards and Regulations ............................................................................ 605.6.1 Objective of zoning regulations ........................................................................... 61
5.7 Action area plan for phase one .................................................................................. 71
5.7.1 Guiding principles for the master plan ................................................................ 72
5.8 Development strategies .............................................................................................. 72
5.8.1 Environment Strategy; .......................................................................................... 72
5.8.2 Transportation Strategy ........................................................................................ 73
5.8.3 Housing Strategy; .................................................................................................. 74
5.8.4 Infrastructure ........................................................................................................ 75
5.8.5 Local Economic Development ............................................................................. 75
CHAPTER SIX: IMPLEMENTATION FRAMEWORK .................................................................. 77
6.1 Institutional framework ............................................................................................... 776.3 Monitoring and evaluation .......................................................................................... 79
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
7/89
vii
List of FiguresFigure 1: ARTISTS IMPRESSION OF KONZA ................................................................................................... 1
Figure 2: The Greenfield site for Konza city ......................................................................................... 3
Figure 3: The context of KTC ................................................................................................................. 4
Figure 4: Urban Centres around KTC .................................................................................................... 5
Figure 5: KTC in the context of Kenya and Nairobi Metropolitan Region......................................... 14Figure 6: Rainfall Distribution in South Eastern Kenya. .................................................................... 14
Figure 7: Section of Nairobi-Mombasa road. ...................................................................................... 15
Figure 8: Nairobi-Mombasa Railway line through Konza Station ..................................................... 15
Figure 9: Large ranches around KTC .................................................................................................. 17
Figure 10: Land Tenure system in Konza area .................................................................................. 19
Figure 11: Market in one of the urban centres .................................................................................. 20
Figure 12 (a & b): Regional Population Dynamics ............................................................................ 21
Figure 14: Commercial developments in Malili centre...................................................................... 22
Figure 14: Semi-permanent house ..................................................................................................... 22
Figure 15: Satellite image of the KTC ................................................................................................. 24
Figure 16: Hydrology of Konza and its environs ................................................................................ 25Figure 17: The panorama of the site with a hill at the background.................................................. 26
Figure 18: Exposed black cotton soil at the site ................................................................................ 27
Figure 19: Wildebeest at the ranch close to Konza site.................................................................... 27
Figure 20: opportunities and challenges of the KTC site .................................................................. 28
Figure 21: The Radial corridor model ................................................................................................. 31
Figure 22:Evaluation criteria for alternative one .............................................................................. 33
Figure 23: The circuit board model..................................................................................................... 34
Figure 24: Illustration of the hard and soft corridors and the combination of the two ................... 37
Figure 25: Distribution of Ecological & Open Spaces ........................................................................ 38
Figure 26: Activities areas connected by the soft corridor................................................................ 40
Figure 27: High density residential together with mix use ............................................................... 41Figure 28: Medium and low density residential in relation to hard and soft corridor ..................... 42
Figure 29: Park and ride along both the soft and hard corridor ....................................................... 43
Figure 30: Utility locations at the site ................................................................................................. 44
Figure 31: Evaluation criteria for alternative two................................................................................ 45
Figure 32: The stitch model ................................................................................................................ 46
Figure 33: Evaluation criteria for alternative three............................................................................ 47
Figure 34: Konza physical development plan .................................................................................... 50
Figure 35: Structuring elements ........................................................................................................ 51
Figure 36: Recreation and open spaces ............................................................................................ 52
Figure 37: Transportation strategy ..................................................................................................... 54
Figure 38: Residential zone ................................................................................................................ 56Figure 39: Commercial and Mixed Use .............................................................................................. 57
Figure 40: Education and techno & life science ................................................................................ 58
Figure 41: Public purpose and utilities ............................................................................................... 59
Figure 42: land budget of entire site .................................................................................................. 60
Figure 43: Land zoning regulations .................................................................................................... 70
Figure 44: Action area for Phase One................................................................................................. 71
Figure 45: Phase 1 Land Use Budget ................................................................................................. 72
http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321639http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321639http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321640http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321640http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321641http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321641http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321641http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321642http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321642http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321646http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321646http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321647http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321647http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321648http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321648http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321659http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321659http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321659http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321648http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321647http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321646http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321642http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321641http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc349321640http://d/KTC%20LPDP%20Word%20Document.doc%23_Toc3493216397/30/2019 Konza Local Physical Development Plan - (2012-2030)
8/89
viii
Acronyms3Rs Reduce, Recycle, Re-use
ASAL Arid and Semi-Arid Land
BPO Business Processing Offshoring
CURP Centre for Urban and Regional PlanningDPP Director of Physical Planning
EBS Elder of Burning Spear
EGH Elder of Golden Heart
EMCA Environmental Management And Coordination Act
ICT Information Communication Technology
IFC International Finance Corporation
ILRI International Livestock Research Institute
ITES Information Technology Enabling Services
JKIA Jomo Kenyatta International Airport
KOTDA
KTC
Konza Technopolis Development Authority
Konza Technology City
KPH Kilometer Per Hour
KWS Kenya Wildlife Service
LPDP Local Physical Development Plan
MDP1/2 Master Delivery Partner 1 and 2
MoIC Ministry of Information Communication
MP Member of Parliament
PPA Physical Planning Act
PPP Private Public Partnership
T.O.Rs Terms of Reference
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
9/89
ix
EXECUTIVE SUMMARYThe preparation of this Plan is informed by the Governments decision to initiate a
technology city at Konza which is located 60 kilometers South East of the capital Nairobi.
This is in line with the provisions of the Kenya Vision 2030 which identified Konza
Technology City as one of the flagship projects under the Economic pillar in the MediumTerm (2015). The Government intends to close the gap between Kenya and other middle
income nations by leveraging the growing regional and global ICT sector.
The main objective of this plan is to provide a framework to guide the development of
Konza City and form a basis upon which the preparation of the Konza Master Plan will
be realized. This has been done by way of appropriately and rationally allocating land
for various land uses within the site. The guiding principles in the preparation of this
Plan include optimal, efficient and economic use of land as provided for in the National
Land Policy, promotion of walkability, health, harmony, safety and efficiency, inclusive
and coordinated governance systems and the structuring of urban environmental
sustainability.
Three development models were presented and evaluated against preset criteria and
presented to the client-Ministry of Information and Communication. The third
alternative-Stitch Model was chosen out of the three as the preferred plan to guide the
development of Konza.
The report is organized into six broad chapters namely; introduction, planning context,
situation analysis, alternative development models, plan proposals and the
implementation framework. The first three chapters give the context in terms of the
background, planning context and analysis of the site to evaluate its suitability for
urban developments. The fourth chapter discusses the three development models while
the fifth chapter details the plan proposals of the preferred option. The last chapter
gives the implementation framework of the plan.
Finally, it is envisioned that the plan will be implemented to the latter in order to realize
its objectives and the Kenya Vision 2030. This will be achieved by adhering to the
zoning standards and regulations provided therein and subject to any other law guiding
the development of Urban Areas and Cities in Kenya.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
10/89
x
Endorsements, Certifications & ApprovalI Certify that this Plan has been prepared and published as per the requirements of the
Physical Planning Act Cap 286.
Signed
_______________________________________Mr. Renson K MbwagwaRegistered Physical Planner, Principal, CURP
_______________________________________
Date
Certified
_______________________________________Mr. Augustine K. Masinde, EBSDirector of Physical Planning
_______________________________________
Date
Approved
_______________________________________Hon. James Orengo, MP, EGHMinister for Lands
_______________________________________
Date
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
11/89
CHAPTER ONE: INTRODUCTION
Figure 1: ARTISTS IMPRESSION OF KONZA
1.1PREAMBLEThe challenge of planning Konza was to successfully come up with a plan that is legally
acceptable in Kenya, responsive to the aspiration of Vision 2030, implementable and
formidable enough to attract targeted local and foreign investment. Consequently, the
LPDP has responded to all procedural and substantive requirements as provided for in
the Physical Planning Act and other legislations. The concerns of the various
stakeholders such as the local community, professionals, and the Ministry of Information
and Communication have also been incorporated. It is envisioned that the plan will be
implemented accordingly to the latter in order to achieve all the aspirations and vision ofa technology city
1.2BACKGROUNDThis Local Physical Development Plan (LPDP) has been prepared to enhance the
realization ofKenya Vision 2030, which is a blue print for the Countrys development for
the next 20 years. Konza Technology City (KTC) is one of the flagship projects of the
Kenya Vision 2030 that is key to positioning Kenya as a leading information and
Communication Technology (ICT) Nation in Africa by leveraging and expanding Kenyas
Information Technology Enabled Services (ITES) sector with emphasis on Business
Processing Outsourcing (BPO). This has become one of the national flagship projects tobe undertaken within specified timelines.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
12/89
2
To realize this objective, the Government purchased a 2,058 Hectares (5,000 acres)
piece of green field land located about 60km East of Nairobi along the Nairobi
Mombasa road and 4Km North of Konza Town. The land was previously part of Malili
ranch and the government bought the land from shareholders after complete
subdivision of Malili ranch was done. The MoIC which is spearheading the project
identified and engaged The International Finance Corporation (IFC) as the TransactionAdvisor who in turn hired Pell Frischmann Consultants, U.K to prepare a concept master
plan to guide the development of KTC. The consultant delivered a Concept Master Plan
showing the broad proposals on the development of the city that required to be stepped
down to realistic action plans for immediate implementation. Furthermore, together
with the Local Physical Development Plan (LPDP), and over a period of six months, an
implementation plan for Phase 1 of the project was prepared by Master Delivery
Partner 1 (MDP1) based on a business plan and detailed master planning to guide
implementation of the subsequent four and a half years of Phase 1 by Master Delivery
Partner 2 (MDP2) in support of the Konza Technology City Development Authority
(KOTDA).
The new technology city will be implemented by both Government and private sector
actors under a Public-Private Partnership (PPP) approach. The Government will bear the
cost of public investments in form of strategic infrastructure and initial investments
during the first phase. This will then attract private investors, PPPs and multinationals
to develop the subsequent phases. MDP1 led by HR&A Advisors was retained by the IFC
on behalf of the MoIC to develop an implementation plan for phase 1 of the proposed
Konza technology city project.
Given the complexities of the approval process, HR&A Advisors partnered with the
Center for Urban and Regional Planning (CURP), a Nairobi-based planning firm withextensive experience in local planning process, to lead the LPDP preparation and
approval process. The Teams assignment was to develop LPDP that provided the
necessary framework for a planned economic growth, land-use and environmental
management, facilitation and regulation of investment and development initiatives and
activities. The LPDP envisages achieving this by providing both the rationale and
principles for the effective interpretation of national development policies in terms
appropriate to KTC, both in the short and long-term. The plan provides a spatial
template for achieving intended actions through formulation of an integrated strategic
structure plan, comprehensive area development plans, and detailed plans for thematic
sectors such as transport, business, real estate and associated support facilities and
services. In addition, the LPDP will set the framework for Phase 1 detailed master plan.This will require the LPDP to be flexible enough not to preclude any options for Phase 1
and to be able to accommodate future phases of growth.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
13/89
3
Figure 2: The Greenfield site for Konza city
1.3SCOPE OF WORKThe LPDP shall cover all the area of green field land registered as LR 9918/13 to
create a broad perspective of development that will occur and provide a stable
framework on which phased development will occur. This will involve distributing land
uses relating directly and indirectly to the development of the techno city. These
activities include designated land for;
Housing; Education Institutions Commercial development; Recreation and open spaces;
The major activities will be integrated by a transportation spine which provides an
efficient and safe connectivity for both motorised and non-motorised traffic. In addition
to this, the spine will provide major public utility requirements which include; water
reticulation, sewerage and sanitation, energy distribution, and communication
infrastructure. Furthermore, this plan has taken keen consideration of environmental
conservation, protection and enhancement to promote environmental sustainability.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
14/89
4
1.4DESCRIPTION OF KONZA SITE AND ENVIRONSKonza Technology City is located at the heart of Athi Kapiti plains within borders of the
wider planning region of the Nairobi Metropolitan Region (NMR) that comprise
Machakos County to the North East, Kajiado County to the West and Nairobi County to
its North West. KTC is located to the South-East of Nairobi, 60 kilometers from the city
centre and 400 kilometers from Mombasa town. Makueni County is to the East of thetechnology city.
Figure 3: The context of KTC
The site covers an area of about 5,000 acres. Major landmark neighboring the site
include Malili Township to the South, Konza Railway Station centre to the South West,
ILRI ranch to the West and Makueni County to the East. The techno city is strategically
located with ease of accessibility. It is serviced by two major international roads i.e.the A 104 and A 109 national highways. A 109 is aligned in a North-West to South-
East direction and links the port of Mombasa to Uganda, Sudan and the Great Lakes
region forming part of the northern corridor.
The main centres around Konza include Malili, Nguluni, Salama. Muumandu, Konza
station, Katumani, Kasunguni, Ulu and Ngiini. These centres are not planned and lack
basic infrastructure thus only provide low level services. These centres are envisaged
to develop as satellite towns to KTC thus the need for proper development control.
This will be achieved through preparation of a zoning plan covering the area around
KTC.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
15/89
5
Figure 4: Urban Centres around KTC
The immediate surrounding environment presents the following opportunities and among
others;
Protecting the integrity of the Konza city Connectivity using A109 Likely revitalization of the railway line Boost of the local economy including increased employment opportunities and
increase demand for agricultural produce
Conversely, it poses the following challenges among others;
Proliferation of unplanned urban development Intensification of land subdivision Increased traffic along A109
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
16/89
6
1.5THE TERMS OF REFERENCEThe main task in this planning exercise as per the Director of Physical Planning was to
develop a detailed LPDP in line with legal requirements to enable implementation of
phase 1 of the KTC project. In accordance with the T.O.Rs, the following are the main
tasks to be accomplished in the preparation of the LPDP inclusive but not limited to;
Undertaking all surveys necessary to ensure understanding of the area such assite analysis, suitability analysis, socio-economic analysis and demographic
analysis;
Stakeholder identification, analysis, mobilization and engagement at variouslevels;
Divide the area into phases and undertake detailed planning of Phase 1; Preparation of plan implementation framework to guide immediate
implementation of Phase 1 and subsequent phases;
Presentation of plan to the stakeholders; Plan publishing and circulation in liaison with the DPP; Incorporation of comments by stakeholders and finalization of the plan; Submission of the plan to the Department of Physical Planning in a defined
format for approval;
1.6METHODOLOGYThe main stages/steps followed in the preparation of LPDP for KTC are:
Reconnaissance: A reconnaissance tour was done on Monday, August 27th,through the following route; Nairobi Rongai Kiserian Isinya Kitengela - Arthi
River Kyumvi Machakos - Malili and Konza. The purpose of the tour was to
appreciate the site and its immediate surroundings in order to assess the planning
needs including requirement for base map preparation and the data requirements.
Base map preparation: After reconnaissance, a base map was prepared torepresent the actual ground situation of the site and to form a basis for detail site
analysis.
Site analysis: A detail site analysis was undertaken to examine physical,topographical, soils, drainage, hydrological characteristics as a way of determining
how the land will be utilised for development proposals.
Investigation/Data collection: Relevant primary and secondary data was procuredwith respect to population and demography, land use, socio economic factors and
infrastructure among other. The information gathered and analyzed provided the
evidence base for formulating strategies and policies.
Public participation: Stakeholders forums were undertaken on September 20thtogether with NEMA and exclusively on November 28th and 29th 2012 involving
meetings with local communities, client ministry, and sectoral ministries such as
water, energy, transport, wildlife and local authorities. Meetings were also held with
the MDP1 consortium that has been retained by the client to prepare a master plan
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
17/89
7
for Phase 1. The consultations were held to capture the needs and concerns of the
stakeholders and to build consensus with respect to the strategies and proposals.
Plan formulation: Based on the analysis of the site, the evidence gatheredthrough investigation and consensus build with various stakeholders, an LPDP
was prepared containing a broad land use framework, land development policies,
general development strategies along thematic areas and action area plan for
Phase 1. The plan implementation framework was also incorporated as part of the
LPDP.
1.8ENVISIONING KONZA TECHNO CITYKonza techno city is envisioned as a green, smart, inclusive and vibrant African silicon
savannah.
Elements inspiring the vision
Kenya Vision 2030 Aspirations of Konza Residents
Assets inherent in Konzas surrounding Urban sustainability elements
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
18/89
8
Rich cultural heritage of the local communities
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
19/89
9
Components of the Vision
Green City Vibrant City
Inclusive Smart
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
20/89
10
1.9OBJECTIVESThe objectives of the plan that would promote the vision of the city are to:
Rationally distributing various activities on the land available; Assessment of the demand and needs of KTC, Formulation of land policy principles for efficiency and sustainability; Promote environmental and ecological sustainability by identifying
environmental fragile areas and assets for protection, conservation and
enhancement;
To develop a detailed framework for implementation of projects in respect toPhase 1 of the KTC;
Formulate regulatory guidelines for controlling the use and development of land; To propose an appropriate framework for the implementation of the entire plan.
1.10GUIDING PRINCIPLESThe following principles shall promote the realization of the vision and objective of the
plan:
Optimal efficient and economic use of land; Health, safety and efficiency; Urban environmental sustainability to be achieved by mixed development,
smart growth, green energy solutions, efficient and cost effective public over
private transportation system, the 3Rs waste management system;
Inclusive and coordinated governance systems.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
21/89
11
CHAPTER TWO: PLANNING CONTEXTPreamble
This chapter explains the domain within which the preparation of this Local Physical
Development Plan was carried out. This mainly entailed policy documents and
legislations that guide Urban Planning and development such as Vision 2030, Nairobi
Metro Vision 2030 and National Land Policy; Sessional Paper no. 3 as it relates to
urban planning. In addition to the above, the national housing policy and geographical
contexts have also been discussed.
2.1POLICY CONTEXT2.1.1 Vision 2030The Kenya Vision 2030 is the sole governments developments blue print to guide its
development agenda for the next 20 years. KTC is one of the key Vision 2030 flagship
economic projects that were identified. The economic pillar of the vision proposes thedevelopment of BPO in the medium term (2015) to enable Kenya to quickly become the
top BPO destination in Africa. This is to be achieved by attracting at least five major
leading Information Technology suppliers, at least 10 large multinational corporations
and global BPO players to Kenya. It is estimated this will create jobs. KTC is envisioned
to have world class communication infrastructure developed by top international IT
suppliers. It also note that Kenya will provide incentive packages for companies to
locate in KTC, provide a-one-stop shop for administration and talent and serve as a
show-case to attract more top foreign IT companies. The vision also directs planning
for high quality urban livelihoods. The LPDP preparation has taken into account these
provisions.
2.1.2 Nairobi Metropolitan 2030 StrategyThe Nairobi metro 2030 recognizes the need to create BPO jobs, identifies the spatial
location within the NMR and the spatial framework required to allow their effective
functioning. Also in its desire to deploy the world class infrastructure and utilities for the
region, it will focus on among other things, smart city/villages strategy. The location of
Konza is strategic in such a manner as to articulate and complement the Nairobi
Metropolitan vision.
2.1.3 National Land PolicyThe National Land Policy (Sessional Paper No. 3) reconciles the many conflicting lawsand mismanagement of land as a resource. The guiding principle is to guide the country
towards efficient, sustainable and equitable use of land for prosperity and posterity. Theoverall objective of the National Land Policy is to secure rights over land and provide for
sustainable growth, investment and the reduction of poverty in line with the
Governments overall development objectives. Specifically the policy shall offer a
framework of policies and laws designed to ensure the maintenance of a system of land
administration and management that will provide: an economically, socially equitable
and environmentally sustainable allocation and use of land; and an efficient and
effective utilization of land and land-based resources in urban areas. This policy acts in
the interest to secure the growth and development of Konza technology city.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
22/89
12
2.1.4 The Housing PolicyProper housing is one of the key challenges facing urban areas in Kenya. The Housing
Policy on the other hand seeks to achieve sustainable human settlement, facilitate the
provision of adequate shelter and a healthy living environment at an affordable cost to
all socio-economic groups in Kenya. The LPDP has adequate provision for the housing
needs of the population of KTC. There will be low density, medium density and highdensity housing. Mix use residential neighbourhoods have been embraced to cut across
the social stratum.
2.2LEGISLATIVE CONTEXT2.2.1 The Physical Planning ActThe preparation of The LPDP is principally based on the provisions of the Physical
Planning Act (PPA) Cap 286) as the principle legislation. This is nevertheless supported
by other legal frameworks such as the Local Government Act (Cap 265), Environment
Management and Coordination Act (EMCA) No. 8 of 1999 among others. The PPA
defines the process of plan preparation, approval, typology, scope and content of the
Plan. Along with PPA, the consultant adhered to the provisions of Physical Planning
(Procurement of Physical Planning Services) Regulations, 2010; Physical Planners
Registration Act (No. 3 of 1996) and other ethical issues related to planning. The
consultant also adhered to the provisions of other legislation like Local Government Act
(CAP 265), Public Health Act (Cap 242), Environmental Management and Co-ordination
Act, and service provision acts such as Water Act (Cap 372), Streets Adoption Act (Cap
406) and any other relevant acts.
As far as PPA is concerned the following procedural aspects were followed:i. Notice of intention to plan
ii. Public participation
iii. Publication
iv. Circulation
The content of the plan has been guided by section 24 and 25 of PPA and Second and
Third Schedules. In addition to the content as indicated in PPA the consultant
considered all other aspects to suit knowledge firms requirements as it deemed
necessary as long as it is consistent with the spirit and letter of the law and the
attendant regulations.
Participation as per the PPA regulations which is also fortified by the constitution 2010
to take care of stakeholder concerns was followed to the letter.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
23/89
13
2.2.2 Environmental Management and Coordination ActThe citys environmental matters have been dealt with in line with the provisions of the
Environmental Management and Coordination Act. This has been widely adhered to by
integrating the natural resources (wildlife) into the city fabric through conservation.
Ecological concerns have also been incorporated in the plan to ensure that the land use
changes are not detrimental to the environment.
2.2.3 The Local Government ActThe Local Government Act provides for the formation and mandates of the local
authorities in the country. This is the law that will be enforced to control development
and use of land and buildings to achieve an efficient and coordinated development
within and outside KTC. The act provisions will be key in ensuring quality development
and building standards.
2.2.4 The Urban Areas and Cities ActThis Act gives guidelines on the management and governance of urban areas and cities
in the country. Section 12 outlines that management of city or municipality be
administered by county government. This can be administered by a board, appointed
manager or such other staff or officers as the county public service may determine. This
will be adhered to and gazzettement of Konza Technology Development Authority
(KOTDA) to oversee the overall management and governance of the city is an indicator
of this aim. It also provides for the preparation of Integrated Development Plans as
reference tool in the decision making to guide social, economic and spatial
development of urban areas and cities.
2.3INSTITUTIONAL FRAMEWORKKonza Technology City falls within the jurisdictions of three counties (Machakos,
Makueni and Ol kejuado). This has implications on cross county administration for the
execution of this plan. The DPP office is the institution charged with the mandate for
supervision of the LPDP and planning of the 10 KM buffer to secure the quality of
developments around the city. The DPP put gazette notice and public notices on the
intention to plan and completion of the plan to notify the public on the planning of the
KTC from the start to end of the process. The DPP will certify the LPDP whereas the
Minister for Lands plays the role of approving the plan. The institution which shall be
charged with the responsibility of controlling development of KTC is KOTDA. The MIC is
the client institution whose role has been spearheading through coordinating, directing
and implementing anchor ICT flagship projects which Konza city project is one.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
24/89
14
2.4GEOGRAPHICAL AND CLIMATIC CONTEXTS
National
,
2.4.1 Climatic ConditionsThe physical environment of any given place is determined by various factors. These
include but not limited to altitude, soils, climate, vegetation and physiographic to list
but a few. Konza lies at an altitude of 600 MASL - 1900 MASL with rainfall ranging
annually from 150 mm to 650 mm rendering the place categorized as Arid and Semi-
Arid Lands. The average temperature of Konza is about 26oC with two rainfall season
during March-May and October-December for long and short rains respectively.
Figure 5: KTC in the context of Kenya and Nairobi Metropolitan Region
Regional: Nairobi Metropolitan
Figure 6: Rainfall Distribution in South Eastern Kenya.
Source: Jaetzold Ralp et al 2010
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
25/89
15
2.4.2 Locational AdvantagesRoads: KTC is located strategically along the A109 and can also be well served by A104which both Trans African highways are connecting Kenya with the neighbouring
countries. The City is situated only 60 km from Nairobi. This positions KTC as a major
gateway from the coastal region to Nairobi.
Railway: The state-owned Kenya Railways Corporation manages Kenya's single-trackrailway system, which runs from Mombasa through Nairobi to the Ugandan border. This
railway was built in the last century and is currently being considered for a complete
overhaul towards adoption of a modern gauge.
Rail services to KTC will be for both freight and passengers. The railway provided has a
design speed of about 180 Km/h. This implies that transit time to Nairobi CentralBusiness District will be approximately 40 minutes and to Jomo Kenyatta International
Airport will be 30 minutes. The train will have a frequency of operation up to every 30
minutes. The City will be connected by a 10 kilometres branch line from Konza station.
This will be a state of the art passenger station either at grade or underground..
Figure 7: Section of Nairobi-Mombasa road.
Figure 8: Nairobi-Mombasa Railway line through Konza Station
Source: CURP, 2012
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
26/89
16
Wildlife:The desire to structure an inclusive city is boosted by the fact that there is awide variety of wildlife on site and a wildlife conservancy in the neighbourhood. In
addition, there are scenic features such as mountains and the natural savanna
grasslands. This will promote local and international tourism which will improve the
citys economy.
Water: Water is a critical resource for sustaining all forms of life, as well as economicand social activities. Challenges of water provision and sanitation are, therefore, to be
reckoned especially with existing resources and facilities, which have continued to
deteriorate and fail to meet the demand of the increasing population.
Current water sources within the area are mainly from sunk boreholes and the Nol-
tureshi water pipeline. Tanathi Water Board has currently identified eight sites for
development of dams. Two dams are under state funding while a third one shall be
funded by the African Development Fund. The Ministry of Water has identified Thwake
dam (Vision 2030 flagship project) to be developed as a source of water for KTC in
three years time. The project dam is projected to supply the city and surrounding areas
with around 100 million litres per day. Water conveyance will be through pumping to
Kilungu Hills and thereafter flow by gravity to the City.
In the meantime, the service providers are in the process of drilling boreholes in Konza
aquifer to provide 2 million litres per day which the Ministry considers sufficient for use
by investors to set up their facilities. Other potential source of water is rainwater
harvesting (rainfall within the larger area average 800 to 1000mm per annum. This
makes the area water deficient), which can be used for grey water applications such as
toilet flushing or irrigation.
Airports/Airstrips:Kenya has a well-developed international and domestic air transportinfrastructure. There are approximately 230 airports in the country. There are three
international airports with the largest being the JKIA based in Nairobi. JKIA current
capacity and expansion plans will be adequate to serve KTC. In addition, there is
potential of development of A private airstrip in the Konza Region.
Power supply: A power gridline of 220 kV and 132 kV transmission lines pass theproject site. The Ministry of Energy has also advised that a 400 kV line has been
tendered between Mombasa and Nairobi and it is assumed that this line will pass
approximately 40km from the site. This power line will be diverted into a Main
substation on the proposed route to supply the development. It has also been assumedthat this line will be capable of providing the total load required by KTC. The Ministry of
Energy is looking at possible means of supply from sustainable sources such as hydro
wind turbines, solar power, and ground source heat pumps. This will be established
once detailed studies are done to determine the feasibility of the listed projects.
Telecommunication: There are four fibre optic cables passing along the easternboundary of the city. The cables link Nairobi to Mombasa, which serves as a hub for
international sub marine cables. KTC will require advanced ICT infrastructure to serve
its business.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
27/89
17
The current 3G mobile telephony will be upgraded to (4G) services. High speed IP
based networks will deliver video services such as cable TV, high definition (HD) TV,
Interactive TV, video on demand (VoD) and video conferencing over cable and wireless
networks. High Speed Internet will be provided over both cabled and wireless access
networks, providing readily accessible broadband services throughout KTC.
2.4.3 Locational ChallengesKTC is located approximately 60 km from Nairobi CBD. This is quite a distance from
areas of high concentration of infrastructural facilities and services around the city of
Nairobi. The virtue of the site being a greenfield with zero developments pose a
challenge of lack of infrastructural facilities and services in place. Such include access
roads, water, sewer system e.t.c... These have to be sought first and the land serviced
in order for development to commence. Land speculation is also rampant around the
KTC based on the anticipation for the new city to develop.
The large scale of the project poses a challenge of predicting the future. A detailed plan
can be achieved only for the first phase with the later land uses being determined over
time after the implementation of the Phase 1. The scale of KTC is three times the CBD
of Nairobi, thus posing a challenge in scale of planning.
The site conditions of KTC presents poorly drained black cotton soils and the general
poorly drained site. The swamps and marshy patches within the site pose drainage
challenge. The fragile ecosystem consisting of variety of wildlife, calls for a balance of
interests in the planning of KTC.
2.4.4 Land UseThe LPDP has taken an overarching look at the future of KTC land use based on what is
already happening around the proposed City and the land use dynamics that are likely to
the future. There is a strong case to develop a strategic approach to protect the proposed
development from being surrounded by uncontrolled developments, which could cause a
depreciation of land values in KTC.
Figure 9: Large ranches aroundKTC
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
28/89
18
In 2006 the wider neighborhood, formerly large tracks of land were sub-divided to its
shareholders in 7.8 acre plots. These plots started being settled in 2007.
The land uses adjacent to KTC site varies from commercial to the South of the site at
Malili Urban Centre, to ranching to the West and East of the site. The land to the West
belongs to ILRI who utilize the land for research purposes retaining it as greenfield. It isenvisioned that ILRIs land use will not change with the coming up of KTC as no hard
developments are allowed on this land. The land use to the East is likely to change from
its initial ranching use to urban use as an impact of development and growth of Konza
Techno City. This land has already been highly subdivided; an early indication of land
use change.
The L.R. No. 9918/6 will change KTC land from to urban land use incorporating a mix of
uses to accommodate all the functions of a city. Details of these land uses are explored
and discussed later in this section and illustrated in the spatial template for KTC. This
will call for proper planning so as to achieve a coordinated growth and urban pattern..
2.4.5 Land TenureThe land tenure that currently applies in the wider planning area includes public, private
and community uses as stipulated in the Kenya Constitution 2010. The MoIC acquired
the 5,000 acre land from Malili Ranch shareholders converting the tenure from private
to public land. The adjacent land West of KTC is public and belongs to ILRI who use it as
a demonstration farm for livestock research. Community land exists in the immediate
lands outside the triangle that shares KTC in form of schools, water points and
conservation areas.
Private land under freehold characterizes land ownership patterns outside KTC. This
has been a result of the sub division process that has have taken place in Malili and
Konza Ranch (refer to figure 10). Individual parcels are given to individual members
though the parcels are not registered. The land owners are issued with share
certificates either as freehold or leasehold.
The land tenure system in the areas adjacent to KTC is critical since freehold land is not
amenable to the planning process as would have been in under leasehold. The
implication is no development control, thus the need to formulate zoning ordinances
and development control guidelines to achieve a coordinated growth of the outside the
city.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
29/89
19
Figure 10: Land Tenure system in Konza area
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
30/89
20
2.5REGIONAL POPULATION DYNAMICS
Figure 11: Market in one of the urban centres
2.5.1 Population structureThe socio-economic study covered Kajiado, Machakos Makueni and Nairobi regions.
These are expected to have significant influence on the growth and development ofKTC. This analysis provides insights on the dynamics of the population expected to
locate in KTC.
Regional population dynamics, show that most likely KTC will have a generally younger
population of 40 years and below with a relatively balanced ration between males and
females. The age and sex structures will be similar to Kajiado, Nairobi, Makueni and
Machakos structures illustrated below.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
31/89
21
Region Male Female Total GrowthrateNo. of
HHAreaKm2 Density
Makueni 433,419 451,108 884,5257 2.8% 186,478 7,966 110.4Machakos 543,139 555,139 1,098,584 3.76% 186,297 6,208 177
Kajiado 345,143 342,169 687,312 4.5% 173,464 21900 31
Nairobi 1,605,230 1,533,139 3,138,369 4.1% 985,016 695 4,515
2.5.2 Peri-urban SettlementsThe peri-urban areas of Konza will need a zoning plan due to the risk of unplanned
informal development taking place outside KTC. There are already unplanned housing
structures coming up especially around Malili, the trend that is expected to continue
across the entire area around the City. These structures are in the form of semi-permanent iron sheets structures and poorly constructed concrete houses.
The housing structure shown in the pictures overleaf is characteristic of the low income
housing that can be found the area adjacent to KTC where absentee landlords are
speculating on land. The tenants in these houses are only stewards of the purchased
land parcels on behalf of real owners who are not residents. However, there are also
commercial developments especially in the main service centres such as Malili, Konza
station, Katumani, Muumandu, Ulu and Nguluni.
Figure 12 (a & b): Regional Population Dynamics
Population Pyramid for Machakos
Source: CBS, 2009
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
32/89
22
2.5.3 Migration TrendsIt is envisaged that there will be immigration of population from Machakos, Kajiado, AthiRiver, Makueni, Mombasa, Kitengela, Nairobi and overseas. This will mainly entail those
in search for investment and employment opportunities. Besides, there will also persons
in search of alternative residence and services such as ICT, tourism, health and
education among others. It is estimated that after the Phase 1 is completed, there will be
approximately 5,000 individuals moving into the city per year.
2.5.4 Gender IssuesGender refers to the socially constructed or determined roles and responsibilities of
men and women in society. The success of any development plan objectives depends
on how best gender mainstreaming has been done to rightfully position both men andwomen in the development process.
2.5.5 Synthesis of PopulationZero human population on-site: The fact that the site for the proposed city currently
has zero population is an opportunity to carry out elaborate and ideal planning without
any limitations such as displacing population, shifting and or rerouting of utility lines
and demolitions. This is a common with areas that have already been settled before
planning is done.
Regional Populationanalysis indicates that most of the population expected in the cityis youthful with an average age of 40 years and below. This implies that the population
of below 20 years will need pre-unit, primary and secondary school institutions. The rate
of household formation will be lower with smaller family sizes thus the design of
housing units and other recreational facilities must reflect their interests.
Analysis of peri-urban settlements justifies the need for preparation of a zoning plan to
cover the area surrounding the city. The foregoing is intended to control haphazard
developments outside the boundary of the city.
Migration Trends: Population growth arising from domestic and international will posethe occasional challenges associated with urban settlements such as insecurity,
Figure 14 (a): Commercial developments in
Malili centre
Figure 14 (a): Semi-permanent house
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
33/89
23
overcrowding, traffic jams, unemployment and urban decay if proper management is
not done. This requires the creation of employment opportunities, police stations, and
patrol investment in proper infrastructure and utilities to serve such population. In
addition low income housing should be provided to prevent upcoming of informal
settlements.
Gender Issues: Regional gender dynamics illustrate a patriarchal society where themale gender dominates in both decision making, wealth and property ownership. The
management and governance structures within the Konza Technology city should be
modeled as to enhance effective participation of both male and female gender in order
to effectively address urban development challenges.
Corridor Comparison: (Waiyaki way, Thika road, Namanga road) illustrate a likelihood of
eruption of urban nucleated settlements along the main routes especially A109 and
A104. These settlements are unplanned with various activities spilling onto the main
carriageway. This shows therefore that such centres as Ulu, Malili, Katumani, Ngiini,Muumandu among others will develop as unplanned satellite towns of the city.
Konza Culture:The rich cultural practices and values of the original inhabitants of thestudy area are worth reckoning. Lifestyles and the totality of culture of the local
community implies that there is need for deliberate effort to evolve spatial and built
design forms that bring forth the historic cultural landscapes and artistry of the local
communities. The harmonious and sustainable co-existence between communal
pastoral practices and a robust wildlife inhabitation illustrate the principle of the
Shared-Steppe thus the concept of a Shared-City. The need for an open air market for
the sale of cultural artifacts like the Maasai market
Cultural centres, theatres and squares should be included in KTC. Konza spaces should
cater to all segments of the local population to which they can relate to with ease.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
34/89
24
CHAPTER THREE: SITUATION AND SITE ANALYSISPreamble
Situation analysis involved the examination of the site conditions in terms of size,topography, drainage and hydrology, soils and geology, and vegetation. Analysis of the
site condition was done to determine land suitability for urban development. Along
with site analysis, the situation analysis examined and determined expected
population to be domiciled in the site and it needs in terms of;
Land Social infrastructure Trunk infrastructure Transportation and Energy requirements
3.1SITE ANALYSIS
Figure 15: Satellite image of the KTC
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
35/89
25
3.1.1 Shape, Size and topographyThe Greenfield site provided for the development of KTC is triangular in shape. The
southern boundary is broader measuring 4.62km, the eastern edge which runs alongA109 measures 6.5 km and the western edge along Konza-Katumani road measures
5.13 km. The eastern and the western edge converge to form an apex like shape thus
creating the triangular shape. The whole site measures 2,058 hectares that translate to
5,000 acres of land.
The topography of Konza techno city site is generally flat undulating gently in a south-
westerly direction. The general slope percentage is less than 10% except in some areas
at the central, northern and southern portion where it rises to 20%. The land therefore
drains southwards into Stony Athi River.
3.1.2 Hydrology and DrainageThe Konza site is well drain with two seasonal rivers, (Stoney Athi, Kimutwa and
Mukuyuni rivers) cutting through the southern end of the site and the other towards the
north of the site. These rivers drain towards the western side of the site. In some parts
along the riverbed, the ground is swampy but in most parts it is generally dry river bed
inside the site.
Figure 16: Hydrology of Konza and its environs
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
36/89
26
Figure 17: The panorama of the site with a hill at the background
3.1.3 Geology and SoilThe underlying basement of an area determines the rock type and eventually the soil
type. Konza base is of complex metamorphic, igneous and sedimentary rocks. The
dominant soil groups are ferromagnesian gneiss. The hilly areas consist of quartz rich
granitoid gneisses-typically black cotton soils. The key characteristic of this soil type is
poorl drainage, low fertility, black cracking and swelling firm clay soils.
3.1.4 Vegetation and wildlifeThe vegetation is mainly savanna grass cover with the area dotted with trees mostly
acacia, thorny ficus and desert pump. Along the river bed where it is mostly marshy,
there are shrubs and the vegetation is greener.
Konza techno city site is adjacent to large ranches like like ILRI which are inhabited
by wildlife. Konza by extension due to it being within the wildlife corridor is habited by
a variety of wildlife. At the time of our field survey, one could spot both the large and
small herbivores like Grevys Zebras, Giraffe, Wildebeest, Antelopes, Dik Diks,
Impalas, Gazelles, Elands, and Squirrels.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
37/89
27
Figure 18: Exposed black cotton soil at the site
Figure 19: Wildebeest at the ranch close to Konza site
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
38/89
28
3.1.5 Synthesis of site analysisThe table below shows a synthesis of the sites opportunities and challenges
Figure 20: opportunities and challenges of the KTC site
3.2POPULATION AND LAND REQUIREMENTSThe total population expected to be domiciled in the city based on the expected jobs
to be created and availability housing development is projected at 240,000 persons.
In the first phase, the city is expected to house a population of 30,000 residents.
Site attribute Opportunities Challenges
Topography Large portion of the site is
generally flat thus suitable for
urban development
The likelihood of flooding is high thus
creating a need for an elaborate
drainage system
Drainage The swampy portion can be
developed into scenic water
features
The swampy portions pose a drainage
challenge as they are prone to flooding
during rainy season
Vegetation Vegetation on site in sparse
thus there will be less
destruction of the natural
environment during construction
activities
Exposure to flush flooding due to the
bare soils.
Wildlife
Corridor
Integrating wildlife conservation
in the development of KTC to
brand the city and promote
tourism.
Displacement of the animals from their
natural habitat
Views and
neighborhood
The surrounding hills give the
city a unique identity and
pristine and scenic setting.
The bare hills may accentuate flooding
within the city
Soils The soil profile is suitable for
urban developments
Deeper excavation of the soils to reach
a firm base
Neighboring
Infrastructural
facilities
Ease of connectivity by use of
A109 and the Konza Railway
Need for interchanges along the A109
and extending the Konza railway line to
KTC
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
39/89
29
Arising from this population projection, the plan shall provide land for:
Social infrastructure: educations, health, recreation, leisure andentertainment;
Trunk infrastructure: sewer, storm water drains, water supply; Transportation: public road network system, public and private parking,
pedestrian walkways and bicycle lanes;
Energy: electricity, solar farms; Housing: mixed development housing comprising of low, medium and high
density developments;
Commercial areas: offices, retails, financial services;
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
40/89
30
CHAPTER FOUR: ALTERNATIVE DEVELOPMENT MODELSPreamble
Given the Greenfield nature of the site and its inherent opportunities and challenges,
various options can be used in its development. Among the options examined are:
The radial corridor The circuit board The stitch model
The aforementioned options were subjected to critical evaluation to select a preferred
option. The preferred model will be adopted by the MoLC and detailed out as the spatial
framework for the development of KTC.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
41/89
31
4.1ALTERNATIVE ONE:RADIAL CORRIDOR
Figure 21: The Radial corridor model
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
42/89
32
This model proposes a radial road structure with the public transport roads
(shown in red) providing the preferred means of access to all parts of the
proposed city. Primary roads (shown in blue) provide the main routes for
distributing vehicular traffic throughout the city
There is a CBD in the heart of the city, easily accessible to all residents and
workers both by public transport, walking, cycling and by car. This CBD will contain
commercial offices, shops, market, a district hospital, hotels, restaurants, leisure
and entertainment facilities and other facilities of this nature.
The office Park is split into two zones to the north and south of the CBD. These
areas are easily accessible to local residents expected to work there and also to
employees living outside the KTC. This provides an attractive setting to attract
inward investment into this sector, in accordance with the Governments Vision
2030.
A strategic reserve site is shown between the CBD and the office Park (south).
This is to cater for future unknown demands, which may include future expansion
of the BPO Park or other needs as determined at a future date by the authorities
of the City. This provides a degree of flexibility built into the plan at the outset.
The main central park is shown between the CBD and the office Park. Unlike the
green space along watercourses, which is more informal, this is proposed to be
laid out as a public park, providing a green lung for the residents and workers.
A site for a university campus (which might be part of a larger university serving
the capital) is shown to the north of the CBD. This will provide an area for
academic buildings, student residences and sports and leisure facilities for
students. It will also be easily accessible to the CBD. It is also sited adjacent to
the northern BPO Park, which will assist in the potential for cross-fertilization of
ideas and business opportunities between the university and the businesses in
the office Park.
The residential community occupies much of the remaining areas of the proposed
Technology City. This will provide accommodation for employees and their families
who will work in the Techno Park, as well as in the CBD and in the various local
community facilities. The residential community will include appropriate provision
for schools, health care facilities, churches and mosques, play facilities and sports
facilities.
Green corridors are proposed along the alignment of the watercourses which are
protected in the plan. This will help to avoid flood risk to the new buildings and
also provides additional open space. These could also serve as wildlife corridors
through the site. The Konza Road is proposed to be paved to provide easy accessfor all vehicular traffic. The site includes a high voltage power line.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
43/89
33
Whilst this might be realigned in the future, for the purpose of the plan, at this
stage a no-build reservation of 60 metres has been incorporated.
The model also proposes a greenbelt belt control zone of approximately 2km
around the site. This would have a number of purposes: to protect the setting ofthe Technology City and guard against the development of informal settlements on
the boundary of the site; to reserve land for the possible future expansion of the
Technopolis; and to institute rigorous control of development in the area around
the site.
4.1.1 Evaluation of Alternative OneThe strength and weaknesses of the radial model based on predetermined criteria
are are presented in the table below.
Figure 22:Evaluation criteria for alternative one
Criteria Best performance Moderate
performance
Worst
performance
Profile of commercial
space viewed from
A109
Flexibility to
accommodate growth
Accessibility of
commercial areas
Connectivity betweenland uses
Public transport
accessibility to/from
Machakos & Nairobi
Public transport
connectivity within
Konza
Ease of walking and
cycling within Konza
Urban structure Sense of place/
character
Quality of public/
green spaces
Ease of phased
implementation
Environmental impact
on wildlife
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
44/89
34
4.2ALTERNATIVE TWO:CIRCUITBOARD
Figure 23: The circuit board model
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
45/89
35
The model is mirrored on the Circuit-board a printer to generate Konza's intended
spatial structure. The circuit board is a befitting metaphor considering that Konza is
designedly a Technology City.
The general progression for a circuit board template design simulates the schematic
capture of the desired spatial structure as follows;
Axial components such as ecological corridors, riparian areas, infrastructuralway-leaves and buffers were are designated and delineated,
A penetrative framework of access systems, complete with gating and switchdevices, are routed and positioned in such a way as to open up the landscape
and provide the required interconnections,
Key functions and activities of a Techno-city are placed in such a way as toensure a balanced distribution,Linear neighbourhood bands are placed to flank selected sections of the primary
access structure.
Infill residential districts and open/green spaces are designated in the left-overspaces,
Prodigious and discordant elements such as water storage facities, treatmentplants, power substations and areas of bulk storage are secured in such a way
as to minimize their undeserious impact on the global settlement structure
and fabric.
Using the circuit board concept, spatial structure is generated that aims at:
Preserving and restoring the integrity of the natural system and sustainability; Securing the efficacy of human and habitat processes and dynamism; pursuing the evolution of wholesome and equitable habitats; Pursuing a positive and alluring image and identity for the region; Seeking to inspire good governance and vibrant democracies.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
46/89
36
4.2.1 The Transportation Systemi. Structuring Site Access & Mobility
The Circuit Board seeks to do so by innovating an access structure that advocates the
separation of personalized/car-oriented transit from mass transit modes. It proposes a
dual-channel access structure that comprises a hard and soft grid by which to cannalizepersonalized motorized traffic and non-motorized and motorized mass transit,
respectively.
The Hard GridThe Circuit Board takes advantage of the opportunity provided by the existing system of
national and regional trunk roads to link to its wider context, as well as to open up
access. A future rail connction from the main Mombasa-Kisumu railway is conceived.
Site penetration proceeds from the A109 highway through three high-level
interchanges, which subsequently channel vehicular traffic through a lower level road
that runs in parallel. Further site penetration is made possible via an assymetric grid
consisting of a limited number of roads that eventually terminate at the Konza-Katumani Road.
The emergent skeletal structure, which is hereby cristened as The Hard Grid, acts as a
primary distributor for vehicular traffic, especially directing personal transport to
medium and low density residential areas This is informed by the fact that these two
areas are the greatest generator and recepient of vehicular traffic as they have a higher
car ownership ratio compared to high density/low income residential areas.
The Soft GridThe dissagregation of personalized and mass transport is in line with the Circuit Boards
aspiration to address the traffic management challenges that bedevil the African city of
the modern era. Consequently, this is achieved by designing a a parralel system of
chanelling future traffic streams in KTC.
The Circuit Board deploys a system of accesses which, unlike the first, is not anchored
on the global structure of external linkages. However, the floaty skeleton is likewise
geared towards organizing internal circulation. Primarily, it acts as a means by which
mass motorised and non-motorized traffic is channeled through the site.
The need for a soft grid is informed by the fact that a far much larger proportion of the
urban citizenry , particularly that which occupies the lower income brackets, and who
tend to dwell in inner city areas and high density neighbourhoods, relies on mass public
and non-motorized transit mechanisms than on private automobiles. It is therefore
thought necessary to spare these areas the burden of transmiting traffic from personal
vehicles. The 100m wide grid provides the basic framework for organizing the
settlement structure, in particular, the alignment of high density mix-use areas, and
activity areas, such as trade hubs and employment centres that attract a lot of
pedestrian movement When combined the dual access system suffices as an elaborate
framework that both facilitates deeper site penetration and efficiently organizes traffic
within KTC.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
47/89
37
Figure 24: Illustration of the hard and soft corridors and the combination of the two
A 40m wide road network, anchored
upon the A109 highway and Konza-
Katumani Rd, will facilitate penetration
into the sites interior through vehicular
mobilit .
A 60m wide green corridor, flanked
by 20m roads, will provide access to
areas of high density and intensive
activity. Its use will be limited to
MRT and NMT modes
The grid is designed so as to allow
intersection at different points that will
eventually be designed as multimodal
interchanges
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
48/89
38
ii. Structuring Ecology & Open SpaceKonzas aspiration for a Green and Shared Space will be achieved both by deploying its
ecological assets and puncturing the emergent built tissues with open spaces. The
principle here is to allow nature to permeate into the settlement fabric. In designing the
ecological/open space structure, the Circuit Board seeks to achieve the following;
To preserve the areas unique and fragile ecological patrimony; To allow the city to breath and enhance natures capacity for self cleansing by
creating areas that will act as city lungs and carbon sinks, respectively;
To promote citizens access to recreational opportunity; To achieve these goals, four types of open spaces are conceived;
a.Ecological CorridorsKonza is home to an extensive and diverse flora and fauna. The proposed Techno-city
sits right in the middle of traditional wildlife corridors emanating from the NairobiNational Park and the wider Kitengela Conservation area. In order to minimize the
impact the city will have of the areas existing ecology, the Circuit Board proposes to
reserve a substantial area at the southern edge of the site (Site 1) which may both be
used for wildlife dispersal and as a bridge between grazing grounds to the west and
breeding grounds to the east. Connectivity to the rangelands west of KTC is made
possible by truncating the Konza-Katumani Road at its southern tip, and reverting
approx 2km to soft/green-scape. A more elaborate infrastructural solution over the
A109 is needed to allow further connectivity to the breeding grounds east of the site.
The wildlife area, which is presently open savannah grasslands and marshlands, will
be improved through selective plantings and damming of the existing perenial stream.
Conservation
Riparian
Parks & Recreation
Buffers
1
23
4
5
Figure 25: Distribution of Ecological &
Spaces
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
49/89
39
b.Riparian AreasThe KTC site is traversed by two streams. The first, which is oriented northwest-
southeast enters the site about 2km from its norhternmost edge, cutting accross the
A109. The second is aligned west-east about half a kilometer from the southern edge.
The two converge at the sites interface with the Konza-Katumani Road. Both thesestreams are perennial, mostly flowing during the long rains, transforming the the sites
lower segments into marshlands, some of which retain water between seasons.
The Circuit Board seeks to protect these streams with a view to preserve the integrity
of natural drainage system. In addittion, it seeks to deploy these and the enveloping
riparian flanks towards expanding Konzas ecological corridor.
To facilitate this, the Circuit Board delineates a riparian area along the northeast-
southwestern stream with a width varying between 60 m and 200 m from the centre
of the stream (Site 2). The area is to be improved through an appropriate landscaping
intervention. Where possible, sections of the riparian may be transformed to providerecreational opportunity for citizens, especially as it cuts through residential areas.
The second stream is integrated with the wildlife corridor.
c.BuffersTwo buffers are conceived at the city scale. One runs parralel to the A109 (Site 3)and
the other envelops the sewage treatment works at its nothern edge (Site 4). The
former is designed to minimize noise pollution from vehicles plying the highway, while
the latter acts as an absorption sponge for sewer related odours. The areas
absorptive capabilities are enhanced through appropriate landscaping.
d.Urban ParksThe fourth ecological element in Konza is the system of open spaces and recreational
areas. The Circuit Board proposes an open space corridor stretching from the Konza-
Katumani Road to the north and terminating at the conservation area to the south
(Site 5). The corridor acts as a front for diverse residential and activity areas. The
prinary function of this space is to provide recreational opportunity for the citys
residents. Consideration is given to ensure ample variety and choice to cater for the
varying needs of the citys multifaceted population. Consequently, the linear open
space is dissected at various points to create seperate and distinct domains of
recreational exposure, including; city parks, golf courses, arboratum, and sportscomplexes. In addittion to citywide open space, the Circuit Board integrates communal
open spaces into the fabric of different neighbourhoods.
7/30/2019 Konza Local Physical Development Plan - (2012-2030)
50/89
40
iii. Structuring Functions & ActivitiesKTC is poised to become East and Central Africas first technology hub. It is therefore
imperative that technology as an activity should impose a distinct footprint on the
citys landscape. In addittion to technology parks, the Circuit Board deems four other
complementing activities as neces