Uran (Gas) MAHARASHTRA STATE POWER GENERATION CO. LTD. Sakri (Solar) WELCOME Koyna (Hydro) Koradi (Thermal) 1
Transcript
Page 1: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Uran (Gas)

MAHARASHTRA STATE POWER GENERATION CO. LTD.

Sakri (Solar)

WELCOME

Koyna (Hydro)

Koradi (Thermal)

1

Page 2: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Second largest Generating company

in the country

Current generation capacity is 13602

MW

Long term PPAs with MSEDCL

Adopted RE policy for establishing 2500 MW

Solar Power

First in Country to utilize sewage treated

water for power generation at its

Koradi plant

Thermal10170 MW,

75.5%

Hydro2580 MW,18.4%

Gas 672 MW, 4.8%

Solar 180 MW, 1.3%

OVERVIEW AND HIGHLIGHTS

2

Page 3: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

POWER GENERATION OVERVIEW

3

Installed Capacity - 13602 MW

Conventional Renewable

Gas (4.8%)Coal (75.5%) Solar (1.3%)

Chandrapur

Koradi

Khaperkheda

Paras

2920 MW

2400 MW

1340 MW

500 MW

1170 MW

Total

Chandrapur

Sakri, Dhule

Shirsufal

Total

5 MW

125 MW

50 MW

180 MW

Hydro(18.4%)

Parli

Bhusawal

Nasik

1210 MW

630 MW

10170 MW

Koyana 1956MW

Small Hydro (21)

374 MW

Uran

West . H. Recovery

432 MW

240 MW

Total672 MW

Total 2580 MW

Ghatghar 250 MW

Page 4: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

MAHAGENCO’S ROADMAP FOR SOLAR

PROJECTS

Page 5: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

“Chief Minister Solar Agriculture feeder Scheme”

“An initiative towards Low cost power for Agricultural Consumers through the Green

Power…..”

Page 6: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Mahagenco’s Existing Solar PV Power Plants

Sr. No. Location of Project Capacity(MW)

COD

1 Tal. Dist. Chandrapur 1 09.04.2010

2 Tal. Dist.Chandrapur 2 18.10.2011

3 Tal. Dist.Chandrapur 2 12.02.2012

4 Shivajinagar Tal.Sakri, Dist. Dhule

50 29.03.2013

5 Shivajinagar Tal.Sakri, Dist. Dhule

75 29.03.2013

6 Shirsuphal Tal. BaramatiDist. Pune

36 19.12.2014

7 Shirsuphal Tal. BaramatiDist. Pune

14 31.03.2015

Total 180

Page 7: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

5MW

Chandrapur

125 MW

Sakri

Dhule

50 MW

Shirsuphal

Pune

Photographs of Existing Solar PV Power

Plants

Page 8: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Chief Minister Solar Agriculture feeder Scheme

• “Hon. CM Solar Agriculture feeder Scheme” dated 14 June 2017

envisages

1. Low cost Power to Agri-consumers

2. Availability of electricity in day time.

3. Reduction in cross subsidy on Industrial & Commercial consumers.

• Mahagenco with the help of MSEDCL and MEDA to implement under

PPP mode, on pilot basis at Ralegan Siddhi in Ahmednagar district and

Kolambi at Yavatmal district in Maharashtra.

• Project to be located on Govt./ Private land in the periphery of 5-10KM

from 11KV to 132KV substations. Considering the load on AG feeders

(Separated) the capacity of Solar power project will be finalized.

• Exemption from all fees/charges/ cess levied by State Govt./ authority for

the projects.

Page 9: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374
Page 10: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Responsibilities of Utilities

• MAHAGENCO :

a. Mahagenco will develop the land and infrastructure.

b. Mahagenco will sign tripartite PPA with the SPD and

MSEDCL for 25 years.

• MSEDCL :

MSEDCL will provide evacuation facility.

• MEDA:

MEDA will register the project and provide VGF for the

infrastructure.

• SOLAR PROJECT DEVELOPER (SPD) :

SPD will develop the project including O&M for the period

of 25 years.

Page 11: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Bidding process for Pilot Projects

• NIT for Kolambi & Ralegan Siddhi for 2MW solar Ag

project at site were published on 19.05.2017.

• The RFP document for these bids were prepared on

basis of REVA & BADALA solar park bids of SECI.

• Bidder selected by Reverse bidding process with

Rs. 3.00/kWh or the minimum tariff quoted by

bidder whichever is lower, as the base price.

Page 12: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Competitive Bidding

• Competitive bidding for both tenders were carried out on 16.06.2017.

• Price offered in reverse bidding For Ralegansiddhi is Rs. 2.94/KWH

• Price offered in reverse bidding For Kolambi is Rs. 2.97/KWH

Page 13: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Status of civil works Ralegan Sidhi

Work Remarks

Topographical survey Work completed

soil investigation / explorationWork completed

WBM Road Work in progress.

Fencing along the periphery Work is in progress

Page 14: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374
Page 15: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374
Page 16: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Status of civil works Kolambi

Work Remarks

Topographical survey Work completed

soil investigation / exploration Work completed

WBM Road Work completed

Fencing along the periphery Work completed

Page 17: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374
Page 18: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Status of 200 MW AG Feeder Projects

• Marathwada region – 50MW

• Vidarbha region – 50MW

• Northen region – 50MW

• Western Maharashtra - 50 MW

• The tariff rate for all the projects was finalized

by reverse bidding to Rs. 3.15/kWh.

• The LoA for the developer is issued on dtd.

14.11.2017.

Page 19: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

PPA & Evacuation Arrangement

• Petition for PPA & PSA is submitted in MERC on dtd.27.11.2017 for all AG Feeder solar projects under “MukhyaMantri Saur Krishi Vahini Yojana” including Ralegan siddhi& Kolambi. The hearing for this is on dtd. 02.01.2018

• Evacuation scheme is finalized by MSEDCL for bothRalegan Sidhi & Kolambi

• All land details for phase-I, 200MW AG feeder solar powerprojects are submitted to MSEDCL for evacuationarrangement.

• The letter regarding evacuation arrangement for SPP atGavhankund is submitted to Director (Projects), MSEDCLon dtd. 16.12.2017

Page 20: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Ralegansiddhi:

LoA issued by MSEDCL to M/s. Prabharanjan Electricals Ahmednagar in JV with Green Flame Pvt. Ltd. Pune on 26.12.2017.( Amount Rs. 32.27 Lakhs)

Manjarda (Kolambi):

1. LoA issued by MSEDCL to M/s. Neha Electricals Nanded for Bay construction on 08.12.2017.( Amount Rs. 11.85 Lakhs)

2. LoA issued by MSEDCL to M/s. Star Electricals & Engg, Amravati for Line erection on 08.12.2017.( Amount Rs. 18.98 Lakhs)

Gavhankund:

Estimation is in progress by MSEDCL.

Evacuation Arrangement Status

Page 21: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Phase I (200 MW) Implementation Progress

• “Bhoomipujan ceremony” for 20 MW AG Feeder cluster at

Gavhankund Tal. Warud, Dist. Amravati is arranged on24.12.2017.

• The LoA is issued to M/s. Sangam Advisors Pvt. Ltd. On dtd.14.11.2017.

• The solar power from this project will be supplied to nearby 9nos. of 33 kV & 11kV substations and 18896 farmers will bebenefited from this project.

• Approx. 3.33 Mus per year can be generated from this Solarproject.

• The expenditure for infrastructure development & evacuationarrangement is as around Rs. 2 Cr which will be done byMSPGCL & MEDA.

• The project cost as around Rs. 80 Cr. will be done bydeveloper.

Page 22: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Land Acquisition Status 300 MW AG Feeder Projects(Phase-II):

• Land acquisition process has started vide GR no. जमीन-2017/प्र.क्र.197/ज-1 dtd. 29.11.2017

• Letters to all district collectors are dispatched.

• The submission of proposals for land acquisition are under process

Page 23: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Registration of projects with MEDA:

• The proposals for registration of the projects atRalegansiddhi & Kolambi are submitted to MEDAalong with requisite documents.

• The proposals for registration of 200 MW AGfeeder Solar Power Projects are submitted to MEDAalong with available documents.

Page 24: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Evacuation Arrangement for 500 MW AG feeder projects

• All land details for phase-I, 200MW and 300 MW (Phase-II)AG feeder solar power projects are submitted to MSEDCLfor evacuation arrangement.

• The letter regarding evacuation arrangement for cluster AGfeeder Solar power project at Gavhankund (Under Vidarbharegion Phase-I) is submitted to Director (Projects), MSEDCLon dtd. 16.12.2017

Page 25: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Marathwada region (Phase –I)Sr.No. Name of project

Site

District Name of the 33/11Kv

Substation

Gov. land

Available

( Hector)

Gat No. Of the

land

Distance from

S/S in KM

Propo.Solar

plant Cap. in (

M.W.)

Land reqd

for project in

(Hector)

Land Status

PHASE-I (200MW)

1 Chauka, A'bad Chauka18.63 25 3 3 6

Proposals Submitted to

collector office

2 Gangapur, A'bad Gangapur

49.6 281/A 4 7 14Proposals Submitted to

collector office

3 Ansarwada

Nilanga,Tal.Latur

Latur Ansarwada

Nilanga,Tal.Latur 4 23,56

Adjacent to S/S

2 4

Joint Measurement

Completed on 02/11/17

4 Nathara, Tal.

Parli,Beed.

Beed Nathara, Tal.

Parli,Beed. 30.53 21,182Adjacent to S/S

8 16Proposals Submitted to

collector office

5 Waghe

Babhulgaon,Tal.Kej

Beed Waghe

Babhulgaon,Tal.Kej 13 16Adjacent to S/S

3 6Proposals Submitted to

collector office

6 Bavi Tal Bhoom Osmanabad Warud

4 Gavthan 3 2 4

Joint Measurement

Completed on 19/09/17

7 Bor-Ranjani , Jalana Jalna Bor-Ranjani , Jalana137 531 1 2 4

Proposals Submitted to

collector office

8 Talni & Koli Nanded Talni Tal. Hadgaon29.09 900,901,902

0.56 12

Proposals Submitted to

collector office

9 Yeldari Parbhani Yeldari Sawangi

37.91 39,41,1691.2 5 10

Proposals Submitted to

collector office

10 Kolha Parbhani Kolha4.59 1,2 6 2 4

Proposals Submitted to

collector office

11 Ghordari Tal.

Sengaon

Hingoli Ghordari

4

256

Adjacent to S/S

2 4Proposals Submitted to

collector office

12 Kedarkheda

Tal.Bhokardan

Jalna Kedarkheda Tal.

Bhokardan 40 22 3 8 16Proposals Submitted to

collector office

372.3550 100

Page 26: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

North Maharashtra (Phase-I)

Sr.No

.

Name of the project

Site

District Name of the

33/11Kv

SubstationGov. land

Available in (

Hector)

Gat No. of

the land

Distance

from

Substation in

KM

Proposed

Capacity in

(MW)

Land reqd

for project

in (Hector)

Land Status

PHASE- I

(200MW)

1 Vadalibhoi

,Tal.Chandwad

Nashik Vadalibhoi15.75 309 0.5 8 15.75

NOC not received from

Grampanvhayat

2 Vadgaon Pangu

,Tal.Chandwad

Nashik Vadgaon Pangu

24.9 83,84 0.5 4 8NOC received,proposal

submitted.

3 Vinchur Tal. Niphad Nashik Vinchur

72 93 6.5 3 6NOC received,proposal

submitted.

4 Jaitane Taluka- Sakri Dhule Jaitane

18 128/1 5 9 18

Land in passation with

Mahagenco 11KV line

passing through plot. Letter

given to CIVIL for land

development 06.01.18

5 Lamkani Dhule Lamkani

18

568(7.61H)-

569(4.94H)-

570(5.75H)

3 8 16NOC received,proposal

submitted.

6 Nimgul , Sindkheda Dhule Nimgul

66 342 3.7 5 10NOC not received from

Grampanvhayat

7 Holmohida

Tal.Shahada

Nandurbar Mohide

Tal.Shahada 39.99

57/2

(23.25H),225

/1

3 8 16NOC received,proposal

submitted

8 Wadangali Tal.Sinnar Nashik Wadangali

Tal.Sinnar 79.48 26/1/1A 0.5 5 10NOC received,proposal

submitted

334.12 22.7 50 99.75

Page 27: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Vidarbha Region (Phase-I)Sr.N

o.

Name of Project

Location

District Name of the 33/11Kv

Substation

Gov. land

Available (

Hector)

Gat No. Of

the Land

Dist. from

Sub-

station in

KM (By

Road)

Proposed

Solar plant

in(M.W.)

Land

required for

project in

(Hector)

Land Status

PHASE-I

1

Nandgaonpeth -2

(shevati)

Amravati Nandgaonpeth -2

(shevati) 11.91 296 5 5 10

Proposal submitted

2

Anjangaon Bari Amravati Anjangaon Bari

20.72

132/1,132/2,1

34/1,143/1,14

4/1

0.3 6 12

Proposal submitted

3

Gavhankund ,

Tal. Warud

Amravati 132/33 KV GSS Warud

,Shendurna Ghat ,

34.06235-236-238-

239-24014 20 34.1

Land Handed over to

MAHAGENCO.

Bhumipoojan ceremany

done on 24/12/2017

4

Panchala,Rajura Chandrapur Vihirgaon

39.32 126 1.5 3 6

Proposal submitted

5Yeoti Yavatmal Kolambi 40

78/99/106/113

/12712 7 14

Proposal submitted

6Yerad Yavatmal Jodmoha 12.72 52,67/3 4 3 6

Proposal submitted

7

Bhojpur

Tal.KuhiNagpur

Kuhi

4 287/1 3 2 4

Proposal is sent by

collector office to

irrigation department

for clearance.

8

Mangrulzanak

Tal.Risod

Washim Mangrulzanak Tal.Risod

7.95 182 3.5 4 8

Proposal submitted

170.68 50 94.1

Page 28: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Western Maharashtra (Phase-I)

Sr.No.

Name of

Project Site

District Name of the

33/11Kv

Substation

Gov. land

Available

( Hector)

Gat No. of the Land

Distance from

S/S in KM

(road)/ Aerial

Proposed

Capacity in

(MW)

Land

required for

project in

(Hector)

Land Status

PHASE-I

1

Mhase Khurd

Parner

A'GAR Ralegan TherpaL

48.2 279 8.9

9

18

Proposal

Submitted

2

Ranjangaon

Mashid Parner

A'GAR Pimpli Gawli

30.34 345 5.8

7

14

Proposal

Submitted

3Kthapal

Sangola

SOLAPUR Kthapal Sangola23.78 978 3.3

612

Proposal

Submitted

4

Gaygavhan

Tal.Sangola

SOLAPUR Gaygavhan

Tal.Sangola 17.8 77 Adjescent to s/s 7 14

Proposal

Submitted

5

Sakhharewadi

Tal. North

Solapur

SOLAPUR Kalman Tal.North

Solapur33.85 109 1.2 5 10

Proposal

Submitted

6

Lahul (Gat No.

715)

SOLAPUR Padsali S/S

11.98 715 2.4

5

10

Proposal

Submitted

7

Jadhavwadi SOLAPUR Aran

17.96 1 3.8

8

16

Proposal

Submitted

8

Lahul (Gat No.

416) Madha

SOLAPUR Bhend

6.35 416 9

3

6

Proposal

Submitted

190.26 50 100

Page 29: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Western Region (Phase II-A)

Sr.

No.

Name of

Project Site

District Name of the

33/11Kv

SubstationGov. land

Available

( Hector)

Gat No. of the

Land

Distance

from S/S in

KM (road)/

Aerial

Proposed

Capacity in

(MW)

Land

required

for project

in

(Hector)

Land Status.

Proposal

Submission

PHASE-II--A

1

Babhulgaon ,

Taluka Inddapur

PUNE Babhulgaon

44.7 318Adjescent to

s/s8 16

Under prcess

2

Dahiwali Tal.

Madha

SOLAPUR Dahiwali

Tal.Madha 14.93 345Adjescent to

s/s6 12

Under prcess

3Anwali Tal.

Pandharpur

SOLAPUR Anwali Tal.

Pandharpur17.21 289/2

Adjescent to

s/s8 16

Under prcess

4Alegaon

Tal.Sangola

SOLAPUR Alegaon

Tal.Sangola 8.4 431Adjescent to

s/s3 6

Under prcess

5Borgaon

Taluka.-Barshi

SOLAPUR Borgaon

Taluka.-Barshi 46.27 50,51,52, &94Adjescent to

s/s9 18

Under prcess

6Kautha

Shrigonda

A'GAR Angare6.1 120 1

26

Under prcess

7Pathari Taluka-

Barshi

SOLAPUR Pathari Taluka-

Barshi 20.47 355 1.52 5 10

Under prcess

8Chikharde

Taluka-Barshi

SOLAPUR Chikharde

Taluka-Barshi 5.09 401/1 1.6 2 4

Under prcess

9Zadi Barshi SOLAPUR Upale S/S

15 113/1 4.77

14Under prcess

178.17 50 102

Page 30: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Western Region (Phase II-B)Sr.N

o.

Name of Project

Site

District Name of the

33/11Kv

Substation

Gov. land

Available

( Hector)

Gat No. of the Land Distance from

S/S in KM

(road) Aerial

Proposed

Capacity in

(MW)

Land

required for

project in

(Hector)

Land Status.

Proposal

Submission

PHASE-II--B

1 Kini Akkalkot SOLAPUR Kini Akkalkot 12.95 558 2.8 5 10 Under prcess

2 Atpadi Tal.Atpadi SANGALI Atpadi 24.74 2605 3.9 8 16 Under prcess

3 Jawala Parner A'GAR Jawala 166.7 1836 3.8 8 16 Under prcess

4 Pokharni, Tal.

Is;ampur

Sangli Nagaon 20 49 1.3 7 14 Under prcess

5 Tikondi, Tal. Jat Sangli Tikondi 14.06 496 0.22 7 14.06 Under prcess

6 Sonayal, Tal.Jat Sangli Sonnayal 5 830 1.4 2 5 Under prcess

7 Maralnathpur Sangli RethareDharan 11 1948 3.5 4 8 Under prcess

8 Haroli Sangli Haroli K’mahankal 9 441 0.7 3 6 Under prcess

9. Umadi Sangi Umadi 10.2 391 2.2 4 8 Under prcess

10. Borgi, Tal. Jat Sangli Borgi Kh. 14.67 8 0.2 2 4 Under prcess

Total 50 MW

Page 31: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Western Region (Phase II-C)

Sr.N

o.

Name of Project

Site

District Name of the

33/11Kv

SubstationGov. land

Available

( Hector)

Gat No. of the Land

Distance from

S/S in KM

(road)/ Aerial

Proposed

Capacity in

(MW)

Land

required for

project in

(Hector)

Land Status.

Proposal

Submission

PHASE-II--C

1 Takali ,Shirol Kolhapur Takali

47.631350(27.86),1194(19

.77)2 12 24

Under prcess

2 Takliwadi

Ghosarwad

Kolhapur Ghosarwad

71.32

590

(46.39),502/1(16.29)

1168(8.64)

1.5 12 24

Under prcess

3 Kothali&Jainapur Kolhapur Kothali

29.17Kothali 1213 (15H),

Jainapur240(14.17)1.5 10 20

Under prcess

4

Ranjani Alkud s

Tal.Kavathemahank

al

Sangali

Ranjani

Tal.Kavathemahan

kal28.49

709 (13.64H),

711(14.85H)2 10 20

Under prcess

5 Kavathemahankal Sangali Kavathemahankal

1 215 1.5 4 8

Under prcess

6 Borgaon

Kavthemankal

Sangali Borgaon

6.32 358 0.1 2 4

Under prcess

183.93 50 100

Page 32: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Marathwada (Phase-II)Sr.N

o.

Name of project

Site

District Name of the 33/11Kv

Substation

Gov. land

Available

( Hector)

Gat No. Of

the land

Distance from

S/S in KM

Propo. Solar

plant Cap. in (

M.W.)

Land

required for

project in

(Hector)

Land Status

PHASE-II -A

1 Sardgaon Tal.Parli Beed Sardgaon Tal.Parli

11.12 158 0.5 5 10Proposals Submitted to

collector office

2 Niwagha Nanded Niwagha

70.14 110/1 0.8 5 10Proposals Submitted to

collector office

3 Hatta Tal.Sengaon Hingoli Hatta30.12 125 0.6 2 4

Proposals Submitted to

collector office

4 Sastur Tal.Lohara Osmanabad Sastur Tal.Lohara18 old Gavthan 0.5 8 16

Proposals Submitted to

collector office

5 Killari Tal. Ausa Latur Killari Tal.Ausa10 old Gavthan 1 3 6

Proposals Submitted to

collector office

6Chikalthan Tal.

Kannad ,

A'badChikalthan. Tal.

Kannad , 11.88 424,425, 426 1.5 6 11.88

Proposals Submitted to

collector office

7 Wanola tal.Mahur Nanded Wanola tal.Mahur76.37

292,310,147,1

703 3 6

Proposals Submitted to

collector office

8 Wangi matola Latur Matola15 30 1.5 6 12

Proposals Submitted to

collector office

9 Digrass Tal .

Kandhar

Nanded Digrass Tal . Kandhar

51.94 614 3 4 8Proposals Submitted to

collector office

10 Kurala

Tal.Kandhar

Nanded Kurala Tal.Kandhar59.29 71 3 4 8

Proposals Submitted to

collector office

11 Kala Nimbala

Tal.Umerga

Osmanabad Bastur Tal.Umerga

7.4 260 4.5 4 8Proposals Submitted to

collector office

361.26 50 99.88

Page 33: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Vidarbha (Phase-II A)

Sr.No

.

Name of Project

Location

District Name of the 33/11Kv

SubstationGov. land

Available (

Hector)

Gat No. Of the

Land

Dist. from

Sub- station

in KM (By

Road)

Proposed Solar

plant in

(M.W.)

Land

required

for

project in

(Hector)

Land Status

PHASE-II -A

1

Khadsing

tal.Washim

Washim Pimpalgaon14.26 98/99 2 5

12 Proposal Submission under

process

2

KakdaraTalegaon

Ashti

Wardha Talegaon Ashti

40.07 43/1 0.8 4

8 Land handover to Dyce Civil-

II MSPGCL Koradi, Nagpur

and measurement of land is in

progress

3

Gangalwadi,

Bramhapuri

Chandrapur Gangalwadi4.76 155,163 1.5 2 4

Proposal Submission under

process

4

Panchala,Rajura Chandrapur Vihirgaon39.32 126 1.5 3 6

Proposal Submission under

process

5Mangrul Chawhala

Tal.Nandgaon KhAmravati

Mangrul Chawhala

Tal.Nandgaon Kh.19.49 25 0.35 3 6

Proposal Submission under

process

6 Sirso ,Murtizapur Akola Sirso ,Murtizapur 17.42 27,28 0.2 3 6Proposal Submission under

process

7

Rithad Tal. Risod Washim Rithad Tal. Risod34.98

441/442/

449/4500.6 7

14 Proposal Submission under

process

8

Rajgaon Washim Rajgaon Tal.Washim15.55 202 1.8 3 6

Proposal Submission under

process

9Titvi Tal.Ghatanji Yavatmal Rajurwadi ,Ghatanji 6.4 32 2.5 3 6

Proposal Submission under

process

10

Ansing Taluka-

Washim

Washim Ansing Taluka-Washim48.7 275 3.8 4 8

Proposal Submission under

process

11

Amgaon Kurd

Tirkhedi, Salekasa

Gondia Salekasa

6.52 179 3.5 2 4

Proposal Submission under

process

12

Palora , Mohadi Bhandara Kardi7.48 474 3.5 2 4

Proposal Submission under

process

13Masala Pen Tal.

RisodWashim Masala Pen Tal. Risod 17.78 210 4 4 8

Proposal Submission under

process

14Malkhed

Bk.Tal.NerYavatmal Malkhed Tal.Ner 48.55

172,173,174,17

54.7 5 10

Proposal Submission under

process

321.28 50 102

Page 34: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Vidarbha (Phase-II B)

Sr.No

.

Name of Project

Location

District Name of the 33/11Kv

Substation

Gov. land

Available (

Hector)

Gat No. Of the

Land

Dist. from

Sub- station

in KM (By

Road) Proposed Solar

plant in (M.W.)

Land

required

for

project in

(Hector)

Land Status

PHASE-II-B

1

Chowa,BhandaraBhandar

Pahela Paoni16.24 85/1 3.6 2 4

Land Acquisition proposal is

with SDO office

2

Kumbhi-Wagholi

Tal. Achalpur

Amravati Pathrot Tal.Achalpur 8.12 274

5

4 8 Proposal Submission under

process

3

Dahegaon

Tal.Ghatanji

Yavatmal Shiroli Tal.Ghatanji 5.96 85.8

3 5.96 Proposal Submission under

process

4

Pandharkavda

Wardha WardhaAnji

32.87 55 8 6 12Land Acquisition order is in

final Stage

5

Talani Taluka-

Morshi

Amravati (132KV/33kv/11kv)Morshi9.56 21 7 4

8 Proposal Submission under

process

6

Khairlanji,Mohadi

Bhandar

Jam

41.83

224 (20.51H)

/209(5.68H) /

226(21.03H)

7.5 8 16

Land Acquisition proposal is

with SDO office.

7

Sambhora Taluka-

Chandur Bazar

Amravati Chandur Bazar

21.04 37,38,39 "8 6

12 Proposal Submission under

process

8

Gavner-Talegaon

Tal.Nandgaon Kh.

Amravati Nandgaon Kh. 8.98 280

10 4

8.98 Proposal Submission under

process

9

Rasulabad,Arvi Wardha Virur ,Arvi7.89 99/1 9.5 2

4 Land Acquisition order is in

final Stage.

10

Nibhora

de.,Tiwasa

Amravati Warkhed 6.0963 2.9 3 6

Proposal Submission under

process

11Eklara banoda

,SangrampurBuldhana Warwat 10.39 129 5.9 4 8

Proposal Submission under

process

12Pangarkhed,Mehak

arBuldhana Dongaon 11.49 3 & 4 10 4 8

Proposal Submission under

process

180.46 50 101

Page 35: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Lift Irrigation Scheme Tembhu, Dist,. Satara

• 60 MW capacity Solar power Project of Tembhu LIS is undertaken.

• NIT for the solar power project published on dtd. 12.08.2017.

• Techno commercial bid opened on 18.10.2017 & price bid opened on dtd.30.01.2018.

• The final price received after reverse bidding is Rs. 3.37/kWh

Mor, Dist. Jalgaon

• 65 MW capacity Solar power project DRP is submitted to WRD.

• Tendering is in process.

Bembla and Lower Wardha

• 15 MW at Bembla, Dist. Yavatmal and Lower Wardha, Dist. Wardha can be installed.

• DPR Submitted by the consultant.

Takari & Mhaisal

• The land identification nearby area is in progress, accordingly DPR will beprepared. Tender will be floated in line with Tembhu LIS.

• Mahagenco will act as Project Implementing Agency (PIA) in aboveprojects.

Page 36: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Sr. No Site Land available(H)

Proposed Capacity (MW)

1Sangli/ Khanapur/ Bhendwade

30.7418

2Sangli/ Khanapur/ Hingangade

25.3715

3Sangli/ Khanapur/ Nagewadi

24.4714

4 Sangli/ Khanapur/ Mahuli 17.36 10

5Sangli/ Khanapur/ Salshinge

8.595

6Sangli/ Khanapur/ Bhikawadi Bk

9.235

7Sangli/ Khanapur/ Hingangade

7.624

Total 123.38 71 MW

Project site locations for Solar power project for Tembhu LIS

Page 37: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

500MW Solar PowerProjects On EPCBasis

Page 38: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

50MW Koudgaon (Non-DCR)

• 50MWAC Crystalline SPV Technology Grid Interactive SolarPV Power Plant can be installed at Koudgaon, Dist.Osmanabad.

• The techno commercial bid opened on dtd. 12.12.2017 and following bidders have submitted their bid

Sr. No. Bidders

1. M/s. BHEL

2. M/s. WAREE ENERGIES LTD

3. M/s. L & T Pvt. Ltd.

Page 39: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

25MW Sakri (DCR)

• 25MWAC Crystalline SPV Technology Grid Interactive Solar PVPower Plant can be installed at Sakri, Dist. Dhule.

• Techno commercial bid was opened on dtd. 31.08.2017 and 5 nos.of bidders has submitted their bid.

Sr. No. Bidders

1. M/s. BHEL

2. M/s. TATA POWER SOLAR SYSTEM LTD

3. M/s. WAREE ENERGIES LTD

4. M/s. ENRICH ENERGY PVT LTD

5. M/s. ADANI POWER LTD

• The price bid was opened on dtd. 11.01.2018 & M/s. BHEL

submitted the lowest bid i.e. Rs.4.99Cr/ MW

Page 40: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Sr. No. Site Location Land in (HR) Approximate MW

1 Sakri Dist. Dhule 44 (Scattered) 25

2 Kachrala Dist. Chandrapur 226 130

3 Uran Dist. Raigad 20 05

4 Shindala Dist. Latur (Phase-1) 132 60

5 Paras 116 60

6 Yawatmal, Taluka- Ner

Nawabpur (16.2 HR),

Mangaladevi (50.75 HR),

Pimpri-Ejara (46.8 HR),

Malkhed-Bu (47.26)

161 80

Total MW 360

• Work order issued to the Consultant for 360 MW for preparation of Detailed Project

Report for various land locations.

• Consultant has submitted the inception report for all the locations of 360 MW and

preparation of DPR is in process.

• The list of all locations is as below:

Page 41: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

250MW Innovative Mode Solar

Projects in Maharashtra

Page 42: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

250 MW Innovative Solar Power Projects

• The LoA for consultancy services for preparation ofDPR for 250 MW innovative solar power projects atcanals, lakes, reservoirs, water bodies of WRD dept. etcand running of bid process, etc is issued on dtd.03.12.2016.

• Work order for preparation of master plan, DPR, etc. for250 MW innovative solar power projects inMaharashtra issued to the consultant on dtd.20.07.2017.

Page 43: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Sr.

No.

Site Discription Estimated

Capacity

of Solar

Projects (MW)

1. Bhatsa Reservoir 07

2. Ghatghar (Lower) Reservoir 28

3. Ghatghar (Upper) Reservoir

4.Vaitarna Reservoir, Vaitarna

Cannels (LBC & RBC)149

5. Alwandi Reservoir

6. Dhamani Reservoir 291

Total 475

The following sites are identified and the MW

capacity of the proposed sites is mentioned

below:

Page 44: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

• Mahagenco has conducted meetings with VIDC,Nagpur and KIDC, Thane.

• Meetings with other irrigation departments viz. Pune,Aurangabad and Jalgaon zones will be held in comingdays.

• Also as per the list given by Irrigation department,150 MW of Solar Power plants can be installed onvarious slopes of dams and land available withirrigation dept. in Maharashtra.

Page 45: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

• Mahagenco published an EoI and 14 participantssubmitted their EoI and after evaluating theconcepts/ideas, 04 were found innovative.

• The enquiry for consultancy services for preparationof DPR, running bid process, etc. for innovative solarpower project at Nagpur Metro Rail Corporation Ltd.(NMRCL) was floated.

• The price bid for the above enquiry was opened on12.07.2017.

• LoA issued to M/s. BRR Renewable Energyconsultant for consultancy services of 16 MWinnovative solar power project at Nagpur Metro.

Nagpur Metro Consultancy

Page 46: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

• Meeting Conducted between Mahagenco

Maha- Metro and Mahadiscom

i) Mahadiscom clarified that all charges will be applicable i.eWheeling charges (9ps/unit), add. Sur- Charge (1.11 ps/unit),cross – Sub-sidy (1.73ps/unit), transmission line charges (34ps/unit) to Maha- Metro as they are purchasing Solar powerfrom third party- ( Developer ).

Total charges Rs. 3.27/unit.

ii) If Maha metro is generating solar power & also utilizing thesame then these charges will not be applicable.

iii) Initial phase Solar power project will be for 16 MW . Onrooftops, of available spaces on Nagpur Metro.

iv) The PPA will be signed between Maha- Metro,Mahadiscom and Solar Power Developer.

v) Mahgenco will act as Project Implementing Agency andproposes as 8 % PIA charges on project Cost to Maha-Metro.

Page 47: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

DONDAICHA SOLAR PARK

Page 48: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Total Land Required for 500MW –

1026 Ha

Land identified - 824.94 Ha

Land under Possession -521.81 Ha

Govt land under advance possession - 45.76 Ha

Private land under possession –476.05 Ha

Land under Acquisition –303.13 Ha

Govt Land to be acquired -103.86 Ha

Private land to be Purchased –199.27 Ha

Land to be identified - 202 Ha

Page 49: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Power Evacuation for Dondaicha Solar Park

• JMR for combined pooling substation land admeasuring 5.44Ha Land carried outwith MSETCL on 11.12.2017 & 12.12.2017

• Tender published for 220/33kV GIS substation, bid opened on 07.12.2017 technicalscrutiny is under progress & LOA placement is expected by month end.

• Tender for LILO arrangement (250MW) is also published on 30.12.2017.

• MSETCL ha requested 11169.27 Lacs for the evacuation arrangement, for whichproposal is processed to deposit token amount of Rs.25.00 Lac from internalresources and balance payment as per work execution milestones.

Power Purchase from Solar Park

• MSEDCL has conveyed consent to purchase entire 500MW from Dondaicha SolarPark, if the price discovered through competitive bidding are in the range of recentbids of Rajasthan and Madhya Pradesh.

• M/s. Reliance Infrastructure Ltd. & Mumbai Metro Rail Corporation Ltd have alsoshown interest to purchase power of 125MW and 50MW resp. from DondaichaSolar Park.

• SECI has requested MSEDCL for confirmation of base tariff of Rs. 3.50 per Kwh(including trading margin) which will be included in RfP document for 250 MW.

Page 50: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

Current Status of the Park

• Vide D.O letter dtd. 11.08.2017 & 11.12.2017 SECI isrequested to carry-out tendering for selection of SPD’s for250MW (5X50MW) Solar Power Project in park throughState Specific VGF Scheme of MNRE.

• Tendering process for 250MW will be started within Onemonth’s time.

• 250MW Solar Projects is expected to be commissioned byJune -2019.

• SECI has carried out site visit on dated 14.12.2017 to starttendering activities for selection of Solar Project Developer.

• Civil works of display board, porta cabin & securityarrangement done at site.

Page 51: Koradi (Thermal) Sakri (Solar)...Sakri, Dhule Shirsufal Total 5 MW 125 MW 50 MW 180 MW Hydro(18.4%) Parli Bhusawal Nasik 1210 MW 630 MW 10170 MW Koyana 1956MW Small Hydro (21) 374

THANK YOU