Uran (Gas)
MAHARASHTRA STATE POWER GENERATION CO. LTD.
Sakri (Solar)
WELCOME
Koyna (Hydro)
Koradi (Thermal)
1
Second largest Generating company
in the country
Current generation capacity is 13602
MW
Long term PPAs with MSEDCL
Adopted RE policy for establishing 2500 MW
Solar Power
First in Country to utilize sewage treated
water for power generation at its
Koradi plant
Thermal10170 MW,
75.5%
Hydro2580 MW,18.4%
Gas 672 MW, 4.8%
Solar 180 MW, 1.3%
OVERVIEW AND HIGHLIGHTS
2
POWER GENERATION OVERVIEW
3
Installed Capacity - 13602 MW
Conventional Renewable
Gas (4.8%)Coal (75.5%) Solar (1.3%)
Chandrapur
Koradi
Khaperkheda
Paras
2920 MW
2400 MW
1340 MW
500 MW
1170 MW
Total
Chandrapur
Sakri, Dhule
Shirsufal
Total
5 MW
125 MW
50 MW
180 MW
Hydro(18.4%)
Parli
Bhusawal
Nasik
1210 MW
630 MW
10170 MW
Koyana 1956MW
Small Hydro (21)
374 MW
Uran
West . H. Recovery
432 MW
240 MW
Total672 MW
Total 2580 MW
Ghatghar 250 MW
MAHAGENCO’S ROADMAP FOR SOLAR
PROJECTS
“Chief Minister Solar Agriculture feeder Scheme”
“An initiative towards Low cost power for Agricultural Consumers through the Green
Power…..”
Mahagenco’s Existing Solar PV Power Plants
Sr. No. Location of Project Capacity(MW)
COD
1 Tal. Dist. Chandrapur 1 09.04.2010
2 Tal. Dist.Chandrapur 2 18.10.2011
3 Tal. Dist.Chandrapur 2 12.02.2012
4 Shivajinagar Tal.Sakri, Dist. Dhule
50 29.03.2013
5 Shivajinagar Tal.Sakri, Dist. Dhule
75 29.03.2013
6 Shirsuphal Tal. BaramatiDist. Pune
36 19.12.2014
7 Shirsuphal Tal. BaramatiDist. Pune
14 31.03.2015
Total 180
5MW
Chandrapur
125 MW
Sakri
Dhule
50 MW
Shirsuphal
Pune
Photographs of Existing Solar PV Power
Plants
Chief Minister Solar Agriculture feeder Scheme
• “Hon. CM Solar Agriculture feeder Scheme” dated 14 June 2017
envisages
1. Low cost Power to Agri-consumers
2. Availability of electricity in day time.
3. Reduction in cross subsidy on Industrial & Commercial consumers.
• Mahagenco with the help of MSEDCL and MEDA to implement under
PPP mode, on pilot basis at Ralegan Siddhi in Ahmednagar district and
Kolambi at Yavatmal district in Maharashtra.
• Project to be located on Govt./ Private land in the periphery of 5-10KM
from 11KV to 132KV substations. Considering the load on AG feeders
(Separated) the capacity of Solar power project will be finalized.
• Exemption from all fees/charges/ cess levied by State Govt./ authority for
the projects.
Responsibilities of Utilities
• MAHAGENCO :
a. Mahagenco will develop the land and infrastructure.
b. Mahagenco will sign tripartite PPA with the SPD and
MSEDCL for 25 years.
• MSEDCL :
MSEDCL will provide evacuation facility.
• MEDA:
MEDA will register the project and provide VGF for the
infrastructure.
• SOLAR PROJECT DEVELOPER (SPD) :
SPD will develop the project including O&M for the period
of 25 years.
Bidding process for Pilot Projects
• NIT for Kolambi & Ralegan Siddhi for 2MW solar Ag
project at site were published on 19.05.2017.
• The RFP document for these bids were prepared on
basis of REVA & BADALA solar park bids of SECI.
• Bidder selected by Reverse bidding process with
Rs. 3.00/kWh or the minimum tariff quoted by
bidder whichever is lower, as the base price.
Competitive Bidding
• Competitive bidding for both tenders were carried out on 16.06.2017.
• Price offered in reverse bidding For Ralegansiddhi is Rs. 2.94/KWH
• Price offered in reverse bidding For Kolambi is Rs. 2.97/KWH
Status of civil works Ralegan Sidhi
Work Remarks
Topographical survey Work completed
soil investigation / explorationWork completed
WBM Road Work in progress.
Fencing along the periphery Work is in progress
Status of civil works Kolambi
Work Remarks
Topographical survey Work completed
soil investigation / exploration Work completed
WBM Road Work completed
Fencing along the periphery Work completed
Status of 200 MW AG Feeder Projects
• Marathwada region – 50MW
• Vidarbha region – 50MW
• Northen region – 50MW
• Western Maharashtra - 50 MW
• The tariff rate for all the projects was finalized
by reverse bidding to Rs. 3.15/kWh.
• The LoA for the developer is issued on dtd.
14.11.2017.
PPA & Evacuation Arrangement
• Petition for PPA & PSA is submitted in MERC on dtd.27.11.2017 for all AG Feeder solar projects under “MukhyaMantri Saur Krishi Vahini Yojana” including Ralegan siddhi& Kolambi. The hearing for this is on dtd. 02.01.2018
• Evacuation scheme is finalized by MSEDCL for bothRalegan Sidhi & Kolambi
• All land details for phase-I, 200MW AG feeder solar powerprojects are submitted to MSEDCL for evacuationarrangement.
• The letter regarding evacuation arrangement for SPP atGavhankund is submitted to Director (Projects), MSEDCLon dtd. 16.12.2017
Ralegansiddhi:
LoA issued by MSEDCL to M/s. Prabharanjan Electricals Ahmednagar in JV with Green Flame Pvt. Ltd. Pune on 26.12.2017.( Amount Rs. 32.27 Lakhs)
Manjarda (Kolambi):
1. LoA issued by MSEDCL to M/s. Neha Electricals Nanded for Bay construction on 08.12.2017.( Amount Rs. 11.85 Lakhs)
2. LoA issued by MSEDCL to M/s. Star Electricals & Engg, Amravati for Line erection on 08.12.2017.( Amount Rs. 18.98 Lakhs)
Gavhankund:
Estimation is in progress by MSEDCL.
Evacuation Arrangement Status
Phase I (200 MW) Implementation Progress
• “Bhoomipujan ceremony” for 20 MW AG Feeder cluster at
Gavhankund Tal. Warud, Dist. Amravati is arranged on24.12.2017.
• The LoA is issued to M/s. Sangam Advisors Pvt. Ltd. On dtd.14.11.2017.
• The solar power from this project will be supplied to nearby 9nos. of 33 kV & 11kV substations and 18896 farmers will bebenefited from this project.
• Approx. 3.33 Mus per year can be generated from this Solarproject.
• The expenditure for infrastructure development & evacuationarrangement is as around Rs. 2 Cr which will be done byMSPGCL & MEDA.
• The project cost as around Rs. 80 Cr. will be done bydeveloper.
Land Acquisition Status 300 MW AG Feeder Projects(Phase-II):
• Land acquisition process has started vide GR no. जमीन-2017/प्र.क्र.197/ज-1 dtd. 29.11.2017
• Letters to all district collectors are dispatched.
• The submission of proposals for land acquisition are under process
Registration of projects with MEDA:
• The proposals for registration of the projects atRalegansiddhi & Kolambi are submitted to MEDAalong with requisite documents.
• The proposals for registration of 200 MW AGfeeder Solar Power Projects are submitted to MEDAalong with available documents.
Evacuation Arrangement for 500 MW AG feeder projects
• All land details for phase-I, 200MW and 300 MW (Phase-II)AG feeder solar power projects are submitted to MSEDCLfor evacuation arrangement.
• The letter regarding evacuation arrangement for cluster AGfeeder Solar power project at Gavhankund (Under Vidarbharegion Phase-I) is submitted to Director (Projects), MSEDCLon dtd. 16.12.2017
Marathwada region (Phase –I)Sr.No. Name of project
Site
District Name of the 33/11Kv
Substation
Gov. land
Available
( Hector)
Gat No. Of the
land
Distance from
S/S in KM
Propo.Solar
plant Cap. in (
M.W.)
Land reqd
for project in
(Hector)
Land Status
PHASE-I (200MW)
1 Chauka, A'bad Chauka18.63 25 3 3 6
Proposals Submitted to
collector office
2 Gangapur, A'bad Gangapur
49.6 281/A 4 7 14Proposals Submitted to
collector office
3 Ansarwada
Nilanga,Tal.Latur
Latur Ansarwada
Nilanga,Tal.Latur 4 23,56
Adjacent to S/S
2 4
Joint Measurement
Completed on 02/11/17
4 Nathara, Tal.
Parli,Beed.
Beed Nathara, Tal.
Parli,Beed. 30.53 21,182Adjacent to S/S
8 16Proposals Submitted to
collector office
5 Waghe
Babhulgaon,Tal.Kej
Beed Waghe
Babhulgaon,Tal.Kej 13 16Adjacent to S/S
3 6Proposals Submitted to
collector office
6 Bavi Tal Bhoom Osmanabad Warud
4 Gavthan 3 2 4
Joint Measurement
Completed on 19/09/17
7 Bor-Ranjani , Jalana Jalna Bor-Ranjani , Jalana137 531 1 2 4
Proposals Submitted to
collector office
8 Talni & Koli Nanded Talni Tal. Hadgaon29.09 900,901,902
0.56 12
Proposals Submitted to
collector office
9 Yeldari Parbhani Yeldari Sawangi
37.91 39,41,1691.2 5 10
Proposals Submitted to
collector office
10 Kolha Parbhani Kolha4.59 1,2 6 2 4
Proposals Submitted to
collector office
11 Ghordari Tal.
Sengaon
Hingoli Ghordari
4
256
Adjacent to S/S
2 4Proposals Submitted to
collector office
12 Kedarkheda
Tal.Bhokardan
Jalna Kedarkheda Tal.
Bhokardan 40 22 3 8 16Proposals Submitted to
collector office
372.3550 100
North Maharashtra (Phase-I)
Sr.No
.
Name of the project
Site
District Name of the
33/11Kv
SubstationGov. land
Available in (
Hector)
Gat No. of
the land
Distance
from
Substation in
KM
Proposed
Capacity in
(MW)
Land reqd
for project
in (Hector)
Land Status
PHASE- I
(200MW)
1 Vadalibhoi
,Tal.Chandwad
Nashik Vadalibhoi15.75 309 0.5 8 15.75
NOC not received from
Grampanvhayat
2 Vadgaon Pangu
,Tal.Chandwad
Nashik Vadgaon Pangu
24.9 83,84 0.5 4 8NOC received,proposal
submitted.
3 Vinchur Tal. Niphad Nashik Vinchur
72 93 6.5 3 6NOC received,proposal
submitted.
4 Jaitane Taluka- Sakri Dhule Jaitane
18 128/1 5 9 18
Land in passation with
Mahagenco 11KV line
passing through plot. Letter
given to CIVIL for land
development 06.01.18
5 Lamkani Dhule Lamkani
18
568(7.61H)-
569(4.94H)-
570(5.75H)
3 8 16NOC received,proposal
submitted.
6 Nimgul , Sindkheda Dhule Nimgul
66 342 3.7 5 10NOC not received from
Grampanvhayat
7 Holmohida
Tal.Shahada
Nandurbar Mohide
Tal.Shahada 39.99
57/2
(23.25H),225
/1
3 8 16NOC received,proposal
submitted
8 Wadangali Tal.Sinnar Nashik Wadangali
Tal.Sinnar 79.48 26/1/1A 0.5 5 10NOC received,proposal
submitted
334.12 22.7 50 99.75
Vidarbha Region (Phase-I)Sr.N
o.
Name of Project
Location
District Name of the 33/11Kv
Substation
Gov. land
Available (
Hector)
Gat No. Of
the Land
Dist. from
Sub-
station in
KM (By
Road)
Proposed
Solar plant
in(M.W.)
Land
required for
project in
(Hector)
Land Status
PHASE-I
1
Nandgaonpeth -2
(shevati)
Amravati Nandgaonpeth -2
(shevati) 11.91 296 5 5 10
Proposal submitted
2
Anjangaon Bari Amravati Anjangaon Bari
20.72
132/1,132/2,1
34/1,143/1,14
4/1
0.3 6 12
Proposal submitted
3
Gavhankund ,
Tal. Warud
Amravati 132/33 KV GSS Warud
,Shendurna Ghat ,
34.06235-236-238-
239-24014 20 34.1
Land Handed over to
MAHAGENCO.
Bhumipoojan ceremany
done on 24/12/2017
4
Panchala,Rajura Chandrapur Vihirgaon
39.32 126 1.5 3 6
Proposal submitted
5Yeoti Yavatmal Kolambi 40
78/99/106/113
/12712 7 14
Proposal submitted
6Yerad Yavatmal Jodmoha 12.72 52,67/3 4 3 6
Proposal submitted
7
Bhojpur
Tal.KuhiNagpur
Kuhi
4 287/1 3 2 4
Proposal is sent by
collector office to
irrigation department
for clearance.
8
Mangrulzanak
Tal.Risod
Washim Mangrulzanak Tal.Risod
7.95 182 3.5 4 8
Proposal submitted
170.68 50 94.1
Western Maharashtra (Phase-I)
Sr.No.
Name of
Project Site
District Name of the
33/11Kv
Substation
Gov. land
Available
( Hector)
Gat No. of the Land
Distance from
S/S in KM
(road)/ Aerial
Proposed
Capacity in
(MW)
Land
required for
project in
(Hector)
Land Status
PHASE-I
1
Mhase Khurd
Parner
A'GAR Ralegan TherpaL
48.2 279 8.9
9
18
Proposal
Submitted
2
Ranjangaon
Mashid Parner
A'GAR Pimpli Gawli
30.34 345 5.8
7
14
Proposal
Submitted
3Kthapal
Sangola
SOLAPUR Kthapal Sangola23.78 978 3.3
612
Proposal
Submitted
4
Gaygavhan
Tal.Sangola
SOLAPUR Gaygavhan
Tal.Sangola 17.8 77 Adjescent to s/s 7 14
Proposal
Submitted
5
Sakhharewadi
Tal. North
Solapur
SOLAPUR Kalman Tal.North
Solapur33.85 109 1.2 5 10
Proposal
Submitted
6
Lahul (Gat No.
715)
SOLAPUR Padsali S/S
11.98 715 2.4
5
10
Proposal
Submitted
7
Jadhavwadi SOLAPUR Aran
17.96 1 3.8
8
16
Proposal
Submitted
8
Lahul (Gat No.
416) Madha
SOLAPUR Bhend
6.35 416 9
3
6
Proposal
Submitted
190.26 50 100
Western Region (Phase II-A)
Sr.
No.
Name of
Project Site
District Name of the
33/11Kv
SubstationGov. land
Available
( Hector)
Gat No. of the
Land
Distance
from S/S in
KM (road)/
Aerial
Proposed
Capacity in
(MW)
Land
required
for project
in
(Hector)
Land Status.
Proposal
Submission
PHASE-II--A
1
Babhulgaon ,
Taluka Inddapur
PUNE Babhulgaon
44.7 318Adjescent to
s/s8 16
Under prcess
2
Dahiwali Tal.
Madha
SOLAPUR Dahiwali
Tal.Madha 14.93 345Adjescent to
s/s6 12
Under prcess
3Anwali Tal.
Pandharpur
SOLAPUR Anwali Tal.
Pandharpur17.21 289/2
Adjescent to
s/s8 16
Under prcess
4Alegaon
Tal.Sangola
SOLAPUR Alegaon
Tal.Sangola 8.4 431Adjescent to
s/s3 6
Under prcess
5Borgaon
Taluka.-Barshi
SOLAPUR Borgaon
Taluka.-Barshi 46.27 50,51,52, &94Adjescent to
s/s9 18
Under prcess
6Kautha
Shrigonda
A'GAR Angare6.1 120 1
26
Under prcess
7Pathari Taluka-
Barshi
SOLAPUR Pathari Taluka-
Barshi 20.47 355 1.52 5 10
Under prcess
8Chikharde
Taluka-Barshi
SOLAPUR Chikharde
Taluka-Barshi 5.09 401/1 1.6 2 4
Under prcess
9Zadi Barshi SOLAPUR Upale S/S
15 113/1 4.77
14Under prcess
178.17 50 102
Western Region (Phase II-B)Sr.N
o.
Name of Project
Site
District Name of the
33/11Kv
Substation
Gov. land
Available
( Hector)
Gat No. of the Land Distance from
S/S in KM
(road) Aerial
Proposed
Capacity in
(MW)
Land
required for
project in
(Hector)
Land Status.
Proposal
Submission
PHASE-II--B
1 Kini Akkalkot SOLAPUR Kini Akkalkot 12.95 558 2.8 5 10 Under prcess
2 Atpadi Tal.Atpadi SANGALI Atpadi 24.74 2605 3.9 8 16 Under prcess
3 Jawala Parner A'GAR Jawala 166.7 1836 3.8 8 16 Under prcess
4 Pokharni, Tal.
Is;ampur
Sangli Nagaon 20 49 1.3 7 14 Under prcess
5 Tikondi, Tal. Jat Sangli Tikondi 14.06 496 0.22 7 14.06 Under prcess
6 Sonayal, Tal.Jat Sangli Sonnayal 5 830 1.4 2 5 Under prcess
7 Maralnathpur Sangli RethareDharan 11 1948 3.5 4 8 Under prcess
8 Haroli Sangli Haroli K’mahankal 9 441 0.7 3 6 Under prcess
9. Umadi Sangi Umadi 10.2 391 2.2 4 8 Under prcess
10. Borgi, Tal. Jat Sangli Borgi Kh. 14.67 8 0.2 2 4 Under prcess
Total 50 MW
Western Region (Phase II-C)
Sr.N
o.
Name of Project
Site
District Name of the
33/11Kv
SubstationGov. land
Available
( Hector)
Gat No. of the Land
Distance from
S/S in KM
(road)/ Aerial
Proposed
Capacity in
(MW)
Land
required for
project in
(Hector)
Land Status.
Proposal
Submission
PHASE-II--C
1 Takali ,Shirol Kolhapur Takali
47.631350(27.86),1194(19
.77)2 12 24
Under prcess
2 Takliwadi
Ghosarwad
Kolhapur Ghosarwad
71.32
590
(46.39),502/1(16.29)
1168(8.64)
1.5 12 24
Under prcess
3 Kothali&Jainapur Kolhapur Kothali
29.17Kothali 1213 (15H),
Jainapur240(14.17)1.5 10 20
Under prcess
4
Ranjani Alkud s
Tal.Kavathemahank
al
Sangali
Ranjani
Tal.Kavathemahan
kal28.49
709 (13.64H),
711(14.85H)2 10 20
Under prcess
5 Kavathemahankal Sangali Kavathemahankal
1 215 1.5 4 8
Under prcess
6 Borgaon
Kavthemankal
Sangali Borgaon
6.32 358 0.1 2 4
Under prcess
183.93 50 100
Marathwada (Phase-II)Sr.N
o.
Name of project
Site
District Name of the 33/11Kv
Substation
Gov. land
Available
( Hector)
Gat No. Of
the land
Distance from
S/S in KM
Propo. Solar
plant Cap. in (
M.W.)
Land
required for
project in
(Hector)
Land Status
PHASE-II -A
1 Sardgaon Tal.Parli Beed Sardgaon Tal.Parli
11.12 158 0.5 5 10Proposals Submitted to
collector office
2 Niwagha Nanded Niwagha
70.14 110/1 0.8 5 10Proposals Submitted to
collector office
3 Hatta Tal.Sengaon Hingoli Hatta30.12 125 0.6 2 4
Proposals Submitted to
collector office
4 Sastur Tal.Lohara Osmanabad Sastur Tal.Lohara18 old Gavthan 0.5 8 16
Proposals Submitted to
collector office
5 Killari Tal. Ausa Latur Killari Tal.Ausa10 old Gavthan 1 3 6
Proposals Submitted to
collector office
6Chikalthan Tal.
Kannad ,
A'badChikalthan. Tal.
Kannad , 11.88 424,425, 426 1.5 6 11.88
Proposals Submitted to
collector office
7 Wanola tal.Mahur Nanded Wanola tal.Mahur76.37
292,310,147,1
703 3 6
Proposals Submitted to
collector office
8 Wangi matola Latur Matola15 30 1.5 6 12
Proposals Submitted to
collector office
9 Digrass Tal .
Kandhar
Nanded Digrass Tal . Kandhar
51.94 614 3 4 8Proposals Submitted to
collector office
10 Kurala
Tal.Kandhar
Nanded Kurala Tal.Kandhar59.29 71 3 4 8
Proposals Submitted to
collector office
11 Kala Nimbala
Tal.Umerga
Osmanabad Bastur Tal.Umerga
7.4 260 4.5 4 8Proposals Submitted to
collector office
361.26 50 99.88
Vidarbha (Phase-II A)
Sr.No
.
Name of Project
Location
District Name of the 33/11Kv
SubstationGov. land
Available (
Hector)
Gat No. Of the
Land
Dist. from
Sub- station
in KM (By
Road)
Proposed Solar
plant in
(M.W.)
Land
required
for
project in
(Hector)
Land Status
PHASE-II -A
1
Khadsing
tal.Washim
Washim Pimpalgaon14.26 98/99 2 5
12 Proposal Submission under
process
2
KakdaraTalegaon
Ashti
Wardha Talegaon Ashti
40.07 43/1 0.8 4
8 Land handover to Dyce Civil-
II MSPGCL Koradi, Nagpur
and measurement of land is in
progress
3
Gangalwadi,
Bramhapuri
Chandrapur Gangalwadi4.76 155,163 1.5 2 4
Proposal Submission under
process
4
Panchala,Rajura Chandrapur Vihirgaon39.32 126 1.5 3 6
Proposal Submission under
process
5Mangrul Chawhala
Tal.Nandgaon KhAmravati
Mangrul Chawhala
Tal.Nandgaon Kh.19.49 25 0.35 3 6
Proposal Submission under
process
6 Sirso ,Murtizapur Akola Sirso ,Murtizapur 17.42 27,28 0.2 3 6Proposal Submission under
process
7
Rithad Tal. Risod Washim Rithad Tal. Risod34.98
441/442/
449/4500.6 7
14 Proposal Submission under
process
8
Rajgaon Washim Rajgaon Tal.Washim15.55 202 1.8 3 6
Proposal Submission under
process
9Titvi Tal.Ghatanji Yavatmal Rajurwadi ,Ghatanji 6.4 32 2.5 3 6
Proposal Submission under
process
10
Ansing Taluka-
Washim
Washim Ansing Taluka-Washim48.7 275 3.8 4 8
Proposal Submission under
process
11
Amgaon Kurd
Tirkhedi, Salekasa
Gondia Salekasa
6.52 179 3.5 2 4
Proposal Submission under
process
12
Palora , Mohadi Bhandara Kardi7.48 474 3.5 2 4
Proposal Submission under
process
13Masala Pen Tal.
RisodWashim Masala Pen Tal. Risod 17.78 210 4 4 8
Proposal Submission under
process
14Malkhed
Bk.Tal.NerYavatmal Malkhed Tal.Ner 48.55
172,173,174,17
54.7 5 10
Proposal Submission under
process
321.28 50 102
Vidarbha (Phase-II B)
Sr.No
.
Name of Project
Location
District Name of the 33/11Kv
Substation
Gov. land
Available (
Hector)
Gat No. Of the
Land
Dist. from
Sub- station
in KM (By
Road) Proposed Solar
plant in (M.W.)
Land
required
for
project in
(Hector)
Land Status
PHASE-II-B
1
Chowa,BhandaraBhandar
Pahela Paoni16.24 85/1 3.6 2 4
Land Acquisition proposal is
with SDO office
2
Kumbhi-Wagholi
Tal. Achalpur
Amravati Pathrot Tal.Achalpur 8.12 274
5
4 8 Proposal Submission under
process
3
Dahegaon
Tal.Ghatanji
Yavatmal Shiroli Tal.Ghatanji 5.96 85.8
3 5.96 Proposal Submission under
process
4
Pandharkavda
Wardha WardhaAnji
32.87 55 8 6 12Land Acquisition order is in
final Stage
5
Talani Taluka-
Morshi
Amravati (132KV/33kv/11kv)Morshi9.56 21 7 4
8 Proposal Submission under
process
6
Khairlanji,Mohadi
Bhandar
Jam
41.83
224 (20.51H)
/209(5.68H) /
226(21.03H)
7.5 8 16
Land Acquisition proposal is
with SDO office.
7
Sambhora Taluka-
Chandur Bazar
Amravati Chandur Bazar
21.04 37,38,39 "8 6
12 Proposal Submission under
process
8
Gavner-Talegaon
Tal.Nandgaon Kh.
Amravati Nandgaon Kh. 8.98 280
10 4
8.98 Proposal Submission under
process
9
Rasulabad,Arvi Wardha Virur ,Arvi7.89 99/1 9.5 2
4 Land Acquisition order is in
final Stage.
10
Nibhora
de.,Tiwasa
Amravati Warkhed 6.0963 2.9 3 6
Proposal Submission under
process
11Eklara banoda
,SangrampurBuldhana Warwat 10.39 129 5.9 4 8
Proposal Submission under
process
12Pangarkhed,Mehak
arBuldhana Dongaon 11.49 3 & 4 10 4 8
Proposal Submission under
process
180.46 50 101
Lift Irrigation Scheme Tembhu, Dist,. Satara
• 60 MW capacity Solar power Project of Tembhu LIS is undertaken.
• NIT for the solar power project published on dtd. 12.08.2017.
• Techno commercial bid opened on 18.10.2017 & price bid opened on dtd.30.01.2018.
• The final price received after reverse bidding is Rs. 3.37/kWh
Mor, Dist. Jalgaon
• 65 MW capacity Solar power project DRP is submitted to WRD.
• Tendering is in process.
Bembla and Lower Wardha
• 15 MW at Bembla, Dist. Yavatmal and Lower Wardha, Dist. Wardha can be installed.
• DPR Submitted by the consultant.
Takari & Mhaisal
• The land identification nearby area is in progress, accordingly DPR will beprepared. Tender will be floated in line with Tembhu LIS.
• Mahagenco will act as Project Implementing Agency (PIA) in aboveprojects.
Sr. No Site Land available(H)
Proposed Capacity (MW)
1Sangli/ Khanapur/ Bhendwade
30.7418
2Sangli/ Khanapur/ Hingangade
25.3715
3Sangli/ Khanapur/ Nagewadi
24.4714
4 Sangli/ Khanapur/ Mahuli 17.36 10
5Sangli/ Khanapur/ Salshinge
8.595
6Sangli/ Khanapur/ Bhikawadi Bk
9.235
7Sangli/ Khanapur/ Hingangade
7.624
Total 123.38 71 MW
Project site locations for Solar power project for Tembhu LIS
500MW Solar PowerProjects On EPCBasis
50MW Koudgaon (Non-DCR)
• 50MWAC Crystalline SPV Technology Grid Interactive SolarPV Power Plant can be installed at Koudgaon, Dist.Osmanabad.
• The techno commercial bid opened on dtd. 12.12.2017 and following bidders have submitted their bid
Sr. No. Bidders
1. M/s. BHEL
2. M/s. WAREE ENERGIES LTD
3. M/s. L & T Pvt. Ltd.
25MW Sakri (DCR)
• 25MWAC Crystalline SPV Technology Grid Interactive Solar PVPower Plant can be installed at Sakri, Dist. Dhule.
• Techno commercial bid was opened on dtd. 31.08.2017 and 5 nos.of bidders has submitted their bid.
Sr. No. Bidders
1. M/s. BHEL
2. M/s. TATA POWER SOLAR SYSTEM LTD
3. M/s. WAREE ENERGIES LTD
4. M/s. ENRICH ENERGY PVT LTD
5. M/s. ADANI POWER LTD
• The price bid was opened on dtd. 11.01.2018 & M/s. BHEL
submitted the lowest bid i.e. Rs.4.99Cr/ MW
Sr. No. Site Location Land in (HR) Approximate MW
1 Sakri Dist. Dhule 44 (Scattered) 25
2 Kachrala Dist. Chandrapur 226 130
3 Uran Dist. Raigad 20 05
4 Shindala Dist. Latur (Phase-1) 132 60
5 Paras 116 60
6 Yawatmal, Taluka- Ner
Nawabpur (16.2 HR),
Mangaladevi (50.75 HR),
Pimpri-Ejara (46.8 HR),
Malkhed-Bu (47.26)
161 80
Total MW 360
• Work order issued to the Consultant for 360 MW for preparation of Detailed Project
Report for various land locations.
• Consultant has submitted the inception report for all the locations of 360 MW and
preparation of DPR is in process.
• The list of all locations is as below:
250MW Innovative Mode Solar
Projects in Maharashtra
250 MW Innovative Solar Power Projects
• The LoA for consultancy services for preparation ofDPR for 250 MW innovative solar power projects atcanals, lakes, reservoirs, water bodies of WRD dept. etcand running of bid process, etc is issued on dtd.03.12.2016.
• Work order for preparation of master plan, DPR, etc. for250 MW innovative solar power projects inMaharashtra issued to the consultant on dtd.20.07.2017.
Sr.
No.
Site Discription Estimated
Capacity
of Solar
Projects (MW)
1. Bhatsa Reservoir 07
2. Ghatghar (Lower) Reservoir 28
3. Ghatghar (Upper) Reservoir
4.Vaitarna Reservoir, Vaitarna
Cannels (LBC & RBC)149
5. Alwandi Reservoir
6. Dhamani Reservoir 291
Total 475
The following sites are identified and the MW
capacity of the proposed sites is mentioned
below:
• Mahagenco has conducted meetings with VIDC,Nagpur and KIDC, Thane.
• Meetings with other irrigation departments viz. Pune,Aurangabad and Jalgaon zones will be held in comingdays.
• Also as per the list given by Irrigation department,150 MW of Solar Power plants can be installed onvarious slopes of dams and land available withirrigation dept. in Maharashtra.
• Mahagenco published an EoI and 14 participantssubmitted their EoI and after evaluating theconcepts/ideas, 04 were found innovative.
• The enquiry for consultancy services for preparationof DPR, running bid process, etc. for innovative solarpower project at Nagpur Metro Rail Corporation Ltd.(NMRCL) was floated.
• The price bid for the above enquiry was opened on12.07.2017.
• LoA issued to M/s. BRR Renewable Energyconsultant for consultancy services of 16 MWinnovative solar power project at Nagpur Metro.
Nagpur Metro Consultancy
• Meeting Conducted between Mahagenco
Maha- Metro and Mahadiscom
i) Mahadiscom clarified that all charges will be applicable i.eWheeling charges (9ps/unit), add. Sur- Charge (1.11 ps/unit),cross – Sub-sidy (1.73ps/unit), transmission line charges (34ps/unit) to Maha- Metro as they are purchasing Solar powerfrom third party- ( Developer ).
Total charges Rs. 3.27/unit.
ii) If Maha metro is generating solar power & also utilizing thesame then these charges will not be applicable.
iii) Initial phase Solar power project will be for 16 MW . Onrooftops, of available spaces on Nagpur Metro.
iv) The PPA will be signed between Maha- Metro,Mahadiscom and Solar Power Developer.
v) Mahgenco will act as Project Implementing Agency andproposes as 8 % PIA charges on project Cost to Maha-Metro.
DONDAICHA SOLAR PARK
•
Total Land Required for 500MW –
1026 Ha
Land identified - 824.94 Ha
Land under Possession -521.81 Ha
Govt land under advance possession - 45.76 Ha
Private land under possession –476.05 Ha
Land under Acquisition –303.13 Ha
Govt Land to be acquired -103.86 Ha
Private land to be Purchased –199.27 Ha
Land to be identified - 202 Ha
Power Evacuation for Dondaicha Solar Park
• JMR for combined pooling substation land admeasuring 5.44Ha Land carried outwith MSETCL on 11.12.2017 & 12.12.2017
• Tender published for 220/33kV GIS substation, bid opened on 07.12.2017 technicalscrutiny is under progress & LOA placement is expected by month end.
• Tender for LILO arrangement (250MW) is also published on 30.12.2017.
• MSETCL ha requested 11169.27 Lacs for the evacuation arrangement, for whichproposal is processed to deposit token amount of Rs.25.00 Lac from internalresources and balance payment as per work execution milestones.
Power Purchase from Solar Park
• MSEDCL has conveyed consent to purchase entire 500MW from Dondaicha SolarPark, if the price discovered through competitive bidding are in the range of recentbids of Rajasthan and Madhya Pradesh.
• M/s. Reliance Infrastructure Ltd. & Mumbai Metro Rail Corporation Ltd have alsoshown interest to purchase power of 125MW and 50MW resp. from DondaichaSolar Park.
• SECI has requested MSEDCL for confirmation of base tariff of Rs. 3.50 per Kwh(including trading margin) which will be included in RfP document for 250 MW.
Current Status of the Park
• Vide D.O letter dtd. 11.08.2017 & 11.12.2017 SECI isrequested to carry-out tendering for selection of SPD’s for250MW (5X50MW) Solar Power Project in park throughState Specific VGF Scheme of MNRE.
• Tendering process for 250MW will be started within Onemonth’s time.
• 250MW Solar Projects is expected to be commissioned byJune -2019.
• SECI has carried out site visit on dated 14.12.2017 to starttendering activities for selection of Solar Project Developer.
• Civil works of display board, porta cabin & securityarrangement done at site.
THANK YOU