Dear Ladies and gentlemen,
Kostroma region that I have the honour to represent has an abundant history of the successful partnership, the unique productions and natural resources.
This edition presents the investment appeal in the most perspective sectors, which are capable to open new hori-zons for your business development.
We do our best to extend the competitive advantages of the Kostroma region creating the most comfortable con-ditions for investments improving the measures of the ad-ministrative barriers lowering.
Your business development plans will be realized in the Kostroma region at the forming investment sites. From our side we provide you with necessary infrastructure.
We invite you to the mutually profitable business partner-ship.
Welcome to the hospitable Kostroma region.Sergey Sitnikov
Kostroma region Governor
3
Land lots for the industrial sites location ...................................... 5
Land lots for farming ....................................................................... 27
Investment proposals ...................................................................... 63
Industrial park “Industrial`nyi” ....................................................... 79
CONTENT
LAND LOTS FOR THE INDUSTRIAL SITES LOCATION
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
7
Land lot limited by the streets Industrial`naya-Bazovaya-Galichskoe highway (Kostroma)
Area - 23,6 ha
Transport availabilityDistance to:Railway station – 5,4 km;• River port – 11,5 km;• Motorway sides with the land lot.•
Civil engineering infrastructure avaliabilityPower supply – along the land lot border;• Gas supply – 170 m far from the land lot border close to Vostochnyi • lane, out of Kostroma city territory;Heat supply – 350 m far from the land lot close to No.4 Vostochnyi • lane;Water supply – 300 m far from the land lot close to No.2 Vostochnyi • lane;Sewerage system - alongside the land lot border;• Communication cable - alongside the land lot border.•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
9
Land lot in Moskovskaya Street near the Klyuchevka - river (Kostroma)
Area - 38,0 ha
Transport availabilityDistance to:Motorway: Moskovskaya Str. – 10 m;• Magistral`naya Str. – 300 m;• Railway – 1,2 km;• houses – 1,1 km•
Civil engineering infrastructure avaliabilityPower supply – 6 m far from the land lot close to Moskovskaya Str.;• Gas supply – 72 m far from the land lot close to Moskovskaya Str.;• Water supply – 20 m in the land lot close to Moskovskaya Str., piping • d-250; 60 m far from the land lot there is a d-800 piping;Sewerage system - 73 m far from the land lot close • to Moskovskaya Str.;Communication cable - across the land lot border from the Moskovs-• kaya Str. side.
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
11
Cluster in Magistral`naya street (Kostroma)
Area - 59,6 ha
Transport availabilityLocated out of the city borderDistance to:Motorway: Moskovskaya Str. – 10 m;• Solonkovskaya Str. – 10 m;• Railway – 1,0 km.•
Civil engineering infrastructure avaliabilityPower supply – 120 m far from the land lot close to Magistral`naya Str.; • Power cable goes alongside Solonikovskaya Str.Gas supply – 65 m far from the land lot close to Soloikovskya Str.;• Water supply – piping of d-150 crosses the land lot, • close to Solonikovskaya Str. there is as well piping d-500;Sewerage system – alongside the land lot • close the Magistral`naya Str.;Communication cable – alongside Magistral`naya Str.•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
13
Land lot on the territory of Baksheevskoe rural settlement close to OAO “Motordetal”
Area - 40,0 ha
Transport availabilityLocated out of the city borderDistance to:Motorway Kostroma-Yaroslavl`– 10 m;• Railway-300 m.•
Civil engineering infrastructure avaliabilityPower supply – 0,3 km far from the land lot border;• Gas supply – 0,5 km far from the land lot border, pressure – 159 kg;• Water supply – 0,3 km far from the land lot;• Sewerage system – crosses the land lot;• Communication cable – crosses the land lot.•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
15
Land lot in Solonikovskaya street, close to No.6
Area - 4,35 ha
Transport availabilityDistance to:Solonikovskaya Str.– 300 m;• Railway – 630 m.•
Civil engineering infrastructure avaliability Power supply – 300-500 m;• Gas supply – 300-500 m;• Water supply – 300-500 m;• Railway•
Land lot usagePlacement of the industrial objects.
Volgorechenskdistance to:
Moscow (357 km)
Kostroma (43 km)
Yaroslavl` (122 km)
Ivanovo (65 km)
17
Land lot limited by:Volgorechensk-Ivankovo-Vladychnoe-Rostilovo-hole Pozdeevo-the Ivanovo region border up to Volgorechensk
Area - 3 600 ha
Transport availability
Motorways:Volgorechensk-Ivankovo-Vladychnoe – 6 km of asphalt• Ivankovo-Tolstokvasovo-Gorki-Neronovo – 11 km of asphalt;• Tolstokvasovo-Mikshino – 3 km of earth road;• Vladychnoe-Rastilovo-hole Pozdeevo-the Ivanovo region border – • 5,5 km of earth road.
Civil engineering infrastructure availabilityPower supply – there two lines VL-220 kW on the territory of the land • lot. The substation is needed;Gas supply – distributing net is 1 km from the land lot border;• Heat supply – there are two variants: gas boiling room or central heat-• ing supply from Kostroma regional power station – distance from the land lot border – 6 km;Water intake facility are 1,5 km far from the land lot border;• Sewerage system is 5,5 km far from the land lot border;•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
19
Land lot situated on the west side of the village Pustoshki
Area - 35,4 ha
Transport availabilityFrom the South the lot has the common border with the motorway • Kostroma-V.Spasskoe (Nikol`skoe rural settlement);Railway is on the North of the land lot.•
Civil engineering infrastructure avaliabilityPower supply – on the territory of v.Pustoshki;• Gas supply – on the territory of v.Pustoshki.•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
21
Land lot surrounding the village Pyesikovo
Area - 59,3 ha
Transport availability
From the South the lot has the common border with the railway; • Motorway – 3 km far from the land lot.•
Civil engineering infrastructure availability Power supply – VL-35 kW•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
23
Land lot to the North of the village Kharino
Area - 66,5 ha
Transport availability
From the South the lot has the common border with the railway; • Motorway – 500 m far from the land lot.•
Civil engineering infrastructure availability Power supply – 200 m far from the land lot, on the territory of v.Kharino;• Gas supply – 200 m far from the land lot, on the territory of v.Kharino.•
Land lot usagePlacement of the industrial objects.
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
25
Land lot 500 m to the West from the village Gubachevo
Area - 1,5 ha
Transport availabilityDistance to:The Centre of the city – 7 km; • Motorway Kostroma – V.Spasskoe – 800 m;• Railway – 1,5 km.•
Civil engineering infrastructure availabilityPower supply – 200 m far from the land lot.•
Land lot usagePlacement of the industrial objects.
LAND LOTS FOR FARMING
Antropovodistrict
29
Land lot of the village Prosek
Area - 631,4 ha
Transport availabilityDistance to the regional centre:By motorway – 167 km; • By railway (Antropovo station) – 178 m;• Distance to the district centre – 3 km;• Road with asphalt covering.•
Land lot property Regional
Civil engineering infrastructure availability Power supply – power line up to 1000 V;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Царево
Bui district
31
Land lot of the village Tsaryovo
Area - 100 ha (possibility of expansion to 200 ha)
Transport availabilityDistance to the regional centre – 67 km;• Distance to the district centre – 25 km;• 1,5 km of the earth road till the motorway Kostroma-Bui.•
Land lot property Regional.
Civil engineering infrastructure availabilityPower supply – own substation for 250 kWt;• Water supply - artesian well;• Gas supply – average pressure 128.•
Labor resources Area population is about 600 people including 250 employable.
Land lot usagePlacement of the agricultural objects.
Bui district
33
Land lot of the village Baranovo
Area - 475 ha
Transport availabilityDistance to the regional centre:By motorway – 100 km; • Railway (Bui station);• Road with asphalt covering• Distance to the district centre – 2 km.•
Land lot propertyThe land lot is under the procedure of converting into the regional property.
Civil engineering infrastructure availabilityPower supply – power line up to 1000 V;• Water supply - artesian well;• Gas supply – average pressure.•
Labor resourcesArea population is about 600 people.
Land lot usagePlacement of the agricultural objects.
Борок
Buidistrict
35
Land lot of the village Borok
Area - 371,7 ha
Transport availabilityDistance to the regional centre – 100 km;• Distance to the district centre – 10 km;• Road with asphalt covering. •
Land lot propertyThe land lot is under the procedure of converting into the regional property.
Civil engineering infrastructure availabilityPower supply – power line up to 1000 V;• Water supply - artesian well;• Gas supply – average pressure.•
Labor resourcesArea population is about 250 people.
Land lot usagePlacement of the agricultural objects.
Manturovodistrict
37
Land lotof the village Falino
Area - 3 ha (possibility of expansion)
Transport availabilityDistance to the regional centre – 280 km;• Distance to the district centre – 25 km;• Road with asphalt covering - 15 km;• Road with crushed stone covering - 10 km.•
Land lot propertyPrivate.
Civil engineering infrastructure availabilityElectrified.
CommentHalf-ruined livestock farm.
Land lot usagePlacement of the agricultural objects.
Mezhadistrict
39
Land lotof the Industrial complex
Area - 6 ha
Transport availabilityDistance to the regional centre – 360 km;• Distance to the district centre – 1 km;• Road with asphalt covering.•
Land lot propertyMunicipal.
Civil engineering infrastructure availabilityPower supply – power line up to 1000 V.
Labor resourcesAvailable.
CommentObject is not completed, no roof.
Land lot usagePlacement of the industrial objects.
Mezhadistrict
41
Land lot of the village Georgievskoe Production base of the former Industrial complex
Area - 4 ha (possibility of expansion)
Transport availabilityDistance to the regional centre – 360 km; • Road with asphalt covering.•
Land lot propertyPrivate.
Civil engineering infrastructure availabilityPower supply – power line up to 1000 V.
Labor resourcesAvailable.
CommentsThe construction total area 300 m2.Ceiling height exceeds 6 m.Barrels for petroleum product are available.Garage and warehouse avaliable.
Land lot usagePlacement of the industrial objects.
Mezhadistrict
43
Land lot of the village Serednyaya Production base of the former agricultural college
Area - 3 ha (possibility of expansion)
Transport availabilityDistance to the regional centre – 360 km; • Distance to the district centre – 5 km;• Road with asphalt covering. •
Land lot propertyPrivate.
Civil engineering infrastructure availabilityElectrified.
Labor resourcesAvailable.
CommentsCeiling height exceeds 6 m.Warehouse available.
Land lot usagePlacement of the industrial objects.
Nerekhtadistrict
45
Land lotof the village Yakushovka
Area - 30 ha (possibility of expansion up to 200 ha)According to the Land distribution Fund data there are about 655 ha of agricultural lands
Transport availabilityDistance to the regional centre – 35 km; • Distance to the district centre – 3 km;• Road with asphalt covering. •
Land lot propertyMunicipal.
Civil engineering infrastructure availabilityPower supply – power line up to 1000 V;• Water supply - artesian well;• Gas supply – average pressure 108.•
Labor resourcesPopulation is 708 people including employable 400.
CommentsCeiling height exceeds 6 m.Warehouse available.
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
47
Land lot of the village AleksandrovoState farm “Aleksandrovskii”
Area - 2 325 ha
Transport availabilityDistance to the regional centre – 64 km; • Distance to the district centre – 12 km;• Road with gravel (partially earth) covering. •
Land lot propertyPrivate, share, municipal, Land distribution Fund.
Civil engineering infrastructure availabilityPower supply – substation;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
49
Land lot of the village IsajevoOOO “Isajevo”
Area - 1 611 ha
Transport availabilityDistance to the regional centre – 92 km; • Distance to the district centre – 42 km;• Road with gravel (partially earth) covering. •
Land lot propertyPrivate, share, municipal.
Civil engineering infrastructure availabilityPower supply - available;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
51
Land lot of the village ZhvalovoAgricultural customer cooperation “Zhvalovo”
Area - 2 587 ha
Transport availabilityDistance to the regional centre – 55 km; • Distance to the district centre – 6 km;• Road with gravel (partially earth) covering.•
Land lot propertyPrivate (2 016 ha);Share (414,4 ha);Municipal (156,9 ha).
Civil engineering infrastructure availabilityPower supply – available;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
53
Land lot of the village SvozovoAgricultural customer cooperation “Svozovo”
Area - 2 627 ha
Transport availabilityDistance to the regional centre – 84 km; • Distance to the district centre – 32 km;• Road with gravel (partially earth) covering. •
Land lot propertyPrivate (496 ha);Share (1 508 ha);Municipal (623 ha).
Civil engineering infrastructure availabilityPower supply – available;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
55
Land lot of the village OshurkiAgricultural customer cooperation “Rassvet”
Area - 2 195 ha
Transport availabilityDistance to the regional centre – 64 km; • Distance to the district centre – 12 km;• Road with gravel (partially earth) covering; • Railway route KOSTROMA-GALICH runs through the territory of the • land lot.
Land lot propertyPrivate (1415 ha);Share (536 ha);Municipal (244 ha).
Civil engineering infrastructure availabilityPower supply – available;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
57
Land lot of the village ZavrazhjeAgricultural customer cooperation “Zavrazhje”
Area - 672,2 ha
Transport availabilityDistance to the regional centre – 64 km; • Distance to the district centre – 12 km;• Road with gravel (partially earth) covering.•
Land lot propertyPrivate (402,7 ha);Share (192,5 ha);Municipal (77 ha).
Civil engineering infrastructure availabilityPower supply – available;• Water supply - artesian well;• Gas supply - projected.•
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
59
Land lotof the village ShakhovoCollective farm “Rossia”
Area - 2 929 ha
Transport availabilityDistance to the regional centre – 57 km; • Distance to the district centre – 7 km;• Road with gravel (partially earth) covering.•
Land lot propertyPrivate (1 817 ha);Share (1 112,6 ha).
Civil engineering infrastructure availabilityPower supply – available;Water supply - water tower;Gas supply - projected.
Land lot usagePlacement of the agricultural objects.
Sudislavl`district
61
Land lot of the village KalinkiFormer Agricultural customer cooperation “Oktyabr`”
Area - 1 809 ha
Transport availabilityDistance to the regional centre – 22 km; • Distance to the district centre – 30 km;• Motorway (partially earth covering).•
Land lot propertyPrivate (945,9 ha);Share (505 ha);Municipal (358,1 ha).
Civil engineering infrastructure availabilityPower supply – available;• Water supply - artesian well.•
Land lot usagePlacement of the agricultural objects.
INVESTMENT PROPOSALS
WOOD PROCESSING INDUSTRYProject name Construction of the pulp-paper plant
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Manturovo municipal district(Manturovo township)
Project coordinator Name Forestry department of the Kostroma regionPostal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Production of the competitive capable to replace import paper and cardboard goods
Basic products (usage) Paper, cardboard
Production capacityPlain paper - 250 000 tonCoated paper – 250 000 tonCoated cardboard – 300 000 ton
Trade area Russia, the near abroad and foreign countries
Main competitors Pulp-paper plants in Ust`-Ilimsk and in Arkhangel`sk
Financial aspects Project total cost 51 billion RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 21 897 million RURDPB 10,8 yearsPlanning period 15 yearsIRR 16,5%
Additional information Project is included in the list of the prior investment projects in Kostroma region in the sphere of forest exploitation
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33Email address spi@[email protected]
Project name Creation of the OSB production in the Kostroma region
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Bui municipal districtProject coordinator Name Forestry department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project
Maximal satisfaction of the home market needs for boards OSB produced with the usage of the new technologies and equipment
Basic products (usage) OSB boards
Production capacity 400 000 m3
Trade area Russian Federation
Main competitors No competitors in RussiaFinancial aspects Project total cost 5 445 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 4 663,9 million RUR
DPB 6,75 years
Planning period 13 years
IRR 31,85%Additional information Estimated annual cutting area volume
– 725 000 m3 Forest composition: 4B2As2P2F
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project name Creation of the integrated house-building factory in the Kostroma region
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Chukhloma municipal district
Project coordinatorName Forestry department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Creation of the complete wood processing complex
Basic products (usage) House assembly
Production capacity Up to 180 000 m3 per year
Trade area CFD regions
Main competitors CFD productionsFinancial aspects Project total cost 900 million RUR
Forms of investmentDirect investments, equipment delivery, long-term partnership, share in building
NPV 247,9 million RUR
DPB 5 years
Planning period 7 years
IRR 24,7%Additional information Estimated annual cutting area volume
– 175 000 m3Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project nameCreation of the modern wasteless timber processing production
in the Kostroma region
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Vokhma municipal district
Project coordinator Name Forestry department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Competitive production output
Basic products (usage)Squared beamBoardPellet
Production capacity 72 000 m3 of lumber72 000 m3 of pellets
Trade area Russian Federation
Main competitors Far offFinancial aspects Project total cost 900 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 268,8 million RUR
DPB 3,7 years
Planning period 6 years
IRR 53,9 %Additional information Estimated annual cutting area volume
– 180 000 m3Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project nameCreation of the production of furniture workpieces made out of birch in the
Kostroma region
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Shar`ja municipal districtProject coordinator
Name Forestry department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Organization of the furniture components production
Basic products (usage) Furniture platesWood chips
Production capacity 40 000 m3 of ready goods80 000 m3 of chips
Trade area Russian Federation, EU countries
Main competitors Far offFinancial aspects Project total cost 1,5 billion RUR
Forms of investmentDirect investments, equipment delivery, long-term partnership, share in building
NPV 122,6 million RUR
DPB 7 years
Planning period 10 years
IRR 28,4 %Additional information Estimated annual cutting area volume
– 160 000 m3Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project nameConstruction of the plant producing granulated timber-fuel (pellets) and
lumber in the Kostroma region
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Galich municipal districtProject coordinator
Name Forestry department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Organization of the production of the innovative goods - pellets
Basic products (usage) Lumber Pellets
Production capacity 120 000 m3 of lumber140 000 m3 of pellets
Trade area Russian Federation, EU countries
Main competitors CFD productionsFinancial aspects Project total cost 2 billion RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 396 million RUR
DPB 6 years
Planning period 8 years
IRR 27,6 %Additional information Estimated annual cutting area
volume – 200 000 m3Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
EXTRACTION AND PROCESSIING OF MINERAL RESOURCESProject name Construction of the ferrosilicon plant in the Kostroma region
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Bui municipal districtProject coordinator
NameThe department of natural resources and environmental protection of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.dpr44.ru
Project descriptionSector Extraction and processing of mineral
resources
Target of the project Creation of the ferrosilicon production – the fi rst one in the European part of Russia
Basic products (usage) Ferrosilicon FS75
Production capacity 20 000 ton
Trade area European Russian iron and steel plants
Main competitors Far offFinancial aspects Project total cost 4 020 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 128,7 million RUR
DPB 5,9 years
Planning period 9 years
IRR 9,2 %Additional information Estimated annual cutting area volume
– 169 000 m3 High-silica sand deposits – 40 million ton
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project nameExtraction and processing of sapropel at the deposit “Galichskoe”
in the Kostroma region
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Galich municipal districtProject coordinator
NameThe department of natural resources and environmental protection of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.dpr44.ru
Project descriptionSector Extraction and processing of mineral
resources
Target of the projectOrganization of the extraction and processing of sapropel, construction of the processing plant
Basic products (usage) Farming, municipal engineering, chemical and pharmaceutical industries, other
Production capacity 10 000 ton
Trade area Russia, CNI and foreign countries
Main competitors Producers of chemical fertilizerFinancial aspects Project total cost 580 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 193,3 million RUR
DPB 7,5 years
Planning period 10 years
IRR 26,8 %Additional information Estimated sapropel deposit of the
Galichskoe Lake – 258 195 000 tonThe capacity of sapropel deposition is about 12,0 m with average index of 5,73 m
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project namePeat extraction at the deposits “Kremnevo”, “Chapyzhnoe”, “Petrovskoe”
and construction of the peat pellet plantin the Kostroma region
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Pyschug municipal districtProject coordinator
NameThe department of natural resources and environmental protection of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
128a, Mira avenue,156013 Kostroma007(4942) 55-36-21007(4942)[email protected]://www.dpr44.ru
Project descriptionSector Extraction and processing of mineral
resources
Target of the project Increase of local fuel assortment in the fuel balance of the Kostroma region
Basic products (usage)Peat pelletMilled peatFarming peat
Production capacity 50 000 ton
Trade area Russia
Main competitors Far off Financial aspects Project total cost 100 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 45,5 million RUR
DPB 5,5 years
Planning period 8 years
IRR 22,8 %Additional information Estimated peat deposits - 7,7 million
tonContact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
AGRICULTURAL SECTORProject name Creation of the dairy farm for 1200 heads
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Susanino municipal districtProject coordinator
Name The department of the agricultural sector of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
37, Marshala Novikova Street,156602 Kostroma007(4942) [email protected]://www.apkkostroma.ru
Project description Sector Agricultural sector
Target of the project Increase of heavy beasts livestock
Basic products (usage) Milk,Milk products
Production capacity 9,6 thousand ton
Trade area Russia
Main competitors Far off Financial aspects Project total cost 534,6 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 5,96 million RUR
DPB 6 years
Planning period 8 years
IRR 10,72 %Additional information The land lot area – 3 600 haContact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
BUILDINGProject name Construction of the housing estate “Agashkina Gora”
Location of the project realization
subject of the Russian Federation Kostroma region
municipality Kostroma
Project coordinator Name The building, architecture and urban planning department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
17, Sennaya Street,156602 Kostroma007(4942) 31-28-12007(4942)[email protected]://www.depstroyko.ru
Project description Sector Building
Target of the project Creation of the up-to-date residential complex
Living area 121 000 m3
Flats number 2 190
Main competitors Building companies of Kostroma
Financial aspects Project total cost 5 569,5 million RUR
Forms of investment Direct investments, share in building
NPV 149,9 million RUR
DPB 3,3 years
Planning period 4 years
IRR 6,04 %
Additional information The land lot area 23,6 ha
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
Project name Construction of the cement plant, annual capacity - 2,7 million ton
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Susanino municipal district Project coordinator
Name The building, architecture and urban planning department of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
17, Sennaya Street,156602 Kostroma007(4942) 31-28-12007(4942)[email protected]://www.depstroyko.ru
Project description Sector Building materials production
Target of the project Creation of the modern industrial production
Basic products Cement
Production capacity 2,7 million ton
Trade area Russia
Main competitors Far offFinancial aspects Project total cost 14,8 billion RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 3,4 billion RUR
DPB 5 years
Planning period 12 years
IRR 16,3 %Additional information For the project implementation
it is possible to use Bedinskoe deposit
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
PROCESSING INDUSTRYProject name Creation of the energy-efficient lamps production
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality Nerekhta and Nerekhta municipal district Project coordinator
Name Body of investment and industrial policy of the Kostroma region
Postal addressTelephoneFaxe-mail address
15, Dzerzhinskogo Street,156006 Kostroma007(4942) 31-20-01007(4942) [email protected]
Project description Sector Industrial production
Target of the projectCreation of the production for output of the advanced technology products – energy-effi cient lamps
Basic products Energy-effi cient lamps
Production capacity 28 million pcs
Trade area Russia
Main competitors Low-quality products from AsiaFinancial aspects Project total cost 2 billion RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 2 164,7 million RUR
DPB 4,9 years
Planning period 7 years
IRR 31,8 %Additional information
Land lot area of the plant – 20 ha There is a possibility of OAO ROSNANO partnership
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
ENERGYProject name Construction of the building block boiler rooms
Location of the project realization
Subject of the Russian Federation Kostroma region
municipality
Project coordinator
Name The department of the fuel-energy complex and tariff policy of the Kostroma region
Postal addressTelephoneFaxe-mail addressweb-site
129G, Sverdlova Street,156029 Kostroma007(4942) 31-52-13007(4942) [email protected]://tektarif.ru
Project description
Sector Heat power engineering
Target of the project Creation of the modern system of the heat supply
Basic products Heat energyHot water
Production capacity 35 000 Hkal
Trade area Kostroma region
Main competitors Absent
Financial aspects
Project total cost 100 million RUR
Forms of investment Direct investments, equipment delivery, long-term partnership, share in building
NPV 8,5 million RUR
DPB 5 years
Planning period 7 years
IRR 16,28 %
Additional informationThe project can be implemented in the form of state-and-private partnership
Contact dataTel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@[email protected]
INDUSTRIAL PARK “INDUSTRIAL`NYI”
Kostromadistance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
81
Land lot in Moskovskaya Str., No.105 close to OAO “Motordetal” (Kostroma)
Area - 137,0 ha
Transport availabilityDistance to:Motorway Kostroma-Yaroslavl`– 10 m;• 3,342 km of railway crosses the land lot.•
Civil engineering infrastructure avaliabilityPower supply - own step-down substation for 220/110/10 kW with the • capacity reserve of 20 MVt;Total consumption - 191,88 MVA;• Gas supply – from distributing net of Kostroma city. Free gas capaci-• ties – 1000 m3/h;Heat supply – own boiling room with the water heating (4PTVM 50) and • steam (2DKVP 20/13 – DKVP 10/13) boilers. Released energy – 75 Hkal/h with reserve of 50 Hkal/h. Total capacity in delivery water – 200 Hkal/h, in steam – 10 ton/h;
83
Water supply – water is delivered from the Volga and from the arte-• sian wells. Household water supply –up to 100 m3/h, total debit – 250 m3/h, free capacities – up to 100 m3/h. Water recycling is provided by 5 water-cooling towers with capacity of 1300 and 1200 m3/h. Free capacity – up to 500 m3/h;Water drain – water escape is performed via city collector in volume • of 150 m3/h;Water treatment – buffer pool equipped with the aeration system, • through load – 900 m3/year. Sewerage system – crosses the land lot;Neutralization system:• - Coolant drain – 20 000 m3/year;- Acid-based substance drain – 100 000 m3/year;- Chrome-containing drain – 36 000 m3/year.
Land lot usagePlacement of the industrial objects.
85
Industrial park is a territory of the former machine building plant possessing up-to-date engineering buildings outfit with the latest in technical equipment and united by the joint infrastructure and service system.
Industrial park specializes in: automobile components production.
Industrial park potential participants:companies organizing new productions;• companies interested in relocation of their productions to the • regions with the higher competitive conditions;foreign companies planning to create their production in • Russia.
Industrial park proposes the unique conditions for the favorable location of the residents` production.
Basic advantages:free connection to the power supply system;• free capacity of gas;• tax remissions for residents;• low costs for land and property;• own heat power produced by the boiler house.•
CONTACTS
Body of Investment and Industrial policy of Kostroma region Administration Telephone: +7(4942) 31-20-01
Kostroma region economic development department Telephone: +7 (4942) 620-519Fax: +7 (4942) 620-536
Kostroma region agricultural sector department Telephone: +7 (4942) 55-16-31Fax: +7 (4942) 45-65-41
Kostroma region forestry department Telephone: +7 (4942) 55-33-02Fax: +7(4942) 55-80-32
Kostroma region natural resources and environmental protection department
Telephone: +7 (4942) 45-01-10Fax: +7 (4942) 51-35-91
Kostroma region property and land relation department Telephone: +7 (4942)45-65-66Fax: +7 (4942) 45-78-50
Kostroma region building, architecture and urban planning department
Telephone: +7 (4942)31-76-30Tel/fax: +7 (4942) 31-28-12
Kostroma region fuel and energy sector and tariff policy department
Telephone: +7 (4942)31-52-13Fax: +7 (4942) 37-34-01
Kostroma region housing and communal services department Telephone: +7 (4942) 31-44-86Fax: +7 (4942) 37-17-32
ADDITIONAL INFORMATIONIn case you have not find the information you are looking for in this booklet and if you have any offers for cooperation with the Kostroma region Administration, we ask you to fill in the following application form and send it to our e-mail address: [email protected] form can be found as well at the Kostroma region authority portal: www.adm44.ru.
1 Investor
2 Investment project name
3
Necessary resources, namely:
Land lot area
Civil engineering infrastructure with the capacity indication (electricity, gas, water)
railway, motorway
other resources (nature, forest etc.)
4Preferable location of the industrial site (city/town, region, distance to the regional or district centre)
5 Other conditions
6 Contacts
Kostroma region Administration15, Dzerzhinskogo Street 156013 Kostroma
Tel.: +7 (4942) 31 34 72www.adm44.ru
Body of Investment and Industrial policy of Kostroma region Administration
15, Dzerzhinskogo Street 156013 KostromaTel.: +7 (4942) 31 20 01