Commissioning Procedure for Khabat PP 132kV SwitchyardProtection Equipment Tests
TOTAL 12 PAGES
(Including Cover)
PROJECT NAME : Khabat Thermal Power Plant Units 1&2 Purpose
☐ For Information☒ For Review
☐ For Approval
☐ For Construction
☐ As-Built
DOCUMENT NO. : KP-00+++-TZ782-V0015
TITLE : Commissioning Procedure for Khabat PP 132kV Switchyard Protection Equipment Tests
OWNER : Ministry of Electricity (MOE) of Kurdistan Regional Government
A 29.04.2015 First Issue DE EÖ AY YÖ
Rev.No.
DATE DESCRIPTIONPREPARED CHECKED REVIEWED APPROVED
GAMA POWER SYSTEMS ENG &CONTRACTING,INC.
Owner
Ministr y of Electrici ty (MOE)of Kurdistan Regional Government
Contractor
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
GAMA POWER SYSTEMS
ENGINEERING & CONTRACTING,INC.
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
2/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 1/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
Khabat Thermal Power Plant Units 1&2 Project132kV Air Insulated Switchgear
COMMISSIONING PROCEDURE FOR 132kV
SWITCHYARD PROTECTION EQUIPMENT TESTS
DOCUMENT NO: KP-00+++-TZ782-V0015
SUBCONTRACTOR: SIEMENS
GAMA REVIEW
DisciplineSuperintendent
HSE Manager QA/QC Manager Site Manager
Name
Date
Sign
Remarks:Any such review or consent by GAMA, shall not relieve the Subcontractor, in any case or for any reason whatsoever,from any obligation, liability or responsibility arising out of or in connection with the Contract, including without being
limited thereto, to the responsibility for errors, omissions, discrepancies and non-compliances. Within this context, thisdocument shall not prevail over or amend the Contract, or relieve the Subcontractor from any of its duties, obligations,responsibilities or liabilities under the Contract.Anything presented herein by the Subcontractor shall in no eventi) excuse the Subcontractor’s non-performance under the Contract, or ii) entitle him to a variation under the Contract or an adjustment to the Contract Price.
SUBCONTRACTOR
Rev.No.
Date Description*Prepared
byHSE
Manager QA/QC
Manager Site
Manager Project
Manager
A 29.04.2015 132kV SwitchyardSteel Erection
Works
DenizEREN
- - - EyyüpÖZBAY
DOCUMENT HISTORY:
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
3/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 2/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
Rev.
No. Date
Remarks
(Reason for Revision)
A 29.04.2015 First Issue
* Descript ion:
Document issue purpose
- First Issue
- For Information
- For Review
- For Approval (or Issued for Construction)
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
4/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 3/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
CONTENT
1.0 OBJECTIVE ........................................................................................................................ 4
2.0 ACCEPTANCE CRITERIA .................................................................................................. 4
3.0 TEST AND COMMISSIONING PROCEDURE ..................................................................... 4
4.0 TEST AND COMMISSIONING SCHEDULE ........................................................................ 6
5.0 PREREQUISITES............................................................................................................... 6
6.0 PRECAUTIONS AND NOTES ............................................................................................ 6
7.0 TEST EQUIPMENT ............................................................................................................ 6
8.0 RESTORATION ................................................................................................................. 6
9.0 REFERENCES ................................................................................................................... 6
10.0 APPENDIX ......................................................................................................................... 7
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
5/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 4/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
1.0 OBJECTIVE
To provide instructions for electrical testing of Protection Equipments before putting
into service. It included visual inspection of the Protection Cubicle’s for proper
installation and cleanness, to verify the correct operation and to verify equipments meet
the acceptable requirements.
2.0 ACCEPTANCE CRITERIA
This procedure applies to the following testing for Protection System.
1) Visual Check of Protection Equipments
2) Protection Cubicle Mechanical and Electrical Functional Tests
3.0 PROCEDURE
3.1 VISUAL CHECK
The system is checked with mentioned items below visually.
3.1.1 Missing Equipment
The devices and equipments that are shown on the drawings are checked to be
mounted
3.1.2 Cable Connections
Power and control cable connections are checked according to drawings
3.1.3 Earthing of Panel
Panel should be earthed from the earthing busbar or earthing terminal
3.2 CUBICLE ELECTRICAL AND MECHANICAL FUNCTIONAL TEST
The systems is functionally tested with mentioned items below as electrical and mechanical.
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
6/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 5/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
3.2.1 Mechanical Checks of Cubicle
The panels are checked that its door and moving parts are operating well
3.2.2 Polarity of DC Voltage
Before energising the system, firstly the terminal connections are checked. After
supplying DC voltage to relevant system, it should be sure that the polarity is
correct by measuring on L(+) and L(-) terminals.
3.2.3 Internal Functional Test
Internal circuitry of panel is checked to be working, regarding the drawings.
3.2.4 External Functional Test
Signals between panels, CB Commands and other equipments of the system isverified according to drawings.
3.2.5 Relay Software Download and Interlocking Conditions
Prepared relay settings file is downloaded to device. Inputs and Outputs are
checked by connection to relay. Interlocks over the relay (CFC etc.) are checked,
regarding the drawings.
3.2.6 Secondary Voltage-Current Injection
All measurements of current and voltage circuits are observed with secondaryinjection.
3.2.7 Simulation of Protection Functions
Protection relays are tested for trip limits by simulation of fault conditions. Trip
signals are also observed. (Omicron156/256 or eqv. is used.)
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
7/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 6/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
4.0 TEST AND COMMISSIONING SCHEDULE
According to updated time schedule, which is submitted separately.
5.0 PREREQUISITIES
1) Protection Panel should be installed.
2) External cable connections should be completed.
3) AC and DC power should be prepared.
4) Panel Grounding should be completed.
6.0 PRECAUTIONS AND NOTES
The following shall be done in order to made safe prior to starting of Protection
Equipment testing
1) Equipments which is related with Protection system should be mounted and
tested before starting Protection Equipment tests.
2) Warning types shall be installed around the HV Switchyard’s in order to provideunauthorized access to testing area.
7.0 TEST EQUIPMENT
Testing equipments with necessary test certificates will be informed later.
8.0 RESTORATION
In case of necessity for processing on the commissioning tests, some revision could be done on
secondary drawing by informing responsible designer.
9.0 REFERENCE
· Electrical Single-Line Diagrams
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
8/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 7/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
10.0 APPENDIX
APPENDIX A – PROTECTION PANEL CHECKLIST
EQUIPMENT IDENTIFICATION
FACILITY UNIT NO. JOB NO. SHEET
____ OF ____
SYSTEM EQUIPMENT NAME/NUMBER
Rated Voltage: Feeder Name: Frequency:
TEST EQUIPMENT
NAME OF MANUFACTURER SERIAL NUMBER:
CALIBRATION DUE DATE PANEL TYPE:
TEST RESULTS
Test results are attached.
REMARKS
SYSTEM COMMISSIONING ENGINEER DATE APPROVED DATE
Control&Tests Status Notes
1 Earthing connection completed?
2 Cable connections completed?
3 Terminals labelled?
4 Polarity of DC Contol Voltage
5 Functional Test of Control Circuit
6 Measurement Devices
7 Alarms and Indications
8 Interlocking Conditions
9 Local&Remote control
10 Voltage Circuit control
11 Current Circuit Control
12 Functional Test of Protection RelaySee attached Test Protocol.
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
9/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 8/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
APPENDIX B- LINE DISTANCE PROTECTION RELAY TEST REPORT
EQUIPMENT IDENTIFICATION
FACILITY UNIT NO. JOB NO. SHEET
____ OF ____
SYSTEM EQUIPMENT NAME/NUMBER
VT Ratio: Frequency: Line Length(km): CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER SERIAL Number:
CALIBRATION DUE DATE Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
Function tests Status Notes
1 Line Differential Protection Test
2 Synchrocheck Function Test Test
3 Dİstance Protection Function Test
4 Backup Protection Test
5 Fault Locator
6 Switch on to Fault Function Test
7 Auto Reclose Function Test
TEST RESULTS
Test results are attached.
REMARKS
SYSTEM COMMISSIONING ENGINEER DATE APPROVED DATE
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
10/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 9/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
APPENDIX C- OVERCURRENT PROTECTION RELAY TEST REPORT
EQUIPMENT IDENTIFICATION
FACILITY UNIT NO. JOB NO. SHEET
____ OF ____
SYSTEM EQUIPMENT NAME/NUMBER
VT Ratio: Frequency: Line Length(km): CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER SERIAL Number:
CALIBRATION DUE DATE Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
TEST RESULTS
Test results are attached.
REMARKS
SYSTEM COMMISSIONING ENGINEER DATE APPROVED DATE
No Control &Tests Status Explanation
1 Output Check
2 Input Check
3 50/51/67, Phase Time Overcurrent
4 50N/51N/67N, Neutral Time Overcurrent
5 49, Thermal Overload
6 46, Unbalance Load Protection
7 75TC, Trip Circuit Supervis ion
8 Ossilographic Fault Records
9 CFC
10 Event Log, Trip Log
11 Measurement Check (P,Q,pf,Energy)
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
11/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 10/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
APPENDIX D – BUSBAR AND BREAKER FAILURE PROTECTION RELAY TEST
REPORT
EQUIPMENT IDENTIFICATION
FACILITY UNIT NO. JOB NO. SHEET
____ OF ____
SYSTEM EQUIPMENT NAME/NUMBER
VT Ratio: Frequency: Line Length(km): CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER SERIAL Number:CALIBRATION DUE DATE Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
Busbar ProtectionTest Settings Operational Sett ings
Current Time Current Time
Idiff>
Idiff>>
Busbar Protection Function Tests
Feeder No
Test I (A) Trip Time (ms)Phase L1
Trip Time (ms)Phase L2
Trip Time (ms)Phase L3
1
2
3
4
5
6
7
8
9
10
11
12
Breaker Failure ProtectionTest Settings Operational Sett ings
Current Time Current Time
Iq>
Iq>>
8/17/2019 KP-00+++-TZ782-V0015-Rev A-protection equipment comm procedure.pdf
12/12
COMMISSIONING PROCEDURE FOR 132kV SWITCHYARD PROTECTIONEQUIPMENT TESTS
Page: 11/11 Doc. No: KP-00+++-TZ782-V0015 Date:29.04.2015
Dok. No: KP-00+++-TZ782-V0015, Rev. No: A
Breaker Failure Protection Function Tests
Feeder No
Test I (A) Trip Time (ms)Phase L1
Trip Time (ms)Phase L2
Trip Time (ms)Phase L3
1
2
3
4
5
6
7
8
9
10
11
12
TEST RESULTS
Test results are attached.
REMARKS
SYSTEM COMMISSIONING ENGINEER DATE APPROVED DATE