  • 7/29/2019 Kpc Presentation Update Feb 09

    1/18

    0

    CONFIDENTIAL

  • 7/29/2019 Kpc Presentation Update Feb 09

    2/18

    1

    LocationLocation

    KPC Coal Agreement Area

  • 7/29/2019 Kpc Presentation Update Feb 09

    3/18

    2

    The CompanyThe Company

    KPC is an Indonesian incorporatedcompany

    In 1982 KPC entered into a CoalContract of Work with the Governmentof Indonesia

    Commenced construction in 1989

    Commenced mining operations in

    1991

    Production has increased from 7 Mt in1992 to 39.7 MT in 2007 and planned toincrease to 41 MT in 2009

    In 2003 Bumi Resources, publiclylisted Indonesian company purchasedKPC from BP and Rio Tinto

    Fully integrated and self supportingoperation

    KPC employs 3,800 people

    Additional 17,300 people employed bycontractors

  • 7/29/2019 Kpc Presentation Update Feb 09

    4/18

    3

    Thick clean deposits with low Ash and SulfurNine principal seamsSeam thickness varies 0.5 metres to 15.0 metresSeam dip varies between 3 to 20Seam product direct or blended to produce range of GARproducts

    Prima 6700Pinang 6300 to 5700Melawan 5350

    Pinang Dome

    Geological structurethat elevated the rank

    of surrounding coalmeasures

    KPCKPC -- Coal DepositCoal Deposit

    Coal Products: Prima 6700, Pinang 6300 5700, Melawan 5350

    June 2008 Resources & Reserves (Mt)

    Recoverable ReservesTotal 1,661 Mt :Sangatta 1,515

    Bengalon 146

    Measured & Indicated Resources(additional to Reserves)

    Total 4,424Sangatta 3,447

    Bengalon 976

  • 7/29/2019 Kpc Presentation Update Feb 09

    5/18

    4

    Mining OperationMining Operation

    DRAWNBYDRAFTINGSECTION-P&T-BINTANG/LOGO3.CH3

    DRAWNBYDRAFT INGSECT ION-P&T-B INTANG/LOGO3 .CH3

    Truck and Shovel, Multiseam Pit Operations

  • 7/29/2019 Kpc Presentation Update Feb 09

    6/18

    5

    Overburden CapacityOverburden Capacity

    5 to 6 M32Komatsu PC 1000

    8 M33Hitachi EX1800

    15 to 16 M34Hitachi EX 2500

    22 M310Hitachi EX3500

    5 (Coal bucket), 8

    (OB bucket)

    4Liebherr 984C

    30 to 34 M312Liebherr 996

    Shovels, m3

    9 x 85 ton, 6 x 100ton

    15Komatsu HD785

    360 T12Liebherr T282

    240 T6830E

    240 T30EH 4500

    85 T23Caterpillar 777

    185 T56Caterpillar 789

    135 T58Caterpillar 785

    Trucks, tons

    CapacityCapacityUnitsUnitsKPC OwnedKPC Owned

    EquipmentEquipment

    Overburden Capacity - 335 million BCM/annum: KPC 140, Thiess 90, PAMA 45, Dharma Henwa 60

  • 7/29/2019 Kpc Presentation Update Feb 09

    7/18

    6

    KPCKPC -- Coal MiningCoal Mining

    Coal is mined using smaller shovels and trucks - Average Strip Ratio 8:1

  • 7/29/2019 Kpc Presentation Update Feb 09

    8/18

    7

    Coal ChainCoal Chain

  • 7/29/2019 Kpc Presentation Update Feb 09

    9/18

    8

    Coal Transportation and Loading FacilitiesCoal Transportation and Loading Facilities

    KPC has complete facilities to provide full coal mining and transportation solutions

    13 km Overland Conveyor rated

    capacity 4,200 tph

    Single belt, 8.5 m/s speed

    Coal delivered to port in 25

    minutes

    Stockpile capacity of 1.2 Mt

    Stacker capacity of 4,000 tph

    Reclaim capacity of 4,700 tph

    Private Port

    2 km Jetty

    17.2 m draft deep water berth at

    low tide

    Load vessels up to 220,000 dwt.

    Loading rate of 4,700 tph

    Ship LoadingPort StockpileCoal Transportation to Loading Port

  • 7/29/2019 Kpc Presentation Update Feb 09

    10/18

    9

    Coal Transshipment FacilitiesCoal Transshipment Facilities

    Tanjung Bara Barge Loading

    2000 tph barge loading facility

    Lubuk Tutung Barge Loading

    2000 tph barge loading facility

    Floating Transfer Station (FTS)

    1000 tph floating loading facility

    Load up to Capesize gearless vessels

    Floating Crane (FC)

    500 tph floating loading facility

    Load up to Capesize gearless vessels

    Combine Loading

    Between FTS & FC

    Up to 1,500 tph loading rate

    Two anchorage loading locations

    Tanjung Bara or Lubuk Tutung

    1 to 3 km barge travel distances

    Short barge cycle times

  • 7/29/2019 Kpc Presentation Update Feb 09

    11/18

  • 7/29/2019 Kpc Presentation Update Feb 09

    12/18

    11

    KPCKPC -- Technical MarketingTechnical Marketing

    Managing Coal Flow and Quality from Pits to Vessel

    Providing Technical Assistance to KPC coal end users

    Coal Quality

    Coal Combustion

    Coal Handling & Storage

    Quality Assurance is an integral part of KPC and Contractors work

  • 7/29/2019 Kpc Presentation Update Feb 09

    13/18

    12

    KPCKPC -- Typical Product Coal QualitiesTypical Product Coal Qualities

    454546Hardgrove Grindability Index57506100-67007100Gross air dried kcal/kg

    53505700-63006700Gross as received

    kcal/kg

    CALORIFIC VALUE

    0.200.600.60Total Sulphur %

    38.040.041.0Volatile Matter (air dried) %

    4.56.05.0Ash (air dried) %

    18.09.0-13.05.0Inherent Moisture (air dried) %

    23.514.0-19.010.5Total Moisture (as received) %

    Melawan

    Coal

    Pinang

    Coal

    Prima

    Coal

    TYPICAL COAL QUALITY

  • 7/29/2019 Kpc Presentation Update Feb 09

    14/18

    13

    KPCKPC -- Coal Market Overview 2008 SalesCoal Market Overview 2008 Sales

    Japan

    28.0%

    Various Europeans

    15.5%

    Taiwan

    13.9%

    India

    10.7%

    Indonesia

    9.3%

    Korea

    5.2%

    China

    4.9%

    Malaysia

    4.8%

    Thailand

    3.6%

    Pakistan

    0.5%

    Other

    12.4%

    Chile

    1.2%

    Philliphines

    2.4%

  • 7/29/2019 Kpc Presentation Update Feb 09

    15/18

    14

    KPCKPC -- Safety SystemSafety System

    Elements: Combination ofNOSA, Rio Tinto, AustralianStandards & Indonesialegislation

    Golden Rules: Generic actionrequired by every individual tominimise the risk of personalinjury

    High Risk SOP: Detailsspecific actions required tocontrol or avoid a riskassociated with a particulartask or activity

    Prima Nirbaya Standard(Includes 11 Fatality Prevention Elements)

    Golden Rules

    MiningHigh Risk SOP

    MaintenanceHigh Risk SOP

    Measurement and Monitoring

    Database Management System - Prinutama

  • 7/29/2019 Kpc Presentation Update Feb 09

    16/18

    15

    KPCKPC -- LTIFR RecordLTIFR Record

    39

    3635 35

    25

    2322

    1918

    31

    22

    1412

    2.86

    2.59

    2.432.31

    1.511.36

    1.11

    0.93

    0.76 0.80

    0.50

    0.32 0.230

    5

    10

    15

    20

    25

    30

    35

    40

    45

    1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

    No.ofLTI

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

    LTIFR

    (per1,0

    00,0

    00Manhours)

    LTI

    LTIFR

    Prima Nirbhaya/NOSA

    Implementation

    FPE & New Golden

    Rules Implementation

  • 7/29/2019 Kpc Presentation Update Feb 09

    17/18

    16

    Accredited to ISO14001 by SGS

    Awarded Gold Medal by EastKalimantan Government for BestEnvironmental Practices last 5 years

    KPCKPC -- Environmental ManagementEnvironmental Management

  • 7/29/2019 Kpc Presentation Update Feb 09

    18/18

    17

    KPC enjoys and maintains good relationshipswith our workforce and trade unions

    KPC actively provides assistance to the localEast Kutai communities

    KPC provides over 5 Million USD annually inCommunity Development Funds and Resources

    KPCKPC -- Industrial and Community RelationsIndustrial and Community Relations