ATLAS GLANCE
11
K.POMMÈS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150
Transcript
Page 1: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

K.POMMÈS (CERN) , B . LANGE (RIO) , V. PAVANI NETO(RIO) ,B. VIEIRA AROSA (RIO)

ATLAS Glance

Since this week our offices are moved to building 3150

Page 2: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

ATLAS GLANCE

In order to manage a heterogeneous and worldwide collaboration, we develop web systems that range from supporting the process of publishing scientific papers to monitoring equipment radiation levels. These systems are vastly supported by Glance, a technology that was set forward in 2004 to create an abstraction layer on top of varied databases that automatically recognizes their modeling and generate web search interfaces.

New web framework : FENCE (Front ENd ENgine for glaNCE) An object-oriented approach to generating highly configurable Web interfaces for the ATLAS experiment. Fence assembles classes to build applications by making extensive use of configuration files.

Page 3: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

ATLAS GLANCE

Page 4: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

In development

Rack Wizard● Web based interface for electronics equipments control● Built with Fence framework● Data compatible with previous application● Provide a search interface for racks● Provide an overview of equipment location

Page 5: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

In development

Example of zone view

Page 6: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

In development

MembershipNew interface for institute activities

Page 7: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

New features

MembershipImproved support for special characters

Page 8: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

F E N C E

FRONT END ENGINE FOR GLANCE

An Object-Oriented approach to deploying highly configurable web interfaces for the ATLAS, ALICE and LHCb experiments;

minimize response time to requirement changes

Flexibility achieved through extensive use of configuration files.

Objective

New features

Page 9: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

F E N C E

ATLAS APPOINTMENTSSearch interfaces (read) Insertion forms

(write)

Custom interfaces

New features

Page 10: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

Other Activities

Maintenance of the central ATLAS WWWThe publishing of meetings is refreshed each hour in order to guarantee the most accurate information.Administration of the Engineering Data Management System (EDMS/CDD).

Page 11: K.POMMS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.

Other Activities

Planning office of the New Small Wheel project

Evaluation of the tool Infor EAM for Assets and toolings inventory