1 Kramer Apartments Corporation Kramer Service Corporation District 8, SR 58 San Bernardino County Michael Whiteside Assistant Chief Engineer Caltrans
Transcript
Page 1: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

1

Kramer Apartments Corporation Kramer Service Corporation

District 8, SR 58 San Bernardino County

Michael Whiteside Assistant Chief Engineer

Caltrans

Page 2: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

2

LOCATION MAP

Interstate 40Barstow Needles

KramerJunction

Project Location

Baker

San Bernardino County

Bakersfield

Page 3: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Project Location

3

Kramer Apartments Corp.&

Kramer Service Corp.

BNSF GradeSeparation

Route 58/395 Separation

Edwards Air Force

Base

KER

N C

OU

NTY

To Bakersfield

SAN

BER

NAR

DIN

O C

OU

NTY

BNSF20 Mule Team Road

Edwards Air Force Base Boundary

Page 4: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

4

Project Location

Kramer Apartments Corp. Properties0.75 AcANTIQUE PARCEL

Kramer Service Corp. Property16.88 AcSERVICES PARCEL

To Barstow

Proposed R/W

KramerJunction

Proposed R/W

Edwards Air Force Base

ROUTE 58

To Bakersfield

Kramer Apartments Corp. Properties3.08 AcMOTEL PARCEL

ROUTE 58

Page 5: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Project Impact

5

Motel ParcelEdwards Air Force Base

Southern Remainder9.21 Ac

Antique Parcel

To Bakersfield To BarstowROUTE 58 IMP

Service Parcel

Northern Remainder 0.97 Ac

Proposed R/W

Subject ParcelFee Acquisition

Legend:

Page 6: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Contacts

Mail 35 Phone 30 Email 87 Personal 26

Page 7: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Project Impact

7

Motel ParcelEdwards Air Force Base

To Bakersfield To BarstowROUTE 58 IMP

Proposed R/W

Motel Parcel (3.08 Ac)

Page 8: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

8

0.13 Ac Fee

Kramer Apartments

Corp.

Project Impact

Motel Parcel

Motel Parcel 3.08 Ac

Page 9: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Project Impact

9

Edwards Air Force Base

Antique Parcel

To Bakersfield To BarstowROUTE 58 IMP

Antique Parcel (0.75Ac)

Proposed R/W

Page 10: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

10

0.05 Ac TCE

0.04 Ac Fee

Project Impact

Antique ParcelKramer

Apartments Corp.

Page 11: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

11

Antique Parcel Related to the findings of the Commission: This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

THE PROPERTY OWNER CONTENDS: Property lines incorrect on drawings

• Buildings don’t traverse property lines

Parking access not to code in after condition Northern driveway a raised median

• Access commercial / over-sized vehicles

Page 12: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

12

Northern Driveway (Right-in/Right-out)

Raised Curbed Median

Signalized Intersection

Antique Parcel

Motel Parcel

Building traverses

property line

Antique Parcel

Southern Driveway

Page 13: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

13

THE PROPERTY OWNER CONTENDS: Property lines incorrect on drawings

• Buildings don’t traverse property lines DEPARTMENT RESPONSE: Confirmed - Buildings traverse property lines Acquisition doesn’t impact building

Antique ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 14: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

14

THE PROPERTY OWNER CONTENDS: Parking access not to code in after condition DEPARTMENT RESPONSE: San Bernardino code 51’ setback Final 63’ provided

Antique ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 15: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

15

THE PROPERTY OWNER CONTENDS: Northern driveway raised median • Access concerns commercial / over-sized vehicles DEPARTMENT RESPONSE: Median required for safety Proximity to signalized intersection Southern signalized driveway Trucks can enter/exit

Antique ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 16: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Project Impact

16

Edwards Air Force Base

Antique Parcel

To Bakersfield To BarstowROUTE 58 IMP

Antique Parcel

Proposed R/W

Page 17: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

17

Edwards Air Force Base

Northern Remainder 0.97 Acres

Southern Remainder9.21 Acres

Project Impact Service Parcel (16.88 Ac)Service Parcel 6.70 Ac Fee0.41 Ac TCE0.09 Ac Utility

Kramer Services Corp

Proposed R/W

ROUTE 58 IMPTo Bakersfield

To Barstow

Page 18: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

18

Edwards Air Force Base

Existing Utility Corridors Service Parcel

Proposed R/W

ROUTE 58 IMPTo Bakersfield

To Barstow

SCE Utility

NextEra Utility

Northern Remainder

SCE EasementNextEra Easement

Page 19: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

19

6.70 Ac Fee0.41 Ac

TCE

Kramer Service Corp.

Service ParcelProject Impact

Page 20: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

20

6.57 Ac Fee

0.41 Ac TCE

Kramer Service Corp.

Service ParcelProject Impact

Page 21: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

21

6.57 Ac Fee

Kramer Service Corp.

Service ParcelProject Impact

Page 22: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

22

Services Parcel Related to the findings of the Commission: This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury. THE PROPERTY OWNER CONTENDS: Replacement private utilities Design is incorrect DEPARTMENT RESPONSE Meeting June 23 Sizes agreed upon Steel casings - 2 water, 1 sewer, 1 future Resolved

Page 23: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

THE PROPERTY OWNER CONTENDS: Left u-turns be allowed at Salton Rd DEPARTMENT RESPONSE No u-turn restrictions at Salton Rd

23

Services ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 24: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

THE PROPERTY OWNER CONTENDS: Northern remainder Move SCE pole to CT R/W DEPARTMENT RESPONSE SCE designed relocation Within in existing easement Line spans limited & balanced Safety & access Relocated to minimize impact Limitations compensation issue

Related to the findings of the Commission:That the property sought to be condemned is necessary for the project.

24

Services ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 25: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

THE PROPERTY OWNER CONTENDS: Replace poles w/ tubular steel

• No guy wires Shorten guy wires Meeting with SCE and CT DEPARTMENT RESPONSE SCE designed Within existing easement SCE - tubular steel not feasible / clearance Many SCE meetings – design/redesign complete Will attend meeting Impacts compensation issue

Related to the findings of the Commission:That the property sought to be condemned is necessary for the project.

25

Services ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 26: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

THE PROPERTY OWNER CONTENDS: CT is seeking new rights for SCE • Existing has no provision for underground Terms of SCE underground easement not reasonable • Should be negotiated DEPARTMENT RESPONSE: Yes, seeking underground easements SCE requirements / issued easement language Not stated specific objections Impacts compensation issue

Related to the findings of the Commission:That the property sought to be condemned is necessary for the project.

26

Services ParcelRelated to the findings of the Commission:This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

Page 27: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

27

All Parcels Related to the findings of the Commission: That a valid offer of compensation has been made.

THE PROPERTY OWNER CONTENDS: Valid offer not made • Private air strip • NextEra easement extinguished DEPARTMENT RESPONSE Written offers made • Service Parcel - March 2016 / rev. Jan 2017 • Antique Parcel - March 2016 / rev Jan 2017 • Motel Parcel - March 2016 Included airstrip, easements, & encumbrances

Page 28: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Summary

1.The public interest and necessity require the proposed project.

2.This project is planned and located in a manner that will be most compatible with the greatest public good and least private injury.

3.The property sought to be condemned is necessary for the proposed project.

4.An offer of compensation has been made.

28

Page 29: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

29

Northerly Remainder Service Parcel

SCE EASE

SCE EASE

A TSP would conflict with Transmission Line

TSP 011E moved 55 ft. south

U-turns are allowed

Only area not encumbered by

SCE Ease

New UG SCE

SR 58 WB OFFRAMP

SR 58 EB ONRAMP

TSP 011E

Page 30: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

30

6.57 Ac Fee

0.41 Ac TCE

Kramer Service Corp.

Service ParcelProject Impact

New SCE TSP

Remove SCE Tower

Page 31: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Existing Utility Corridors Service Parcel

Page 32: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Existing Utility Corridors Service Parcel

Page 33: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

33

Kramer Junction

Services Parcel

NextEra easement

New

Era easement

ROUTE 58 IMP

13 Acres$18.1m

8 Acres$17.5m

Southern CA Edison easement

Page 34: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

34

SCE Transmission Relocation Letter

Page 35: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

35

Motel Parcel

Southerly Service, Antique and Motel Remainder ParcelsInitial Proposed Design

45 ft. Driveway (Right-in/Right-out)

Raised Curbed Median to prevent left turns

SignalizedT-Intersection

(3-legged)

45 ft. Driveway

Service ParcelAntique Parcel

Page 36: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

36

Southerly Service, Antique and Motel Remainder ParcelsDarr’s Proposed Design

60 ft. Driveway (Right-in/Right-out)

Raised Curbed Median

Signalized Intersection(4-legged)

Antique Parcel

Motel Parcel

Service Parcel

Page 37: Kramer Apartments Corporation Kramer Service Corporation · Project Impact 16 Edwards Air Force Base Antique Parcel To Bakersfield ROUTE 58 IMP To Barstow Antique Parcel Proposed

Design Changes Negotiated

Interchange layout Minimize impacts

Constructing 60’ driveway and signalized intersection Intersection directly into property

R/W reduced 25’ feet avoid workshop Setback SCE poles 25’/50’ Clear areas Extra space into driveway

Ramp access control from 300’ – 100’ Future development Maintain access

Paved access north remainder / designated left-turn Maintain access

Replace/encase private utilities & extra casing for future 46


Recommended