K.U. CO. 8 E.K.R.E.C.C. EXISTING & PROPOSED TRANSMISSION LINES
IN THE AREA OF THE INTERCONNECTED TRANSMISSION SYSTEM
t LEGEND-t
@ ELECTRlC GENERATING STATION - K. u. co.
6% ELECTRIC GENERATING STATION - E. K.R. E.C.C.
B EXISTING K.” CO. TRANSMISSION LINES - 136 KY B OVER
- EXISTING K. “. CO. TRANSMISSION LINES - 69 K Y TO 136 K”
- EXISTING K U. CO. TRANSMISSION LlNES - 22 K ” TO 69 K Y -. ^_.
+wyyc PROPOSED K.“. CO. TRANSMISSION LINES - 69 K” TO 156 K ” -4
y*wcIc PROPOSED K.“. CO. WIRE REPLACEMENT SO,, CONVERSION TO HIGHER VOLTAGE
- COMPLETED K.“. CO. TRANSMISSION LINES
- EXISTING E K.R.E.C.C. B MEMBER CO-OP OWNED TRANS. LINES-MS 6
m PROPOSED E.K.R.E.C.C. TRANSMISSION LINES - 69 KV
A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON K.“. CO. SYSTEM
A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON E.K.R.E.C.C. SYSTEM
0 K. “. CO. LOAD CENTERS ON E.K.R.E.C.C. SYSTEM
n POINTS OF INTERCONNECTlON BETWEEN K. “. CO. B E. K. R.E.C.C. SYSTEH
4so,r of Ml,99 - -
10 5 0 80 20
March 5.1956
69 K.V. m OOWENTON
ELIZAGETHTC
HODGENVILLE’ BEATTYVILL
MPBELLSVILLE _
- ?Y HORSE CAVE;r ^.. /-
EAST BERNSTA
b-- Goose ROCK
r---T CUMEIERLAND-
h
Revised March 5, 1956
EXHIBITB - FIRST REVISION
LIST OF TRANSMISSION LINES ANB ASSOCIATED SWITCHING FACILITIES TO BE CONSTRUCTEB OR ACQUIRED BY EAST EENTUCKY
R. E. C. C.
TRANSMISSION LINES -' Location Voltage
Summer Shade to Temple Hill 69,000 Temple Hill to Glasgow 69,000 Glasgow to Goodnight 69,000 Goodnight to Munfordville 69,000 Goodnightto Bonayr 69,000
tifordville to Stephensburg 69,000 22.3 Completed Stephensburg to Hodgenville 69,000 17.6 Completed Stephensburg to Elizabethtown 69,000 11.5 Completed Elizabethtown to Bardstown 69,000 26.6 Completed Bardstown to Springfield (REA) 69,000 16.0 Completed Springfield (REA) to Perryville 69,000 16.0 Completed
Springfield (REA) to Springfield (City) 69,000 69,000 Knob Lick to Summer Shade
Knob Lick to Greensburg Perryville to Newby Newby to Ford
69,000 69,000 69,000
Ford to Summer Shade via Windsor Phil-Highland Line to Peytons Store Windsor to Elihu Sewellton Tap Sewellton to Jamestown
Summer Shade to Albany 69,000 33.4 Completed Albany to Monticello 69, ooo 20.0 Completed Monticello to Whitley City 69, ooo 23.0 June 30, 1956 Whitley City to Gold Bug 69,000 18.0 Completed (1) Lebanon to Sulfur Creek 69,000 16.0 Jan. 1 ,I1960
Ford to Richmond Richmond to Berea Berea to Brodhead Ford to Hunt #l Circuit Hunt to Headquarters
- Headquarters to Murphysville 69,000 19.9 Completed Headquarters to Cynthiana 69,000 11.8 Completed Cynthiana to Renaker 69,000 10.0 Completed (1)
Renaker to Lees Lick Lees Lick to Scott Renaker to Berlin Renaker - Williamstown Sinai to Bonds Mill
New Liberty to Williamstown New Castle to New Liberty New Castle - Clay Village Bonds Mill to Vanarsdell - Ford to Lexington - Winchester Line Ford - Hunt #2 Circuit Hunt - stanton '
Hope - Hillsbo???
4.6 Completed (1) 13.4 Completed 17.0 Completed 33.0 Completed ILL.1 Completed (2)
69, ooo
~;~::: 6g:ooo 69,000
115.9 Completed 15.0 Completed 18.0 Completed 15.0 Completed 0.5 Completed,
g>;;; (3)
69: ooo 69, ooo 69, ooo
11.0 Completed 13.0 MY 31, 1~956 16.0 June 30, 1956
6.5 Completed 33.5 Completed
69, ooo
fg%: 6g:ooo 69,000
7.2 10.0 24.0 14.5 6.5
Completed Completed Completed 1)
i Completed 1) Completed
69,000 69,000 69,000 69,000 g,;;; (3)
6g:ooo
16.5 August 1, 19% lg.8 August 1, 1956 16.1 Completed
4.5 Completed 12.0 Completed
7-o (2) Completed 16.5 Completed
69,000 14.2 Completed 69,000 14.0 Jan. 1, :L960 M,~O 22.0 Completed
Miles Tentative Date
-of Completion
9.9 Completed 9.0 Completed (1) 5.8 Completed
15.9 Completed 9.0 Jan. 1, :Lg60
.
h
,
Revised March 5,' 19586 Sheet 2
EXHIBITB- FIRST REVISION
TRANSMISSION LINES (con'd)
Loca%ion Vol%age Miles
Tyner-McKee 69,000 10.0 Fall Rock - Manchester 69,000 6c.o Manchester - Goose Rock 69,000 6.0 Hillsboro - Charters 69,000 25.0 Stanton - zaehariah 69,000 1700 Zachariah - Bea%%yville 69,000 1300 Beattyville - Tyner 69,000 24c.o E. Berns%adt - Tyner 69,W
@woo) 28.5
Tyler - Fall Rock BridgepQr% Tap
~;~~:: 103
Iqan Tap 6g:ooo
2!,2 Nicholasville Tap 2,8 BonnievflIe Substation Tap-Double Cir, 69,000 Elizabethtown Tap-Double Cir. 69,000 ;e~g; 0
Total Miles 983.8
- SWITCHIN FACILITIES DESCRIPTION
Tentative Date of Completion
Completed (1) July 1, I.956 December 1, 1957 Completed (1) Completed Completed Completed Completed (1) Completed (1) Completed Completed Completed Completed Indefinite
Tentative Date of Completion
oil circuit Air Break O%her Breaker (4) Stitch(4) Location
Summer Shade Summer Shade Summer Shade Summer Shade Temple Hill
GOQdni&% Munfordvflle Bonnievilbe
(Temple Hill Line) 1 (Knob Lick Line9 1 (Columbia Line) 1 (Albany Line) 1
Completed Completed Completed Completed Completed 2
Comple%ed Completed
2
f (138 kv) 1 l-30 MVA )
138/69 KV I Comple%ed Autotransf.) .'
Completed Completed Completed Completed Completed
1 4
Bos%on Stephensburg Bardstown Springfield (EN) Knob Lick
Greensburg Perryville Newby
- Lancaster Highland
Liberty Tap Pain% Phil Windsor Windsor
Elihu Columbia Columbia Sewellton Sewell%on Junction
- Albany Monticello Whitley City Gold Bug Lebanon (Sulfur Creek Line)
Completed Complete~d Completed Completed Completed
2 Completed 2 Comple%ed 2 Completed 1 Completed
Completed Completed Completed Completed Completed
Completed Completed Completed Completed 1
1 Jan. 1, 1960.
,
SWITCHING FACILITIES (Con'd)
Iocation
Berea Brodhead Hunt (1st Circuit) Hunt (2nd Circuit)
rh;;:e; MBTc.h 5, 1956
EXHIBITB- FlRST,REVISION
‘DESCRIPTION Oil Circuit Air Break Tentative Bate
Sideview Headquarters Berlin Renaker (Williamstown and Lees
Lick Lines) Renaker (Berlin and Cynthiana Lines) Scott
Lee's Lick Colemansville Falmouth Tap Point williamstown
P New Liberty
New Castle Clay Village Bond's Mill Avon Tap Ford (Newby #l and Hunt #l Lines) Ford (Newby #2 Line) Ford (Hunt #51 -Line) Ford (Richmond Line) Ford (Lexington Line) Stanton Hope Hillsboro Goddard
Beattyville Tyner Tyner ED Bernstadt Fall Rock Manchester Horse Cave Corinth Owingsville
_- Zachariah Elizabethtown
Breaker (4)
Notes :
2 2
1
2 1 1 1 1 1
1
2
1
Swltch(41
2 1 3 1
2 3 2
2
2 2 1 2 1
2 1 2 1 (138 kv)
z 1 2
3 2 2
Other of Completion
Completed June 30, 19% Completed Completed
Completed Completed Completed
Completed (5) .Completed (5) Completed
Completed Completed Indefinite August 1.1 19% August l,, 1956
Completed August l,, 1956
To be acquired from local cooperative Second Circuit Initial operation at 69 kv, future 138 kv 69 kv unless indicated Supervisory control not operating at this time. Total Circuit Mileage Or at a later date to coincide with Ford Unit 3 operation
-
Completed Oct. 1, :1g57 (7) Completed Completed Completed Completed October l, 1957 (7) Completed Completed Completed Completed (1)
Completed Completed 1)
I Completed 1) Completeld (1) July 1, 19% July 1, 1956 Completed Completed Completed Completed Completed
i
EXHIBIT C - FIRST REVISION
LIST OF TRANSMISSION LINES AND ASSOCIATED SWITCHINGFACILITIESTOBE CONSTRUCTEiD
BY'KENTUCKYUTILITIESCOMRANY
TRANSMISSION LINES
Location
Lebanon to Springfield (REA Line) Lebanon to Campbellsville Campbellsville to Greensburg Stephensburg to Leitchfield Jamestown to Elihu Boston Tap Lexington to Avon Dix Dsm to N. Richmond N.*Richmond to Higby Mill Kenton Station to Sharon Tyrone-Georgetown Sharon to Berlin Georgetown to Scott Falmouth Tap Line New Liberty to Carrollton via mrsaw Bedford Tap Line Rosine to Leitchfield
TOTAL MILES 268.4
W FACILITIES
Voltage
2;~~~ :I t 69:oc~~ (1) 69,000 (1) g;,g: (2)
69:ooo (1) 69,000 (3)
69,000 34,500
Miles
15.0 30.0 10.0 18.0 27.0
4.0 11.0 22.0 20.0 32.0 19.4 9.0
14.0 5.0
29.0
2e:;
Revised March 5, 1956
Tentative Date of Completion -
March 15, 1956 Completed Completed Indefinite Indefinite Completed Oct. 1, 1957 (5) Indefinite (6) Completed Completed Completed Completed Oct. 1, 1956 Completed Aug. 1, 1956 Completed Completed
DESCRIPTION Oil Circuit Air Break
Switches (4) Other Location Breakers (4)
Elizabethtown Lebanon E 1) Bonnieville t 2 138 kv) Campbellsville Greensburg Jamestown Dix Dam (Richmond Line) 1 Higby Mill (Richmond) 1 Lexington 1 Avon Richmond 69 KV Switching 4 Richmond 69 KV (Dix Dam) 1 Georgetown 2
3 (34.5 W)
Tyrone 1 - Leitchfield Nicholasville (Dix Line) Brodhead Floyd Rockholds Richland Cumberland Rice Station Goidbug Murphysville Kenton Sta. (Sharon Line) 1 Sharon Clay Village
2 1 1
1 4
: l-20 MVA 69/34.5 KV Supv. Controls
1 2 1 3 2-34.5 KS7 2 1 2-34.5 KV l-34.5 KV 1 2
2 1
Tentative Date of Comp:Let ion
Indefiniite Completed Completed Completed Completed my 1, :~956 Indefinite (6) Completed Oct. 1, 1957 (5) Oct. 1, 1957 (5) Completed Indefinite (6) Completed
Completed Completed Completed Completed Completed Completed Completed Completed my 1, ~956 Completed Completed Completed Completed Aug. 1, 1956
SEP 2 7 1955
,. . Revised March 5> 1956 Sheet 2 .
- EXRIBIT C - FIRST REVISION
SWITCHING FACILITIES (Con'd) DESCRIPTION
Oil Circuit Air Break Switches (4) Location Breakers (4)
Taylorsville City Taylorsville REA Bridgeport New Liberty Carrollton 2 Bedford Tap Point Corinth Campbellsburg East Bernstadt Owingsville Beattyville
London 2 Lebanon 2 (138 kv)
-
1 (34.5 w
Other
1 1 1 3 1 1
- I
; 1 1 3 (34.5 Kv - 5 WA) (W34.5
Ke Auto j
ans. >
Tentative Date of Completion
Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Sept. 15, 1956 Indefinite Sept. 15, 1956 Completed Completed Completed
Completed Jan. 1, 195'7
Replacing existing 34.5 KV facilities Replace conductor only Initial operation at 69 KV, future 138 KV , 69 KV unless indicated Or at a later date to coincide with Ford Unit #3 operation The parties hereto will jointly consider the economic feasibility and neces- sity of this project on, or immediately after, the date on which East Ken- tucky makes definite plans for additional generating capacity at its Dale Generating Station, beyond its Unit #3 or at any time that operating ex- perience shows defin%te need for this project. Kentucky Utilities reserves the rEght to construct this line at any tPme prior to the above date at its discretion.
. Revised March 5, 1956
EXKIBITD - FIRST REVISION
East Kentucky Owned Facilities to be Dispatched In Accordance with the Provisions of Paragraph 7 (6).
1. Transmission line from Ford to Summer Shade by way of Elizabethtown.
2. Transmission line from Springfield Coop Substation to City of Springfield.
3* Transmission line from Clay Village to New Liberty.
4, Transmission line from Ford to Murphysville by way of Headquarters.
5. Transmission line from Headquarters to New Liberty by way of Rena&r.
6, Transmission line from Scott to Berlin by way of Renaker.
7. Transmission line from Ford to Tyner by way of Beattyville.
8, Transmission line from Stanton to Goddard by way of Rope.
go Transmission line from Ford to Richmond.
10. Transmission line from Sewellton Junction to Jamestown by way of Sewellton. e 11. Transmission line from Ford to Summer Shade by way of Windsor.
12. Transmission line from Elihu to Windsor.
139 Transmission line from East Bernstadt to Manchester by way of Tyler.
14. Transmission line from Richmond to Brodhead by way of Berea.
15. Transmission line from Greensburg to Summer Shade by way of Knob Lick.
16. Transmission line from Ford to Avon Tap.
17. Transmission line fran Summer Shade to Gold Bug.
18. All switching devices in the above lines and at their terminals, except at Ford.
EKHIBITE - FIRST REVISION
Member Cooperative Load Centers Connected to Kentucky Utilities Transmission System
Bedford Nicholasville Taylorsville
Bridgeport Rice Station Vanarsdell
Csmpbellsville Richland Cumberland
Lebanon Rockholds Floyd
Logan
Campbellsburg
Sinai Camp Ground
Athertonville (Sulfur Creek)
The kilowatt-hours delivered to the above load centers shall be used to determine the wheeling charge to be paid by East Kentucky pursuant to Section 8 (h) provided that during the period, defined below, kilowatt-hours on which East Ken- tucky pays the wheeling charge for the above load centers in any month shall not be more than 132$ of the kilowatt-hours delivered to the Kentucky Utilities load centers listed on Exhibit G, as amended. Should such deliveries to the load cen- ters during any month of the period, defined below, exceed the said 132'$ as stated, payment shall be limited as though deliveries had remained at the 136 level.
/-4 The period referred to in the preceding paragraph shall begin March 1
and shall continue until such date as the sum of the maximum (undiversified 1 1956, de-
mands of the load centers of Kentucky Utilities listed on Exhibit G, as amended from time to time, shall, within any calendar yesr, amount to 11,730 kw plus the normal increase, as hereinafter defined. The "normal increase" shall be computed by applying seven per cent(@) per year increase to said amount of 11,730 kw for each year after 1954. Said seven per cent shall be applied on a compounded basis.
A load center near Winchester to serve the East Kentucky office will be con- nected to the Kentucky Utilities transmission system. The kilowatt-hours delivered to it and to any other new load center of East Kentucky which may be hereafter con- nected to the transmission lines of Kentucky Utilities (other than a load center re- sulting solely by reason of a division of one of the above listed load centers) will be excluded from the provisions of the 132$ limit stated above.
This Exhibit must be amended to reflect the future addition or removal of Member Cooperative load centers connected to Kentucky Utilities transmission lines in the area of the interconnected transmission system shown on Exhibit A.
--
-
SEP 2 1195s
.
h h
.- Revised March ‘5, “I.956
EXHIBITF - FIRST REVISION
Member Cooperative Ioad Centers Connected to East Kentucky Transmission System
Tyner
Fall Rock
Beattyville
E. Bernstadt
Brodhead
Springfield
Columbia
Phil
Iancaster
Perryville. - Peytons Store
Highland
Temple Hill
New Castle
Clay Village (Benson Road)
Bardstown
Cynthiana
Four Oaks
Goodnight ~-yr Knob Lick
Munfordville
Williamstown
Newby
Berea (Hickory
Berlin
Headquarters
c01emansville
Lees Lick
Sideview
Hunt
Elizabethtown
New Liberty
Scott (Penn)
McKee
Hodg@nville
This Exhibit must be amended to reflect the future addition or removal of Member
Goose Rock
Stephensburg
Monticello
Windsor
Sewellton
Murphysville
Plains) Albany
Whitley City
Charters
Hillsboro
Stanton
Frenchburg
Hope
Greensburg
Somerset
South Fork
Zachariah (Campton)
Wyoming
Sand Lick
Cooperative Ioad Centers connected to East Kentucky transmission lines
of the intWXOMeCted transmission system shown on Exhibit A.
-
in the ares
.
Revised March sL 1956 7
EXHIBITG - FIRST REVISION
Kentucky Utilities Ioad Centers Connected to East Kentucky Transmission System
Cave City F&mouth
Horse Cave Owingsville
Munfordville Liberty
Boston Whitley City
Columbia
Beattyville
Mackville
This Exhibit must be amended to reflect the future addition or removal of Kentuck;y
Utilities Load Centers connected to East Kentucky transmission lines in the area Iof
the interconnected transmission system shown on Exhibit A. -
.
. .
c . .
agree to substitute
EXRIBITA-
EXHIBITB -
h
EXHIBIT c -
EXHIBIT D -
EKRIBITE -
FXRIBITF-
EXHIBITG-
- .
. r
. .
MODIFICATION OF EXHIBITS
This modification is made as of June 12, 1956, to the agreement dated February 1,
1954, between East Kentucky Rural Electric Cooperative Corporation (East Kentucky)
and Kentucky Utilities Company (Kentucky Utilities).
East Kentucky and Kentucky Utilities accept the following revised exhibits and
said revisions for those attached to the original contract:
Map of Kentucky Utilities Company and East Kentucky
Rural Electric Cooperative Corporation. Existing and
Proposed Transmission Lines. Dated March 5, 1956, Re-
drawn and Revised May 1, 1956.
FIRST REVISION. LIST OF TRANSMISSION LINES AND ASSOCIAI!ED
SWITCHING FACILITIES TO BE CONSTRUCTED OR ACQUIRED BY EAST
KENTUCKY R, E. C. Ci Revised March 5, 1956.
FIRST REVISION. LIST OF TRANSMISSION LINES AND ASSOCIATED
SWITCHING FACILITIES TO BE CONSTRUCTED BY KENTUCKY UTILI-
TIES COMPANY. Revised March 5, 1956.
FIRST REVISION. East Kentucky Owned Facilities To Be
Dispatched In Accordance With the Provision of Paragraph
7 (4. Revised March 5, 1956.
FIRST REVISION. Member Cooperative Load Centers Connected
to Kentucky Utilities Transmission System. Revised June 11,
19%.
FIRST REVISION. Member Cooperative Load Centers Connected to
East Kentucky Transmission System. Revised March 5, 1956.
FIRST REVISION. Kentucky Utilities Load Centers Connected
to East Kentucky Transmission System. Revised March 5, I-956.