+ All Categories
Home > Technology > Kuching | Jan-15 | Local Practitioners’ Works (East Shan State)

Kuching | Jan-15 | Local Practitioners’ Works (East Shan State)

Date post: 16-Jul-2015
Category:
Upload: smart-villages
View: 79 times
Download: 1 times
Share this document with a friend
Popular Tags:
18
Local PractitionersWorks Local Practitioners Works East Shan State East Shan State Recorded assessment surveys by REAM and Recorded assessment surveys by REAM and Local People U Kyi Thein, U Khun Kyaw, U Ye Naing and Group Naing and Group
Transcript

Local Practitioners’ WorksLocal Practitioners  Works

• East Shan StateEast Shan State 

Recorded assessment surveys by REAM andRecorded assessment surveys by REAM and Local People U Kyi Thein, U Khun Kyaw, U Ye Naing and GroupNaing and Group

3.4 Private Sector Participation & PracticeA ti T d A hi t Ph t hi hli htActions Towards Achievements Photos highlight Practice for Policy 

REAM 2

Nam SuNam SuMH Station

1995 REAM 3

• Nam Paung MH St ti E t ShStation, Eastern Shan State

• established in 2010• established in 2010• Electrify 200 HH

• 200 Ks/ Unit

• Now engaging with G idGovernment grid extension 

REAM 4

REAM 5

Taung Chay Village MH Electrification

REAM 6

Mini-grid to Inndein Pagoda

Electrif b Electrify by Village MH Power

REAM 7

No.2 Turbine / Generator set

REAM 8

Nam Su MH Village Electrification in Kyaing Tone

REAM 9

REAM 10

4. Challenges4. Challenges

Electricity distribution System established by IPP

since 2005 REAM 11

Electrical appliances using  in MH electrified village in Eastern Shan State

REAM 12

Village tariff-management system

Village Tariff payment 

Cash‐counter

Village Electricity Bill Slip

REAM 13

Nam Wop Hydro Plant start operating in April 2014>>>300 kW x 3<<<

REAM 14

WATER MANAGEMENT INFRASTRUCTURE ESTABLISHMENT

REAM 15

REAM 16

REAM 17

REAM 18