Local PractitionersWorks Local Practitioners Works North Shan State North Shan State Recorded assessment surveys by REAM and Recorded assessment surveys by REAM and Local People U Sai Htun Hla and Group
Transcript
Page 1: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

Local Practitioners’ WorksLocal Practitioners  Works

• North Shan StateNorth Shan State 

Recorded assessment surveys by REAM andRecorded assessment surveys by REAM and Local People U Sai Htun Hla and Group

Page 2: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

1 Overview• Pico 34• Micro 110• Mini 4Mini 4• Functioning 79‐73%• Now have grid 15.54%• Do not have grid 84.46%

Page 3: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

2 Business Plans2 Business Plans• Implementation of Micro Hydro 7 Types• Na Ta‐la FundDRD• DRD

• Co‐operated Limited owned• WB supported V‐owned Micro HydroC B i G• Co. Business Groups

• V‐owned• Private owned

Page 4: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

2 Business Plans2 Business Plans 

• Implementation of Micro Hydro 7 TypesImplementation of Micro Hydro 7 Types• Na Ta‐la Fund• DRD• Co‐operated Limited owned• WB supported V‐owned Micro Hydro• Co. Business GroupsCo. Business Groups• V‐ownedP i d• Private owned

Page 5: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

3 Short Term Long Term Business Plan3 Short Term Long Term Business Plan

• Production in present and aim more to produceProduction in present and aim more to produce• Micro Hydro MHP Turbines; Small Power Transformers;Transformers;

• MHP Spare parts manufacture;Mostly Budget is fine for manufacture, and some hardships in some regions; eg., 

Cost 20 Lah Kyat / 1 KW max make fair Quality materials was found

Page 6: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

4 Challenges4 Challenges • Regions no Peace and Tranquility• Inadequate Budget• Rare Skilled Workers • Weak Tech• Non Complete MHP Policy yet• Non Complete MHP Policy yet• Due to little Profit appear few Investor Groups • Grid reach make the Local Self‐alone MHP Practitioner face hard‐to‐stand

• Lack of good Transportation

Page 7: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

5 Request5 Request• Technological Trainings ;• Public Awareness; • Capacity Buildings;p y g• Needed Policy to define for sufficient and secure • Village Electrification, i.e., Village Energy SecurityVillage Electrification, i.e., Village Energy Security and Adequacy;

• To solve Fund Long Term Loan in fair interest fromTo solve Fund, Long Term Loan in fair interest from Org. or Suitable Bank 

• would develop Village Electrification• would develop Village Electrification works/Projects well‐done

Page 8: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

L l W k h Local Workshop produce Village Electrification Transformer

REAM 8

Page 9: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 9

Page 10: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 10

Page 11: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 11

Page 12: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 12

Page 13: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 13

Page 14: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

Private Workshop equipments and tools are locally made

Imported machines are better but very expensive to be invested byvery expensive to be invested by 

local entrepreneurs

REAM 14

Page 15: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

Products of Northern Shan StateProducts of Northern Shan State

REAM 15

Page 16: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 16

Page 17: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 17

Page 18: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 18

Page 19: Kuching | Jan-15 | Local Practitioners’ Works (North Shan State)

REAM 19


Recommended