1 Kumtor Gold Company “KGC” May 2019
Transcript
Page 1: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

1

KumtorGold Company

“KGC”May 2019

Page 2: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

2

KGCBackground

Page 3: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

3

Historical Safety TRIF Performance

10.82

2.29 2.2 2.05

4.544.91

3.26 3.57

2.22

1.23 1.04 1.110.38 0.24 0.35 0.31 0.19 0.2 0.23 0.21 0.39 0.14 0.19 0.00

0

2

4

6

8

10

12

1996 – 2017 TRIF(KGC + CONTRACTORS)

Page 4: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

4

Historical Production & Net Earnings

22.5

9

31.7

7

41.1

6

43.2

8

52.4

7

54.3

2

77.7

1

84.8

6

81.0

4

85.4

2 114.

78

115.

55

115.

54

116.

47

150.

60

147.

61

176.

69

191.

72

169.

53

144.

40

181.

88

180.

33

0

50

100

150

200

Tonnes Mined ('Million)TOTAL TONNES MINED: 2,379.73

502

645 611 670

753

529

678 657

501

304 301

556 525 568 583

315

600 568 521 551 563 535

$19 $1 $(9) $4 $32 $(18) $14 $42 $23 $(15) $(8)

$93 $109

$303

$436

$(119)

$192 $129 $138

$225 $220 $188

(200)

(100)

0

100

200

300

400

500

600

700

800

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Ounces Poured & Net Earnings

Total Ounces Poured ('000) Net Earnings ('000)

TOTAL OUNCES POURED: 12.0 million TOTAL NET EARNINGS: $2.0 billion

Page 5: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

5

Contribution to Kyrgyz Republic Economy

Page 6: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

6

Tailings Management Facility

Kumtor River

Lysyi Pit Petrov Lake

Central PitSarytor Waste Dump

Central Valley Waste Dump

Northeast Waste Dump

Sarytor Pit SW Pit

Mill

Davydov Glacier

Mega Shop

5

Site Map

Page 7: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

7

KGCLife of Mine

Page 8: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

8

LOM – Estimated Production

2019e 2020 2021 2022 2023 2024 2025 2026 LOM

Total Tonnes Mined (kt) 170,020 157,010 168,017 132,652 85,552 713,251

Mining Rate (t/d) (millions) 0.46 0.42 0.46 0.36 0.23 - - - 0.19

Mill Tonnes (millions) 6.59 5.90 5.89 5.89 5.89 5.90 5.89 3.67 51.46

Mill Grade (g/t) 3.13 3.4 3.3 3.8 2.6 1.5 1.0 1.2 2.57

Contained Oz 663,895 647,662 621,555 727,677 497,921 289,288 183,783 136,990 3,768,770

Recovery % 81.7% 80.2% 82.5% 82.5% 74.7% 67.1% 54.3% 57.9% 77.4%

Recovered Oz 542,088 519,108 513,021 600,659 371,677 194,094 99,841 79,374 2,919,862

Carbon Fines Recovered Oz 18,000 3,932 3,932 3,932 3,932 3,932 3,932 3,932 45,525

Est. Total Recovered, Oz 560,088 523,040 516,953 604,591 375,609 198,026 103,773 83,306 2,940,393

Page 9: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

9

LOM – Estimated Cash FlowMDP 2019e 2020 2021 2022 2023 2024 2025 2026

Gold Produced (oz) 560,087 523,118 516,063 607,965 400,477 200,335 133,702 107,446 Gold Price ($ US/ounce) 1,275 1,300 1,300 1,300 1,300 1,300 1,300 1,300 Total Gross Revenues ($ x 1000) 714,112 685,086 671,963 789,394 489,483 261,177 137,263 111,046

Operating, Exploration & Reclamation Costs ($ x 1000)

281,410 142,402 246,851 167,381 148,002 97,775 87,560 48,968 Capital Costs ($ x 1000) 146,436 274,776 134,389 126,245 74,210 1,300 800 400 14% Revenue Based Taxes ($ x 1000) 99,976 95,550 93,730 110,110 68,250 36,400 19,110 15,465 Total Cash Outflow ($ x 1000) 527,822 516,192 478,548 408,170 293,493 137,362 108,770 66,421 Net Cash Flow ($ x 1000) 186,290 168,894 193,416 381,223 195,990 123,815 28,493 44,626

186,290 168,894 193,416

381,223

195,990

123,815

28,493 44,626

2019 2020 2021 2022 2023 2024 2025 2026

Net Cash Flow ($'000)

LOM Cash Flow = $1.3 billion

Page 10: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

10

Mine & Geology

Page 11: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

11

Long Section/Cross SectionCentral Area Grade x Thickness Long Section

SB Zone

Hockey Stick

Central PitNortheast

Southwest

Sarytor

150

520406080

100120

NE

Area planned for drilling works

Potential targets for NE extensions

Potential targets for north extensions

Potential targets for SW extensions

Potential targets for northeast extensions

Page 12: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

12

Exploration Opportunities -In-Pit vs Regional

Central Pit Northeast

SouthwestSarytor

NKumtor Trend Gold Distribution

Project holes

An $18 million exploration drilling program was planned for 2018-2019 years at the Kumtor mine. Planned exploration work is aimed at estimating the possible resources on the flanks of the South-West, Central Pit,

North-Eastern and Sarytor areas. The exploration drilling program was launched in June 2018. A total of 156 exploration holes are planned to be drilled. The total drilling will be 56,000 m. Infill drilling in Hockey Stick zone program has started since May 2019. Total drilling will be 20,000 м.

Page 13: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

13

Exploration Opportunities -In-Pit vs Regional

GxTAu g/t*m

Current CentralPit Outline

Pit Shell 20

Southwest CB#3

Sarytor CB#2

Geological exploration areas

Page 14: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

14

2018 YE Central Pit Development

Page 15: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

15

2019 YE Central Pit Development

Page 16: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

16

2020 YE Central Pit Development

Page 17: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

17

2021 YE Central Pit Development

Page 18: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

18

2022 YE Central Pit Development

Page 19: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

19

2022 YE SW Pit Development

Page 20: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

20

2023 YE Sarytor Pit Development

Page 21: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

21

Dump Plan 2023

Page 22: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

22

Mill Processing

Page 23: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

23

Pit

Thickener Section

Tailings

Crushed Ore Stockpile

SAG Mill

Ball Mill

Grinding Section

Froth Flotation Section

Cyclones

Effluent Treatment

PlantKumtor River

Crushing Section

Carbon in Leach

Refining

Gold Dore Electro

Winning

13

Process Flow Sheet

Page 24: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

24

Historical performance – Throughput, Grade and Recoveries

3.50

4.00

4.50

5.00

5.50

6.00

6.50

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

5.55

4.77

4.54

4.65

5.14

3.71

4.54

4.41

3.38

2.27

2.36

3.89

3.74

4.15

3.79

2.79

4.26

3.89

6

3.57

4

3.43

5

3.57

8

3.28

6

73.3

4%

78.5

0%

79.3

7%

81.5

0%

83.0

7%

78.1

3%

82.1

5%

72.9

5%

81.1

5%

72.7

2%

72.7

2%

79.6

6%

79.6

6%

79.5

3%

80.7

6%

75.6

2%

79.3

4%

78.0

0%

78.7

6%

79.2

4%

79.0

9%

79.3

4%

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

HISTORICAL

Grade(g/t) Recovery(%)

Page 25: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

25

Expected LOM – Throughput, Grade and Recoveries

6,593 5,907 5,891 5,891 5,891 5,907 5,891

3,669

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

2019 2020 2021 2022 2023 2024 2025 2026

TONNES OF ORE MILLED (000’s)

Page 26: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

26

KGCSocial &

Closure Plan

Page 27: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

27

Community & Social ProgramsProject 2013 2014 2015 2016 2017 2018 2019

planned Total

Karagat +project 301,372 226,230 284,427 101,202 913,231

Greenhouses 138,499 100,460 109,544 348,503

Microcredit agencies 1,040,066 851,808 198,385 104,745 70,000 69,535 70,000 2,404,538

"Youth Banks" 315,713 284,287 285,000 885,000

Repair of Bokonbaevo-Ton road 1,943,061 1,943,061

"One Village One Product" 174,022 89,150 80,000 127,650 115,000 585,822

Support for orphanage "Svetly Put" 91,193 74,220 74,060 239,473

Educational projects support 206,319 206,319

Rehabilitation of land (Lipenka and Ak-Dobo villages of Djety-Oguz region in 2013 and Svetlaya Polyana village of Djety-Oguz region in 2014) 200,000 242,000 442,000

Ecological camps , forums and other ecological initiatives 155,304 19,284 44,288 218,876

Donations 1,842,235 1,179,755 170,282 56,790 42,683 153,001 165,000 3,609,746

Karakol Zoo 84,301 49,701 22,972 20,400 177,374

Fruit dryers for youth regional committees 46,329 46,329

Heart surgery for children 90,313 7,960 98,273

Irrigation improvement in Djety-Oguz and Ton regions 173,546 188,800 86,200 171,248 200,000 819,794

"Youth Mean Business" project (support of small businesses of regional youth) 275,000 75,165 42,300 74,130 466,595

Potable water project 76,501 47,300 135,387 200,000 459,188

Community Owned projects (playgrounds, football fields and other initiatives) 136,745 31,944 90,000 344,422 300,000 903,111

"Bio.kg. Organic Aimaks" project 33,996 80,000 93,730 207,726

Ecological project "Green Point" 60,007 20,000 20,000 100,007

Issyk-Kul Education Improvement project 50,119 70,000 149,699 130,000 399,818

Biodiversity Conservation at Sarychat Eertash reserve 8,430 8,430

Local Business Initiatives 127,407 150,000 127,407

Emergency earthworks 60,000 60,000

Earthworks on rehabilitation of pastures 150,000 150,000

Project on introducing waste segregation in rural areas of Issyk-Kul oblast 60,000 60,000

Scholarship 30,000 30,000

DONATION FOR THE THIRD WORLD NOMAD GAMES 752,658 752,658 Total 6,407,784 3,198,987 1,885,440 814,890 648,883 2,227,298 1,630,000 16,663,281

Page 28: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

28

Conceptual Closure Plan – Costs & Timing

Area / Activity Total Cost ($000's)

% of Total Cost

Waste Rock Dumps $7,046 12%Tailings Impoundment $20,607 36%Pits $6,544 12%Roads, Landfills, Waste Disposal $1,223 2%Buildings $2,572 5%Other Demolition & Equip Removal $1,197 2%Water Treatment $5,578 10%Decontamination, Other Miscellaneous Costs $1,044 2%Closure Plan Management $625 1%Construction Management $1,974 3%Monitoring & Maintenance $3,756 7%General & Administration $1,020 2%Human Resources $3,561 6%

LOM Direct Cost Total $56,747 100%

Page 29: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

29

Conceptual Closure Plan – Key Assumptions

• Standardized Reclamation Cost Estimator (SRCE) Model used to estimatecosts (conservative assumptions where required)

• Mining finishes in 2023, and milling in 2026• Final waste rock dump footprints based on 2013 modelling which provide a

reasonable assessment of future movement• Topsoil stockpiled on site will be adequate for rehab requirements• Monitoring activities during closure/post-closure phases include water quality,

geotechnical stability & biodiversity• TMF spillway design based on Probable Maximum Flood event• Post closure land uses are accepted by stakeholders• Davidov glacier will continue to move toward the pit• The tailings dam cap can be placed by crushing rock in the Mill and depositing

via the tailings pipeline.• The TMF does not need to be revegetated (supported by GIIP)• A small number of buildings and roads will remain for a scientific research

centre

Page 30: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

30

Risks & Continuous

Improvement

Page 31: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

31

Major Production Risks

LOM Production Risks 2019 2020 2021 2022 2023 2024 2025 2026

SafetyOccurrence of LTI 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H)

Mine / MaintenancePitwalls Movement halting execution of planned Mine Plan 13(H) 13(H) 13(H) 13(H) 13(H) - - -

Waste Dumps Movement halting execution of planned Mine Plan 10(M) 10(M) 10(M) 10(M) 10(M) - - -

Pit Floods preventing ore mining 9(M) 6(M) 6(M) 9(M) 9(M) - - -Negative Block Model Reconciliation 9(M) 9(M) 9(M) 13(H) 13(H) - - -Equipment Mechanical Availability not meeting targets 6(M) 7(M) 8(M) 9(M) 7(M) - - -

Mill / Mill MaintenanceOre recoveries 5 (L) 5 (L) 8 (M) 8 (M) 8 (M) 8 (M) 8 (M) 8 (M)Equipment Mechanical Availability not meeting targets 13(H) 9(M) 9(M) 9(M) 9(M) 9(M) 9(M) 9(M)

Mill building foundation stabilization 22(E) 14(H) - - - - - -

EnvironmentMAC limit compliance 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H)MAD limit compliance 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H) 13(H)

Page 32: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

32

Continuous Improvement InitiativesImplemented CI Projects Date UOM Benefit

Mine1 Double tray extensions (ice movement) Jan-18 tonnes (mil) 0.22 New technology - Blast maker Implementation Mar-18 tonnes (mil) 7.33 Conveyor for ice transportation Apr-18 tonnes (mil) 0.44 Optimization of blast initiation systems Jan-19 $,(mil) 0.025 Mine sense dispatch system Jan-19 tonnes (mil) 0.76 Improve road conditions Mar-19 tonnes (mil) 0.2

Mill1 Increase Production Rates to 759 tpoh Jan-18 tpoh 7612 Flocculent Optimisation Jan-18 $,(mil) 0,07 3 Carbon fines processing Jan-18 Ounces 10,0434 FLT Cyclopack installation Sep-18 $,(mil) 0.15 Extraction of gold from tailings pond solution May-19 Ounces 350oz/y

Maintenance1 Tire repairs Jan-18 $,(mil) 0.72 Borusan Component Life Extension Jan-18 $,(mil) 0.63 3 Certified Rebuild of Dozers Jan-18 $,(mil) 1.74 Improve Liebherr shovel availability Jan-19 % 865 Own Component Rebuild in BMK Jan-19 $,(mil) 1.2

Page 33: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

33

CI: Tower Mill & Leach Tanks

Current situation:

• Enumerated ore characteristics decrease Mill overall recovery, which affects to gold production

Conceptual Idea Add:• 2 Tower Mills to ultra grind flotation

concentrate fine-dispersed gold • 2 Leaching Tanks to increase extraction of gold

while leaching the flotation tails • The 2 Tower Mills and 2 Leaching Tanks are two

parts of one project

Key requirement:• Approval from Board of Centerra (possibly 2H

2019)Risk:• Permitting and licenses delays

• Approximate Capex: $18M• Potential overall recovery: 2-3%• Expected payback: <2 years

Page 34: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

34

Headcount

Page 35: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

35

Workforce

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 (end of April)

Mine National 337 381 415 408 419 458 513 574 551 678 745 735 718 838 892 972 1023 979 943 976 1100 1088 1064Expatriate 25 23 18 13 10 9 6 7 4 4 4 2 6 8 8 6 4 7 7 6 1 0 0

Mill National 96 108 109 119 120 119 121 120 130 134 136 142 139 134 135 132 127 120 138 135 140 139 145Expatriate 27 26 25 17 18 16 14 13 13 10 3 3 2 2 1 1 1 2 1 1 5 0 0

Site Admin. National 415 397 488 453 456 438 433 434 449 528 542 650 595 645 652 656 678 676 650 640 662 679 640Expatriate 36 29 23 16 14 22 17 18 23 24 15 16 16 16 14 14 16 15 9 2 1 1 0

Maintenance National 178 200 209 218 224 226 227 226 247 280 344 441 429 471 489 529 547 548 540 553 558 564 572Expatriate 66 63 53 57 53 50 46 36 27 28 37 43 35 43 41 53 69 64 53 53 53 53 40

Bishkek Administration National 66 226 133 200 208 209 210 209 200 208 216 192 196 198 201 212 218 227 199 184 167 154 155Expatriate 3 15 8 9 7 10 9 9 9 11 10 9 9 9 9 8 10 11 10 9 6 7 6

Exploration National 0 0 0 0 0 0 0 0 58 61 52 53 53 109 109 103 4 0 0 0 0 27 62Expatriate 0 0 0 0 0 0 0 0 26 22 21 21 20 20 13 9 3 0 0 0 0 0 0

Underground National 0 0 0 0 0 0 0 0 0 0 0 4 76 87 95 40 0 0 0 0 0 0 0Expatriate 0 0 0 0 0 0 0 0 0 0 0 17 34 42 51 6 0 0 0 0 0 0 0National 1092 1312 1354 1398 1427 1450 1504 1563 1635 1889 2035 2217 2206 2482 2573 2644 2597 2550 2470 2488 2627 2651 2638Expatriate 157 156 127 112 102 107 92 83 102 99 90 111 122 140 137 97 103 99 80 71 66 61 46

Total 1249 1468 1481 1510 1529 1557 1596 1646 1737 1988 2125 2328 2328 2622 2710 2741 2700 2649 2550 2559 2693 2712 2684

10921312 1354 1398 1427 1450 1504 1563 1635

18892035

2217 22062482 2573 2644 2597 2550 2470 2488

2627 2651 2638

157 156 127 112 102 107 92 83 102 99 90 111 122 140 137 97 103 99 80 71 66 61 46

12491468 1481 1510 1529 1557 1596 1646 1737

1988 21252328 2328

2622 2710 2741 2700 2649 2550 2559 2693 2712 2684

0

500

1000

1500

2000

2500

3000

1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 2 0 1 7 2 0 1 8 2 0 1 9 ( E N D

O F A P R I L )

WORKFORCE TRENDNational Expatriate Total

Page 36: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

36

Opportunities & Threats

Page 37: Kumtor Gold Company “KGC”€¦ · • The tailings dam cap can be placed by crushing rock in the Mill and depositing via the tailings pipeline. • The TMF does not need to be

37

Top 5 - Opportunities & Threats

Opportunites Threats1. Near Pit Exploration 1. Fuel Price2. Underground 2. Gold Price3. Continued CI Initiatives 3. Abnormal Hot Weather4. Concession Area Exploration 4. Control of Pit Walls5. Regional Exploration 5. Bulk Commodities Supplies Availability