www.construction.murrob.com KHUSELEKA North-West, Rustenburg PROJECT TYPE: OPENCAST MINING CLIENT: Anglo Platinum Limited VALUE: R109 Million CONSULTANTS: None PROJECT DURATION: 24 Months DATE OF PROJECT: 1 November 2011 PROJECT DESCRIPTION: Opencast Mining of Merensky Reef to a depth of 20m. Approximate volumes mined for the project :- Topsoil 384,428m³ Overburden 1,342,440m³ Ore 169,878m³ Topsoil Rehab 337,189m³ Filling Void 1,039,109m³
Transcript
Page 1: Kuseleka Opencast

www.construction.murrob.com

KHUSELEKA North-West, Rustenburg

PROJECT TYPE: OPENCAST MINING

CLIENT:

Anglo Platinum Limited

VALUE:

R109 Million

CONSULTANTS:

None

PROJECT DURATION:

24 Months

DATE OF PROJECT:

1 November 2011

PROJECT DESCRIPTION:

Opencast Mining of Merensky Reef to a depth of

20m.

Approximate volumes mined for the project :-

• Topsoil 384,428m³

• Overburden 1,342,440m³

• Ore 169,878m³

• Topsoil Rehab 337,189m³

• Filling Void 1,039,109m³

Recommended