Date post: | 26-Mar-2015 |
Category: |
Documents |
Upload: | robert-hunter |
View: | 213 times |
Download: | 0 times |
KYUNG IN CONSTRUCTION (L.L.C)
KYUNG IN CONSTRUCTION (L.L.C)
May. 2006
2
INDEXINDEX
A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory
B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea
C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers
3
A. About UsA. About Us
1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in
Dubai 5. Accomplishment in Middle East 6. Factory
4
1. Greeting1. Greeting
Since establishing KYUNGIN PRECISION in 1989, we’ve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan.
We promise to do always our best for customer’s satisfaction with abundant experiences and professionalism sincerely.
We need your encouragements and supports hereafterand also hope your continuous prosperity.
From Manufacturing To Construction
From Manufacturing To Construction
2. Introduction2. Introduction
NAME KYUNG IN CONSTRUCTION L.L.C
DATE OF ESTABLISHMEN
TFEB. 2006
MANAGING DIRECTOR
CHA, YEONSUK
LOCATION DUBAI
MAIN PRODUCTION
1. PILING MACHINE MANUFACTURING2. BOREHOLE PILING WORKS
6
3. Organization3. Organization
Operators Labors Factory Workers
Office Workers
Total
11 35 7 5 58
Managing Director
Construction
Division
Manufacturing
Division
Piling Team
Sales Factory Administration
7
4. Current Available Equipment in Middle East4. Current Available Equipment in Middle East
No
ItemQ’nt
yMaker( or
Brand)Remark
1 Pile Driver 5 KYUNG IN
3ea * KID600-L302ea * KID1200-L42
2 Crane 2SMITOMO
/KOBELLCO55Ton
3 Generator 5CAT 3306/NTTA-855
4 Compressor 5 SULLAIR
5 Excavator 2 HUYNDAI 1M³
8
5. Accomplishment in Middle East (Dubai)5. Accomplishment in Middle East (Dubai)
Project NameJEBEL ALI POWR AND DESALINATION
PLANT PHASE ‘L’- PHASE II, U.A.E
Scope of Works
Borehole Piling Works, Load Test, Pile Trimming Works
Project Volume
1. Original Order- Dia. * Depth : Ø600 * 15M- No. of Piles : 2,547ea - Total Length : 38,205M2. Additional Order - Dia. * Depth : Ø600 * 14M - No. of Piles : 249ea - Total Length : 3,486M
Remarks - Shortened Construction Period by 90 days
9
5. Accomplishment in Middle East (Bahrain)5. Accomplishment in Middle East (Bahrain)
Project NameAL-MARSA FLOATING CITY: MEENA
TOWER PROJECT
Scope of Works
Borehole Piling Works, Load Test, Pile Trimming Works
Project Volume
A. for Ø600 - Dia. * Depth : Ø600 * 11M- No. of Piles : 402ea - Total Length : 4,422MB. for Ø700- Dia. * Depth : Ø600 * 11M- No. of Piles : 82ea - Total Length : 902M
Remarks
10
6. Factory6. Factory
11
B. Construction SiteB. Construction Site
1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing
Method2. Pile Cutting3. Load Test 4. Job Site in Dubai & Korea
12
1-1. Merits of Full Casing Method (1)1-1. Merits of Full Casing Method (1)
① Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface
☞ in comparison with Bentonite Method
13
1-1. Merits of Full Casing Method (2)1-1. Merits of Full Casing Method (2)
② Quick Performance: High Productivity & Cost
Saving
14
③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution
1-1. Merits of Full Casing Method (3)1-1. Merits of Full Casing Method (3)
15
1-2. Procedure of Full Casing Method (1)1-2. Procedure of Full Casing Method (1)
①Preparation
② Drilling ③Completion of Drilling
16
1-2. Procedure of Full Casing Method (2)1-2. Procedure of Full Casing Method (2)
④ Re-bar Cage
Installment
⑤ Concrete Placement
⑥ Casing Removal
17
1-3. Our Strength in Full Casing Method1-3. Our Strength in Full Casing Method
1. We achieved a great success in Full Casing Method in Middle East for the first time.
2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai.
3. International Patent applied for ‘Boring Method for Sand Layer and Auger Machine’ for the first time in the World.
* Tile of Invention : “AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME”
* Applied Number : PCT/KR2006/001391
18
2. Procedure of Pile Cutting (1)2. Procedure of Pile Cutting (1)① Excavation for Pile Cutting
② Pile Cutter Setting
③ Placing Pile into Pile Cutter
19
2. Procedure of Pile Cutting (2)2. Procedure of Pile Cutting (2)④ Cutting Pile and Moving Debris ⑤ Clean Pile Head
20
3. Procedure of Load Test (1)3. Procedure of Load Test (1)① Excavation for Load Test
② Pile head Cutting and Leveling
③ Setting of Cylinder Hydraulic Jack
21
3. Procedure of Load Test (2)3. Procedure of Load Test (2)
④ Lying of Test Beam
⑤ Loading Concrete Blocks
⑥Gage Setting
22
4-1. Job Site in Dubai : Jebel Ali Power Plant (1)4-1. Job Site in Dubai : Jebel Ali Power Plant (1) Jebel Ali Power Station & Desalination ‘L’-
Phase Ⅱ
23
4-2. Job Site in Dubai : Jebel Ali Power Plant (2)4-2. Job Site in Dubai : Jebel Ali Power Plant (2) Jebel Ali Power Station & Desalination ‘L’-
Phase Ⅱ
24
4-2. Job Site in Bahrain4-2. Job Site in Bahrain
Bahrain MEENA TOWER PROJECT
25
4-2. Job-Site in Korea : DTH Hammer Rock Piling4-2. Job-Site in Korea : DTH Hammer Rock Piling KTX (Korea Train Express) Construction Site
① ② ③
④ ⑤
☞ Our DTH Hammer Machine is used
for all railroad tracks in Korea
Such as KTX tracks, Kyungbu line
Honam line and so on.
26
4-2. Job-Site in Korea : Rock-Bed Piling 4-2. Job-Site in Korea : Rock-Bed Piling
27
4-2. Job-Site in Korea : Ø1000 Piling 4-2. Job-Site in Korea : Ø1000 Piling
28
4-2. Job-Site in Korea : Soil Piling 4-2. Job-Site in Korea : Soil Piling
29
C. Production of Piling MachineC. Production of Piling Machine
1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws &
Hammers
30
Dia. Ø800 Ø600
10M
15M
20M
25M
30M
35M
40M
45M
1-1. Drilling Rig : KID8001-1. Drilling Rig : KID800
Ø6
00
*29
.5M
Ø8
00
*27
M
Ø6
00
+2
7M
• K-150DP
• KCA-890
Model Hole Dia.
Drilling Depth Leader Length Auger Driver Casing Driver
KID800Ø800 Max. 36M
33M * Ø711 K-150DP KCA-890Ø600 Max. 42M
Note;
1. ① & ② Hole : drilled with One Full Casing at one time.
2. ③ Hole : another casing of 15M is jointed by welding with the first casing.
3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling.
4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E.
+1
5M
27M
42M
Depth
29.5M
① ③②
31
1-2. Drilling Rig : KID12001-2. Drilling Rig : KID1200
Dia. Ø1200 Ø800
10M
15M
20M
25M
30M
35M
40M
45M
Ø8
00
*29
.5M
Ø1
20
0*2
7M
Depth
Ø8
00
+2
7M
• K-240DP
• KCA-1200
Model Hole Dia. Drilling DepthLeader Length
Auger Driver Casing Driver
KID1200-AØ1200 Max. 39M
39M * Ø711 K-240DP KCA-1200Ø800 Max. 42M
+1
5M
27M
42M
29.5M
Note;
1. ① & ② Hole : drilled with One Full Casing at one time.
2. ③ Hole : another casing of 15M is jointed by welding with the first casing.
3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling.
4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E.
① ③②
32
* Structure of Drilling Rig* Structure of Drilling Rig
Ø
Ø
Ø
* Note : The specification is subject to be changed for improvement without prior notice.
33
1-5. Pictures of Pile Drivers (1)1-5. Pictures of Pile Drivers (1)
KID1200 KID800
34
1-5. Pictures of Pile Drivers (2)1-5. Pictures of Pile Drivers (2)
KID1200-L36 JSP Machine
35
2. DTH Hammer (1)2. DTH Hammer (1)
from Ø400 to Ø1200
36
2. DTH Hammer (2)2. DTH Hammer (2)
from Ø400 to Ø1200
37
3. Auger & Casing Drivers3. Auger & Casing Drivers
Casing DriversEarth Augers Hydraulic AugerMulti Shaft Augers
Doughnut Auger
38
3-1. Auger Driver K-Series (1)3-1. Auger Driver K-Series (1)
39
3-1. Auger Driver K-Series (2)3-1. Auger Driver K-Series (2)
40
3-2. Casing Driver KCA-Series (1)3-2. Casing Driver KCA-Series (1)
41
3-2. Casing Driver Series (2)3-2. Casing Driver Series (2)
42
4-1. Screw & Bits4-1. Screw & Bits
43
4-2. Hammers Set & Bits4-2. Hammers Set & Bits
44
Contact UsContact Us
• Website : www.kyungin21.com• E-mail : [email protected]• Tel: • Mobile : +971-50-8033848• Fax : • Address :