L. Greiner 1 IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing
Transcript
Page 1: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 1IPHC-LBNL Phone Conference 05/2012

STAR

IPHC-LBNL Phone Conference

News and updated ladder testing

Page 2: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 2IPHC-LBNL Phone Conference 05/2012

STARTopics

• Two power bus cable design and status• Power regulator testing cable design and

status• Ladder testing results post IPHC visit (MS)• General project progress.• Discussion

Page 3: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 3IPHC-LBNL Phone Conference 05/2012

STARTwo power bus cable design

• Design and layout are complete.• Gerbers have been sent to Rui at CERN

PBC shop.• LBNL PO has been placed.• Waiting on delivery date.

Page 4: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 4IPHC-LBNL Phone Conference 05/2012

STARTwo power bus cable design (cont)

Outer and Inner driver board design and layout complete. Outer driver board has been sent for fabrication (10 pieces) to CERN PCB shop.

Page 5: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 5IPHC-LBNL Phone Conference 05/2012

STARPower Regulator Test Cable

• Power regulator cable test schematic is complete.

• Power regulator cable layout is underway.• We will be producing these PCBs locally,

not in the CERN PCB shop.

Page 6: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 6IPHC-LBNL Phone Conference 05/2012

STARPXL Project News

• Preparation for DOE yearly review at BNL in July• Primarily a project progress review with significant technical content.• A set of documentation for the PXL detector CD-2/3 is available at

http://rnc.lbl.gov/hft/hardware/docs/sensor_review/summary_v2.doc • Additional documentation for this review will be posted soon.

• New Virtex-6 based RDO motherboards.• Design is complete and testing has finished• 3 PCB architecture, new connectors, cables, 9U VME physical format.• Full complement of 10 assembled boards have been ordered for the

prototype run RDO. Expected delivery in 3 weeks.

• Significant Progress in mechanical structures.• See pictures next slide

Page 7: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 7IPHC-LBNL Phone Conference 05/2012

STARHardware progress

Page 8: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

L. Greiner 8IPHC-LBNL Phone Conference 05/2012

STARDiscussion Topics

• Ladder testing results. • Implications of instability in thresholds and noise.• Any other suggested testing?• Are these effects understandable through the

analysis of the sensor design?• Ultimate 2 submission schedule.• Monthly phone conferences – propose a

schedule. (2nd Tuesday of every month?) Please check your recurring meetings)