arc5410 Advanced Structure and Construction

Page 2: L10  envelope pt2

5.0 The Building Envelope Pt. 2Enclosure systems: cladding, curtain wall, envelope, skin, exterior membrane

Page 3: L10  envelope pt2
Page 4: L10  envelope pt2
Page 5: L10  envelope pt2
Page 6: L10  envelope pt2
Page 7: L10  envelope pt2
Page 8: L10  envelope pt2
Page 9: L10  envelope pt2
Page 10: L10  envelope pt2
Page 11: L10  envelope pt2
Page 12: L10  envelope pt2
Page 13: L10  envelope pt2
Page 14: L10  envelope pt2
Page 15: L10  envelope pt2
Page 16: L10  envelope pt2
Page 17: L10  envelope pt2
Page 18: L10  envelope pt2
Page 19: L10  envelope pt2
Page 20: L10  envelope pt2
Page 21: L10  envelope pt2
Page 22: L10  envelope pt2
Page 23: L10  envelope pt2
Page 24: L10  envelope pt2
Page 25: L10  envelope pt2
Page 26: L10  envelope pt2
Page 27: L10  envelope pt2
Page 28: L10  envelope pt2
Page 29: L10  envelope pt2
Page 30: L10  envelope pt2
Page 31: L10  envelope pt2
Page 32: L10  envelope pt2
Page 33: L10  envelope pt2
Page 34: L10  envelope pt2
Page 35: L10  envelope pt2
Page 36: L10  envelope pt2
Page 37: L10  envelope pt2
Page 38: L10  envelope pt2

Lowara Office Building Renzo Piano Building Workshop nr. Vicenza, Italy 1985

Page 39: L10  envelope pt2
Page 40: L10  envelope pt2
Page 41: L10  envelope pt2
Page 42: L10  envelope pt2

Hall 26 Hanover Expo-Trade Show Thomas Herzog, arch Jorg Schlaich, engr1994 - 1996 Herzog and Partner, Munich Schlaich Bergermann and Partner, Stuttgart

Page 43: L10  envelope pt2
Page 44: L10  envelope pt2
Page 45: L10  envelope pt2

Competition Brief: 25,000 - 30,000 m2

important criteria: load bearing structure for long spansminimum height roof with high points to enhance natural ventilationdaylight preferred, direct sunlight restricteduse of renewable materials and savings in energy use

Page 46: L10  envelope pt2
Page 47: L10  envelope pt2

Natural light: external sun screening on south façade and roof triple glazing with light reflecting grids

mirrored soffit

Artificial lighting: lights on sides of glass ducts projected upward and reflected off mirrored ceiling

lights on sides of glass ducts projecting downwardsuspended lighting in strip along underside of ceiling

Page 48: L10  envelope pt2
Page 49: L10  envelope pt2
Page 50: L10  envelope pt2
Page 51: L10  envelope pt2
Page 52: L10  envelope pt2
Page 53: L10  envelope pt2
Page 54: L10  envelope pt2
Page 55: L10  envelope pt2
Page 56: L10  envelope pt2
Page 57: L10  envelope pt2
Page 58: L10  envelope pt2
Page 59: L10  envelope pt2
Page 60: L10  envelope pt2
Page 61: L10  envelope pt2
Page 62: L10  envelope pt2
Page 63: L10  envelope pt2
Page 64: L10  envelope pt2

Horizontal section showing pre-tensioned back to back steel channels. Vertical section showing 80mm x 50mm façade rail.

Page 65: L10  envelope pt2

COUNCIL OF TALL BUILDINGS AND URBAN HABITAT

Chicago Conference October, 2009

See presentation by engineer Richard Tomasetti of Thornton, Tomasetti Inc.

He discusses the new tower by Calatrava called the Chicago Spire.