L13 Notched Beam Absorber Update PIP Weekly Meeting Talk. Salah Chaurize April 4 th 2012. L13 Absorber Review A ction I tems. Look at Shielding options that use special shapes of heavy m ix c oncrete around pipes on inside wall. - PowerPoint PPT Presentation
Popular Tags:
18
L13 Notched Beam Absorber Update PIP Weekly Meeting Talk Salah Chaurize April 4 th 2012
Transcript
Page 1: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

L13 Notched Beam AbsorberUpdate

PIP Weekly MeetingTalk

Salah ChaurizeApril 4th 2012

Page 2: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

L13 Absorber Review Action Items• Look at Shielding options that use special shapes of heavy mix concrete

around pipes on inside wall.– Mars Calculations show we can achieve shielding goals with steel and standard

concrete. Will continue to refine solution avoiding high lead time methods.

• Use marble masks on upstream face of absorber. Protect downstream side corrector with mask also. Aisle side marble would protect personnel additionally. – This is being looked at now and will be implemented in some form.

• Do not use sand filled bags in odd shaped areas around absorber.– Looking at robust Ceramic cloth based option to make small shielding bags. Also

looking at small cut steel option.

• Use Transverse Damper system to map Notch beam kicker wave form– Will look into this method for commissioning purposes.

Page 3: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

Work In ProgressRelated to Noker Kicker Systems and Absorber assembly

• Fabricating CX1168 Thyratron Aluminum Cabinet enclosure.

• Working on Power Supply Control cables and Control Chassis.

• Testing Short BKEE(Short) Series magnets.• L13 Absorber pre-assembly at MAB in progress• Working with Controls Group to implement

absorber motion controls

Page 4: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

• New Copper Absorber Jaw(Liner) design in progress to help dissipate heat.

• Database work and naming conventions for Notched beam Kicker System in progress.

Work In ProgressRelated to Noker Kicker Systems and Absorber assembly

Page 5: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

Preliminary Short Kicker Magnet Pulse Testing using CX2610 Pulser

• The test facility used was provided by Chris Jensen at the A0 kicker test cage. Thanks to Chris and EE Support.

• We tested a long standard magnet, BKED012 and a short magnet BKEE001.

• We kept test variables the same with changes in the magnets only. When changes were made with ferrite sharping beads etc., test were conducted with both magnets again.

Page 6: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

C. Jensen

Page 7: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

C. Jensen

Page 8: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

C. Jensen

Page 9: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

C. Jensen

Page 10: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk
Page 11: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

L13 Region Aisle Clearance issue

• Aisle Restriction issues.• Looking to increase aisle side clearance for

magnet and material moves through area.• Need 54” or more.• New design has 56” aisle clearance.

Page 12: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk
Page 13: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

• Corner of original position of Concrete blocks.• Was 49” clearance now with new design has 56” clearance.

Page 14: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk
Page 15: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

• Steel Plate 6” thick with marble overlay V. Sidorov

Steel plate rather than concrete blockson aisle side

Page 16: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

• Polyethylene mask currently in design.V. Sidorov

Page 17: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

Screw Jacks – Liner Motion Control

Page 18: L13 Notched Beam Absorber Update PIP Weekly Meeting Talk

Pre-assembly at MAB