3
r ---"’-":=W’P 17 o 84 \ I-- A 1--7 /-/ L- / ~ L-;;; "’-~ 79 "’- ---;;... ~- "’----..... ---..... / / / S\~ / /, /’ ~ \G~’ ~’ / Sl\)\~l~~’-’.l~l \L:}\I\ / / ~\~ / / / / / / / / 7 O LEGEND CONTOUR (1m INTERVAL) LPI NSW LiDAR SURVEY EXTENT OF QUARRY DELINEATED WITH ST AR PICKETS ---------50_____________ ----<:tAR PICKET EXISTING ACCESS TRACK -~~-~-~~~--~-~------~-~--~- ~~~~~---~~~~~~~~--~~~~~--~~ TEMPORARY DRAINAGE PIPE ------- SEDIMENT A TION BASIN MIN. VOLUME 145m3 JUTE-LINED DRAIN ~ 1 ;;- ;;-1 + \ \ \ \ v.. \ \ ’.: \ \ \ \ \ \. BENCHING MAX. SP ACING 20m ----_........ REV OrlglNllssue DETAn.S or NDMENT CG CG DKSlGKIO DRAIN CKECm iPP80Y! DATE TATTERSALL LANDER PTYLTD ~ DE’ lOPMENT CONSULTANTS ENGINEERING. SURVEYING ..t- PLANNING 2 Bourke St. P.O.Box 5BO RAYMOND TERRACE 2324 Fax (02) .8871738 Phone (02) .1J 1~O SOIL & WATER MANAGEMENT PLAN FOR QUARRY SITE LOT 1011N DP 1049845 BUNDABAH ROAD, BUNDABAH SHEET BIZ!: A3 SEDIMENT FENCE SCALE 1:800 AT A3 DATE: SHEET No. I OF I Plotted 16:02 22/02/11 "NO GO" ZONE VVVVVVVVVV’ /VVVVVVVVV’v VVVVVVVVVV’ . Oenoh the original signature and date ..hen rev sion ..u issul!d. CLIENT: lEA GARDENS FARMS PlY l TO JOB No.: 206511 CCt.tPUlER FlLE : S:\pro ects\Fam! Cove\O.... \206511- Quarr SWI1P.dw
Transcript
Page 1: ~l~~’-’.l~l · Icl Ensure rehc.bilitated lands have effectively reduced the erosion hazard and initiate upgrading or repair as appropriate. IdJ Construct additional erosion and/or

r ---"’-":=W’P

17

o

84

\

I--

A

1--7 /-/

L-

/

~ L-;;;

"’-~ 79 "’- ---;;... ~-

"’----..... ---.....

/ /

/ S\~ /

/, /’

~\G~’~’

/ Sl\)\~l~~’-’.l~l \L:}\I\ / / ~\~ /

/ /

/ /

/ /

/

7

O

LEGEND

CONTOUR (1m INTERVAL)

LPI NSW LiDAR SURVEY

EXTENT OF QUARRY DELINEATED

WITH ST AR PICKETS

---------50_____________

----<:tAR PICKET

EXISTING ACCESS TRACK-~~-~-~~~--~-~------~-~--~-

~~~~~---~~~~~~~~--~~~~~--~~

TEMPORARY DRAINAGE PIPE -------

SEDIMENT A TION BASIN

MIN. VOLUME 145m3

JUTE-LINED DRAIN ~ 1 ;;- ;;-1 +

\

\

\

\ v..

\ .

\ ’.: \

.

\

\ .

\ .

\ .

\.

BENCHING

MAX. SP ACING 20m----_........

REV

OrlglNllssue

DETAn.S or NDMENT

CG CG

DKSlGKIO DRAIN CKECm iPP80Y! DATE

TATTERSALL

LANDER PTYLTD ~ DE’lOPMENT CONSULTANTS

ENGINEERING. SURVEYING ..t- PLANNING

2 Bourke St. P.O.Box 5BO

RAYMOND TERRACE 2324

Fax (02) .8871738 Phone (02) .1J1~O

SOIL & WATER MANAGEMENT PLAN

FOR QUARRY SITE

LOT 1011N DP 1049845

BUNDABAH ROAD, BUNDABAH

SHEET

BIZ!: A3SEDIMENT FENCE

SCALE

1:800 AT A3

DATE:

SHEET No.

I OF I

Plotted 16:02 22/02/11"NO GO" ZONE

VVVVVVVVVV’ /VVVVVVVVV’v VVVVVVVVVV’

. Oenoh the original signature and date ..hen rev sion ..u issul!d. CLIENT: lEA GARDENS FARMS PlY l TO JOB No.: 206511 CCt.tPUlER FlLE : S:\pro ects\Fam! Cove\O.... \206511- Quarr SWI1P.dw

Page 2: ~l~~’-’.l~l · Icl Ensure rehc.bilitated lands have effectively reduced the erosion hazard and initiate upgrading or repair as appropriate. IdJ Construct additional erosion and/or

Self-supporting geotextile

Inflow

~/

Length/width ratio 3:1 min.

2

{~7

Water depth 1500 mm min.

Cross-section

Plan View

,

~,

Cut-off trench 600 mm

min. depth backfilled with

impermeable day aOO

compacted

1.5 m star pickets at max. 2.5 m centres

r

~ 600

mmCin..

... ... i iDiS,UroOO.roo . . . . : .: ,.’ ,.’ ,..’ "’~i~;Q’n,of .

..~o:"

/ On soil, 150 mm x 100 mm trench

with compacted backfill and on

rock, set into surface concrete

SECTION DETAIL

..

..

r_ 20 m max. ’;;-MPIESCP)

(unlesS stated otherwise on

t Flow

Min.1.5m

PLANStar pickets at maximum 2.5 m spacings

Construction Notes

1. Remove all vegetation and topsoil from under the dam wall and from within the storage area.

2. Construct a cut-off trench 500 mm deep and 1,200 mm wide along the centreline of the

embankment extending to a point on the gully wall level with the riser crest.

3. Maintain the trench free of water and recompact the materials with equipment as specified

in the SWMP to 95 per cent Standard Proctor Density.

4. Select fill following the SWMP that is free of roots, wood, rock, large stone or foreign material.

5. Prepare the site under the embankment by ripping to at least 100 mm to help bond compacted fill to the existing substrate.

6. Spread the fill in 100 mm to 150 mm layers and compact it at optimum moisture content

following the SWMP.

7. Construct the emergency spillway. 8. Rehabilitate the structure following the SWMP.

Construction Notes

1. Construct sediment fences as close as possible to being parallel to the contours of the site, but

with small returns as shown in the drawing to limit the catchment area of anyone section. The

catchment area should be small enough to limit flow if concentrated at one point to 50 I/s in the

design storm, usually the 10yr event. 2. Cut a 150-mm deep trench along the upslope line of the fence for the bottom of the fabric to be

entrenched.

3. Drive 15m long star pickets into ground at 25m intervals Imaxl at the downslope edge of the trench.

Ensure any star pickets are fitted with safety caps. 4. Fix self-supporting geotextile to the upslope side of the posts ensuring it goes to the base of the

trench. Fix the geotextile with wire ties or as recommended by the manufacturer. Only use

geotextile specifically produced for sedimeM fencing. The use of shade cloth for this purpose is not

satisfactory. 5. Join sections of fabric at a support post with a 150mm overlap. 6. Backfill the trench over fhe base of the fabric and compact it thoroughly over the geotextile.

EARTH BASIN - WET SO 6-4SEDIMENT FENCE SD 6-8

(APPLIES TO ’TYPE D’ AND TYPE F’ SOILS ONLY)

GENERAL NOTES - SOIL & WA TER MANAGEMENT

1. This plan is to be read in conjunction with other engineering

plans and any written instructions that may be issued.

2. The quorry operotor sholl implement 011 soil erosion ond sediment

control measures prior to disturbance of the related catchment

area and to the satisfc.ction of Council.

3. The location of "silt" fences, barrier fences, sediment traps, basins and other devices are indicative only and final locations

are to be decided on site. Variations will be permitted to best

suit the circumstances.

4. Cleored vegetotion must be disposed of by ,- il chipping or mulching for future landscaping and usage, or

iil transport to an approved landfill facility. S. Temporary crossbanks Ibunds constructed with earth, strc.w bales

or sandbagsl. shall be constructed during earthworks to limit

slope length, where possible, to eo metres. These shall be

constructed immediately prior to forecast rain c.nd during

temporory closure of the site. induding weekends. 6, Temporary rehabilitation should be undertaken on disturbed areas

where works have stopped and soils are expected to remain

exposed for two months. 7. The quarry operator will inspect Illl erosion and pollution control

works at least weekly and following every rainfc.1l event greater than Smm, providing particular attention to the following matters!

la) Ensure drains operote effectively ond initiate repoir as required. Ibl Remove spilled sand lor other materilllsJ from hazard c.reas,

including lands closer than S metres from likely areas of

concentroted or high velocity flows such as waterwoys. Icl Ensure rehc.bilitated lands have effectively reduced the erosion

hazard and initiate upgrading or repair as appropriate. IdJ Construct additional erosion and/or sediment control works as

might become necessary to ensure the desired protection is given to downslope lands and waterways, i.e., make ongoing changes to

the plan. lei Maintain erosion and sediment control measures in 0 functioning

condition until all earthwork octivities are completed ond the site

is rehabilitated.

If} Remove temporary soil conservation structures as a Ic.st activity in the rehabilitation program.

e. Utilise a single access only to the stock pile sites. 9. 00 not taint clean catchment water with silt from the works.

10. Rehabilitate the site as soon os possible ofter the completion of

quarrying c.ctivities and within 10 working days. Lllnds where

works are not to continue for more than 20 working days must

be rehabilitated. Such rehabilitation shall invoLve the spraying of

o straw- bitumen mulch to the disturbed londs or equivolent. 11. Access areas limited to Il maximum width of 10 Ipreferably SI

metres.

12. All positions shown are approximate and are best determined on site in conjunction with the superintendent.

13. Conformity with this plan shall in no way reduce the

responsibility of the quarry operator to protect against water

domage during the course quarrying activities. 14. Topsoil and spoil shall be stockpiled in non-hazard areas and

protected from surface run-off by diversion drains or similar.

Stockpiles sholl be surrounded on downstreom sides by silt

fencing. Stockpiles shall be suitably compacted to inhibit erosion.

Where the stockpiling period exceeds four 141 weeks, the

stockpile shall be seeded to encourage vegetation growth. 15. Topsoil sholl be re-spreod ond stobilised os soon os possible.

Disturbed areas shall be left with Q scarified surface to

encourage water infiltration and assist keying in topsoil. 16. The qUllrry operc.tor shall maintain grass cover until all works

have been completed. by frequent wotering and mowing where

required. 17. Site access shall be restricted to a nominated point. The

construdion of a shake-down area wiU be required at the entry to the site.

1e. Fa.cilities and/or equipment must be provided for the application of water to disturbed c.rec.s to minimise the genera~ion of airborne dust from any area disturbed by construction activities.

19. Material removed from sediment control structures must be

disposed of in a way that does not pollute waters or bushland.

20. Woste disposal containers must be provided on site for the collection and disposal of aIL industrial and domestic type wastes

generated on site.

21. Runoff from vehicle, construction plont or mobile plont maintenance and cleaning areas must be contained, collected c.nd

disposed of in a manner to prevent entry into any waters, including sediment retention ponds.

22. Fuelling of vehicles and construction plont must be carried out

with an operator or driver present, and in a way that prevents any spillage occurring,

A

REV

CG CG

DBSlmD DRAIN CBECXI:D ""’110m> DATE

TATTERSALL

LANDER I’TYLTD ~ DEVELOPMENT CONSULTANTS

ENGINEERING, SURVY1NG ct’ PLANNING

2 Bourke St. P.o. Bolt 580

RAYMOND TERRACE 2324

Fall: (02) 49871738 Phone (02) 488711500

Ortglnallssue

DETAlLS OF’ AMENDMENT

Stabilise slockpile surface

I Sediment fence

<.,

\ 8/0..06(, "’Ok)

/.

Denote the original signature and dati! vhen revisiDn ViS issued.

Construction Notes

1. Place stockpiles more than 5m from existing vegetation, concentrated water flow, roads and hazard areas.

2. Construe! on the contour as low, flat, elongated mounds. 3. Where there is sufficient area, topsoil stockpiles shall be less than 2m in height. 4. Where they are to be in place for more than 10 days, stabilise following the approved ESCP or

SWMP to reduce the C-factor to less than 0.10.

5. Construct earth banks IStd Drawing 5-51 on the upslope side to divert water around stockpiles 8.

sediment fences IStd Drawing 6-811-2m downslope.

STOCKPILES SD 4-1

Gradient of drain Con .be constructed with

"om~~: 1

2m min. .1

NOTE, Only to be used as temporary bank where maximum upslope length is BOrn.

Construction Notes

1. Build with gradients between 1 %-5%.

2. Avoid removing trees and shrubs if possible - work around them. 3. Ensure the structures are free of projections or other irregularities that could impede water

flow.

4. Build the drains with circular, parabolic or trapezoidal cross sections, not V-shaped. 5. Ensure the banks are properly compacted to prevent failure.

6. Complete permanent or temporary stabilisation within 10 days of construction.

EARTH BANK (LOW FLOW) SD 5-5

CLIEN’I’ TEA GAROENS FARMS PTY l TO

COUNCIL

MID COAST

PARISH

CQWEAMBAH

SCALE

1oB00 AT AJ

DATE ,

COMPUTER ALE : S:\pro ects\Fame Cove\Dw \206511 - Quarr

BHEET No.

2 OF 2

Plolted 16,D2 22/02/17

SWMP.dw

:REFERENCE

21700017STANDARD DRAWINGS 8. GENERAL NOTES

SOIL 8. WATER MANAGEMENT PLAN

LOT 1011N DP 1049845

BUNDABAH ROAD, BUNDABAH

SHEET

SIZE: A3

JOB No.’ 206511

Page 3: ~l~~’-’.l~l · Icl Ensure rehc.bilitated lands have effectively reduced the erosion hazard and initiate upgrading or repair as appropriate. IdJ Construct additional erosion and/or

/o/////~ / ./ ./

/ I I

/

/

./

/

/

I

/

(

\

\

\ "

\

\

\

\

\

\

\

\

"

"

"

"

"

\

\ "

"

"

"

"

"

\

"

"

\

\

"

"

\

"

\

"

"

"

"

"

"

’\

"

"-

\

"

"-

’\

" "-

’-

’-

"-

’\

\

\

\

\ "

"

\ "

"

\

\

\

"

"

"

"

\ ’-

,

’\

\ "

" ’-

’\

\

"

\

\

\ "

"-

\

\ ’-

’- ,

"-

"

’I

\

\ "

\

\

\

\ ’- ,

’- ,

"

" ,

"

\

’- \

’\ "

\ "

" \

\ \

\ "

\ "

" " ’

\ ’\ , " " ,

,," \

\" \

\ "- " " ’- , " ’

\ ’" \ ", \ ,,’,

------ , , \ " , , ,

"- ,

,

,

\

"

" \

\ "

" ’

"- ,"- ........., ............ ’........... " ’,,-" " " .............................................

.......... ........... .......... ""-...

,,-’, "- ’,- " ," ,~ "

--" ’- ’- ",- "

’- ", , "" "- ’

.......... ..........."""’" ’.......... -.......... , "" , ~~

-........ ........... ""-........... ............

,

, "- ’- "- ,

............-.,. "" ".........- "’" ’..................... ...........

, ,’, , "-

"- ’ ,

’-

NOTES

~T ABILISE REHABILlT A TED LANDFORM AS PER CHAPTER 7 OF "MANAGING URBAN STORMWATER - SOILS & CONSTRUCTION"

VOLUME 1 (LANDCOM, 20041 (THE "BLUE BOOK"I

RIP SOIL TO A DEPTH OF 300mm AND SPREAD TOPSOIL TO A

MINIMUM DEPTH OF 75mm (50mm ON SA TTER SLOPES I REFER

TO BLUE BOOK DRAWING SO 7-1 "SEEDBED PREPARATION"

HYDROMULCH USING NA TIVE SEED MIXTURE.

"

\

"-

\ "- ’-

"’-" "

’\

’\

"

"-

" ,,,

,

,

.

.

----......

"-

"

\

\

’-,

’-

, ,

’-

"

’-

’\

"-

" ,

’-

,

, ,

’" "

’-

,

,

,

, ,,

-~60 _" ,

’- "-

’- " , ’- , , , , \ "

" "

"IYEf; \ \

(1BIl.;l~ \ flOIl; \ " \

\

,,""" " ,,’- " \ \ \ \ \ \

\ "" \ \ \

" ,," \ "

\ \ \

\ \" \ \ \ "

\"" ’ \ " "

\ " "

"

\ " " "

" " " ’-" " ’\" , "

\ " ------, " ,

\ ’\ ,

......................... ,----

,

,

B~ 1;:;,____ ,

IY ’’><)1’

’\

"

"

"

\ "

"

"

"-

,

’-

,,"-

" ,

"

" ,

, ,

,

,,,

,

,

"-

"

,

--, "61_ , ----

--- -

--62,- "-

----- -- -,

,

"’----

--

" ,

,

,

...........

-................ ............................... ...........

"’............. -

64-. , ,

--- ,

6 "-

" ’" ’ S, " --- , , ,

,

’-

-6. " " ,

, "- " 6, " "

___ ---

, ,-’ 6’,> " ,

, ~,,,, ,

" &, "- ’-

"

, ’ 6’9 " "- " "

, "

’? "’>0

’-

" " " " " ’,> 7,

, " \ \ \ "

<" "\ ", "" \ \ \ ,

LE VEL \ " \ \ \ \ "SPREADER \ \ "- \

\ \ \ \ \ \ \ \ \ \ " \ I \ \ \ \ ,

\ \ \ \ "I "

" " \ ----\---_ I \ "

.

-/----~- ~ ---r-----I---~---:h-----7--~\--~~-,-7---~ ,I ". ). I.. \.

.

\

\. \ ’. / ,’. " \

.

) ,.

I. l "

.

.

.’ . _~_________

.

\ .

}_----7-----t~--~ -~-~---f--~-’--’-’----- \

.\ _----(--) I I / /-( I I I ,I ) -

I J ./ ) ACCESS TRACK /

\ ( ( I TO REMA,IN ) 1 / / (./ / ) ( ) / /

( / J ./

II I I I \ /

I ) I 1./ /

/ / I I

./ /

/ 1 ( (

r ENS RE SHEET FL W ACROSS / ) // rACCESS TRACK IS MAINT A~NED ./

I 1./ ./ ./ I __-- ./ ./

./ ././ ././ ./

./ ././ ./ r / ./ r./ __-- ./

./ / ./ ./

./ ./ ./ ././ ./

./ I ./ / _-./ ./

./ ./ ( 1 ./ /

./ / /

r ./

/ / I

I ./

I ./

( /

/ ! LEVE( / / /

BAiTER If J././ SPREADER .// ( ./

,/--’ : /./ / ,/.//

I 1/ ./ ./ ./ /

: ’.’ PIPE UNDER ./-’ ././ .// ./

:.//../ ACCESS TRACK./ ./ ./ /

--, -- -: .// I 1/ ; /././ LEGEND \ -,,--.i-./ I / -’ ./ ~./ ’

./ I EXISTING CONTOUR (1m INTERVAL! ./ -

" .’

./) / /

1 / LPI NSW LiDAR SURVEY " \___

(( I I ./

./\\ ~~ ACCES’S TRACK \) / REHABILITATED SITE CONTOUR ././ \ \ TO REMAIN j) I (1m INTERVAL!

"./ -- ~\- - -

./ ./ ( -\ \

/ ./ )

I EXTENT OF QUARRY DELlNEA TED

\. .

\ ./

./ ) " r\__././ 1

/ / WITH STAR PICKETS

\-./. \ ./J 1 -------./ \ \ / --’ I 1

\ .

\ /’" /’

\ .__X I / ’(’" \ / / /

/ \\./ ./ (

\ .........., ---

\ ./ \ 1./ / \ /’, / >\,\1

./

-’./ ’\ "/’/ \ r \ -. \

,,

"

’-

’- ,

, ,

,

,,

,

"-

"

" ,

"

"

"- ,

,

, ,

,,

./ ./

I

/

/ ./

/

)

1

I

/

(

\

\

\

\

\

\

\

\----’ \~ "

\

\

"

"

"

"- ’-

,

OF’,

,

, ,

,

,

63__ ,

,

’" ,,

,’",,

,

,"

\ ,

---

"- ,

--~,

,

" ,

" ,

"-

"

"

, ---

,

---

"

’,> <_

,

’-"-

’\

( ,

~

- "-

".~ ’.,

" ;l -

---,---, ~

-./

--

-~

-- ~

-

-------r---

~

~-

./

/.:..--------’-./

-

./% SLOP~./-

-

_/---

--

-~/’-

/

’/

/

/

/

./

I / /

./

/ /

./

I ./

/

I

/ ./

) ./

~/ -

-/-

/./ I

-

~-

~-

~’-

./

-----::- ---

-

~ -- I

/ ./

--

--

/

./

./

I

/ /

-

-

.//

-./ -

--=---~" v

,"

~" -", -

RE’ij- -" "

AB/~ i-"

-=-> == > _ > ! -

-~

/BA TTER

- --

./

/ ./

----

./

./

./

/’ ./

./

./

./

-

./

/’

./

/

./ ./

--

./

./ ./

,I

-,

"

"-

"

" ,

"-

--

./ ./

/

--

./ ./

/ ./

/ ./

/ ./

--

---

,

"

---

/’

./

’- ,

,

r

./

/

/’ ./

./

/ ./

./

./ ./

./

~,/ ./

././

./

/

//’

, ./ ./

/ -’

./- / /’

./

/ --

-_/ ./

--

--

-----76----, /’- --~

~ ----

/’

/’./

--

--/

/

./

--

---,~ --~--

-- --

-75- _ _ _ _

_

_

-- - -

---

-- ---

--

-

---

-- -

, ./ r

./ ./

~50_ ----

./

, ~ ~

74__ ,

./ ’- - - - -73.

..........

-- - - - -

--- ./

_ __ -72-

- - - _ _ _ _

./

-- -------

-----,

--~

----- ./

-- ,...,------ ---------------

50_______________--

./--

.....-----~

’"

----71----__ ./

--------,....,.--------- -::::-

STAR

PICKET

--

,

, ,

,

,

,

" ,

--

, -- -70

--- - - - - - -.....

-..... -~ --

,

__

’ ’- -69

- -

./

, -- _

_68- _ - - - _ _

_

/-------

--

./--

./-----

-,----:"’" -".... --

----;------ -- -,-

-.--~-

ACCESS TRACK/-’---

---

---

’-- --

.-I

/

I

J

I

I

1->->->->-

./

/’--~---~-~~-~-~-~------------- , ~

,

,----_/

"

--

’"

DRAINAGE PIPE---------

"-

,

~/’ ./

DRAINAGE CHANNEL--- ----"

/---

A3

./

COUNCIL

MID COAST

PARrsH

[OWEAMBAH

SCALE

1:800 AT A]

DATE:

REFERENCE

21700018TATTERSALL

LANDER PTYLTD ~ DE’lELOP~ENT CONSULTANTS

ENGlNITRINC, SURI’YlNG ~ PLANNING

2 Bourke St. P,O.Box 580

RAYMOND TERRACE 2324

P’u: (De) 4g871738 Phon. {a2l 49871:100

REHABILlT A TION PLAN

FOR QUARRY SITE

LOT 1011N DP 1049845

BUNDABAH ROAD, BUNDABAH

SHEET

SIZE

SHEET No.

t OF t

PloHtd 16:02 22/02117REV

Origln.lllssue

DETAD...S or AMENDMENT

(G (G

BSlCXEO DRAWN CHECno APPROVED DATE

CLIENT: TEA GARDENS FARMS PTY l TODtnott the originaL signature and date ...hen revision...as issued JOB No.: 206511 COIl4PUTER FllE : $:\pro ech\Famt COVt\Ow \206511- auarr SWMP.dw