Project Overview
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
WIS 157 Construction Staging - 2013
Phase 1 Ramp Closed
Ramp Closed
I-90 Reconstruction ProjectLa Crosse County, WI
Phase 2 Ramp Open
Ramp Open
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
I-90/US 53/WIS 35 – Diamond Interchange Alternative
Rose St.
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Construction by Year - 2013
LEGEND 2013 WIS 157
2013 Temporary Roadway Widening/Connections PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Construction by Year - 2014
LEGEND 2014 Westbound I-90
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Construction by Year - 2015
LEGEND 2015 Eastbound I-90
2015 Southbound WIS 35 (North) PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Construction by Year - 2016
LEGEND 2016 WIS 35/US 53/Rose St.
NOTE: Construction may extend into 2017
PRELIMINARY September 2012
Oak Forest Drive at Rose Street
Roundabout Alternative PREFERRED: Traffic Signal Alternative
I-90 Reconstruction ProjectLa Crosse County, WI
PRELIMINARY September 2012
LEGEND
Sidewalk Shared use path
Great River State Bike Trail Note: No grade separated crossings are proposed along Rose St. and on-street bike accommodations will be provided along Rose St. from Livingston St. to Elm St.
I-90 Reconstruction ProjectLa Crosse County, WI
Rose Street Bicycle/Pedestrian Connections
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Detour Plan – Southbound WIS 157 to Eastbound I-90
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Detour Plan – Northbound WIS 157 to Westbound I-90
PRELIMINARY September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Preliminary West George Street Concepts
Alternative 1 – September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Preliminary West George Street Concepts
Alternative 2 – September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Preliminary West George Street Concepts
Alternative 3 – September 2012
I-90 Reconstruction ProjectLa Crosse County, WI
Preliminary West George Street Concepts
Alternative 4 – September 2012