LA Storage, LLCHackberry Gas Storage Project
Virtual Community Informational Meeting
August 18, 2020
Agenda
2Confidential
Welcome & Introductions
Meeting Format & Instructions
Project Presentation
Participant Q&A Session
Closing Remarks | Next Steps
Meeting Format & Instructions
• This informational meeting is open to the public to attend virtually
• You will only hear the presenters, all other participants will be muted
• Project presentation will be approximately 20 minutes, followed by a Question & Answer period
3
• You may submit a question at any time during the presentation:• Screened for appropriateness and duplication• Directed to the appropriate Sempra subject-matter expert for response
• More information will be available:• “Frequently Asked Questions” will be available after this informational
meeting and posted on project website by August 24• Copy of this PowerPoint presentation will also be available on the project
website @ www.SempraLNG.com/la-storage-hackberry
Submitting your question
• Select Q&A on the right side of the screen.
• Type your question in the Compose Box, and then select Send
• If you want to ask your question anonymously, click on the box “Ask anonymously”
• You can also “like” any published questions by clicking on the thumbsup icon
4
About LA Storage
About The Company:
• LA Storage, LLC (LAS) is a subsidiary of Sempra LNG
• In Southwest Louisiana, Sempra LNG also owns:• Majority interest in the Cameron LNG export facility operating in Hackberry• Compressor stations in Ragley and Sulphur• Cameron Interstate Pipeline (CIP)• LA Storage Pipeline (LASP)
5
About The LA Storage – Hackberry Project:
• Sempra LNG has owned the LA Storage site since 2006
• Operations currently on site includes weekly pressure monitoring and cavern maintenance
• LAS is proposing to develop this site by constructing & operating a new high deliverability storage facility and associated supporting infrastructure
• New project is similar in scope to a previously permitted and approved project by Sempra in 2008 under CP08-454.
LA Storage Project Overview
6
4 Caverns
3 Existing caverns
1 New cavern
11.4 Miles of 42” pipe from the facility to interconnect with PAPLC
5.2 Miles of 42” pipe from the facility to interconnect with CIP
1 Compressor station located on the storage site
6.6 Miles of 16” brine line with
4 Brine disposal sites
6 Freshwater wells located on the storage site
LA Storage Project Schedule
July 1, 2020
Pre-file Request
July Pre-file Request Accepted
August 2020
Draft Resource Reports 1 & 10
Community Informational
Meetings (Open House events)
September 2020
Scoping Meetings
October 2020
Draft Resource Reports 1-12
January 2021
Application Submittal
June 2021
Environmental Assessment (EA)
September 2021
Certificated Authorization (FERC Order)
Q1 2022
Commence Construction
Activities
7
Permitting Agencies
8
FEDERAL
STATE
LOCAL
• Federal Energy Regulatory Commission (FERC)• U.S Army Corps of Engineers (USACE)• U.S. Fish & Wildlife Service (USFWS)• NOAA National Marine Fisheries Service (NOAA)• Environmental Protection Agency (EPA)
• Louisiana Department of Environmental Quality (LDEQ)• Louisiana Department of Natural Resources (LDNR)• Louisiana Department of Wildlife and Fisheries (LDWF)• Louisiana Office of Cultural Development (LOCD)
• Calcasieu Parish• Cameron Parish
Application Process & Environmental Review
9
Project Surveys
• Landowner letters & property surveys
• Field surveys
Environmental & Cultural Information
• Wetlands & Waterbodies
• Federal & State Listed Species
• Local birds & animals
• Endangered species
• Cultural Resources
• Historical properties
• Artifacts
Application Filing: January 2021• Incorporates all survey, environmental & cultural information
along with Stakeholder feedback• FERC approval not expected until September 2021
LA Storage Project Amenities
11
In addition to meeting or exceeding all federal permit requirements, the LA Storage project will incorporate the following project amenities:
• Compressor Station:• Noise level will not exceed 55 decibels (dBA), which is no louder than a
home dishwasher – FERC regulation requirement• Compressors will be completely enclosed to help reduce and minimize
noise during operation• Noise surveys will be conducted before and after construction to verify
compliance with requirements
• Down-lighting will be used to maintain and ensure safety, while minimizing visual impacts
• Fencing around the project for security and safety
• Construction Safety Measures:• Construction will occur mostly during daylight hours• Construction contractors will have safety plans to ensure
local traffic laws are obeyed by workers
Safety Practices
• Safety IS our priority
• Sempra LNG has an excellent safety record • Operations include three local facilities: − Cameron Interstation Pipeline (CIP)
− Cameron LNG (CLNG)
− LA Storage (LAS) – current operations
• Regular safety audits done by both Sempra and Regulatory Agencies
• Hackberry Project will also be regulated by Pipeline and Hazardous Material Safety Administration (PHMSA)• Designed to meet or exceed regulatory requirements
• Well-trained and qualified professional staff
• Pipeline welds will be tested to ensure integrity
• Installation of cathodic protection on pipelines
12
Project Benefits
13
Sempra and its family of companies continues to grow its investment in Louisiana.
The construction and operations of this proposed LA Storage project will provide some of the following benefits:
Jobs: • Creates new design, engineering and
construction jobs• Peak of more than 300 construction workers• Long-term positions to operate and maintain
these facilities
Support of Local Businesses: Provides a new source of revenue for local providers of goods and services
Taxes: Generates new taxes estimated at more than $5 million during construction
Community Involvement: Support of local nonprofits and business organizations through the company’s charitable giving and employee engagement efforts
Stakeholders Outreach & Community Engagement
14
Landowner Notifications• Pipeline survey letters• Landowner letter with project details
Meetings various Stakeholder Groups• Permitting Agencies• Elected Officials• Community & Business Leaders• General Public
Community Informational Meetings• August 18 – Virtual Meeting• August 20 – In-Person, by appointment only• Ongoing – connect by email or phone
Project Information• Project website: www.SempraLNG.com/la-storage-hackberry• Project fact sheet• Project Frequently Asked Questions (update available 8/24)
FEDERAL ENERGY REGULATORY COMMISSION
Purpose of Pre-Filing
“The purpose of the pre-filing process is to
encourage early involvement of interested
stakeholders and to identify and resolve
issues before the Commission receives an
application.”
16
FERC Environmental Review Process &
Public Comment Opportunities
Prefiling Process: July 2020 – January 2021
• Landowner Surveys
• Community Informational Events – August 2020
• FERC Scoping Process
• Project Feedback – Ongoing
Applicant Files Application: January 2021
• Publicly available on eLibrary
FERC Review Process
• Publishes environmental report; 30-day public comment period
• Construction authorization & compliance
FERC Process
18
https://elibrary.ferc.gov/idmws/docket_search.asp
• LAS – Hackberry Project Docket# PF20-5-000
FERC Website - ELibrary
19
https://ferconline.ferc.gov/FERCOnline.aspx
FERC – Subscribing & Submitting Documents
20
Mail Comments to:
Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street NE, Room 1A
Washington, DC 20426
FERC Docket No. PF20-5-000
FERC – Submitting Comments
Submitting your question
• Select Q&A on the right side of the screen.
• Type your question in the Compose Box, and then select Send
• If you want to ask your question anonymously, click on the box “Ask anonymously”
• You can also “like” any published questions by clicking on the thumbs up icon
22
Project Contacts
Environmental & Permitting:Michael Taylor – [email protected]
Stakeholder & Community Engagement:Kelly Prasser – [email protected]
LA Storage website:www.SempraLNG.com/la-storage-hackberry
General information | Community Line:(832) 706-4849