Lab to Land Initiative. Meghalaya. SIRD Meghalaya. established in 1986 as Autonomous Institution Apex Level Institute for Training and Research in Rural Development. NODAL AGENCY FOR CAPACITY BUILDING AND TRAINING FOR RD PROGRAMMES. Organizational Structure. - PowerPoint PPT Presentation
Popular Tags:
31
Meghalaya
Transcript
Page 1: Lab to Land Initiative

Meghalaya

Page 2: Lab to Land Initiative

established in 1986 as Autonomous Institution

Apex Level Institute for Training and Research in Rural Development

NODAL AGENCY FOR CAPACITY BUILDING NODAL AGENCY FOR CAPACITY BUILDING AND AND

TRAININGTRAININGFOR RD PROGRAMMES FOR RD PROGRAMMES

Page 3: Lab to Land Initiative

ADMINISTRATIVE, ACADEMIC AND HOSTEL MINISTERIAL AND SUPPORT STAFF

Page 4: Lab to Land Initiative

VisionVision◦ To emerge as a premiere, most trusted and

innovative Institute for Training, Research and Consultancy in Rural Development.

MissionMission◦ Develop Human Resource through progressive

systematic approaches of social mobilization, participation, knowledge-skill based education and training, and resource value chain without disturbing the unique tribal culture that is prevalent in the State.

Page 5: Lab to Land Initiative
Page 6: Lab to Land Initiative

Predominantly tribal – Khasi Borders Assam Rich fertile soils and subtropical climate Inaccessible villages Date of inception: 2nd October 1952 Main Occupation is Agriculture

Page 7: Lab to Land Initiative

Area in sq km: 1105 No. of Villages: 267 No. of Households: 23896 Population:

132803 BPL HH: 8335 Literacy: 67% Main to total workers: 80% Villages with paved approach roads: 93% Irrigation: 3% Villages with safe drinking water: 89%

Page 8: Lab to Land Initiative

Net sown area: 8552 ha Area sown more than once: 1420 ha Total cropped area: 9972 ha Area under Forests: 47528 ha Area not available for cultivation: 9480 ha Fallow land: 6783 ha Land under trees crops and groves: 10912 ha Cultivable Wasteland: 27245

Page 9: Lab to Land Initiative

No. of Colleges: 3 No. of Secondary Schools: 32 No. of Higher Secondary Schools: 3 No. of Upper Primary Schools: 104 No. of Lower Primary Schools: 302

Page 10: Lab to Land Initiative

No. of Sub Centres: 16 No. of Public Health Centres: 4 No. of CHC: 2

Page 11: Lab to Land Initiative

No. of Main markets: 6 No. of Banks: 7 Post Offices and branch office: 7

Page 12: Lab to Land Initiative
Page 13: Lab to Land Initiative

No of VEC: 267 No. of AEC: 63 No. of Registered HH: 23562 No. of Job Cards Printed: 21528 No. of Job Cards issued: 20959 No. of applicants demanding Work: 12054 No. of HH provided employment: 10510 No. of days per HH; 48.034 No. of Man days generated: 1328614 No. of Projects completed: 43 No. of ongoing works: 683

Page 14: Lab to Land Initiative

Name of the Project : Stream Bank erosion control Location : Pyllun VECLength : 0.200 KmCost: : 1.89 Lakhs

Page 15: Lab to Land Initiative

Construction of of Drinking Water Well at Lumnongrim:Cost: 4.21 Lakhs

Page 16: Lab to Land Initiative

No. of SHGs formed: 382 No. of SHGs Passed Grade I: 160 No. of SHGs passed Grade II: 54 No. of SHGs taken up EA: 27 No. of Women SHGs: 160 BPL families crossing poverty line: 250 PF pending with Bank: 12 RF pending with banks: 16

Page 17: Lab to Land Initiative

Annual Target: 562 Houses under construction: 562 Percentage utilization of funds: 91.01%

Page 18: Lab to Land Initiative

IAY Construction of Smti. Helen Nongbsap at Umeit village.Sanction Amount Rs.38,500/-Year 2007-08

Page 19: Lab to Land Initiative

IGNOAPS: 2498 beneficiaries IGNDPS: 180 beneficiaries IGNWPS: 930 beneficiaries

Page 20: Lab to Land Initiative

MGNREGS with Horticulture Development Scheme

MGNREGS with NWDPRA MGNREGS with RRTC Umran irrigation

projects MGNREGS with ICAR Farming Systems,

Fishery ponds, Land Development

Page 21: Lab to Land Initiative

Ensure 100% delivery of all Rural sector programmes through Capacity Building, Training, Awareness generation, convergence and effective planning and implementation for sustainable development.

Page 22: Lab to Land Initiative

Selection of Umsning Block approved Preliminary Meeting with, DC, PD DRDA,

BDO for data collection and chalking out action Plan

SIRD as the Nodal Agency to coordinate with State, District and Block

Constituting Committees completed

Page 23: Lab to Land Initiative

Data Collection Conduct TNA Preparation of training and capacity building

material Develop and organize participative decentralized

planning for ◦ NRM, ◦ Livelihood enhancement, ◦ Rural Connectivity, Housing, Infrastructure◦ Drinking Water and sanitation◦ Employment ◦ Marketing◦ Etc

Consolidate workable plans Convergence of Programmes

Page 24: Lab to Land Initiative

Selection and capacity building of village level resource persons

Develop leadership and entrepreneurship and skills for economic growth

Develop infrastructure and connectivity Develop Markets Provision of basic needs like safe drinking

water, housing and sanitation Integrating capacity building and training with

actual field implementation Carry out Social Audit Monitoring of outcomes Evaluation

Page 25: Lab to Land Initiative

Sl. No.

Activity Schedule

1 Data Collection In progress

2 District Level Meeting to be chaired by DC for preparation of detail Action Plan

November 8, 2010

3 Block Level meeting to be chaired by DC and nomination of Block Nodal Officers

November 10, 2010

4 State level Meeting for approval of Action Plans

November 15, 2010

5 Selection of Block Level Trainers November 8, 2010

6 Conduct of TNA November 8 – 24, 2010

7 Organizing participatory village planning November 15 – December 15, 2010

8 Consolidation of workable plans December 20,2010

9 ToT for Block and Village level trainers November 29 – December 9, 2010

Page 26: Lab to Land Initiative

Sl. No.

Activity Schedule

9 Preparation of Capacity Building and Training Material

In progress

10 Block and village level capacity building and training

December 1, 2010 – February 28, 2011

11 Ensuring effective delivery of programme implementation

Throughout the project period

12 Monitoring of outcomes December 15 till project completion

13 Projection of outcomes On Completion of Project

14 Implementation of IEC based activities November onwards

15 Expected date of completion May 2011

Page 27: Lab to Land Initiative

Members of Local Durbar, VEC and AEC Officials working with and for the development of VECs and

AECs,◦ The main categories of such officials are as follows:◦ Project Directors of DRDA◦ Assistant Project Officers ◦ District Heads of Line departments◦ Block Development Officers◦ Extension Officers, Soil and Water Conservation Officers◦ Junior Engineers and Technical Assistants◦ Anganwadi workers,◦ Primary Health Workers and ASHA workers,◦ Public Health Workers,◦ Teachers and Education Administration Workers.◦ Gram Sevaks ◦ Community Coordinators

Community Level Workers Pressure groups within the Village such as SHGs and CBOs, Elected representatives and officials of higher levels of

Government.

Page 28: Lab to Land Initiative

Officials: 150 Master Trainers: 15 Elected Reps & PE&IC members: 1335 Youth Volunteers: 801 SHGs 3200 Community Coordinators: 63 Social Audit Committee members: 1335 VMC members: 2403 BDMC members: 40 Total:Total: 99709970

Page 29: Lab to Land Initiative

2 Training Associates 15 Master Trainers 2 Data Entry Operators 2 office assistants

Page 30: Lab to Land Initiative

Sl. No.

Activity Amount

1 Data Collection and Conduct of TNA 200000.00

2 Village Level Planning Exercise 801000.00

3 Conduct of Training programmes (ToTs, Awareness, Block and Village Level trainings)

2000000.00

4 Engagement of Training associates, office assistants, data entry operators

600000.00

5 IEC Activities 1500000.00

6 ICT and Block level infrastructure 800000.00

7 Transportation for field activities 480000.00

Total 6381000.00