1www.songda6.com.vn
SONG DA 6 JOINT STOCK COMPANY
PROFILE
www.songda6.com.vn
LABOUR HERO OF RENOVATION ERA
HEAD OFFICETM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha NoiTel: 024.22253666Fax: 024.22253366Email: [email protected]: www.songda6.com.vn
Des
igne
d an
d Pr
oduc
ed b
y w
ww
.hal
i.vn
2 www.songda6.com.vn
HYDROPOWER AND IRRIGATION CONSTRUCTION
CIVIL AND INDUSTRIAL CONSTRUCTION
ENERGY PROJECT AND REAL ESTATE PROJECT
INVESTMENT
RENEWABLE ENERGY CONSTRUCTION
URBAN TRANSPORTATION CONSTRUCTION
BLASTING, DRILLING AND EXCAVATION OF ROCK
MATERIAL PRODUCTION
ROLLER COMPACTEDCONCRETE WORK
CONVENTIONAL VIBRATED CONCRETE WORK
FOUNDATION TREATMENT
· Crushed Stone production· Sand production· Conventional vibrated concrete production· Roller compacted concrete production
· Mining, foundation excavation· Soil, dirt excavation· Transport of soil, material
· RCC work· Concrete work· Precast concrete production
Promoting the cutural strength of Song Da artisans along with experiences in each national key project, Song Da 6 is heading toward the goal of being the professional construction entity, being EPC contractor in Vietnam and worldwide.
3www.songda6.com.vn
content
[4-5] LETTER OF GENERAL DIRECTOR
[6-7] OVERVIEW OF SONG DA 6
[8-9] HISTORY OF ESTABLISHMENT AND DEVELOPMENT
[10-13] ORGANIZATION STRUCTURE
[14-15] FINANCIAL CAPACITY - BUSINESS REGISTRATION
[16-17] HUMAN RESOURCES
[18-28] HYDROPOWER CONSTRUCTION
[29-32] CIVIL AND INDUSTRIAL CONSTRUCTION
[33-34] TRANSPORTATION CONSTRUCTION
[35] RENEWABLE ENERGY CONSTRUCTION
[36-43] EQUIPMENT CAPACITY
[44-45] ACHIEVEMENTS
[46-47] TITLE AND QUALITY CERTIFICATE
[48-51] SOME PHOTOS OF SONG DA 6 JSC’S OPERATION
[52] SOCIAL ATIVITIES
[53-55] PARTNERS OF SONG DA 6 JSC
4 www.songda6.com.vn
to our customers!Song Da 6 JSC was established on 1st May 1983 (formerly Hydraulic Construction Company) from the early days of Hoa Binh Hydropower construction which has layed the foundation for our construction industry. Over 30 years of working and developing, Song Da 6 JSC’s name has been associated with prominent achievement in national key projects which Song Da 6 was entrusted the construction such as Hoa Binh hydropower, Yaly hydropower, Son La hydropower, Lai Chau hydropower,etc. Nowadays, beside our coreprofession Hydropower and Irrigation Construction, Song Da 6 has grown to become a multi-sectors company in transportation construction, civil and industrial construction. Some of Song Da 6’s significant projects recently such as National Assembly House, Ngang Pass Tunnel, Hanoi metropolitan railway, line
LetteR oF GeneRAL DIRectoR
5www.songda6.com.vn
With the criterion: “Quality and progress are trademarks, effectiveness the best marketing approach in the market mechanism”. Song Da 6 has affirmed the prestige brand in the field of infrastructure construction, contributed remarkably to the industrialization and modernization of Vietnam and to the prosperity of Lao PDR, step by step applied modern technologies to construction and developed towards sustainable values in the future.
Sincerely,
GENERAL DIRECTOR
DAo XuAn tuAn
Cat Linh - Ha Dong, Ho Chi Minh metropolitan railway, line Ben Thanh - Suoi Tien, Nam An Khanh Complex Buildings are highly evaluated by investors. Song Da 6 is possessing quality human resources with over 300 engineers, technical staffs, modern production procedures according to ISO9001-2008, high technology plants and equipment from G8 countries, etc contributing to the capabilities of construction and material production by which Song Da 6 is qualified to serve as the maincontractor, EPC for hydropower projects, civil and industrial projects in Vietnam and worldwide.
With the criterion “Quality, progress are trademarks - Customer satisfaction is the purpose of business of the Company”, we never stop learning, innovating and investing in training our personnel to become knowledgeable, understand the law, professional in working; researching and applying new technique on production; at the same time improving our technologies to bring environmental-friendly, reasonable price construction products and meet requirements on progress, quality.
We define our future development that is constructed by the attempt of Song Da 6’s personnel as well as by the trust of our Partners and Customers. We pledge to be a reliable and long-term companion of Customers on the path of development; commit to deliver quality, durable construction products with fastest progress and reasonable market price.
TỔNG QUAN VỀ CÔNG TY· Tên công ty: Công ty Cổ phần Sông Đà 6· Tên tiếng Anh: Song Da 6 Joint Stock Company· Trụ sở chính: Toà nhà TM, Khu đô thị Văn Khê, Phường La Khê,
Quận Hà Đông, Hà Nội· Tel: 024.2225 3666 | Fax: 024.2225 3366· Website: www.songda6.com.vn· Email: [email protected]· Mã số thuế: 4400135552· Vốn điều lệ: 347.716.110.000 VNĐ
6 www.songda6.com.vn
oVeRVIeW oF SonG DA 6· name: Song Da 6 Joint Stock Company· Head office: TM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha Noi· tel: 024.2225 3666· Fax: 024.2225 3366· Website: www.songda6.com.vn · email: [email protected]· tax code: 4400135552· charter capital: 347.716.110.000 VNĐ
7www.songda6.com.vn
VISIon 2025
To develop Song Da 6 to be a professional construction contractor, qualified to serve as the main contractor or EPC contractor for hydropower, renewable energy, transportation, civil and industrial construction projects, to master the construction technology for modern, high-tech required projects, to possess management model that consists with international practice, to have quality workforce, qualified to integrate in the International market.
MISSIon
to our customers
Song Da 6 is the trustful and long-term companion on the development path, commits to provide construction products with the best quality, sustainability and the best progress with market price.
to our Shareholders
Song Da 6 is a sustainable and profitable organization that ensures long-term interest to shareholders.
to our employees
Song Da 6 provides a professional, friendly, safe environment to ensure material and spiritual life; creates motivation and support for employees to expand their capabilities and development.
to our Society
Song Da 6 accompanies with the development of Song Da Corporation and the modernization of Vietnam, fulfills obligations to pay taxes, actively participates in social activities, commits to bring environment-friendly construction products.
coRe VALue
Profession in construction by possessing modern management model and high technology to create quality work with suitable progress and reasonable price.
8 www.songda6.com.vn
HIStoRY oF eStABLISHMent AnD DeVeLoPMent
1/5/1983
1986 - 1995
3/1/2006
25/12/2006
Year
Year
Year
Year
Year
12/2011
Song Da 6 JSC was established with the initial name Hydraulic Construction Company
Song Da 6 honourably received "Second Class Labour Medal" in 1986; "First Class Labour Medal" in 1989; "Third Class Independence Medal" in 1995; "Third Class Victory Medal" in 1996. To earn these awards, Song Da 6 was continuously heading forward, overcoming all difficulties and challenges to complete all tasks assigned. This was the pride of all generations that have worked at Song Da 6 and this was our motivation to develop and grow.
Song Da 6 was awarded "Labour Hero of Renovation Era" and "Second Class Independence Medal" by the Communist Party and the State. These were honourable and noble prizes for Companies who had remarkable achievements in business and production.
Until now, Song Da 6 JSC is operating in compliance with business registration with tax code 4400135552 dated 12th May 2017 issued by Hanoi Planning and Investment Department.
Song Da 6 JSC was officially actived in form of Joint Stock Company according to Business Registration no 3903000072 issued by Gia Lai Province's Planning and Investment Department.
Song Da 6 was officially listed in Hanoi Stock Exchange.
10 www.songda6.com.vn
oRGAnIZAtIon StRuctuRe
Shareholder
Internal SupervisoryBoard Board Of Management
General Director
Supervisory Board
Technical DeputyDirector
Economic & Financial
Deputy Director
Investment & Bidding
Deputy Director
SONG ĐA 6. 06
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SONG ĐA 6.01SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SONG ĐA 6.04SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SONG ĐA 6 - Ha Noi
SONG ĐA 6.05
SONG ĐA 6.03
Representative O�ce in Laos
Vientiane
Hoang Sa islands
Changsha Islands
LAOS
Human Resources Department
Project and Bidding Department
Engineering and Technology Department
Economic and Strategy Department
Finance and Accounting Department
Material andEquipment Department
Risk Management Department
Song Da 6.01 Branch
Song Da 6.03 Branch
Song Da 6.04 Branch
Song Da 6.05 Branch
Song Da 6.06 Branch
Hanoi Branch
Representative O�ce In Vientiane, Laos
· Supervisory Board: 03 members
· Board of Management: 05 members
· Board of Director: 4 members
· 07 Departments
· 06 Branches
· Representative Office in Laos
11www.songda6.com.vn
Shareholder
Internal SupervisoryBoard Board Of Management
General Director
Supervisory Board
Technical DeputyDirector
Economic & Financial
Deputy Director
Investment & Bidding
Deputy Director
SONG ĐA 6. 06
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SONG ĐA 6.01SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SONG ĐA 6.04SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6 SÔNG ĐÀ 6
SÔNG ĐÀ 6SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SÔNG ĐÀ 6
SONG ĐA 6 - Ha Noi
SONG ĐA 6.05
SONG ĐA 6.03
Representative O�ce in Laos
Vientiane
Hoang Sa islands
Changsha Islands
LAOS
Human Resources Department
Project and Bidding Department
Engineering and Technology Department
Economic and Strategy Department
Finance and Accounting Department
Material andEquipment Department
Risk Management Department
Song Da 6.01 Branch
Song Da 6.03 Branch
Song Da 6.04 Branch
Song Da 6.05 Branch
Song Da 6.06 Branch
Hanoi Branch
Representative O�ce In Vientiane, Laos
Song Da 6.01 Branch+ Add: Phi Nhu Commune, Dien Bien Dong District, Dien Bien ProvinceSong Da 6.03 Branch+ Add: San Xay District, Attapeu Province, Laos
Song Da 6.04 Branch+ Add: Nam Nhun commune, Nam Nhun District, Lai Chau Province+ Tel: 02313 880 988+ Fax: 02313 880 688
Song Da 6.05 Branch+ Add: Loc Bac Commune, Bao Lam District, Lam Dong Province
Song Da 6.06 Branch+ Add: Thong Nhat Commune, Hoanh Bo District, Quang Ninh Province+ Tel: 0333699 830+ Fax: 0333699 818
Ha noi Branch+ Add: TM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha Noi+ Tel: 04 2225 3818+ Fax: 04 2225 3828
Representative office in Laos+ Add: Phontong Street Chanthabuly District, Vientiane, Laos.+ Tel: +856 20 98247606
BRAncHeS
12 www.songda6.com.vn
Mr. Dao Xuan tuan Member
Mr. Bui Dinh Dong Member
BoARD oF MAnAGeMent
Mr. Dang Quoc BaoChairman
Mr. Ho Sy Hung Member
Mr. nguyen Sinh thao Member
13www.songda6.com.vn
BoARD oF DIRectoR
Mr. nguyen Minh tuan Deputy Director
Mr. Dao Xuan tuan General Director
Mr. Le tien thu Deputy Director
Mr. Ha Quoc thinh Deputy Director
14 www.songda6.com.vn
BUSINESS PERFORMANCE FROM 2012 TO 2016
FInAncIAL cAPAcItY
2013 20152014 2016 20170
200
400
600
800
1000
1200
1400
REVENUE
TOTAL VALUE OF PRODUCTION AND BUSINESSTOTAL ASSETS
PROFIT AFTER TAX
2013 2014 2015 2016 20170
200
400
600
800
1000
1200
1400
1600
20170
200
400
600
800
1000
1200
1400
1600
2013 2014 2015 2016
0
10
20
30
40
50
70
80
60
2013 2014 2015 2016 2017
Billion Dong
Billion Dong Billion Dong
Billion Dong
no content unit 2013 2014 2015 2016 2017
1 Total value of production and business Billion Dong 1,203.6 1,402.3 1,423.3 1,427.6 1,131.0
2 Revenue Billion Dong 1,164.0 1,299.1 1,246.8 919.7 959.3
3 Profit after tax Billion Dong 44.3 71.3 63.1 48.5 31.5
4 Average personal income Million Dong 7.9 9.3 9.2 9.2 9.8
5 Payment to National Budget Billion Dong 90.4 83.9 76.7 77.1 54.4
6 Total Asset Billion Dong 1,338.3 1,299.0 1,400.7 1,453.4 1,475.0
7 Equity Billion Dong 441.2 513.6 509.9 500.2 485.8
8 Dividend rate % 15 15 15 12 8
16 www.songda6.com.vn
HuMAn ReSouRceS
With the orientation of sustainable development and affirm the prestige of Song Da 6 in each project, Song Da 6 concentrates on enhancing quality of workforce to meet partners’ requirements. We nurture talents and management skill through experience at project site, at the same time create a hard-working, effective environment so that all members reach to their fullest potential and contribute to develop an united and professional company.
17www.songda6.com.vn
employee Structure chart Total labour: 1581 people = 100%
+ Bachelor degree and above: 207 people = 13.1%
+ Diploma degree and associate: 44 people = 2.81%
+ Technical workers, unskilled workers: 1298 people = 82.1%
Bachelor degree and above
13.1%
2.81%
Diploma degree and associate
82.1%
Technical workers, unskilled workers
18 www.songda6.com.vn18 www.songda6.com.vn
Hydropower construction is Song Da 6’s strength since its establishment. With experienced, competent employees, engineers to survey, plan, set up method statement for high-capacity hydropower projects and modern, high-technology equipments, Song DA 6 is heading toward to master to construction technology and move forward to be the investor of national and international hydropower projects, assisting to reduce electricity shortage.
HYDRoPoWeR conStRuctIon
Annual Electricity Production: 8,16 billion kw/hr
Investor: Electricity of Vietnam
Construction period: 1979 - 1996
Dam: Rock with clay core
Dam length: 734 m
Dam height: 128 m
Reservoir Capacity: 9 billion cubic meter
Turbine: 8 unitsExcavation quantity: 50,000,000 cubic meter
Concrete quantity: 1,899,000 cubic meter
Grouting: 205,000 m
Metal equipment installation: 46,721 ton
Investor: Electricity of Vietnam
Contract value with Song da 6: 100 billion Dong
Construction period: 1993 - 2000
Dam: Rock with clay core
Dam height: 60 m
Reservoir capacity: Over 1 billion cubic meter
Turbine: 4 units
Excavation quantity: 18,000,000 cubic meter
Concrete quantity: 5,010,000 cubic meter
Grouting: 116,000 m
Metal equipment installation: 17,500 ton
Tunnel drilling length: 7,582 m
Yaly Hydropower ProjectCapacity 720 MW
Hoa Binh Hydropower ProjectCapacity 1920 MW
Hoa Binh Hydropower ProjectCapacity 1920 MW
19www.songda6.com.vn 19www.songda6.com.vn
Investor: Can Don Hydropower Joint Stock Company
Contract value with SD6: 127 billion Dong
Construction period: 2000 - 2004
Dam: Gravity Concrete Dam
Dam Length: 745 m
Dam Height: 45.5 m
Reservoir Capacity: 165.5 million cubic meter
Turbine: 02 units
Excavation quantity: 2,000,000 cubic meter
Concrete quantity: 219,000 cubic meter
Grouting: 8,377 m
Metal Equipment Installation: 3,730 ton
Can Don Hydropower Project - Capacity 776 MW
Se San 3A Hydropower Project - Capacity 108 MW
Investor: Electricity of Vietnam
Contract value with SD6: 686.6 billion Dong
Construction period: 2003 - 2010
Dam length: 850 m
Dam height: 74.13 m
Dam crest width: 10 m
Dam: RCC Dam
Average water level: 36 m
Reservoir Capacity: 893 million cubic meter
Turbine: 3 units
Excavation quantity: 2 million cubic meter of rock, soil
Concrete quantity: 1.42 x 106 cubic meter
Grouting: 53.79 x 103 long meter
Se San 4A Hydropower Project - Capacity 360 MW
Investor: Se San 3A Power Investment and Development Joint Stock Company
Contract value with SD6: 381 billion Dong
Construction period: 2002 - 2007
Dam: Gravity Concrete Dam
Dam length: 110.73 m
Dam height: 35 m
Dam crest width: 13 m
Average water level: 36 m
Reservoir Capacity: 80.6 million cubic meter
Turbine: 2 units
Excavation quantity: 820 x 103 cubic meter
Concrete quantity: 282.73 x 103 cubic meter
20 www.songda6.com.vn
The largest Hydropower in South East AsiaInvestor: Electricity of Vietnam
Construction period: 2005 - 2012
Annual Electricity Production: 9,429 billion kw/h Contract value with SD6: 430 billion Dong
Dam: RCC Dam
Dam height: 138.1 m
Reservoir Capacity: 9.26 x 106 cubic meter
Turbine: 6 units
Son La Hydropower - Capacity 2400 MW
Lai Chau Hydropower Project - Capacity 1200 MW
Investor: Electricity of Vietnam
Construction period: 2011 - 2016
Contract value with SD6: 710 billion Dong
Dam: Gravity Concrete Dam
Turbine: 2 units
21www.songda6.com.vn
Investor: Viet - Lao Power Joint Stock Company
Contract value with SD6: 639 billion Dong
Construction period: 2006 - 2011
Dam length: 650 m Dam height: 94 m
Dam crest width: 10 m
Reservoir capacity: 930 million cubic meter
Turbine: 2 units
Excavation quantity: 8.5 million cubic meter
Concrete quantity: 2.46 cubic meter
Tunnel: 8.79 x 103 long meter
Xekaman 3 Hydropower Project - Lao PDR Capacity 250 MW
Xekaman 1 Hydropower Project - Capacity 290 MW
Investor: Viet - Lao Power Joint Stock Company
Contract value with SD6: 631.27 billion Dong
Construction period: 2010 - 2015
Dam: RCC Dam
Dam length: 310 m Dam height: 120 m
Turbine: 2 units
Concrete quantity: 880,000 cubic meter
Basin area: 3,580 square km
Reservoir: 4.8 square km
22 www.songda6.com.vn
Investor: Petro Vietnam
Contract value with SD6: 359 billion dong
Construction period: 2008 - 2013
Dam: Gravity concrete dam
Dam length: 366.9 m
Dam height: 244.6 m
Dam crest width: 8 m
Turbine: 2 units
Basin area: 5,345 square km
Hua Na Hydropower Project - Capacity 180 MW
Investor: Vietnam National Coal - Mineral Industries Holding Corporation Limited
Construction period: 2013 - 2015
Contract value with SD6: 415 billion dong
Dam length: 471 m
Dam height: 72 m Dam crest width: 10 m
Dam: RCC dam
Turbine: 2 units
Construction period: 3 years
Dong Nai 5 Hydropower Project - Capacity 150 MW
Investor: Electricity of Vietnam
Contract value with SD6: 1099 billion Dong
Construction period: 2007 - 2016
Dam: Gravity Concrete Dam
Dam length: 267 m Dam height: 374 m Reservoir Capacity: 184.2 million cubic meter
Turbine: 2 units
Excavation quantity: 2,869,400 cubic meter Concrete quantity: 936,720 cubic meter
Grouting: 30,050 long meter
Metal Equipment Installation: 13,378.2 ton
Huoi Quang Hydropower Project - Capacity 520 MW
23www.songda6.com.vn
Investor: Viet - Lao Power Joint Stock Company
Contract value with SD6: 285 billion Dong
Construction period: 2010 - 2017
Dam: Gravity Concrete Dam
Dam length: 166.6 m
Dam height: 26 m
Turbine: 2 units
Concrete quantity: 66,298 cubic meter
Reservoir capacity: 8.56 million cubic meter
Basin area: 3,740 square km
Xekaman - Sanxay Hydropower Project - Capacity 32 MW
Nam Chien Hydropower Project - Capacity 200 MW
Investor: Nam Chien 1 Hydropower Joint Stock Company
Contract value with SD6: 172 billion dong
Construction period: 2005 - 2012
Dam height: 135 m Turbine: 2 units
24 www.songda6.com.vn
Pac Ma Hydropower Project - Capacity 140 MW
Investor: Dakrong Hydropower Joint Stock Company
Contract value with SD6: 298 billion Dong
Construction period: 2015 - 2017
Dam: Gravity Concrete Dam
Dam length: 229.19 m
Dam height: 51.8 m
Turbine: 2 units
Excavation quanity: 483,000 cubic meter
Concrete quantity: 131,030 cubic meter
Grouting: 4,750 cubic meter
Dong Van Hydropower Joint Stock Company - Capacity 28 MW
Investor: Pac Ma Hydropower Joint Stock Company
Contract value with SD6: 652 billion Dong
Construction period: 2016 - 2019
Turbine: 4 units
25www.songda6.com.vn
Investor: Viet Long Industrial JSC
Contract value with SD6: 74 billion Dong
Construction period: 2016 - 2017
Dam: Arch Dam
Turbine: 2 units
Concrete quantity: 55,000 cubic meter
Su Pan 1 Hydropower Project - Capacity 30 MW
Nam Cum 4 Hydropower Project - Capacity 54 MW
Investor: Nam Cum Hydropower Joint Stock Company
Contract value with SD6: 400 billion Dong
Construction period: 2017 - 2019
Dam: Gravity Concrete Dam
Turbine: 2 units
Concrete quantity: 160,450 cubic meter
26 www.songda6.com.vn
Investor: Dong A Investment - Construction Joint Stock Company
Contract value with SD6: 247 billion Dong
Construction period: 2016 - 2018
Dam: Gravity Concrete Dam
Turbine: 2 units
Concrete quantity: 141,200 cubic meter
Song Ma 3 Hydropower Project - Capacity 29.5 MW
Song Lo 2 Hydropower Project - Capacity 28 MW
Investor: Thanh Binh Limited Company
Contract value with SD6: 251.81 billion Dong
Construction period: 2015 - 2018
Dam: Gravity Concrete Dam
Dam length: 173.20 m
Dam height: 36.2 m
Turbine: 2 units
Basin area: 8,330 square km
Excavation quanity: 294,140 cubic meter
Concrete quantity: 61,520 cubic meter
Investor: Nam Luc South East Asia Hydropower Joint Stock Company
Construction period: 15/01/2018
Nam Luc Hydropower Project - Capacity 24MW
27www.songda6.com.vn
no Project capacity (MW)
Investor contract value (billion Dong)
I PRoJectS coMPLeteD
1 Hoa Binh Hydropower 1920 Electricity of Vietnam
2 Yaly Hydropower 720 Electricity of Vietnam 100
3 Selabam Hydropower 70 Lao PDR 100
4 Vinh Son Hydropower 66 Vinh Son hydropower JSC 62
5 Song Hinh Hydropower 70 Electricity of Vietnam 370
6 Can Don Hydropower 72 Can Don hydropower JSC 127
7 Se San 3 Hydropower 260 Electricity of Vietnam 50
8 Se San 3A Hydropower 108 Se San 3A Power Investment and Development Joint Stock Company
381
9 Se San 4 Hydropower 360 Electricity of Vietnam 686.6
10 Se San 4A Hydropower 63 Se San 4A hydropower JSC 246
11 Pleikrong Hydropower 100 Electricity of Vietnam 25
12 Son La Hydropower 2400 Electricity of Vietnam 430
13 Binh Dien Hydropower 44 Binh Dien Hydropower JSC 25
14 Huong Son Hydropower 33 Song Da Corporation 15
15 Xekaman 3 Hydropower 250 Viet-Lao Power JSC 639
16 Nam Chien 1 Hydropower 200 Song Da Corporation 172
17 Huoi Quang Hydropower 520 Electricity of Vietnam 1099
18 Lau Chau Hydropower 1200 Electricity of Vietnam 710
19 Ngoi Phat Hydropower 72 2 Northern Hydropower Construction and Consultant Joint Stock Company
39
20 Hua Na Hydropower 180 Petro Vietnam 359
21 Dong Nai 5 Hydropower 150 Vietnam National Coal - Mineral Industries Holding Corporation Limited
415
22 Ban Chat Hydropower 220 Electricity of Vietnam 18
23 Xekaman 1 Hydropower 290 Viet-Lao Power JSC 631.27
ReMARKABLe HYDRoPoWeR AnD IRRIGAtIon PRoJectS
28 www.songda6.com.vn
ReMARKABLe HYDRoPoWeR AnD IRRIGAtIon PRoJectS
no Project capacity (MW)
Investor contract value (billion Dong)
24 Truoi irrigation project - Hue 408 Irrigation Project Management Board 5
25 National border embankment - Quang Ninh Province
Basic Water and irrigation Construction Management Board
5
26 Watering irrigation System Kon Tum people’s Committee 1.2
II PRoJect In PRoGReSS
1 Xekaman - Sanxay Hydropower
32 Viet-Lao Power JSC 285
2 Dong Van Hydropower 28 Dakrong Hydropower JSC 2989
3 Song Lo 2 Hydropower 28 Thanh Binh JSC 251.81
4 Song Ma 3 Hydropower 29.5 Dong Da Investment and Construction JSC - Hung Hai Group
247
5 Nam Cum 4 Hydropower 54 Nam Cum Hydropower JSC - Hung Hai Group
400
6 Pac Ma Hydropower 140 Pac Ma Hydropower JSC - Hung Hai Group
652
7 Su Pan 1 Hydropower 30 Viet Long Industrial JSC 74
8 Nam Ban 1 Hydropower 6.3 Hung Hai Construction Investment and Trade JSC - Hung Hai Group
55
9 Song Cho 2 Hydropower 7 Song Cho Hydropower JSC 120
29www.songda6.com.vn
Investor: Ministry of Construction
Contract value with SD6: 470 billion Dong
Construction period: 2011 - 2015
Location: Lot D and E - Ba Dinh Politics Center - Hanoi
Scale: 2 basements, 5 floors, total floor area: 63,240 square meter
Investor: Song Da - Hoang Long Joint Stock Company
Contract value: 267 billion Dong
Construction period: 2014 - 2016
Location: Lot HH6 - Nam An Khanh New Urban, Hoai Duc, Hanoi
Scale: 1 basement, 18 floors, total floor areas 44,300 square meter
18T1 Building - Hh6 - Nam An Khanh Urban
cIVIL AnD InDuStRIAL conStRuctIonPrior to the international economic integration trend, with the goal of sustainable development, creating jobs for the Company, Song Da 6 has involved in the construction of civil projects, urban areas, contributed to the growth of the Country.
National Assembly House
30 www.songda6.com.vn
32T Building - Hh6 - Nam An Khanh Urban
Ct2 Building - Van Khe Urban
TM Building - Van Khe Urban
Investor: Song Da - Hoang Long Joint Stock Company
Contract value: 295 billion Dong
Construction period: 2015 - 2018
Location: Lot HH6 - Nam An Khanh New Urban, Hoai Duc, Hanoi
Scale: 32 floors, total floor areas 49,300 square meter
Investor: Song Da 6 Joint Stock Company
Contract value: 214 billion Dong
Construction period: 2007 - 2010
Location: Van Khe Urban, Ha Dong District, Hanoi
Scale: 1 basement, 25 floors, total floor areas 42,750 square meter
Investor: Song Da 6 Joint Stock Company
Contract value: 41 billion Dong
Construction period: 2009 - 2010
Location: Van Khe Urban, Ha Dong District, Hanoi
Scale: 1 basement, 10 floors, total floor areas 8,460 square meter
31www.songda6.com.vn
Housing For Vice Ministers And Equivalent - Xuan Phuong Urban
Investor: Song Da 7 Urban Investment and Industrial Zone Joint Stock Company
Contract value: 62 billion Dong
Location: Xuan Phuong Urban, Tu Liem District, Hanoi
Investor: Luks Limited Company, Thua Thien Hue Province
Contract value with SD6: 30 billion Dong
Construction period: 2004 - 2007
Scale: 2.4 billion ton per year
Luks Cement Factory
HOUSING FOR VICE MINISTERS AND EQUIVALENT WORKING AT PARLIAMENT OFFICESLocation: Lot TTS, TT10, Xuan Phuong Urban, Tu Liem District, HanoiInvestor: Song Da 7 Urban Investment and Industrial Zone Joint Stock CompanyConsultant: Consultancy Company Limited of University of Civil Engineering
32 www.songda6.com.vn
no Project Investor contract value (billion Dong)
I PRoJect coMPLeteD
1 National Assembly House Ministry of Construction 470
2 18T1 Building - HH6 - Nam An Khanh Urban, Hoai Duc, Hanoi Song Da - Hoang Long JSC 267
3 CT2 Building - Van Khe Urban, Ha Dong District, Hanoi Song Da 6 JSC 214
4 TM Building - Van Khe Urban, Ha Dong District, Hanoi Song Da 6 JSC 41
5 Housing for vice ministers and equivalent - Xuan Phuong Urban
Song Da 7 Urban Investment and Industrial Zone Joint Stock Company 62
6 Hoa Binh Cement Factory Song Da Corporation 50
7 Luong Son Cement Factory, Hoa Binh Hoa Binh Industry Department 30
8 X18 Cement Factory, Hoa Binh Hoa Binh Industry Department 25
9 Sugar Factor, Hoa Binh Hoa Binh Industry Department 15
10 Luks Cement Factory Luks Thua Thien Hue Limited Company 30
11 Operator House Noi Bai Airport Vietnam Airlines Corporation 7
12 Social Insurance Headquarter in Gia Lai, Ninh Thuan, Hai Duong
Gia Lai, Ninh Thuan, Hai Duong Provincial Social Insurance 7
13 Phu Tho Starch Processing Factory Phu Tho Crushing Company 2
14 Universal crematorium, Bia Ria - Vung Tau Ba Ria Province Industrial Department 7
15 Juice Factory, Kien Giang Province Kien Giang Juice Company 3
16 Thuan Hoa Hotel, Thua Thien Hue Hue Travel Company 3
17 Investment and Construction of Van Tuong City infrastructure, Quang Ngai Song Da 6 JSC 30
II PRoJect In PRoGReSS
1 32T Building - HH6 - Nam An Khanh - Hoai Duc - Hanoi Song Da - Hoang Long JSC 295
2 Mining and supplying limestone for Ha Long Cement Factory Ha Long Cement JSC 540
ReMARKABLe cIVIL - InDuStRIAL PRoJectS
33www.songda6.com.vn
tRAnSPoRtAtIon
Ho Chi Minh Urban Railway Project, Line Ben Thanh - Suoi Tien
Investor: Song Da Corporation
Contract value with SD6: 25 billion Dong
Construction period: 2003 - 2004
Main tunnel length: 495 m
Width: 11.5 m
Height: 7.5 m
Ngang Pass Tunnel
Investor: Ho Chi Minh City People’s Committee
Contract value with SD6: 67 billion Dong
Construction period: 2015 - 2016
34 www.songda6.com.vn
no Projects Investor contract value (billion Dong)
1 Ho Chi Minh Road Ministry of Transport 70
2 Ngang Pass Tunnel Song Da Corporation 25
3 Access Road to Dung Quat Oil Refinery Factory
Oil Refinery Management Board 56
4 Road in Dong Dang, Lang Son Lang Son Transport Department 5
5 Song Cau Road, Phu Yen Song Cau Commune people’s committee
67
6 Hanoi Urban Railway Project, Line - Cat Linh - Ha Dong
Ministry of Transport 58
7 Ho Chi Minh Urban Railway Project, line Ben Thanh - Suoi Tien
Ho Chi Minh City People’s Committee 67
Hanoi Urban Railway Project, Line Cat Linh - Ha Dong
ReMARKABLe tRAnSPoRtAtIon PRoJectS
Investor: Ministry of Transport
Contract value with SD6: 58 billion Dong
Construction period: 2013 - 2014
35www.songda6.com.vn
With the development through many national key projects and the orientation of diversifying business lines, Song Da 6 is always ready to cooperate in the investment and construction in the field of renewable energy nationally and internationally to supply electricity to the country and promote the development of other economic sectors.
ReneWABLe eneRGY conStRuctIon
WInD PoWeR PRoJectS
SoLAR PoWeR PRoJectS
36 www.songda6.com.vn
eQuIPMent cAPAcItY
Mechanical Consrtruction CAT Crawler Crane
Hydraulic Rock Drilling Machine
Furukawa rock drilling machine in Xekaman 3 Hydro-power Project Site
Song Da 6 JSC has over 400 plants and equipments with total value of 500 billion Dong including: sand, stone crushing plants (METSO 500.000 m3 per year crushing plant; TDU-90; PDSU-110;CEMCO TUBOR 80 capacity from 180 ton per hour to 250 ton per hour, etc), concrete batching plants (batching plants with cooling tower, capacity from 60 m3 per hour to 125 m3 per hour); 12ton tower crane; MD900B 50 ton tower crane; crawler cranes from 20 ton to 70 ton; mechanical equipments such as Furukawa rock driller, excavators, dump trucks, mixing trucks,etc. One of Song Da 6’s advantages and strength is the modern plants and equipment capacity. Majority of plants and equipments are manufactured according to G7 and Northern Europe technology to not only create products with quality and safety but also minimize impacts to the environment.
37www.songda6.com.vn
Transporting trucks launching emulation activities in Huoi Quang Hydropower Project Site
Wheel Loader Compactor
38 www.songda6.com.vn
+ Crushed stone Production: 1,000,000 m3 per year+ Sand Production: 600,000 m, per year
350 Ton per hour Sand, stone crushing and filtering plant
250 Ton per hour Sand, stone crushing and filtering plant
Material Production
39www.songda6.com.vn
+ Conventional Vibrated Concrete Production (Cool): 500,000 m3 per year+ Roller Compacted Concrete Production (Cool): 800,000 m3 per year
120 m3 per hour CVC Batching Plant (Cool)
Concrete Production
RCC Bathching Plant
40 www.songda6.com.vn
concRete conStRuctIon cAPAcItY
To bring into play more than 30 years of operation efforts, with the orientation to master the modern technology, dynamic and creation, Song Da 6’s concrete construction capacity has been extraordinary improved.
Conveyor belt system at Dong Nai 5 Hydropower Project
Roller Compacted Concrete work at Dong Nai 5 Hydropower Project
41www.songda6.com.vn
Potain Tower Crane at Se San 4 Hydropower Project
MD-900B and Zoomlion Tower Crane at Huoi Quang Hydropower Project
Potain Tower crane and 1200 ton Crawler Crane at National Assembly House Project
42 www.songda6.com.vn
KeY conStRuctIon eQuIPMent
no equipment unit Specification Quantity (pcs)
1 Bulldozer CV 110 ÷ 180 8
2 Excavator m3 0.8 ÷ 3.6 19
3 Wheel Loader m3 2.2 ÷ 3.2 22
4 MD 900B Tower Crane Ton 50 2
5 Tower crane Ton 10 ÷ 12 9
6 Crawler Crane & Crane tire Ton 25 ÷ 70 11
7 Concrete Batching Plant m3/hr 60 ÷ 125 9
8 Rock Drilling Machine Mm 76 ÷ 105 5
9 Air Compressor m3/min 2 ÷ 30 7
10 Crushing Plant T/hr 150 ÷ 350 7
11 Mixing Truck m3 6 ÷ 8 36
12 Dump Truck m3 12 ÷ 25 63
13 Generator KVA 50 ÷ 500 12
44 www.songda6.com.vn
AcHIeVeMentS
Title and Medal Song Da 6 was awarded
+ Labour Hero of Renovation Era Medal (2011)+ 1st Class Labour Medal (1989), 2nd Class Labour
Medal (1986)+ 2nd Class Independence Medal (2011), 3rd Class
Independence Medal (1995)+ 3rd Class Victory Medal (1996)+ 1st Class Enterprise (1999)+ Certificate of Merit from Electricity of Vietnam
(2000,2001,2002)+ Certificate of Merit from Ministry of Construction
(2003,2004)+ Certificate of Merit from Gia Lai People’s Committee,
Certificate of Merit from Electricity of Vietnam (2008)
+ Certificate of Merit from Portal of Vietnamese Trade Unions, Outstanding Labour in Construction (2006)
+ Excellent Construction Emulation Flags (2005, 2007, 2008, 2009)
+ Excellence Union Activity in Construction Flag (2005)+ Outstanding Member of Song Da Corporation Flag
(2007)+ Government emulation flags (2010, 2013)+ Ministry of Construction’s Emulation Flag (2012)+ Emulation flags of the Government, Ministries
LISt oF tItLe SonG DA 6 WAS AWARDeD
45www.songda6.com.vn
+ 3rd Labour Medal : 20 individuals+ Certificate of Merit from Prime Minister: 10 Collectives
and 25 individuals+ Certificate of Merit from Ministry of Construction: 78
collectives and 340 individuals+ Ministerial Emulation Fighter: 220 individuals+ Excellence Labour Unit: 65 units+ Certificate of Merit from Party Committee of the
Centrally-run Businesses’ Sector for achievements in “Learning and following the moral Example of Ho Chi Minh” Campaign from 2007 to 2010
+ The Golden Table of the Organizer of the program “Anthem of Ancient Citadel” for the first time
+ Labour HeroCollectiveMr. Nguyen Van Nhi - Position: Team Leader
- Labour Hero- National Emulation soldiers
Mr. Nguyen Van Tung - Position: Party Committee Sec-retary, ChairmanMr. Ho Sy Hung - Position: Former Party Committee Secretary, Former Chairman
+ 2nd Class Labour HeroMr. Do Dinh HienMr. Nguyen Van Tung
LISt oF tItLe SonG DA 6’S eMPLoYeeS HAVe AWARDeD
48 www.songda6.com.vn
SoMe PHoto oF SonG DA 6 JSc’S oPeRAtIon
Song Da 6 always strives to maintain the title of a integrity, strong party and leads employees, people to implement well internal labor rules, promote democracy and continue to build and maintain the corporate culture of Song Da 6.
1. Operation of Communist party
Mr. Dang Quoc Bao - General Director received Red Star Award in 2014
Mr. Dang Van Nhi was awarded “Labour Hero Medal” by the Minister of Construction Nguyen Hong Quan.
Mr. Dang Quoc Bao - party committee secretary of Song Da 6 Joint Stock Company
The Company 12th Executive Committee, term 2015-2020
49www.songda6.com.vn
Deputy prime Minister Hoang Trung Hai awarded Labour Hero in Renovation Area flag and medal to Song Da 6 Joint Stock Company
Mr. Dang Quoc Bao - General Director received Vietnam Gold Star 2015 Award
Meeting on Song Da 6 30th anniversary
50 www.songda6.com.vn
The Song Da 6 Union has well performed its glorious mission, keeping abreast of the production and life of employees, launching emulation activities, encouraging and protecting the legitimate rights and interests of employees, become the firm support for employees.
2. Operation of Trade Union
The Company Trade Union Congress, term 2012 - 2017
Promoting the emulation activities at National Assembly House
Mr. Nguyen Khac Ha - President of Trade Union
51www.songda6.com.vn
The Song Da 6 Youth Union always affirms the youth, the leading role of the youth through various activities, emulation, actively contributes to improve the political spirit, community awareness and preserve traditional culture in the company.
3. Operation of Youth Union
Mr. Pham Van Mai - Central Union Secrectary awards “For the young generation” Medal to executives and employees
of Song Da 6
Executive Board of the Youth Union 13th (2017 - 2019)
Mr. Doan Van Quyet and Mr. Bui Van Quyen in national “Young skilled workers” Ceremony 2014
52 www.songda6.com.vn
Mr. Nguyen Van Tung, Party Secretary - Chairman presents gifts to flood victims in 3 central provinces of Vietnam
Song Da 6 JSC presents gifts to the flood victims in Quang Binh
Song Da 6 JSC is the sponsor of charity program “ Ha Giang Lunar New Year”
Sustainable business development is a solid foundation for Song Da 6 to express their responsibility to the community. By charitable and practical humanitarian activities, Song Da 6 has shown kindness, sharing love with the unfortunates, the poor or the people in disaster. .. above all is the deep gratitude to the generations who have fallen for the independence and freedom of the nation.
SocIAL ActIVItIeS
54 www.songda6.com.vn
Joint Stock Commercial Bank for Investment and Development of Vietnam
Joint Stock Commercial Bank for Foreign Trade of Vietnam
Vietnam Joint Stock Commercial Bank for Industry
and Trade
Military Commercial Joint Stock Bank
Vietnam National Coal - Mineral Industries Holding Corporation
Limited
Se Sa 4A Hydropower Joint Stock Company
Viet Long Industrial Joint Stock Company
Petro Vietnam Institute of Machine and Tool Industry
Luks Cement Vietnam Limited Company
Hung Hai GroupVietnam Railway
Authority
POSCO E&C
Thanh Binh Limited Company
Viet - Lao Power Joint Stock Company
55www.songda6.com.vn
SÔNG ĐÀ 10
CÔN
G TY
CỔ PHẦN CƠ ĐIỆN & XÂY DỰNG VIỆT NAM
MECO JSC
Song Da 10 Joint Stock Company
Can Don Hydropower Joint Stock Company
Long Viet Joint Stock Company
Binh Dien Hydropower Joint Stock Company
Ministry of Construction
Ha Long Cement Joint Stock Company
Huong Son Hydropower Joint Stock Company
Power Engineering Consulting Joint Stock
Company 1
Northern Cement Trading Joint Stock
Company
SÔNG ĐÀ 4 SÔNG ĐÀ 5 SÔNG ĐÀ 9
Song Da 4 Joint Stock Company
Song Da 5 Joint Stock Company
Song Da 9 Joint Stock Company
Electricity of Vietnam GS Engineering and Construction
Vietnam - Italia Steel Joint Stock Company
56 www.songda6.com.vn
SONG DA 6 JOINT STOCK COMPANY
PROFILE
www.songda6.com.vn
LABOUR HERO OF RENOVATION ERA
HEAD OFFICETM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha NoiTel: 024.22253666Fax: 024.22253366Email: [email protected]: www.songda6.com.vn
Des
igne
d an
d Pr
oduc
ed b
y w
ww
.hal
i.vn