+ All Categories
Home > Documents > LAJPAT NAGAR DND FLYWAY - UTTIPEC · 2018. 7. 20. · LAJPAT NAGAR DND FLYWAY Ramp connecting...

LAJPAT NAGAR DND FLYWAY - UTTIPEC · 2018. 7. 20. · LAJPAT NAGAR DND FLYWAY Ramp connecting...

Date post: 22-Mar-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
1
ng Ashram Flyover and Proposed Kilokari Flyover posed Kilokari Flyover Kilokari Flyover e w Parking 0 Ring Road from Ashram Flyover to DND Flyover Extension of Existing Ashram Flyover beyond Kilokari Junction Integrated with Kalindi Bypass Integrated Transit Corridor Development and Street Network/ Connectivity Plan for the corridor/influence zone (Upper Level Plan) Path
Transcript
Page 1: LAJPAT NAGAR DND FLYWAY - UTTIPEC · 2018. 7. 20. · LAJPAT NAGAR DND FLYWAY Ramp connecting Existing Ashram Flyover and Proposed Kilokari Flyover Proposed Bus Stop Elevated portion

DND FLYWAY

LAJPAT NAGAR

Ramp connecting Existing Ashram Flyover and Proposed Kilokari Flyover

Proposed Bus Stop

Elevated portion of Proposed Kilokari Flyover

Approach of Proposed Kilokari Flyover

Proposed Planting Zone

Proposed Pathway

Proposed Cycle Track

Proposed Cycle Rikshaw Parking

LEGEND:

SCALE:

DESIGNED BY:

DRAWN BY:DATE:

The information contained herein is Confidential & Property ofFeedback Infrastructure Services Private Limited and not forPublication. The Information is Issued on the Understanding that nopart thereof shall be Copied or Communicated to a Third Partywithout Authorisation in Writing from Feedback InfrastructureServices Private Limited

APPROVED BY:

CHECKED BY:

CLIENT: DESIGN CONSULTANTS:

Feedback Infra Pvt. Ltd.15th Floor, Tower 9B,DLF Cyber City Phase-III,Gurgaon 122002

0

Ring Road from Ashram Flyover to DND Flyover

P.R.

T.S.

A.D.

A.S.

Extension of Existing Ashram Flyover beyond Kilokari Junction Integrated with Kalindi Bypass

Integrated Transit Corridor Development and Street Network/ Connectivity Plan

for the corridor/influence zone

2M

0.5M

FO

OT

PA

TH

SECTION-A-A

BU

IL

DIN

G L

IN

E

1.5M

12.60

9M

0.5M

PROPOSED FLYOVER

CARRIAGEWAY

SECTION-C-C

51M

9.5M

0.5M

9M

0.5M

PROPOSED FLYOVERCARRIAGEWAY

SECTION-D-D

47M

0.5M1.5M

2.7M

9M

FO

OT

PA

TH

BU

IL

DIN

G L

IN

E

PROPOSED FLYOVER RAMP

15.5M

BU

IL

DIN

G L

IN

E

BU

IL

DIN

G L

IN

E

1M

9.9M 9M

0.5M

FO

OT

PA

TH

10.5M

BU

IL

DIN

G L

IN

E

0.5M

14.6M

0.5M

2M 3M

0.5M

10.6M

2M

8.9

0.5M

PROPOSED FLYOVER RAMP

PROPOSED FLYOVER RAMP

CARRIAGEWAY

CY

CL

E T

RA

CK

GR

EE

N B

UF

FE

R

VACANT LAND

40.2M

(Upper Level Plan)

Pedestrian & Cycle Mix Path

Tree type - 1

Tree type - 2

Tree type - 3

Tree type - 4

VA

CA

NT

L

AN

D

2M 3M 2M 7.5M

0.5M

9.9M

0.5M

PROPOSED FLYOVER RAMPCARRIAGEWAY

CY

CL

E T

RA

CK

GR

EE

N B

UF

FE

R

FO

OT

PA

TH

SECTION-B-B

37.5M

10.5M

CARRIAGEWAY

0.5M

CY

CL

E T

RA

CK

1.5M

FO

OT

PA

TH

CY

CL

E T

RA

CK

1.5M

FO

OT

PA

TH

2.2M

CY

CL

E T

RA

CK

CY

CL

E T

RA

CK

Recommended